Progress originates from the willingness to think big and to face challenges with farsigh-tedness. This attitude made EEW one of the global leaders offering solutions for large-diameter steel pipes. This is what counts and what our customers and partners can rely upon, now and in future.

We apply the highest standards, to ourselves and also to our products which are manufac- tured by our staff working in our affiliated plants around the globe. It is a question of responsibility to which we, at EEW, assign ourselves day by day. We move in complex markets where one thing counts more than anything else: customised solutions for chal-lenging tasks. This needs skills. This needs experience. Above all, it needs people who support you to achieve the best possible results.

Together we develop new dimensions.

Welcome to our world!

With power and passion

EEWGROUP

GOinG fORWaRd

1936Foundation

1982 Establishment of a second mill in Erndtebrück

13,651,493 €Turnover

140Employees

1995 Point-to-Point Construction

Service was born

1952Production of steel fuel-oil tanks

3,323,397 €Turnover

60Employees1974

Extended production programme to include large DSAW pipes

1994Turning point in EEW’s history: Installation of a 13.2 press bending machine

24,542,010 €Turnover

199Employees

2001Becoming international:

Foundation of EEW Korea

75,167,144 €Turnover

510Employees

2008EEW SPC – start of production

560,731,379 €Turnover

1,144Employees

2010Foundation of WELDEC.

EEW Pickhan joins the group. Start of EEW Malayisa.

375,360,643 €Turnover

1,488Employees

2012Foundation of Global Pipe Company

606,517,925 €Turnover

1,742Employees

2015OSB and EEW KHPC – start of production

2014EEW Bergrohr joins the group. 4 – 5

REliablE On dEcisivE maRkEts

Superlatives dictate the markets of our clients – we at EEW offer customised solutions. We provide the necessary infrastructure to enable the production of oil and gas in increasingly deeper offshore areas and colder regions.

Offshore wind farms are safely supported on our XL monopiles and generate with increa-singly larger turbines permanently more

power in much deeper waters. Civil construc-tions such as bridges, skyscrapers, stadiums or airports go beyond their potential in record time with EEW – in height as well as in design.

Here is what all our solutions have in common: the knowledge that superlatives also have to demonstrate cost effectiveness. Now and in future.

WindSince clean energy needs strong foun-dations

for safe energy and strong buildings

civil construction Spectacular architecture rests upon safe pillars

Oil / GasWe turn a cold sea into safe and comfor-table warmth

31000

1maRkEts

sOlUtiOns

cOmPany

6 – 7

•Steelpipesandconesforlegs,bracings,

pilesandcaissons

•Pre-fabricatedlegsandbracings,includingprofiling

•Pre-fabricatedsleevesandconductorguides

•Conductorandriserpipes

•Monopilesandtransitionpieces

•Pilesforjackets

•Suctionpiles

•Installationtoolsandequipment

(followers,spreaderbars,ballastweightsetc.)

•Fullyassembledlegsforjack-uprigs

structural Pipes

by numerous products and tailor-made solutions

PREcisiOn mEEts flExibility ©

Sta

nisla

v Ko

mog

orov

– F

oto

lia.c

om

LSAW steel pipes of high quality and meeting inspection requirements for applications in

•PowerPlants

•GasTreatmentPlants

•Refineries

•ChemicalPlants

•LNGTerminals

line Pipes

Process Pipes

•Straightsteelpipes

•Conductorpipes

•Strain-baseddesignpipes

•Inductionbends

•Bucklearrestors

•Pipesforfinger-typeslugcatcherfacilities

•Compressorstationpiping

•Pipesandeccentricreducersforpigreceivers/

launchers

•Riserpipes/riserpipesystemsincl.bends

•Pipesforgasstorage

8 – 9

© S

tani

slav

Kom

ogor

ov –

Fo

tolia

.co

m

© okinawakasawa – Fotolia.com

cOnvincinGOnshore and offshore

© Photographic Servi

ces,

Shel

l Int

. Ltd

.

