wells and springs survey report.f.062910 - … and springs survey sunrise powerlink ii wells and...
TRANSCRIPT
Prepared for
San Diego Gas & Electric Company 8316 Century Park Court, CP52G
San Diego, California 92123
Wells and Springs Survey Sunrise Powerlink Project
Environmentally Superior Southern Route
San Diego and Imperial Counties, California
Prepared by
Geosyntec Consultants 10875 Rancho Bernardo Road, Suite 200
San Diego California 92127
Project Number SC0525
June 2010
Wells and Springs SurveySunrise Powerlink
ii Wells and Springs Survey Report.F.062910.doc
TABLE OF CONTENTS
1. INTRODUCTION ................................................................................................ 1 1.1 Terms of Reference ..................................................................................... 1 1.2 Project Background ..................................................................................... 1 1.3 Project Objectives ........................................................................................ 1 1.4 Scope of Services......................................................................................... 2
2. IDENTIFICATION OF POTENTIAL BLASTING SITES ................................. 3 2.1 Tower Structures ......................................................................................... 3 2.2 Access Roads, Tower Pads, and Pull Sites .................................................. 3
3. RECORDS REVIEW ........................................................................................... 4 3.1 Published Maps ........................................................................................... 4 3.2 Municipal and State Database ..................................................................... 4 3.3 Aerial Photographs ...................................................................................... 4 3.4 EPA Sole Source Aquifer Designations ...................................................... 5
4. FIELD RECONNAISSANCE .............................................................................. 6 4.1 Aerial Reconnaissance ................................................................................. 6 4.2 Ground Reconnaissance .............................................................................. 6
5. SUMMARY, CONCLUSION, AND RECOMMENDATIONS .......................... 7
6. LIMITATIONS ..................................................................................................... 8
7. REFERENCES ..................................................................................................... 9
Wells and Springs SurveySunrise Powerlink
iii Wells and Springs Survey Report.F.062910.doc
LIST OF TABLES
Table 1: Summary of Structure Assessments
Table 2: Summary of Grading Area Assessments
LIST OF FIGURES
Figure 1: Site Location
Figure 2: Mile Post 0 through 17
Figure 3: Mile Post 17 through 25
Figure 4: Mile Post 25 through 42
Figure 5: Mile Post 42 through 62
Figure 6: Mile Post 62 through 80
Figure 7: Mile Post 80 through 92
Figure 8: Mile Post 92 through 111
Figure 9: Mile Post 109 through 117.2
LIST OF APPENDICES
Appendix A: Electronic Geographic Information System (GIS) Shape Files on a Compact Disk
Wells and Springs SurveySunrise Powerlink
iv Wells and Springs Survey Report.F.062910.doc
WELLS AND SPRINGS SURVEY
SUNRISE POWERLINK PROJECT
I certify that this document and attachments presented in this report are accurate and complete. This report was prepared by the staff of Geosyntec Consultants under my supervision to ensure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who are directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete.
_____________________________________ __6/29/2010______
Veryl Wittig Date California Professional Geologist No. 7115
Wells and Springs SurveySunrise Powerlink
1 Wells and Springs Survey Report.F.062910.doc
1. INTRODUCTION
1.1 Terms of Reference
This report presents the results of a Wells and Springs Survey (Survey) performed as part of the environmental site assessment for San Diego Gas and Electric’s (SDG&E) Sunrise Powerlink Project (Project) within San Diego and Imperial Counties, California. This report was prepared by Mr. Alexander J. Greene, PG, CEG, and Mr. Doug Baumwirt, PG, and has been reviewed by Mr. Veryl Wittig, PG, CHg of Geosyntec Consultants (Geosyntec), in accordance with the peer review policies of the firm.
1.2 Project Background
We understand that SDG&E is planning the construction of an approximately 117-mile, 500 kV to 230 kV transmission line extending from the existing Imperial Valley Substation in Imperial County to the Sycamore Substation in San Diego County, California (Figure 1). The project entails the construction of approximately 441 towers in addition to the grading of numerous tower pads, access roads, and pull sites along the alignment, some of which may require blasting due to adverse ground conditions that preclude the use of conventional excavation techniques for construction. In accordance with Sunrise Mitigation Measure H-4B, as defined in the Sunrise Powerlink Environmental Impact Report/Environmental Impact Statement (EIR/EIS), we performed a survey to identify existing groundwater wells and springs within a half-mile radius of proposed tower locations and designated project grading sites that will potentially require construction-related blasting.
1.3 Project Objectives
As defined in the Sunrise Powerlink Final EIR/EIS, Sunrise Mitigation Measure H-4B states:
“Avoid blasting where damage to groundwater wells or springs could occur. Blasting shall be managed with a Blasting Plan for each site. The Plan shall include the blasting methods, distance calculations to estimate the area of effect of the blasting, and surveys for wells and springs within the blast influence area (no less than ½ mile from the blasting location). Blasting shall not be allowed where damage to wells or springs could occur according to the Applicant’s Blasting Plan, and a rock anchoring or mini-pile system shall be used if these resources could be damaged as a result of blasting or any earth working method used as an alternative to blasting. Where inadvertent damage to wells within an EPA-designated Sole Source Aquifer occur as a result of earthwork, the Applicant shall compensate the landowner in the form of well repair or replacement, and shall provide the landowner with a water storage tank and sufficient potable water within 48 hours and throughout the interim between damage and repair or replacement. Where inadvertent damage to other wells or springs
Wells and Springs SurveySunrise Powerlink
2 Wells and Springs Survey Report.F.062910.doc
occurs as a result of earthwork, the Applicant shall compensate the landowner in the form of remedial cash payment, repair, or replacement, as appropriate. The burden of proof of no impact shall rest with the Applicant.”
The objective of this study was to supply SDG&E with the necessary information to facilitate the blasting contractor’s preparation of Blasting Plans as specified in the Sunrise Mitigation Measure H-4B. The Spring and Well Survey is not intended to present a list of sites where blasting will occur as part of the Powerlink construction, rather, it is document to address Mitigation Measure H-4B and to provide the necessary information for the blasting contractors when they are preparing their site-specific blasting plans, as necessary.
Based on our experience with previous blasting studies performed for SDG&E infrastructure, it is our professional opinion that a ½-mile influence radius is an acceptable range to satisfy the intentions described within Sunrise Mitigation Measure H-4B.
1.4 Scope of Services
Geosyntec performed a multi-phased scope of work to identify wells and springs within the ½-mile radii of applicable towers, and project grading sites including: A review of the preliminary geotechnical report prepared by URS Corporation [URS, 2009] to identify applicable proposed tower locations and subsurface conditions which may require blasting during construction; A records review of available published maps, municipal and state databases, and aerial photographs along the alignment; An aerial and ground reconnaissance performed to identify additional well and spring locations and to confirm locations of wells and springs identified during the records review; and Preparation of this report to present the findings of the Survey. A detailed description of our survey is described in the following sections.
Wells and Springs SurveySunrise Powerlink
3 Wells and Springs Survey Report.F.062910.doc
2. IDENTIFICATION OF POTENTIAL BLASTING SITES
2.1 Tower Structures
Geosyntec understands that approximately 441 towers are proposed for the Sunrise Powerlink project. However, due to the subsurface conditions underlying many of the proposed tower locations, it was deemed unnecessary to evaluate each of the tower locations for the wells and springs survey. Therefore, a review of the preliminary geotechnical report for the proposed overhead transmission portion of the Project was performed to identify those proposed tower locations which, based on reported underlying geologic conditions, would not likely require blasting for construction. The preliminary geotechnical report prepared by URS contains subsurface velocity data from seismic refraction surveys and limited geotechnical borings that were performed at the proposed tower locations for use in engineering evaluations for tower foundation design. Given the large number of tower locations along the alignment, the boring and seismic velocity data was reviewed and interpreted using industry-accepted correlations to rippability to determine which proposed tower locations for which blasting may be required. The criteria for determining if blasting may be required at an individual tower location was based on the presence of subsurface conditions in which seismic velocities (apparent P-wave Vp) of greater than or equal to 5,000 feet per second (fps) within a depth of 30 feet below ground surface at or near the tower location. Additionally, locations in which crystalline bedrock outcropped at the ground surface were also considered as having the potential for blasting. Based on this initial screening, the number of tower sites potentially requiring blasting was reduced from 441 to 248. A list of the identified towers is presented in Table 1.
