wells and springs survey report.f.062910 - … and springs survey sunrise powerlink ii wells and...

36
Prepared for San Diego Gas & Electric Company 8316 Century Park Court, CP52G San Diego, California 92123 Wells and Springs Survey Sunrise Powerlink Project Environmentally Superior Southern Route San Diego and Imperial Counties, California Prepared by Geosyntec Consultants 10875 Rancho Bernardo Road, Suite 200 San Diego California 92127 Project Number SC0525 June 2010

Upload: phamhuong

Post on 10-Apr-2018

219 views

Category:

Documents


4 download

TRANSCRIPT

Prepared for

San Diego Gas & Electric Company 8316 Century Park Court, CP52G

San Diego, California 92123

Wells and Springs Survey Sunrise Powerlink Project

Environmentally Superior Southern Route

San Diego and Imperial Counties, California

Prepared by

Geosyntec Consultants 10875 Rancho Bernardo Road, Suite 200

San Diego California 92127

Project Number SC0525

June 2010

Wells and Springs SurveySunrise Powerlink

ii Wells and Springs Survey Report.F.062910.doc

TABLE OF CONTENTS

1.  INTRODUCTION ................................................................................................ 1 1.1  Terms of Reference ..................................................................................... 1 1.2  Project Background ..................................................................................... 1 1.3  Project Objectives ........................................................................................ 1 1.4  Scope of Services......................................................................................... 2 

2.  IDENTIFICATION OF POTENTIAL BLASTING SITES ................................. 3 2.1  Tower Structures ......................................................................................... 3 2.2  Access Roads, Tower Pads, and Pull Sites .................................................. 3 

3.  RECORDS REVIEW ........................................................................................... 4 3.1  Published Maps ........................................................................................... 4 3.2  Municipal and State Database ..................................................................... 4 3.3  Aerial Photographs ...................................................................................... 4 3.4  EPA Sole Source Aquifer Designations ...................................................... 5 

4.  FIELD RECONNAISSANCE .............................................................................. 6 4.1  Aerial Reconnaissance ................................................................................. 6 4.2  Ground Reconnaissance .............................................................................. 6 

5.  SUMMARY, CONCLUSION, AND RECOMMENDATIONS .......................... 7 

6.  LIMITATIONS ..................................................................................................... 8 

7.  REFERENCES ..................................................................................................... 9 

Wells and Springs SurveySunrise Powerlink

iii Wells and Springs Survey Report.F.062910.doc

LIST OF TABLES

Table 1: Summary of Structure Assessments

Table 2: Summary of Grading Area Assessments

LIST OF FIGURES

Figure 1: Site Location

Figure 2: Mile Post 0 through 17

Figure 3: Mile Post 17 through 25

Figure 4: Mile Post 25 through 42

Figure 5: Mile Post 42 through 62

Figure 6: Mile Post 62 through 80

Figure 7: Mile Post 80 through 92

Figure 8: Mile Post 92 through 111

Figure 9: Mile Post 109 through 117.2

LIST OF APPENDICES

Appendix A: Electronic Geographic Information System (GIS) Shape Files on a Compact Disk

Wells and Springs SurveySunrise Powerlink

iv Wells and Springs Survey Report.F.062910.doc

WELLS AND SPRINGS SURVEY

SUNRISE POWERLINK PROJECT

I certify that this document and attachments presented in this report are accurate and complete. This report was prepared by the staff of Geosyntec Consultants under my supervision to ensure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who are directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete.

_____________________________________ __6/29/2010______

Veryl Wittig Date California Professional Geologist No. 7115

Wells and Springs SurveySunrise Powerlink

1 Wells and Springs Survey Report.F.062910.doc

1. INTRODUCTION

1.1 Terms of Reference

This report presents the results of a Wells and Springs Survey (Survey) performed as part of the environmental site assessment for San Diego Gas and Electric’s (SDG&E) Sunrise Powerlink Project (Project) within San Diego and Imperial Counties, California. This report was prepared by Mr. Alexander J. Greene, PG, CEG, and Mr. Doug Baumwirt, PG, and has been reviewed by Mr. Veryl Wittig, PG, CHg of Geosyntec Consultants (Geosyntec), in accordance with the peer review policies of the firm.