shell PearlYear: 2007 – 2010Customer: QSGTL (MWK / JGC)Destination: QatarMaterial: ASTM A 387 Gr. 91 / Gr. 11 ASTM A 516 / API 5L Gr. B TP 321Dimensions: 457.0 – 1,524.0 mm mm O. D. up to 60.00 mm W. T.Tonnage: 33,100 for project in total

Zadco Upper ZakumYear: 2014 / 2015Customer: PetrofacDestination: UAEMaterial: API 5L Gr. X60 UNS N 08825 Clad MaterialDimensions: 487.0 – 1,067.0 mm O. D. 11.13 – 53.93 + 3.0 mm W. T.Tonnage: 5,400

statoil Gina krog JacketYear: 2013 / 2014Customer: HeeremaDestination: NorwayMaterial: S355 G9 + M, S355 G10 + N / M Z35 S420 G1 + M, S420 G2 + M Z35 S460 G1 + M, S460 G2 + M Z35Dimensions: 660.4 – 2,032.0 mm O. D. 20.0 – 100.0 mm W. T. 900 – 29,708 mm lengthTonnage: 6,000

Oil/Gas

aramco JazanYear: 2015 / 2016Customer: various EPCsDestination: Saudi ArabiaMaterial: API & ASTM grades incl. sour serviceDimensions: 660.4 – 2,428.4 mm O. D. 9.5 – 70.0 mm W. T.Tonnage: 50,000

© TTstudio – Fotolia.com

sakhalin iYear: 2010 / 2011 Customer: Exxon Neftegas Destination: Russia Material: API 5L Gr. X60M API 5L Gr. L415M Low Temp. Strain-based design Dimensions: 508 mm O. D. 33.0 & 36.3 mm W. T. Tonnage: 15,800

moho nord tlP ProjectYear: 2013 – 2015Customer: Total E&P CongoDestination: Congo Water depth: approx. 800 m Material: API 5L Gr. X65 mod. S355KT-40 / KT-20Dimensions: Tendon segments: 610 mm O.D., 25.4 mm W. T., up to 80 m length Tendon piles: O. D. 2,133.6 mm, W. T. 50.0 – 100.0 mm FPU piles: O. D. 2,133.6 mm, W. T. 40.0 – 50.0 mmTonnage: 8,524

‘Why i rely on EEW? because i can always count on personal service and perfect solutions.’Ricardo Carver, Tendon Lead Engineer, Total

Walney Extension (3+4)Year: 2016 / 2017Customer: DONG Energy Destination: UKMaterial: S355ML / NLDimensions: 7,400 – 8,400 mm O. D. 51.0 – 92.0 mm W. T. up to 72,400 mm lengthTonnage: 75,000

Wind

11 – 14

burj khalifaYear: 2007Customer: AMPDestination: UAEMaterial: ASTM A 572 Gr. 50Dimensions: 711.0 – 1,524.0 mm O. D. up to 55.0 mm W. T.Tonnage: 700

civil construction

Customer: EnBW Destination: GermanyTonnage: 83,950

baltic i + ii

PressandRollbending–12"to96"OD

based on 355 MPa NYS

WT

OD

9.53(0.375)

12.70(0.500)

14.27(0.562)

15.88(0.625)

17.48(0.688)

19.05(0.750)

20.62(0.812)

22.23(0.875)

24.61(0.969)

25.40(1.000)

26.19(1.031)

28.58(1.125)

29.36(1.156)

30.96(1.219)

31.75(1.250)

32.54(1.281)

34.93(1.375)

38.10(1.500)

38.89(1.531)

39.67(1.562)

41.28(1.625)

44.45(1.750)

45.24(1.781)

46.02(1.812)

47.63(1.875)

50.80(2.000)

53.98(2.125)

59.54(2.344)

63.50(2.500)

101.60(4.000)

324 (12)

356 (14)

406 (16)

457 (18)

508 (20)

559 (22)

610 (24)

660 (26)

711 (28)

762 (30)

813 (32)

864 (34)

914 (36)

965 (38)

1016 (40)

1067 (42)

1118 (44)

1168 (46)