2.2 Access Roads, Tower Pads, and Pull Sites
Prior to performing our survey, Geosyntec was provided a list from Bureau Veritas detailing 85 proposed grading sites for project access roads, tower pads, and pull sites delineating sites in which the proposed cuts exceed 5 feet in depth. The 5-foot cut screening criteria was based on the unlikelihood that conventional excavation methods would meet refusal, potentially resulting in blasting, within the upper weathering profile at each of the proposed grading sites. Similar to the survey performed for the individual tower locations, each of the 85 delineated grading sites was assessed for having the potential for blasting using a combination of the available subsurface data, aerial photographic review, and professional judgment. Based on this assessment, the number of grading sites determined to potentially require blasting in which proposed cuts exceeded 5 feet were reduced from 85 to 19. A list of the identified grading sites is presented in Table 2.
Wells and Springs SurveySunrise Powerlink
4 Wells and Springs Survey Report.F.062910.doc
3. RECORDS REVIEW
Following our identification of the 248 tower sites and 19 grading sites potentially requiring blasting, a records search was performed utilizing available literature and municipal and state databases to identify known wells and springs within the ½-mile search radii of each applicable tower and grading site. Additionally, United States Environmental Protection Agency (USEPA)-designated Sole Source Aquifer’s were identified.
3.1 Published Maps
Our initial document review was performed using an electronic Geographic Information System (GIS) database of United States Geological Survey (USGS) 7.5-minute quadrangle topographic maps along the alignment. The topographic maps were overlayed in a GIS application with the proposed alignment, ½-mile buffer area, and identified tower and grading locations potentially requiring blasting. The locations of previously mapped wells and springs identified on the USGS topographic maps were limited, but generally did not include private property wells.
3.2 Municipal and State Database
The second phase of our document review consisted of contacting public agencies with jurisdiction along the alignment including the Bureau of Land Management (BLM), Forestry Department, and the County of San Diego (County), to collect published and unpublished information regarding the location of wells and springs within the search radii. Discussions with the BLM and Forestry Department indicated that USGS and County databases should be used to obtain the requested information. The search area and parameters were provided to the County and a list of locational data for registered wells on both public and private properties within the search radii was obtained. Similar to the information obtained from the USGS topographic maps, the provided County groundwater well GIS layer was overlayed with the proposed alignment, ½-mile buffer area, and identified tower and grading locations potentially requiring blasting. Due to unavailable detailed locational data and privacy concerns, the County database reported well locations in the center of the host parcel; therefore, additional detailed plotting was required.
3.3 Aerial Photographs
The July 2008 aerial base map utilized for our survey was obtained from SDG&E and provided a one-foot resolution along the entire alignment. Prior to conducting our field reconnaissance, a detailed review of the provided aerial photographic base map in combination with Google Earth Pro™ and Microsoft© satellite and photographic imagery was performed to further refine locations of wells provided from the municipal and state databases. While performing the aerial photographic review, potential locations of natural springs within the influence radius were
Wells and Springs SurveySunrise Powerlink
5 Wells and Springs Survey Report.F.062910.doc
noted by identifying suspect features such as surficial ponding or streams, intersecting bedrock lineaments, and localized dense vegetation which may suggest shallow or day-lighting groundwater related to springs. Additional survey of the potential spring locations noted during the aerial photograph review was performed as part of the field reconnaissance task.
3.4 EPA Sole Source Aquifer Designations
Geosyntec obtained the EPA-designated Sole Source Aquifer (SSA) list from the EPA website [USEPA, 2010]. Two SSAs exist along the Sunrise Powerlink alignment, including: The Ocotillo-Coyote Wells Aquifer, which approximately extends from Mile Post 18 to Mile Post 31; and The Campo Cottonwood Aquifer, which approximately extends from Mile Post 52 to Mile Post 84. Although the Sunrise Mitigation Measure H-4B does not explicitly require the delineation of the SSAs, it should be noted that these areas represent an additional level of sensitivity with respect to protection of existing wells and springs. The two applicable SSAs are plotted on Figures 2 through 9.
Wells and Springs SurveySunrise Powerlink
6 Wells and Springs Survey Report.F.062910.doc
4. FIELD RECONNAISSANCE
Given the number of proposed tower and grading locations identified to potentially require blasting for construction, and the remote nature of portions of the proposed alignment, our field reconnaissance required utilization of both ground and aerial surveys. The purpose of our field reconnaissance was to “ground truth” data on the locations of wells and springs identified in our records review, and to identify additional wells and springs not included in the data obtained.
4.1 Aerial Reconnaissance
Aerial reconnaissance was performed on 11 March 2010 along the length of the alignment. The helicopter used for this task was provided by Corporate Helicopters of San Diego, California. The aerial reconnaissance was performed to confirm well and spring locations identified in the records review as well as to identify unknown wells and suspect features which might suggest shallow or day-lighting groundwater. The aerial reconnaissance allowed for a detailed review along the remote sections of the alignment as well as in areas where ground surveys were problematic due to private property access constraints. During the reconnaissance, locations of identified wells and springs were plotted on aerial photographs displaying the proposed tower locations along with the ½-mile buffer zone. Additionally, a Global Positioning Systems (GPS) device was used to create a track log of the flight for further documentation.
4.2 Ground Reconnaissance
Ground reconnaissance was performed between 23 March and 10 June 2010 by two-person teams from our firm. Prior to performing ground surveys for the project, our field personnel attended SDG&E’s SWEAP training and followed all mandated safety protocol detailed therein during the extent of the ground reconnaissance. The ground surveys were generally performed to locate private wells on properties not identified in the County database and to confirm and spot check locations that had been identified. This visual survey was performed from public right-of-ways without entering private property. Similar to the aerial reconnaissance, locations were plotted on aerial photographs displaying the proposed tower and grading locations along with the ½-mile buffer zone.
Wells and Springs SurveySunrise Powerlink
7 Wells and Springs Survey Report.F.062910.doc
5. SUMMARY, CONCLUSION, AND RECOMMENDATIONS
Information obtained from our survey detailing the locations of the identified wells and springs was compiled using a GIS application. Locations of wells and springs that were refined during our aerial photographic review and aerial and ground reconnaissance were accurately plotted to the extent possible. Where access or aerial photographic constraints limited the accurate identification of well and spring locations, the locations were plotted conservatively by plotting the feature on the alignment-side of the parcel. The results from our assessment of groundwater wells, springs, and SSAs within the ½-mile influence radii of towers and grading sites potentially requiring blasting is presented graphically on Figures 2 through 13 of this report. Tabulated summaries of wells and springs identified within ½-mile of towers and grading areas is presented in Tables 1 and 2, respectively. Additionally, a GIS layer of the alignment is provided on a compact disk as Appendix A to this report which allows for specific portions of the alignment to be viewed at various scales and configurations for use in project planning. Geosyntec believes that the information reported herein includes the necessary well and spring locational data for blasting contractors to prepare Blasting Plans in accordance with Sunrise Mitigation Measure H-4B. We understand that as part of the construction blasting, the blasting contractor will perform pre-and post-blast surveys of the existing improvements within the vicinity of the proposed blasting. We recommend that the wells and springs within ½ mile of the proposed blasting be included as part of these surveys. We further understand that the blasting contractor will measure ground vibrations using seismographs located near existing improvements as part of the blasting. The nearby wells and springs should be considered when measuring the ground vibrations resulting from construction blasting. The proposed Blasting Plans and the results of the blasting measurements should be reviewed by SDG&E’s blasting consultant.