1.2 Project Background

We understand that SDG&E is planning the construction of an approximately 117-mile, 500 kV to 230 kV transmission line extending from the existing Imperial Valley Substation in Imperial County to the Sycamore Substation in San Diego County, California (Figure 1). The project entails the construction of approximately 441 towers in addition to the grading of numerous tower pads, access roads, and pull sites along the alignment, some of which may require blasting due to adverse ground conditions that preclude the use of conventional excavation techniques for construction. In accordance with Sunrise Mitigation Measure H-4B, as defined in the Sunrise Powerlink Environmental Impact Report/Environmental Impact Statement (EIR/EIS), we performed a survey to identify existing groundwater wells and springs within a half-mile radius of proposed tower locations and designated project grading sites that will potentially require construction-related blasting.

1.3 Project Objectives

As defined in the Sunrise Powerlink Final EIR/EIS, Sunrise Mitigation Measure H-4B states:

“Avoid blasting where damage to groundwater wells or springs could occur. Blasting shall be managed with a Blasting Plan for each site. The Plan shall include the blasting methods, distance calculations to estimate the area of effect of the blasting, and surveys for wells and springs within the blast influence area (no less than ½ mile from the blasting location). Blasting shall not be allowed where damage to wells or springs could occur according to the Applicant’s Blasting Plan, and a rock anchoring or mini-pile system shall be used if these resources could be damaged as a result of blasting or any earth working method used as an alternative to blasting. Where inadvertent damage to wells within an EPA-designated Sole Source Aquifer occur as a result of earthwork, the Applicant shall compensate the landowner in the form of well repair or replacement, and shall provide the landowner with a water storage tank and sufficient potable water within 48 hours and throughout the interim between damage and repair or replacement. Where inadvertent damage to other wells or springs

Wells and Springs SurveySunrise Powerlink

2 Wells and Springs Survey Report.F.062910.doc

occurs as a result of earthwork, the Applicant shall compensate the landowner in the form of remedial cash payment, repair, or replacement, as appropriate. The burden of proof of no impact shall rest with the Applicant.”

The objective of this study was to supply SDG&E with the necessary information to facilitate the blasting contractor’s preparation of Blasting Plans as specified in the Sunrise Mitigation Measure H-4B. The Spring and Well Survey is not intended to present a list of sites where blasting will occur as part of the Powerlink construction, rather, it is document to address Mitigation Measure H-4B and to provide the necessary information for the blasting contractors when they are preparing their site-specific blasting plans, as necessary.

Based on our experience with previous blasting studies performed for SDG&E infrastructure, it is our professional opinion that a ½-mile influence radius is an acceptable range to satisfy the intentions described within Sunrise Mitigation Measure H-4B.

1.4 Scope of Services

Geosyntec performed a multi-phased scope of work to identify wells and springs within the ½-mile radii of applicable towers, and project grading sites including: A review of the preliminary geotechnical report prepared by URS Corporation [URS, 2009] to identify applicable proposed tower locations and subsurface conditions which may require blasting during construction; A records review of available published maps, municipal and state databases, and aerial photographs along the alignment; An aerial and ground reconnaissance performed to identify additional well and spring locations and to confirm locations of wells and springs identified during the records review; and Preparation of this report to present the findings of the Survey. A detailed description of our survey is described in the following sections.