1219 (48)

1321 (52)

1422 (56)

1524 (60)

1575 (62)

1829 (72)

2134 (84)

2438 (96)

Rollbending–largediameter

WT

OD

35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 130 150 170

1016 (40)

1067 (42)

1118 (44)

1168 (46)

1219 (48)

1321 (52)

1422 (56)

1524 (60)

1829 (72)

2134 (84)

2438 (96)

2845 (112)

3500 (128)

5000 (197)

6000 (236)

7000 (236)

10000 (394)

divERsity cREatEs POssibilitiEsExploring unique dimensions

* * * * *

*

* *

* *

* *

* *

* *

*

*

*

*

*

*

*

*

*

*

*

2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW

2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW

2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW

PipeLength

4.8 + 4.2 m 6.1 + 4.2 m 4.2 m

OD mm (")

WT mm (")

based on 355 MPa NYS

WT

OD

9.53(0.375)

12.70(0.500)

14.27(0.562)

15.88(0.625)

17.48(0.688)

19.05(0.750)

20.62(0.812)

22.23(0.875)

24.61(0.969)

25.40(1.000)

26.19(1.031)

28.58(1.125)

29.36(1.156)

30.96(1.219)

31.75(1.250)

32.54(1.281)

34.93(1.375)

38.10(1.500)

38.89(1.531)

39.67(1.562)

41.28(1.625)

44.45(1.750)

45.24(1.781)

46.02(1.812)

47.63(1.875)

50.80(2.000)

53.98(2.125)

59.54(2.344)

63.50(2.500)

101.60(4.000)

324 (12)

356 (14)

406 (16)

457 (18)

508 (20)

559 (22)

610 (24)

660 (26)

711 (28)

762 (30)

813 (32)

864 (34)

914 (36)

965 (38)

1016 (40)

1067 (42)

1118 (44)

1168 (46)

1219 (48)

1321 (52)

1422 (56)

1524 (60)

1575 (62)

1829 (72)

2134 (84)

2438 (96)

material grades•Carbonsteels,incl.sourservice•HighstrengthcarbonsteelsuptoX120•Lowalloysteels,Cr/MoorNialloyedacc.toallASTMstandards

•Stainlesssteels•Duplex,superduplex,6%Mo,13%Crsupermartensiticsteels

•Highnickelalloys•Cladmaterials

divERsity cREatEs POssibilitiEs

* * * * *

*

* *

* *

* *

* *

* *

*

*

*

*

*

*

*

*

*

*

*

2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW

2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW

2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW 2LW

PipeLength

6.1* + 12.2 + 13.2 m 13.2 m 12.5 m

LW = longitudinal weldsWT = wall thicknessOD = outside diameter

16 – 17

approvalsISO9001 EEWGroup

ISO14001 EEWGroup

ISO50001 EEWGermany,SPC,Pickhan

OHSAS18001 EEWGroup

EN1090 EEWGermany,SPC,Pickhan,OSB,KHPC

API2B EEWGermany,SPC,Malaysia,Korea,GPC,Bergrohr,KHPC

API5L EEWGermany,Korea,Malaysia,GPC,Bergrohr

API5LC EEWGermany,Korea

API5LD EEWGermany,Korea,Malaysia,Bergrohr

ASMEU,U2,S EEWGermany

PED9723EG EEWGermany,Malaysia,Korea,Pickhan,Bergrohr

ADHP0 EEWGroup

aswellasnumerouscustomerapprovals

GlObal PREsEncEside by side.

A list of local sales agencies in further countries is available on our website (www.eew-group.com). If your country is not listed there, please contact our headoffice ([email protected]).

Being close to our customers and their projects – for EEW this is more than only a promise. With our mills, representations and services, we are personally available for our customers worldwide. Our employees show complete commitment – for EEW, for our custo-mers and for bringing off something extraordinary.