Wells and Springs SurveySunrise Powerlink
8 Wells and Springs Survey Report.F.062910.doc
6. LIMITATIONS
The wells and springs survey performed for this project consisted of a records review of available published maps and state and municipal databases, aerial photographic review, and aerial and ground reconnaissance. The information provided herein is based on those specific resources and is of the assumption that the available data is correct and provides a complete record of the locations of known wells and springs. Due to private property access constraints on portions of the alignment, some of the identified locations are generalized and may require further site-specific surveys to refine the exact locations. Additionally, the presence of unregistered private wells may not have been identified. For the purpose of this assessment, Geosyntec considers springs as exhibiting established, reliable, long-term discharge capable of supporting localized dense vegetation, streams, ponds, or economically useful quantities of water. This report has been performed in accordance with current practices and the standard of care exercised by scientists and engineers performing similar tasks in this area. It is our understanding that the exact number of towers requiring blasting for foundation construction has not yet been identified. Our identification of ground conditions at individual towers and grading sites requiring blasting is based on conservative estimates of industry accepted correlations between seismic velocity and rippability with conventional equipment. Additionally, the subsurface information utilized to refine the locations of towers and grading sites potentially requiring the use of blasting was based on information provided by others and is assumed to be accurate. Should actual ground conditions vary at specific tower and grading locations from that presented in the preliminary geotechnical report, the need for additional surveys to identify wells and springs may be required. Geosyntec is not liable for any use of the information contained in this data report by persons other than the SDG&E or their subconsultants, or the use of information in this report for any purposes other than referenced in this report without the expressed, written consent of Geosyntec.
Wells and Springs SurveySunrise Powerlink
9 Wells and Springs Survey Report.F.062910.doc
7. REFERENCES
URS Corporation (URS), 2009. “Draft Report-Revision 2, Geotechnical and Geologic Hazards Investigation, Sunrise Powerlink Project, San Diego and Imperial Counties, California”, prepared for San Diego Gas & Electric Company, dated October 16, 2009.
USEPA, 2010. “USEPA Publications and Resources, Sole Source Aquifers” USEPA Website, December 2001. Web. Accessed 20 April 2010.
TABLE 1Summary of Tower Assessments
Spring and Well SurveySunrise Powerlink
Structure Designation1 Link Section Segment Voltage
(kilovolts)Potential Helicopter
Only Sites2Number of
Wells and Springs3
SSDE1 5 4 18 230 No N/ACP2 5 4 18 230 No N/ACP3 5 4 18 230 No N/A
CP6-1 5 4 18 230 No 0CP7 5 4 18 230 No 0
CP8-2 5 4 18 230 No N/ACP9-1 5 4 18 230 No 0CP10 5 4 18 230 No 0
CP11-1 5 4 18 230 No 0CP12-1 5 4 18 230 No 0CP13-2 5 4 18 230 Yes N/ACP14 5 4 18 230 Yes N/A
CP15-1 5 4 18 230 No 0CP16-1 5 4 18 230 No 0CP17-1 5 4 18 230 No 0CP18-1 5 4 18 230 No 1CP19-1 5 4 18 230 No 1CP20 5 4 18 230 Yes N/ACP21 5 4 18 230 No N/A
CP22-1 5 4 18 230 No N/ACP23 5 4 18 230 Yes N/A
CP24-1 5 4 18 230 No N/ACP25-2 5 4 18 230 No 9CP26 5 4 18 230 No 8CP27 5 4 18 230 Yes N/A
CP28-1 5 4 18 230 Yes N/ACP29-1 5 4 18 230 No 3CP31-2 5 5 18 230 No 3CP32-2 5 5 18 230 Yes N/ACP33-2 5 5 17 230 Yes N/ACP33A 5 5 17 230 Yes N/ACP34-2 5 5 17 230 Yes N/ACP35-2 5 5 17 230 Yes N/ACP36-1 5 5 17 230 Yes N/ACP37-2 5 5 17 230 Yes N/ACP39 5 5 17 230 Yes N/A
CP40-2 5 5 17 230 No 0CP41-2 5 5 17 230 No 4CP42-1 5 5 17 230 Yes N/ACP43-1 5 5 17 230 Yes N/ACP44-1 5 5 17 230 Yes N/ACP45-1 5 5 17 230 Yes N/ACP46-2 5 5 17 230 Yes N/ACP47-2 5 5 17 230 Yes N/A
CP47A-1 5 5 17 230 Yes N/ACP48-2 5 5 17 230 Yes N/ACP49-1 5 5 17 230 Yes N/ACP50-1 5 5 17 230 Yes N/ACP51-2 5 5 17 230 Yes N/ACP52 5 5 17 230 Yes N/A
CP53-1 5 5 17 230 Yes N/A
TABLES - Well and Spring Survey REV 6-25-10.xlsx Page 1 of 9
TABLE 1Summary of Tower Assessments
Spring and Well SurveySunrise Powerlink
Structure Designation1 Link Section Segment Voltage
(kilovolts)Potential Helicopter
Only Sites2Number of
Wells and Springs3
CP54-1 5 5 17 230 Yes N/ACP55 5 5 17 230 Yes N/A
CP56-1 5 5 17 230 Yes N/ACP57 5 5 17 230 Yes N/A
CP58-1 5 5 17 230 Yes N/ACP59 5 5 17 230 Yes N/ACP60 5 5 17 230 Yes N/A
CP61-1 5 5 17 230 Yes N/ACP62-2 5 5 17 230 Yes N/ACP62A 5 5 17 230 Yes N/ACP63-3 5 5 17 230 Yes N/ACP64-2 5 5 17 230 Yes N/ACP65-1 5 5 17 230 Yes N/ACP66-2 5 5 16 230 Yes N/ACP67-3 5 5 16 230 Yes N/ACP68-1 5 5 16 230 Yes N/ACP69-2 5 5 16 230 No 4CP70-3 5 5 16 230 No N/ACP71 5 5 16 230 Yes N/A