Wells and Springs SurveySunrise Powerlink

3 Wells and Springs Survey Report.F.062910.doc

2. IDENTIFICATION OF POTENTIAL BLASTING SITES

2.1 Tower Structures

Geosyntec understands that approximately 441 towers are proposed for the Sunrise Powerlink project. However, due to the subsurface conditions underlying many of the proposed tower locations, it was deemed unnecessary to evaluate each of the tower locations for the wells and springs survey. Therefore, a review of the preliminary geotechnical report for the proposed overhead transmission portion of the Project was performed to identify those proposed tower locations which, based on reported underlying geologic conditions, would not likely require blasting for construction. The preliminary geotechnical report prepared by URS contains subsurface velocity data from seismic refraction surveys and limited geotechnical borings that were performed at the proposed tower locations for use in engineering evaluations for tower foundation design. Given the large number of tower locations along the alignment, the boring and seismic velocity data was reviewed and interpreted using industry-accepted correlations to rippability to determine which proposed tower locations for which blasting may be required. The criteria for determining if blasting may be required at an individual tower location was based on the presence of subsurface conditions in which seismic velocities (apparent P-wave Vp) of greater than or equal to 5,000 feet per second (fps) within a depth of 30 feet below ground surface at or near the tower location. Additionally, locations in which crystalline bedrock outcropped at the ground surface were also considered as having the potential for blasting. Based on this initial screening, the number of tower sites potentially requiring blasting was reduced from 441 to 248. A list of the identified towers is presented in Table 1.

2.2 Access Roads, Tower Pads, and Pull Sites

Prior to performing our survey, Geosyntec was provided a list from Bureau Veritas detailing 85 proposed grading sites for project access roads, tower pads, and pull sites delineating sites in which the proposed cuts exceed 5 feet in depth. The 5-foot cut screening criteria was based on the unlikelihood that conventional excavation methods would meet refusal, potentially resulting in blasting, within the upper weathering profile at each of the proposed grading sites. Similar to the survey performed for the individual tower locations, each of the 85 delineated grading sites was assessed for having the potential for blasting using a combination of the available subsurface data, aerial photographic review, and professional judgment. Based on this assessment, the number of grading sites determined to potentially require blasting in which proposed cuts exceeded 5 feet were reduced from 85 to 19. A list of the identified grading sites is presented in Table 2.

Wells and Springs SurveySunrise Powerlink

4 Wells and Springs Survey Report.F.062910.doc

3. RECORDS REVIEW

Following our identification of the 248 tower sites and 19 grading sites potentially requiring blasting, a records search was performed utilizing available literature and municipal and state databases to identify known wells and springs within the ½-mile search radii of each applicable tower and grading site. Additionally, United States Environmental Protection Agency (USEPA)-designated Sole Source Aquifer’s were identified.

3.1 Published Maps

Our initial document review was performed using an electronic Geographic Information System (GIS) database of United States Geological Survey (USGS) 7.5-minute quadrangle topographic maps along the alignment. The topographic maps were overlayed in a GIS application with the proposed alignment, ½-mile buffer area, and identified tower and grading locations potentially requiring blasting. The locations of previously mapped wells and springs identified on the USGS topographic maps were limited, but generally did not include private property wells.

3.2 Municipal and State Database

The second phase of our document review consisted of contacting public agencies with jurisdiction along the alignment including the Bureau of Land Management (BLM), Forestry Department, and the County of San Diego (County), to collect published and unpublished information regarding the location of wells and springs within the search radii. Discussions with the BLM and Forestry Department indicated that USGS and County databases should be used to obtain the requested information. The search area and parameters were provided to the County and a list of locational data for registered wells on both public and private properties within the search radii was obtained. Similar to the information obtained from the USGS topographic maps, the provided County groundwater well GIS layer was overlayed with the proposed alignment, ½-mile buffer area, and identified tower and grading locations potentially requiring blasting. Due to unavailable detailed locational data and privacy concerns, the County database reported well locations in the center of the host parcel; therefore, additional detailed plotting was required.