Production & Administration

Sales Office

Sales Agency

25,000 MTPAProduction Capacity

28,000 m2

Production Floor

58,000 m2

Property

70Employees

108,000 MTPAProduction Capacity

82,000 m2

Production Floor

224,000 m2

Property

550Employees

170,000 MTPAProduction Capacity

32,000 m2

Production Floor

239,000 m2

Property

430Employees

150,000 MTPAProduction Capacity

25,000 m2

Production Floor

52,500 m2

Property

210Employees

120,000 MTPAProduction Capacity

31,300 m2

Production Floor

81,000 m2

Property

250Employees

204,000 MTPAProduction Capacity

57,000 m2

Production Floor

120,000 m2

Property

254Employees

18,000 MTPAProduction Capacity

7,000 m2

Production Floor

17,500 m2

Property

100Employees

48,000 MTPAProduction Capacity

16,600 m2

Production Floor

70,000 m2

Property

100Employees

100 Transition Pieces PAProduction Capacity

14,000 m2

Production Floor

87,000 m2

Property

100Employees

EEWGROUP

18 – 19

Production & Administration

Sales Office

Sales Agency

25,000 MTPAProduction Capacity

28,000 m2

Production Floor

58,000 m2

Property

70Employees

108,000 MTPAProduction Capacity

82,000 m2

Production Floor

224,000 m2

Property

550Employees

170,000 MTPAProduction Capacity

32,000 m2

Production Floor

239,000 m2

Property

430Employees

150,000 MTPAProduction Capacity

25,000 m2

Production Floor

52,500 m2

Property

210Employees

120,000 MTPAProduction Capacity

31,300 m2

Production Floor

81,000 m2

Property

250Employees

204,000 MTPAProduction Capacity

57,000 m2

Production Floor

120,000 m2

Property

254Employees

18,000 MTPAProduction Capacity

7,000 m2

Production Floor

17,500 m2

Property

100Employees

48,000 MTPAProduction Capacity

16,600 m2

Production Floor

70,000 m2

Property

100Employees

100 Transition Pieces PAProduction Capacity

14,000 m2

Production Floor

87,000 m2

Property

100Employees

we support each other and protect each other. Within the framework of our HSE management system, it is our own approach to ensure that our worldwide activities comply with appropri-ate law and rules as well as with our customers’, society’s and employees’ expectations. By con-tinuous self-assessment, learning reviews and training programmes, we steadily improve our HSE performance.

We don’t make any compromise where the qua-lity of our products and services is concerned. We are aware of our responsibility for the society, the environment as well as the health and safety of our more than 1,800 employees worldwide.

The responsibility we take is not only repre-sented by our certifications but especially in our daily cooperation: we care for each other,

takinG REsPOnsibility

•ISO9001

(qualitymanagement)

•ISO14001

(environmentmanagement)

•ISO50001

(energymanagement)

•OHSAS18001

(HSEmanagement)

QHsEcertifications

because everything depends on trust

© corepics – Fotolia.com

We are proud of our employees. They demon-strate day by day that there aren’t any limits which restrict knowledge. Vivid communication and strong teams ensure continuous progress.

As a family-owned company, we set high value on social coherence. At the same time, we advocate for each individual with convic-tion, whether in apprenticeship or dual study programme, as skilled employee or in a mana-ging capacity: we encourage our employees to enlarge their knowledge and support the personal occupational career. It is the combi-nation of individual strengths and team spirit which is significant for the extraordinary quality of our products.

‘my motivation? Helping to turn ideasinto reality.’Frank Sommer, EEW Erndtebrück

20 – 21

always striving for improvement

© corepics – Fotolia.com

22 – 23

‘if you choose EEW, you are choosing a strong partner you can rely on – worldwide.’Dr.-Ing. Harald Stolten, Managing Director Erndtebrücker Eisenwerk GmbH & Co. KG

Im Grünewald 257339 ErndtebrückGermany

P.O. Box 10 01 0057335 ErndtebrückGermany

Phone (+49) 27 53 609-0Fax (+49) 27 53 609-190E-Mail [email protected]

www.eew-group.com © p

sv-m

arke

ting.

deEEW

GROUP

ERNDTEBRüCKEREISENWERKGMBH&CO.KG