CP72-2 5 5 16 230 Yes N/ACP73-2 5 5 16 230 Yes N/ACP74-2 5 5 16 230 Yes N/ACP75-1 5 5 16 230 Yes N/ACP76-1 5 5 16 230 Yes N/ACP77 5 5 16 230 Yes N/A
CP78-2 5 5 16 230 Yes N/ACP79-1 5 5 16 230 Yes N/ACP80-1 5 5 16 230 Yes N/ACP81-1 5 5 16 230 Yes N/ACP82-1 5 5 16 230 Yes N/ACP83 5 5 16 230 Yes N/ACP84 5 5 16 230 Yes N/A
CP85-1 5 5 16 230 Yes N/ACP86 5 5 16 230 Yes N/A
CP87-1 5 5 16 230 No N/ACP88-1 5 5 16 230 No N/ACP95-1 5 7 16 230 No N/ACP96-1 5 7 16 230 No N/ACP98-1 5 7 14 230 No N/ACP99-2 5 7 14 230 No 16
CP100-1 5 7 14 230 No 11CP101-1 5 7 14 230 Yes N/ACP103-2 5 7 14 230 Yes N/ACP104-1 5 7 14 230 Yes N/ACP105-1 5 7 14 230 Yes N/ACP106-1 5 7 14 230 Yes N/ACP107 5 7 14 230 Yes N/ACP108 5 7 14 230 Yes N/A
CP109-1 5 7 14 230 Yes N/ASSDE2 5 7 14 230 No N/ASSDE3 5 7 14 230 No N/A
TABLES - Well and Spring Survey REV 6-25-10.xlsx Page 2 of 9
TABLE 1Summary of Tower Assessments
Spring and Well SurveySunrise Powerlink
Structure Designation1 Link Section Segment Voltage
(kilovolts)Potential Helicopter
Only Sites2Number of
Wells and Springs3
SSDE4 2 8A 14 500 No N/AEP1-3 2 8A 12 500 No 6EP2-3 2 8A 12 500 Yes N/AEP3-3 2 8A 12 500 Yes N/AEP4-3 2 8A 12 500 Yes N/AEP5-2 2 8A 12 500 Yes N/AEP6-1 2 8A 12 500 Yes N/AEP7-1 2 8A 12 500 Yes N/AEP8-2 2 8A 12 500 Yes N/AEP9-1 2 8A 12 500 No N/A
EP10-2 2 8A 12 500 Yes N/AEP11-3 2 8A 12 500 No 7EP12-3 2 8A 12 500 No 7EP13-3 2 8A 12 500 Yes N/AEP14-1 2 8A 12 500 Yes N/AEP15 2 8A 12 500 Yes N/A
EP16-1 2 8A 12 500 Yes N/AEP17 2 8A 12 500 Yes N/AEP18 2 8A 12 500 Yes N/A
EP19-1 2 8A 12 500 Yes N/AEP20-2 2 8A 12 500 Yes N/AEP21-1 2 8A 12 500 Yes N/AEP22-1 2 8A 12 500 Yes N/AEP23-2 2 8A 12 500 Yes N/AEP24-1 2 8A 12 500 No N/AEP25-2 2 8A 12 500 Yes N/AEP26-1 2 8A 12 500 No N/AEP27-1 2 8A 12 500 No N/AEP28-3 2 8A 12 500 Yes N/AEP29-2 2 8A 12 500 Yes N/AEP30-2 2 8A 12 500 No N/AEP31-1 2 8A 12 500 Yes N/AEP32-1 2 8A 12 500 No N/AEP33-1 2 8A 12 500 Yes N/AEP34-1 2 8A 12 500 Yes N/AEP35-1 2 8A 12 500 Yes N/AEP36-1 2 8A 12 500 No 10EP37-2 2 8A 12 500 Yes N/AEP39-1 2 8A 12 500 No 6EP40-1 2 8A 11 500 Yes N/AEP41 2 8A 11 500 Yes N/AEP42 2 8A 11 500 No N/A
EP43-1 2 8B 11 500 Yes N/AEP44 2 8B 11 500 Yes N/A
EP45-1 2 8B 11 500 Yes N/AEP47-2 2 8C 11 500 Yes N/AEP48 2 8C 10 500 Yes N/AEP49 2 8C 10 500 No 1EP50 2 8C 10 500 Yes N/A
TABLES - Well and Spring Survey REV 6-25-10.xlsx Page 3 of 9
TABLE 1Summary of Tower Assessments
Spring and Well SurveySunrise Powerlink
Structure Designation1 Link Section Segment Voltage
(kilovolts)Potential Helicopter
Only Sites2Number of
Wells and Springs3
EP51-1 2 8C 10 500 No 1EP52-1 2 8C 10 500 No 2EP53-2 2 8C 10 500 Yes N/AEP54 2 8C 10 500 No 5
EP56-3 2 8C 10 500 Yes N/AEP57-1 2 8C 10 500 Yes N/AEP58-2 2 8C 10 500 Yes N/A
EP62A-1 2 8C 10 500 Yes N/AEP63 2 8C 10 500 Yes N/AEP64 2 8C 10 500 Yes N/A
EP65-1 2 8C 10 500 No 0EP66 2 8C 10 500 No 1EP67 2 8C 10 500 No 1EP68 2 8D 9 500 No 1EP69 2 8D 9 500 Yes N/AEP70 2 8D 9 500 Yes N/AEP71 2 8D 9 500 Yes N/AEP72 2 8D 9 500 Yes N/AEP73 2 8D 9 500 Yes N/A
EP74-1 2 8D 9 500 Yes N/AEP75-2 2 8D 9 500 Yes N/AEP76-2 2 8D 9 500 Yes N/AEP77 2 8D 9 500 Yes N/AEP78 2 8D 9 500 Yes N/A
EP78A 2 8D 9 500 Yes N/AEP79 2 8D 9 500 Yes N/AEP80 2 8D 8 500 Yes N/AEP81 2 8D 8 500 Yes N/AEP82 2 8D 8 500 Yes N/AEP83 2 8D 8 500 Yes N/AEP84 2 8D 8 500 No N/A
EP85-2 2 8D 8 500 No N/AEP86-1 2 8D 8 500 Yes N/AEP87-1 2 8D 8 500 Yes N/AEP88-2 2 8D 8 500 Yes N/AEP89-1 2 8D 8 500 No 35EP90-1 2 8E 8 500 No N/AEP91 2 8E 8 500 No 30EP92 2 8E 8 500 No 25EP93 2 8E 8 500 No 23EP94 2 8E 8 500 No N/AEP95 2 8E 8 500 No N/AEP96 2 8E 8 500 No 5EP97 2 8E 8 500 No N/A
EP98-1 2 8E 8 500 No N/AEP99-2 2 8E 8 500 No N/A
EP101-2 2 8E 7 500 Yes N/AEP102-3 2 8E 7 500 Yes N/A
EP102A-1 2 8E 7 500 Yes N/A
TABLES - Well and Spring Survey REV 6-25-10.xlsx Page 4 of 9
TABLE 1Summary of Tower Assessments
Spring and Well SurveySunrise Powerlink
Structure Designation1 Link Section Segment Voltage
(kilovolts)Potential Helicopter
Only Sites2Number of
Wells and Springs3
EP103-2 2 8E 7 500 Yes N/AEP103A 2 8E 7 500 No 5EP104-2 2 8E 7 500 No 5EP105-2 2 8E 7 500 No 3EP106-3 2 8E 7 500 Yes N/AEP107-3 2 8E 7 500 Yes N/AEP108-2 2 8E 7 500 Yes N/AEP109-1 2 8E 7 500 Yes N/AEP110-2 2 8E 7 500 Yes N/AEP111-4 2 8E 7 500 Yes N/AEP112-3 2 8E 7 500 No N/AEP112A 2 8E 7 500 No N/AEP113-4 2 8E 7 500 No 0EP114-2 2 8E 7 500 Yes N/AEP115-1 2 8E 7 500 Yes N/AEP116-1 2 8E 7 500 Yes N/AEP117-2 2 8E 7 500 Yes N/AEP118-2 2 8E 7 500 Yes N/AEP119-2 2 8E 7 500 Yes N/AEP120-4 2 9A 7 500 Yes N/AEP120A 2 9A 7 500 Yes N/AEP121-3 2 9A 7 500 Yes N/A
EP121A-1 2 9A 7 500 Yes N/AEP122-1 2 9A 7 500 Yes N/AEP123-1 2 9A 7 500 Yes N/AEP124 2 9A 7 500 Yes N/AEP125 2 9A 7 500 No N/A
EP126-1 2 9A 7 500 No N/AEP127 2 9A 7 500 No N/AEP128 2 9A 7 500 Yes N/AEP129 2 9A 7 500 Yes N/A
EP130-1 2 9A 7 500 No N/AEP131 2 9A 7 500 No 0
EP132-2 2 9A 7 500 Yes N/AEP134-1 2 9A 7 500 Yes N/AEP135 2 9A 7 500 Yes N/AEP136 2 9A 7 500 Yes N/AEP137 2 9A 7 500 Yes N/A
EP138-2 2 9A 7 500 Yes N/AEP139-1 2 9A 7 500 Yes N/AEP140 1 9A 7 500 Yes 0EP141 1 9B 7 500 No N/A