3.3 Aerial Photographs

The July 2008 aerial base map utilized for our survey was obtained from SDG&E and provided a one-foot resolution along the entire alignment. Prior to conducting our field reconnaissance, a detailed review of the provided aerial photographic base map in combination with Google Earth Pro™ and Microsoft© satellite and photographic imagery was performed to further refine locations of wells provided from the municipal and state databases. While performing the aerial photographic review, potential locations of natural springs within the influence radius were

Wells and Springs SurveySunrise Powerlink

5 Wells and Springs Survey Report.F.062910.doc

noted by identifying suspect features such as surficial ponding or streams, intersecting bedrock lineaments, and localized dense vegetation which may suggest shallow or day-lighting groundwater related to springs. Additional survey of the potential spring locations noted during the aerial photograph review was performed as part of the field reconnaissance task.

3.4 EPA Sole Source Aquifer Designations

Geosyntec obtained the EPA-designated Sole Source Aquifer (SSA) list from the EPA website [USEPA, 2010]. Two SSAs exist along the Sunrise Powerlink alignment, including: The Ocotillo-Coyote Wells Aquifer, which approximately extends from Mile Post 18 to Mile Post 31; and The Campo Cottonwood Aquifer, which approximately extends from Mile Post 52 to Mile Post 84. Although the Sunrise Mitigation Measure H-4B does not explicitly require the delineation of the SSAs, it should be noted that these areas represent an additional level of sensitivity with respect to protection of existing wells and springs. The two applicable SSAs are plotted on Figures 2 through 9.

Wells and Springs SurveySunrise Powerlink

6 Wells and Springs Survey Report.F.062910.doc

4. FIELD RECONNAISSANCE

Given the number of proposed tower and grading locations identified to potentially require blasting for construction, and the remote nature of portions of the proposed alignment, our field reconnaissance required utilization of both ground and aerial surveys. The purpose of our field reconnaissance was to “ground truth” data on the locations of wells and springs identified in our records review, and to identify additional wells and springs not included in the data obtained.

4.1 Aerial Reconnaissance

Aerial reconnaissance was performed on 11 March 2010 along the length of the alignment. The helicopter used for this task was provided by Corporate Helicopters of San Diego, California. The aerial reconnaissance was performed to confirm well and spring locations identified in the records review as well as to identify unknown wells and suspect features which might suggest shallow or day-lighting groundwater. The aerial reconnaissance allowed for a detailed review along the remote sections of the alignment as well as in areas where ground surveys were problematic due to private property access constraints. During the reconnaissance, locations of identified wells and springs were plotted on aerial photographs displaying the proposed tower locations along with the ½-mile buffer zone. Additionally, a Global Positioning Systems (GPS) device was used to create a track log of the flight for further documentation.

4.2 Ground Reconnaissance

Ground reconnaissance was performed between 23 March and 10 June 2010 by two-person teams from our firm. Prior to performing ground surveys for the project, our field personnel attended SDG&E’s SWEAP training and followed all mandated safety protocol detailed therein during the extent of the ground reconnaissance. The ground surveys were generally performed to locate private wells on properties not identified in the County database and to confirm and spot check locations that had been identified. This visual survey was performed from public right-of-ways without entering private property. Similar to the aerial reconnaissance, locations were plotted on aerial photographs displaying the proposed tower and grading locations along with the ½-mile buffer zone.