EP142-1 1 9B 6 500 Yes N/AEP143-1 1 9B 6 500 Yes N/AEP144 1 9B 6 500 Yes N/AEP145 1 9B 6 500 Yes N/AEP146 1 9B 6 500 Yes N/AEP147 1 9B 6 500 Yes N/A
EP148-1 1 9B 6 500 Yes N/AEP149-1 1 9B 6 500 Yes N/AEP150 1 9B 6 500 Yes N/A
TABLES - Well and Spring Survey REV 6-25-10.xlsx Page 5 of 9
TABLE 1Summary of Tower Assessments
Spring and Well SurveySunrise Powerlink
Structure Designation1 Link Section Segment Voltage
(kilovolts)Potential Helicopter
Only Sites2Number of
Wells and Springs3
EP151 1 9B 6 500 Yes N/AEP152-2 1 9B 6 500 Yes N/AEP170 1 9B 6 500 No 1EP171 1 9B 6 500 No N/AEP172 1 9B 6 500 No N/A
EP173-1 1 9B 6 500 No N/AEP174 1 9B 6 500 No N/AEP175 1 9B 6 500 No N/AEP176 1 9B 6 500 No N/AEP177 1 9B 6 500 No N/AEP178 1 9B 6 500 No N/AEP179 1 9B 6 500 No N/AEP180 1 9B 6 500 No N/AEP181 1 9B 6 500 No N/AEP182 1 9B 6 500 No 1EP183 1 9B 6 500 Yes N/A
EP184-1 1 9B 6 500 No 1EP185-1 1 9B 6 500 No 0EP186-1 1 9B 6 500 No 0EP187-2 1 9B 6 500 No 0EP188-1 1 9B 6 500 Yes N/AEP189-3 1 9B 6 500 Yes N/AEP190-2 1 9B 6 500 No 0EP191-1 1 9B 6 500 No 0EP192-1 1 9B 6 500 No 0EP193-1 1 9B 6 500 No 0EP194-2 1 9B 6 500 Yes N/AEP195-1 1 9B 6 500 Yes N/AEP196-1 1 9B 6 500 No 1EP197-2 1 9B 6 500 No 1EP198-3 1 9B 6 500 No 1EP199-3 1 9B 6 500 No 1EP200-3 1 9B 6 500 No 2
EP200A-1 1 9B 6 500 No N/AEP201-3 1 9B 6 500 No 2EP202-3 1 9B 6 500 No N/AEP203-3 1 9B 6 500 No N/AEP204-3 1 9B 6 500 No 4EP205-2 1 9B 6 500 No 4EP206-1 1 9B 6 500 No N/AEP207 1 9B 5 500 No 3EP208 1 9B 5 500 No 3
EP209-1 1 9B 5 500 No 4EP210 1 9B 5 500 No 3EP211 1 9B 5 500 No 2EP213 1 9B 5 500 No 1EP214 1 9B 5 500 No 3EP215 1 9B 5 500 No 7
EP217-1 1 9C 5 500 No 8EP218-1 1 9C 5 500 No 4EP219-1 1 9C 5 500 No 3
TABLES - Well and Spring Survey REV 6-25-10.xlsx Page 6 of 9
TABLE 1Summary of Tower Assessments
Spring and Well SurveySunrise Powerlink
Structure Designation1 Link Section Segment Voltage
(kilovolts)Potential Helicopter
Only Sites2Number of
Wells and Springs3
EP220-1 1 9C 5 500 No 10EP221-2 1 9C 5 500 Yes N/AEP221A 1 9C 5 500 Yes N/AEP223-1 1 9C 5 500 Yes N/AEP224-1 1 9C 5 500 Yes N/AEP225-1 1 9C 5 500 Yes N/AEP226-1 1 9C 5 500 Yes N/AEP227 1 9C 5 500 Yes N/AEP228 1 9C 5 500 Yes N/A
EP229-1 1 9C 5 500 Yes N/AEP230-1 1 9C 5 500 Yes N/AEP231-1 1 9C 5 500 Yes N/AEP231A 1 9C 5 500 Yes N/AEP232-1 1 9C 5 500 Yes N/AEP233-1 1 9C 5 500 Yes N/AEP234-1 1 9C 5 500 Yes N/AEP235-1 1 9C 5 500 Yes N/AEP236-1 1 9C 5 500 Yes N/AEP237-1 1 9C 5 500 Yes N/AEP238-1 1 9C 5 500 Yes N/AEP239-1 1 9C 5 500 No N/AEP240 1 9C 5 500 No N/AEP242 1 9C 5 500 No N/AEP243 1 9C 5 500 No N/AEP244 1 9C 5 500 No N/A
EP245-1 1 9C 5 500 No 0EP246 1 9C 5 500 No 0EP247 1 9C 5 500 No 0EP248 1 9C 5 500 No 0EP249 1 9C 5 500 No 0EP250 1 9C 5 500 No N/AEP251 1 9C 5 500 No N/A
EP252-1 1 9C 5 500 No N/AEP252A-1 1 9C 4 500 Yes N/AEP253-2 1 9C 4 500 Yes N/AEP254-3 1 9C 4 500 Yes N/AEP255-2 1 9C 4 500 No 0EP256 1 9C 4 500 No 0EP257 1 9C 4 500 No 0
EP258-3 1 9C 4 500 No N/AEP259-3 1 9C 4 500 Yes N/AEP259B 1 9C 4 500 Yes N/AEP261-2 1 9C 4 500 Yes N/AEP261A 1 9C 4 500 Yes N/AEP262-4 1 9C 4 500 Yes N/A
EP263A-2 1 9C 4 500 Yes N/AEP263B-2 1 9C 4 500 Yes N/AEP264-4 1 9C 4 500 Yes N/AEP265-2 1 9C 4 500 Yes N/AEP266-2 1 9C 4 500 Yes N/AEP267-2 1 9C 4 500 Yes N/A
TABLES - Well and Spring Survey REV 6-25-10.xlsx Page 7 of 9
TABLE 1Summary of Tower Assessments
Spring and Well SurveySunrise Powerlink
Structure Designation1 Link Section Segment Voltage
(kilovolts)Potential Helicopter
Only Sites2Number of
Wells and Springs3
EP269-1 1 9C 4 500 Yes N/AEP270-2 1 10A 4 500 Yes N/AEP271-2 1 10A 4 500 Yes N/AEP272-3 1 10A 4 500 Yes N/AEP273-1 1 10A 4 500 Yes N/AEP274-1 1 10A 4 500 Yes N/AEP275-1 1 10A 4 500 Yes N/AEP276-1 1 10A 4 500 Yes N/AEP277-1 1 10A 3 500 Yes N/AEP278-1 1 10A 3 500 Yes N/AEP279-1 1 10A 3 500 Yes N/AEP280-1 1 10A 3 500 Yes N/AEP281 1 10A 3 500 Yes N/AEP290 1 10B 3 500 No N/A
EP291-1 1 10B 3 500 No N/AEP292-1 1 10B 3 500 No N/AEP293 1 10B 3 500 No N/AEP294 1 10B 3 500 No N/AEP295 1 10B 3 500 No N/AEP296 1 10B 3 500 No N/AEP297 1 10B 3 500 No N/AEP298 1 10B 3 500 No N/AEP299 1 10B 3 500 No N/A
EP300-1 1 10B 3 500 No N/AEP301 1 10B 3 500 No N/A
EP302-1 1 10B 2 500 No N/AEP303-2 1 10B 2 500 No N/AEP304-2 1 10B 2 500 No 1EP305-3 1 10B 2 500 Yes N/AEP306-1 1 10B 2 500 No N/AEP307-1 1 10B 2 500 No N/AEP308 1 10B 2 500 No N/AEP309 1 10B 2 500 No N/AEP310 1 10B 2 500 Yes N/A
EP311-1 1 10B 2 500 Yes N/AEP312 1 10B 2 500 Yes N/AEP313 1 10B 2 500 No N/AEP314 1 10B 2 500 Yes N/A
EP315-1 1 10B 2 500 Yes N/AEP316-2 1 10B 2 500 No N/AEP317 1 10B 2 500 Yes N/A
EP318-1 1 10B 2 500 No N/AEP319 1 10B 2 500 No N/A
EP320-1 1 10B 2 500 No N/AEP321-1 1 10B 2 500 No N/AEP322-1 1 10B 2 500 No N/AEP323-1 1 10B 2 500 Yes N/AEP324 1 10B 2 500 Yes N/A
EP325-2 1 10B 2 500 No N/AEP326 1 10B 2 500 No N/AEP327 1 10B 2 500 No N/A
TABLES - Well and Spring Survey REV 6-25-10.xlsx Page 8 of 9
TABLE 1Summary of Tower Assessments
Spring and Well SurveySunrise Powerlink
Structure Designation1 Link Section Segment Voltage
(kilovolts)Potential Helicopter
Only Sites2Number of
Wells and Springs3
EP328-1 1 10B 2 500 No N/AEP329-1 1 10B 2 500 No N/AEP330-1 1 10B 2 500 No N/AEP331 1 10B 2 500 No N/AEP332 1 10B 2 500 No N/AEP333 1 10B 2 500 No N/AEP334 1 10B 2 500 No N/AEP335 1 10B 2 500 No N/AEP336 1 10B 2 500 No N/AEP337 1 10B 2 500 No N/AEP338 1 10B 2 500 No N/AEP339 1 10B 2 500 No N/AEP340 1 10B 2 500 No N/AEP341 1 10B 2 500 No N/AEP342 1 10B 2 500 No N/AEP343 1 10B 2 500 No N/AEP344 1 10B 2 500 No N/AEP345 1 10B 2 500 No N/AEP346 1 10B 2 500 No N/AEP347 1 10B 2 500 No N/AEP348 1 10B 2 500 No N/AEP349 1 10B 2 500 No N/AEP350 1 10B 2 500 No N/AEP351 1 10B 2 500 No N/AEP352 1 10B 2 500 No N/AEP353 1 10B 2 500 No N/AEP354 1 10B 2 500 No N/AEP355 1 10B 2 500 No N/AEP356 1 10B 2 500 No N/AEP357 1 10B 2 500 No N/AEP358 1 10B 2 500 No N/AEP359 1 10B 2 500 No N/AEP360 1 10B 2 500 No N/AEP361 1 10B 2 500 No N/A
EP362-1 1 10B 2 500 No N/AEP363-1 1 10B 2 500 No N/ASSDE5 1 10B 2 500 No N/A
Notes:1 - Structural tower designation as of May 20102 - List of helicopter only construction sites (provided by SDG&E, dated 5/1/10)3 - Number of wells and springs within 1/2 mile of designated tower location identified as potentially requiring blasting based on surficial geology and/or subsurface conditions
TABLES - Well and Spring Survey REV 6-25-10.xlsx Page 9 of 9
TABLE 2Summary of Grading Area Assessments
Spring and Well SurveySunrise Powerlink
Designated Grading Area1 Approximate Location of Designated Grading Area
Number of Wells and Springs2
CP6-1 Pad CP6-1 N/ACP7 Pad and Road CP7 N/ACP8-2 Pad CP8-2 N/ACP10 Pad and Road CP10 N/ACP11-1 Pad and Road CP11-1 N/ACP12-1 Pad and Road CP12-1 N/APull Site Pad and Road South of CP14 and CP15 N/APull Site Pad and Road North of CP23 N/ACP24-1 Pad CP24 N/APull Site Pad East of CP31-2 N/APull Site Pad and Road Southeast of CP40-2 N/APull Site Pad and Road West-southwest to CP49-1, CP50-1, CP51-2 62Pull Site Pad and Road East -southeast of CP55 32Pull Site Pad and Road South and east of CP64-2 N/ACP87-1 and CP88-1 Pad CP87-1 and CP88-1 N/APull Site Pad and Road Southwest of CP87-1 and CP88-1 N/AAccess Road Improvements Bauer Property off Peutz Valley Road N/APull Site Pad and Road North of CP95-1 and CP96-1 N/ACP95-1 and CP96-1 Access Road CP95-1 and CP96-1 N/ACP98-1 Pad and Road CP98-1 N/APull Site Pad East of CP109-1 N/APull Site Pad West of EP9-1 N/APull Site Pad and Road North and east of EP22-1 N/APull Site Pad and Road South and north of EP23-2 N/APull Site Pad South of EP36-1 14Pull Site Pad and Road North of EP-42 and west of EP40-1 and EP41 19EP-42 Pad EP42 N/APull Site Pad and Road East of 47-2 0Existing Road Improvement East of EP50 1EP52-1 Pad and Road EP52-1 5Pull Site Pad Southwest of EP67 N/APull Site Pad East of EP67 N/APull Site Pad East of EP78 N/APull Site Pad West of EP78A N/APull Site Pad and Road East of EP83 N/APull Site Pad and Road East of EP89-1 N/APull Site Pad South of EP89-1 N/APull Site Pad and Road Southwest of EP91 70Pull Site Pad and Road East of EP91 74EP98-1 Road Northeast of EP98-1 N/AEP99-2 Pad and Road EP99-2 N/APull Site Pad and Road Northeast of EP99-2 N/AEP105-2 EP105-2 N/APull Site Road West of EP106-3 N/APull Site Pad and Road West and southwest of EP108-2 and east of EP107-3 N/APull Site Pad and Road North and northeast of EP108-2 2Pull Site Pad and Road South of EP113-4 13Pull Site Pad East of EP113-4 13Pull Site Pad and Road Southwest of EP125 N/AEP125 Pad and Road EP125 N/AEP126-1 Pad and Road EP126-1 N/APull Site Pad and Road Southwest of EP131 N/A
TABLES ‐ Well and Spring Survey REV 6‐25‐10.xlsx Page 1 of 2
TABLE 2Summary of Grading Area Assessments
Spring and Well SurveySunrise Powerlink
Designated Grading Area1 Approximate Location of Designated Grading Area
Number of Wells and Springs2
Existing Road Improvement North of EP137 along Thing Valley Road N/APull Site Pad and Road West of EP141 N/AEP141 Pad and Road EP141 N/APull Site Pad and Road North of EP141 N/APull Site Pad West-northwest of EP170 5Pull Site Pad East of EP170 N/AEP176 Pad and Road EP176 N/APull Site Pad and Road Northwest of EP178 N/AEP185-1 Pad and Road EP185-1 0Pullsite Pad and Road Southeast of EP187-2 N/AEP192-1 Pad and Road EP 192-1 N/APull Site Pad South-southeast of EP192-1 N/APull Site Pad and Road South of EP193-1 0Pull Site Pad and Road South of EP203-3 N/APull Site Pad and Road North of EP204-3 N/AEP214 Pad and Road EP214 N/APull Site Pad and Road North of EP215 N/APull Site Pad and Road West of EP215 N/APull Site Pad and Road West of EP219-1 19Pull Site Pad and Road Northwest of EP219-1 20Pull Site Pad North-northwest of EP220-1 N/APull Site Pad and Road West of EP221-2 N/APull Site Pad Southeast of EP225-2 N/AEP246 Pad and Road EP246 and east of EP246 0Pull Site Pad and Road Southwest of 255-2 N/APull Site Pad and Road East of EP255-2 N/APull Site Pad and Road North-northeast of EP269-1 0Pull Site Pad and Road West of EP301 N/APull Site Pad and Road North-northeast of EP301 N/APull Site Pad East of EP313 N/APull Site Pad East of EP322-1 N/APull Site Pad and Road Southeast of EP338 N/APull Site Pad and Road Southeast of EP343 N/A