Wells and Springs SurveySunrise Powerlink

7 Wells and Springs Survey Report.F.062910.doc

5. SUMMARY, CONCLUSION, AND RECOMMENDATIONS

Information obtained from our survey detailing the locations of the identified wells and springs was compiled using a GIS application. Locations of wells and springs that were refined during our aerial photographic review and aerial and ground reconnaissance were accurately plotted to the extent possible. Where access or aerial photographic constraints limited the accurate identification of well and spring locations, the locations were plotted conservatively by plotting the feature on the alignment-side of the parcel. The results from our assessment of groundwater wells, springs, and SSAs within the ½-mile influence radii of towers and grading sites potentially requiring blasting is presented graphically on Figures 2 through 13 of this report. Tabulated summaries of wells and springs identified within ½-mile of towers and grading areas is presented in Tables 1 and 2, respectively. Additionally, a GIS layer of the alignment is provided on a compact disk as Appendix A to this report which allows for specific portions of the alignment to be viewed at various scales and configurations for use in project planning. Geosyntec believes that the information reported herein includes the necessary well and spring locational data for blasting contractors to prepare Blasting Plans in accordance with Sunrise Mitigation Measure H-4B. We understand that as part of the construction blasting, the blasting contractor will perform pre-and post-blast surveys of the existing improvements within the vicinity of the proposed blasting. We recommend that the wells and springs within ½ mile of the proposed blasting be included as part of these surveys. We further understand that the blasting contractor will measure ground vibrations using seismographs located near existing improvements as part of the blasting. The nearby wells and springs should be considered when measuring the ground vibrations resulting from construction blasting. The proposed Blasting Plans and the results of the blasting measurements should be reviewed by SDG&E’s blasting consultant.

Wells and Springs SurveySunrise Powerlink

8 Wells and Springs Survey Report.F.062910.doc

6. LIMITATIONS

The wells and springs survey performed for this project consisted of a records review of available published maps and state and municipal databases, aerial photographic review, and aerial and ground reconnaissance. The information provided herein is based on those specific resources and is of the assumption that the available data is correct and provides a complete record of the locations of known wells and springs. Due to private property access constraints on portions of the alignment, some of the identified locations are generalized and may require further site-specific surveys to refine the exact locations. Additionally, the presence of unregistered private wells may not have been identified. For the purpose of this assessment, Geosyntec considers springs as exhibiting established, reliable, long-term discharge capable of supporting localized dense vegetation, streams, ponds, or economically useful quantities of water. This report has been performed in accordance with current practices and the standard of care exercised by scientists and engineers performing similar tasks in this area. It is our understanding that the exact number of towers requiring blasting for foundation construction has not yet been identified. Our identification of ground conditions at individual towers and grading sites requiring blasting is based on conservative estimates of industry accepted correlations between seismic velocity and rippability with conventional equipment. Additionally, the subsurface information utilized to refine the locations of towers and grading sites potentially requiring the use of blasting was based on information provided by others and is assumed to be accurate. Should actual ground conditions vary at specific tower and grading locations from that presented in the preliminary geotechnical report, the need for additional surveys to identify wells and springs may be required. Geosyntec is not liable for any use of the information contained in this data report by persons other than the SDG&E or their subconsultants, or the use of information in this report for any purposes other than referenced in this report without the expressed, written consent of Geosyntec.

Wells and Springs SurveySunrise Powerlink

9 Wells and Springs Survey Report.F.062910.doc

7. REFERENCES

URS Corporation (URS), 2009. “Draft Report-Revision 2, Geotechnical and Geologic Hazards Investigation, Sunrise Powerlink Project, San Diego and Imperial Counties, California”, prepared for San Diego Gas & Electric Company, dated October 16, 2009.

USEPA, 2010. “USEPA Publications and Resources, Sole Source Aquifers” USEPA Website, December 2001. Web. Accessed 20 April 2010.

TABLES

TABLE 1Summary of Tower Assessments

Spring and Well SurveySunrise Powerlink

Structure Designation1 Link Section Segment Voltage

(kilovolts)Potential Helicopter

Only Sites2Number of

Wells and Springs3

SSDE1 5 4 18 230 No N/ACP2 5 4 18 230 No N/ACP3 5 4 18 230 No N/A

CP6-1 5 4 18 230 No 0CP7 5 4 18 230 No 0

CP8-2 5 4 18 230 No N/ACP9-1 5 4 18 230 No 0CP10 5 4 18 230 No 0

CP11-1 5 4 18 230 No 0CP12-1 5 4 18 230 No 0CP13-2 5 4 18 230 Yes N/ACP14 5 4 18 230 Yes N/A