Notes:1 - Proposed grading area designation as of May 2010 with planned cuts greater than five feet2 - Number of wells and springs within 1/2 mile of designated grading areas identified as potentially requiring blasting based on surficial geology and/or subsurface conditions
TABLES ‐ Well and Spring Survey REV 6‐25‐10.xlsx Page 2 of 2
10 0 105 Miles
Figure
1San Diego June 2010
Site Location
Milepost 117.2
Environmentally Superior Southern RouteSunrise Powerlink
Milepost 0
RouteSurveyed Tower 0.5 Mile Buffer
MP-9
MP-8
MP-7
MP-6
MP-5
MP-4
MP-3
MP-2
MP-1
MP-0
MP-17MP-16
MP-15MP-14
MP-13 MP-12
MP-11
MP-10EP309
EP314 EP331EP332
EP333EP334
EP335
EP336EP337
EP338
EP339EP340
EP341EP342
EP343EP344
EP345EP346
EP347EP348
EP349EP350
EP351
EP352EP353
EP354
EP355EP356
EP357
EP358EP359
EP360
EP361
SSDE5
EP311-1
EP318-1
EP325-2
EP363-1EP362-1
EP330-1
EP329-1EP328-1
EP323-1EP322-1
EP321-1
EP320-1
EP316-2
EP315-1 EP327EP326EP324EP319EP317EP313
EP312EP310
EP308
80
8
98
JacumbaWilderness Area
Coyote MountainsWilderness Area
Spring and Well SurveyMile Post 0 Through 17
Environmentally Superior Southern RouteSunrise Powerlink
Figure
2
S:\G
IS\S
C05
25\W
ella
ndSp
ring
Surv
ey\
June
2010
\Sp
ring
_We
lls_0
17fJ
une
2010
.mxd
San Diego June 2010
1 0 10.5 Miles
Ocotillo-Coyote Wells
Legend
Interstate
Major Road
Southern Route
SpringWellMilepostTower (Not Surveyed)Tower (Surveyed)Tower Surveyed 0.5 Mile BufferSole Source Aquifer
Environmentally Superior
National Forest
Wilderness Area
BLM
State Land Dept
USFS
Homeland Security
Military
Federal
Indian Reservation
Agency Jurisdiction
MP-19
P3
P272 3
EP281
EP290
EP293
EP294
EP295
EP296
EP297
EP298
EP299
EP301
EP308EP310
EP273-1
EP274-1
EP275-1
EP276-1
EP277-1
EP278-1
EP279-1
EP280-1
EP291-1
EP292-1
EP300-1
EP302-1EP304-2
EP305-3
EP307-1
EP311-1
EP306-1
EP303-2
EP309
MP-25
MP-18
MP-17
2
80
8
8
98
JacumbaWilderness Area
Coyote MountainsWilderness Area
Anza-BorregoDesert State
Park
Spring and Well SurveyMile Post 17 Through 25
Environmentally Superior Southern RouteSunrise Powerlink
Figure
3
S:\G
IS\S
C05
25\S
prin
g_W
ells
_172
5.m
xd
San Diego June 2010
0.5 0 0.50.25 Miles
Legend
Interstate
Major Road
Southern Route
SpringWellMilepostTower (Not Surveyed)Tower (Surveyed)Tower Surveyed 0.5 Mile BufferSole Source Aquifer
Environmentally Superior
National Forest
Wilderness Area
BLM
State Land Dept
USFS
Homeland Security
Military
Federal
Indian Reservation
Agency Jurisdiction
Ocotillo-Coyote Wells
P278 2
MP-43
MP-42
MP-41
MP-40
MP-37MP-36
MP-34 MP-32
MP-28
MP-26
MP-25
MP-39
MP-38
MP-35 MP-33 MP-31 MP-30
MP-29
EP207
EP208
EP210EP211
EP213
EP215
EP228
EP243EP251
EP257
EP221A
EP259B
EP261A
EP202-3EP203-3
EP204-3
EP206-1
EP218-1
EP220-1
EP223-1
EP224-1
EP226-1
EP230-1
EP233-1
EP235-1EP255-2
EP258-3EP259-3
EP262-4
EP264-4EP265-2
EP266-2EP267-2
EP269-1
EP270-2
EP272-3
EP273-1
EP275-1
EP276-1
EP263A-2
EP263B-2
EP252A-1
EP277-1
EP274-1
EP271-2
EP261-2
EP254-3EP253-2
EP252-1
EP245-1EP239-1EP238-1
EP237-1
EP236-1
EP234-1EP232-1
EP231-1
EP229-1
EP225-1
EP221-2
EP219-1
EP217-1
EP209-1
EP205-2
EP231AEP256
EP250
EP249EP248
EP247EP246
EP244EP242EP240
EP227
EP214
8
8
8
94
JacumbaWilderness Area
Carrizo GorgeWilderness Area
CampoReservation
Anza-BorregoDesert State
Park
Spring and Well SurveyMile Post 25 Through 42
Environmentally Superior Southern RouteSunrise Powerlink
Figure
4San Diego June 2010
0.5 0 0.50.25 Miles
S:\G
IS\S
C05
25\S
prin
g_W
ells
_172
5.m
xd
Ocotillo-Coyote Wells
Legend
Interstate
Major Road
Southern Route
SpringWellMilepostTower (Not Surveyed)Tower (Surveyed)Tower Surveyed 0.5 Mile BufferGrading Area Surveyed
Sole Source AquiferEnvironmentally Superior
National Forest
Wilderness Area
BLM
State Land Dept
USFS
Homeland Security
Military
Federal
Indian Reservation
Agency Jurisdiction
P97
P96
P95
P94
P93P92
P91
P84
P83
P99-2
P98-1
P90-1
P89-1
P87-1
P223-1
P101-2
P88-2
P86-1P85-2MP-64
MP-63
MP-61
MP-59
MP-58
MP-57
MP-56
MP-55
MP-54
MP-53
MP-49
MP-48
MP-47
MP-46
MP-45
MP-44
MP-43
MP-42
MP-41
MP-40
MP-66
MP-65
MP-62
MP-52 MP-51 MP-50
MP-39
MP-38
EP124EP125
EP128
EP129
EP131
EP135EP136
EP137
EP140EP141
EP174EP175
EP177
EP179
EP181
EP183
EP207
EP208
EP210EP211
EP213
EP215
EP120A
EP221A
EP104-2
EP105-2EP106-3
EP107-3
EP109-1
EP111-4EP115-1
EP116-1
EP118-2EP119-2
EP120-4
EP126-1
EP132-2EP134-1
EP186-1EP187-2
EP189-3
EP190-2
EP191-1
EP193-1
EP194-2EP195-1
EP197-2
EP199-3
EP200-3
EP202-3
EP203-3
EP204-3
EP206-1
EP218-1
EP220-1
EP223-1
EP200A-1
EP121A-1
EP102A-1
EP221-2
EP219-1EP217-1
EP209-1
EP205-2
EP201-3
EP198-3
EP196-1
EP192-1
EP188-1
EP185-1
EP184-1
EP173-1
EP152-2
EP149-1
EP148-1
EP143-1
EP142-1
EP139-1
EP138-2
EP130-1
EP123-1EP122-1
EP121-3
EP117-2
EP114-2EP113-4
EP112-3
EP110-2
EP108-2
EP103-2
EP101-2
EP112A
EP103A
EP99-2
EP98-1
EP90-1EP89-1EP88-2
EP87-1EP86-1EP85-2
EP214
EP182
EP180
EP178
EP176
EP172
EP171EP170
EP151EP150
EP147EP146
EP145EP144
EP127
EP97
EP96EP95
EP94
EP93EP92
EP91
EP8483
1
1
8
94
Carrizo GorgeWilderness Area
CampoReservation
ManzanitaReservation
La PostaReservation
ClevelandNational Forest
ClevelandNational Forest
Spring and Well SurveyMile Post 42 Through 62
Environmentally Superior Southern RouteSunrise Powerlink
Figure
5San Diego June 2010
0.5 0 0.50.25 Miles
Campo-Cottonwood
Legend
Interstate
Major Road
Southern Route
SpringWellMilepostTower (Not Surveyed)Tower (Surveyed)Tower Surveyed 0.5 Mile BufferGrading Area Surveyed
Sole Source AquiferEnvironmentally Superior
National Forest
Wilderness Area
BLM
State Land Dept
USFS
Homeland Security
Military
Federal
Indian Reservation
Agency Jurisdiction
EP30-2
EP97
EP96EP95
EP94
EP93EP92
EP91
EP84
EP83EP82EP81EP80
EP79EP78EP77EP73
EP72
EP71
EP70
EP69
EP68
EP67EP66EP64
EP63
EP54EP50EP49EP48EP44
EP42
EP78A
EP103A
EP99-2
EP98-1
EP90-1EP89-1
EP87-1EP76-2
EP75-2EP74-1
EP65-1
EP58-2
EP57-1EP56-3
EP53-2EP52-1
EP51-1
EP47-2EP45-1EP43-1
EP40-1EP39-1
EP37-2
EP36-1
EP35-1
EP34-1
EP33-1
EP32-1
EP31-1
EP107-3
EP106-3
EP105-2
EP104-2
EP103-2
EP102-3EP101-2
EP102A-1
EP41
EP88-2
EP86-1EP85-2
EP62A-1
MP-64
MP-63
MP-61
MP-66
MP-65
MP-62MP-80
MP-79
MP-78
MP-77 MP-74MP-73
MP-71MP-69
MP-76 MP-75
MP-72MP-70 MP-68
MP-67
MP-64
MP-63
1
94
94
94
HauserWilderness Area
CampoReservation
ClevelandNational Forest
ClevelandNational Forest
Spring and Well SurveyMile Post 62 Through 80
Environmentally Superior Southern RouteSunrise Powerlink
Figure
6San Diego June 2010
0.5 0 0.50.25 Miles
S:\G
IS\S
C05
25\S
prin
g_W
ells
_628
0.m
xd
Campo-Cottonwood
Legend
Interstate
Major Road
Southern Route
SpringWellMilepostTower (Not Surveyed)Tower (Surveyed)Tower Surveyed 0.5 Mile BufferGrading Area Surveyed
Sole Source AquiferEnvironmentally Superior
National Forest
Wilderness Area
BLM
State Land Dept
USFS
Homeland Security
Military
Federal
Indian Reservation
Agency Jurisdiction
CP103-2
MP 94MP-92
MP-91
MP-89
MP-88
MP-87
MP-85
MP-84
MP-83
MP-82
MP-81
MP-80
MP-90
MP-86
EP15
EP17EP18
CP107
EP1-3EP2-3
EP3-3
EP4-3
EP5-2
EP7-1
CP98-1
CP99-2
EP10-2EP11-3
EP14-1
EP19-1
EP22-1EP23-2
EP24-1
EP25-2EP26-1
EP27-1
EP29-2
EP30-2
EP31-1
EP33-1EP34-1EP35-1
CP100-1
CP104-1
CP109-1CP106-1CP105-1
CP101-1
EP32-1
EP28-3
EP21-1EP20-2
EP16-1
EP13-3
EP12-3
CP95-1CP96-1
EP9-1EP8-2
EP6-1
SSDE4SSDE3 SSDE2
CP108
8
8
94
79
Pine CreekWilderness Area
HauserWilderness Area
SycuanReservation
ClevelandNational Forest
Spring and Well SurveyMile Post 80 Through 92
Environmentally Superior Southern RouteSunrise Powerlink
Figure
7San Diego June 2010
0.5 0 0.50.25 Miles
S:\G
IS\S
C05
25\S
prin
g_W
ells
_809
2.m
xd
Legend
Interstate
Major Road
Southern Route
SpringWellMilepostTower (Not Surveyed)Tower (Surveyed)Tower Surveyed 0.5 Mile BufferSole Source Aquifer
Environmentally Superior
National Forest
Wilderness Area
BLM
State Land Dept
USFS
Homeland Security
Military
Federal
Indian Reservation
Agency Jurisdiction
Campo-Cottonwood
P99-2
P1
P104-1
P101-1
P105-1
P103-2
P100-1
MP-99
MP-98
MP-97MP-96
MP-95 MP-94 MP-93MP-92
MP-91
MP-111
MP-110
MP-109
MP-108
MP-107 MP-106
MP-105
MP-104MP-102
MP-101
MP-100
MP-103
CP39
CP52
CP55
CP57CP59
CP60
CP71
CP77
CP83CP84
CP86
CP62A
CP96-1
CP36-1
CP37-2
CP40-2CP41-2
CP42-1
CP43-1
CP44-1
CP45-1CP46-2
CP47-2
CP48-2CP49-1
CP63-3CP64-2
CP65-1CP66-2
CP68-1CP69-2
CP70-3
CP73-2CP75-1
CP78-2CP79-1CP80-1
CP81-1
CP87-1
CP104-1CP103-2
CP101-1CP100-1
CP47A-1
CP99-2
CP98-1
CP95-1
CP88-1
CP85-1
CP82-1
CP76-1
CP74-2
CP72-2
CP67-3
CP62-2
CP61-1CP58-1
CP56-1
CP54-1
CP53-1
CP51-2
CP50-1
CP35-2
8
67
Capitan GrandeReservation
BaronaReservation
ViejasReservation
SycuanReservation
EwiiaapaaypReservation
ClevelandNational Forest
Spring and Well SurveyMile Post 92 Through 111
Environmentally Superior Southern RouteSunrise Powerlink
Figure
8San Diego June 2010
0.5 0 0.50.25 Miles
S:\G
IS\S
C05
25\S
prin
g_W
ells
_921
11.m
xd
Legend
Interstate
Major Road
Southern Route
SpringWellMilepostTower (Not Surveyed)Tower (Surveyed)Tower Surveyed 0.5 Mile BufferGrading Area Surveyed
Sole Source AquiferEnvironmentally Superior
National Forest
Wilderness Area
BLM
State Land Dept
USFS
Homeland Security
Military
Federal
Indian Reservation
Agency Jurisdiction
MP-117.2
P46-
MP-115
MP-114
MP-112
MP-111
MP-110
MP-109
MP-117
MP-116
MP-113
CP2CP3
CP7 CP10 CP14
CP21
CP23 CP27
CP39
CP33A
CP12-1
CP16-1
CP17-1
CP18-1
CP19-1
CP22-1CP28-1
CP32-2
CP33-2
CP34-2
CP36-1
CP37-2
CP40-2
CP41-2CP42-1
CP44-1
CP43-1
CP35-2
CP31-2CP29-1
CP25-2
CP24-1
CP15-1CP13-2CP11-1CP9-1
CP8-2CP6-1
SSDE1
CP26
CP20
67
Spring and Well SurveyMile Post 109 Through 117.2Environmentally Superior Southern Route
Sunrise Powerlink
Figure
9San Diego June 2010
0.5 0 0.50.25 Miles
S:\G
IS\S
C05
25\S
prin
g_W
ells
_109
117.
2.m
xd
Legend
Interstate
Major Road
Southern Route
Spring
Well
Milepost
Tower (Not Surveyed)
Tower (Surveyed)
Tower Surveyed 0.5 Mile Buffer
Environmentally Superior
National Forest
Wilderness Area
BLM
State Land Dept
USFS
Homeland Security
Military
Federal
Indian Reservation
Agency Jurisdiction