CP15-1 5 4 18 230 No 0CP16-1 5 4 18 230 No 0CP17-1 5 4 18 230 No 0CP18-1 5 4 18 230 No 1CP19-1 5 4 18 230 No 1CP20 5 4 18 230 Yes N/ACP21 5 4 18 230 No N/A

CP22-1 5 4 18 230 No N/ACP23 5 4 18 230 Yes N/A

CP24-1 5 4 18 230 No N/ACP25-2 5 4 18 230 No 9CP26 5 4 18 230 No 8CP27 5 4 18 230 Yes N/A

CP28-1 5 4 18 230 Yes N/ACP29-1 5 4 18 230 No 3CP31-2 5 5 18 230 No 3CP32-2 5 5 18 230 Yes N/ACP33-2 5 5 17 230 Yes N/ACP33A 5 5 17 230 Yes N/ACP34-2 5 5 17 230 Yes N/ACP35-2 5 5 17 230 Yes N/ACP36-1 5 5 17 230 Yes N/ACP37-2 5 5 17 230 Yes N/ACP39 5 5 17 230 Yes N/A

CP40-2 5 5 17 230 No 0CP41-2 5 5 17 230 No 4CP42-1 5 5 17 230 Yes N/ACP43-1 5 5 17 230 Yes N/ACP44-1 5 5 17 230 Yes N/ACP45-1 5 5 17 230 Yes N/ACP46-2 5 5 17 230 Yes N/ACP47-2 5 5 17 230 Yes N/A

CP47A-1 5 5 17 230 Yes N/ACP48-2 5 5 17 230 Yes N/ACP49-1 5 5 17 230 Yes N/ACP50-1 5 5 17 230 Yes N/ACP51-2 5 5 17 230 Yes N/ACP52 5 5 17 230 Yes N/A

CP53-1 5 5 17 230 Yes N/A

TABLES - Well and Spring Survey REV 6-25-10.xlsx Page 1 of 9

TABLE 1Summary of Tower Assessments

Spring and Well SurveySunrise Powerlink

Structure Designation1 Link Section Segment Voltage

(kilovolts)Potential Helicopter

Only Sites2Number of

Wells and Springs3

CP54-1 5 5 17 230 Yes N/ACP55 5 5 17 230 Yes N/A

CP56-1 5 5 17 230 Yes N/ACP57 5 5 17 230 Yes N/A

CP58-1 5 5 17 230 Yes N/ACP59 5 5 17 230 Yes N/ACP60 5 5 17 230 Yes N/A

CP61-1 5 5 17 230 Yes N/ACP62-2 5 5 17 230 Yes N/ACP62A 5 5 17 230 Yes N/ACP63-3 5 5 17 230 Yes N/ACP64-2 5 5 17 230 Yes N/ACP65-1 5 5 17 230 Yes N/ACP66-2 5 5 16 230 Yes N/ACP67-3 5 5 16 230 Yes N/ACP68-1 5 5 16 230 Yes N/ACP69-2 5 5 16 230 No 4CP70-3 5 5 16 230 No N/ACP71 5 5 16 230 Yes N/A

CP72-2 5 5 16 230 Yes N/ACP73-2 5 5 16 230 Yes N/ACP74-2 5 5 16 230 Yes N/ACP75-1 5 5 16 230 Yes N/ACP76-1 5 5 16 230 Yes N/ACP77 5 5 16 230 Yes N/A

CP78-2 5 5 16 230 Yes N/ACP79-1 5 5 16 230 Yes N/ACP80-1 5 5 16 230 Yes N/ACP81-1 5 5 16 230 Yes N/ACP82-1 5 5 16 230 Yes N/ACP83 5 5 16 230 Yes N/ACP84 5 5 16 230 Yes N/A

CP85-1 5 5 16 230 Yes N/ACP86 5 5 16 230 Yes N/A

CP87-1 5 5 16 230 No N/ACP88-1 5 5 16 230 No N/ACP95-1 5 7 16 230 No N/ACP96-1 5 7 16 230 No N/ACP98-1 5 7 14 230 No N/ACP99-2 5 7 14 230 No 16

CP100-1 5 7 14 230 No 11CP101-1 5 7 14 230 Yes N/ACP103-2 5 7 14 230 Yes N/ACP104-1 5 7 14 230 Yes N/ACP105-1 5 7 14 230 Yes N/ACP106-1 5 7 14 230 Yes N/ACP107 5 7 14 230 Yes N/ACP108 5 7 14 230 Yes N/A

CP109-1 5 7 14 230 Yes N/ASSDE2 5 7 14 230 No N/ASSDE3 5 7 14 230 No N/A

TABLES - Well and Spring Survey REV 6-25-10.xlsx Page 2 of 9

TABLE 1Summary of Tower Assessments

Spring and Well SurveySunrise Powerlink

Structure Designation1 Link Section Segment Voltage

(kilovolts)Potential Helicopter

Only Sites2Number of

Wells and Springs3

SSDE4 2 8A 14 500 No N/AEP1-3 2 8A 12 500 No 6EP2-3 2 8A 12 500 Yes N/AEP3-3 2 8A 12 500 Yes N/AEP4-3 2 8A 12 500 Yes N/AEP5-2 2 8A 12 500 Yes N/AEP6-1 2 8A 12 500 Yes N/AEP7-1 2 8A 12 500 Yes N/AEP8-2 2 8A 12 500 Yes N/AEP9-1 2 8A 12 500 No N/A

EP10-2 2 8A 12 500 Yes N/AEP11-3 2 8A 12 500 No 7EP12-3 2 8A 12 500 No 7EP13-3 2 8A 12 500 Yes N/AEP14-1 2 8A 12 500 Yes N/AEP15 2 8A 12 500 Yes N/A

EP16-1 2 8A 12 500 Yes N/AEP17 2 8A 12 500 Yes N/AEP18 2 8A 12 500 Yes N/A

EP19-1 2 8A 12 500 Yes N/AEP20-2 2 8A 12 500 Yes N/AEP21-1 2 8A 12 500 Yes N/AEP22-1 2 8A 12 500 Yes N/AEP23-2 2 8A 12 500 Yes N/AEP24-1 2 8A 12 500 No N/AEP25-2 2 8A 12 500 Yes N/AEP26-1 2 8A 12 500 No N/AEP27-1 2 8A 12 500 No N/AEP28-3 2 8A 12 500 Yes N/AEP29-2 2 8A 12 500 Yes N/AEP30-2 2 8A 12 500 No N/AEP31-1 2 8A 12 500 Yes N/AEP32-1 2 8A 12 500 No N/AEP33-1 2 8A 12 500 Yes N/AEP34-1 2 8A 12 500 Yes N/AEP35-1 2 8A 12 500 Yes N/AEP36-1 2 8A 12 500 No 10EP37-2 2 8A 12 500 Yes N/AEP39-1 2 8A 12 500 No 6EP40-1 2 8A 11 500 Yes N/AEP41 2 8A 11 500 Yes N/AEP42 2 8A 11 500 No N/A

EP43-1 2 8B 11 500 Yes N/AEP44 2 8B 11 500 Yes N/A

EP45-1 2 8B 11 500 Yes N/AEP47-2 2 8C 11 500 Yes N/AEP48 2 8C 10 500 Yes N/AEP49 2 8C 10 500 No 1EP50 2 8C 10 500 Yes N/A

TABLES - Well and Spring Survey REV 6-25-10.xlsx Page 3 of 9

TABLE 1Summary of Tower Assessments

Spring and Well SurveySunrise Powerlink

Structure Designation1 Link Section Segment Voltage

(kilovolts)Potential Helicopter

Only Sites2Number of

Wells and Springs3

EP51-1 2 8C 10 500 No 1EP52-1 2 8C 10 500 No 2EP53-2 2 8C 10 500 Yes N/AEP54 2 8C 10 500 No 5

EP56-3 2 8C 10 500 Yes N/AEP57-1 2 8C 10 500 Yes N/AEP58-2 2 8C 10 500 Yes N/A

EP62A-1 2 8C 10 500 Yes N/AEP63 2 8C 10 500 Yes N/AEP64 2 8C 10 500 Yes N/A

EP65-1 2 8C 10 500 No 0EP66 2 8C 10 500 No 1EP67 2 8C 10 500 No 1EP68 2 8D 9 500 No 1EP69 2 8D 9 500 Yes N/AEP70 2 8D 9 500 Yes N/AEP71 2 8D 9 500 Yes N/AEP72 2 8D 9 500 Yes N/AEP73 2 8D 9 500 Yes N/A

EP74-1 2 8D 9 500 Yes N/AEP75-2 2 8D 9 500 Yes N/AEP76-2 2 8D 9 500 Yes N/AEP77 2 8D 9 500 Yes N/AEP78 2 8D 9 500 Yes N/A

EP78A 2 8D 9 500 Yes N/AEP79 2 8D 9 500 Yes N/AEP80 2 8D 8 500 Yes N/AEP81 2 8D 8 500 Yes N/AEP82 2 8D 8 500 Yes N/AEP83 2 8D 8 500 Yes N/AEP84 2 8D 8 500 No N/A

EP85-2 2 8D 8 500 No N/AEP86-1 2 8D 8 500 Yes N/AEP87-1 2 8D 8 500 Yes N/AEP88-2 2 8D 8 500 Yes N/AEP89-1 2 8D 8 500 No 35EP90-1 2 8E 8 500 No N/AEP91 2 8E 8 500 No 30EP92 2 8E 8 500 No 25EP93 2 8E 8 500 No 23EP94 2 8E 8 500 No N/AEP95 2 8E 8 500 No N/AEP96 2 8E 8 500 No 5EP97 2 8E 8 500 No N/A

EP98-1 2 8E 8 500 No N/AEP99-2 2 8E 8 500 No N/A

EP101-2 2 8E 7 500 Yes N/AEP102-3 2 8E 7 500 Yes N/A

EP102A-1 2 8E 7 500 Yes N/A

TABLES - Well and Spring Survey REV 6-25-10.xlsx Page 4 of 9

TABLE 1Summary of Tower Assessments

Spring and Well SurveySunrise Powerlink

Structure Designation1 Link Section Segment Voltage

(kilovolts)Potential Helicopter

Only Sites2Number of

Wells and Springs3

EP103-2 2 8E 7 500 Yes N/AEP103A 2 8E 7 500 No 5EP104-2 2 8E 7 500 No 5EP105-2 2 8E 7 500 No 3EP106-3 2 8E 7 500 Yes N/AEP107-3 2 8E 7 500 Yes N/AEP108-2 2 8E 7 500 Yes N/AEP109-1 2 8E 7 500 Yes N/AEP110-2 2 8E 7 500 Yes N/AEP111-4 2 8E 7 500 Yes N/AEP112-3 2 8E 7 500 No N/AEP112A 2 8E 7 500 No N/AEP113-4 2 8E 7 500 No 0EP114-2 2 8E 7 500 Yes N/AEP115-1 2 8E 7 500 Yes N/AEP116-1 2 8E 7 500 Yes N/AEP117-2 2 8E 7 500 Yes N/AEP118-2 2 8E 7 500 Yes N/AEP119-2 2 8E 7 500 Yes N/AEP120-4 2 9A 7 500 Yes N/AEP120A 2 9A 7 500 Yes N/AEP121-3 2 9A 7 500 Yes N/A

EP121A-1 2 9A 7 500 Yes N/AEP122-1 2 9A 7 500 Yes N/AEP123-1 2 9A 7 500 Yes N/AEP124 2 9A 7 500 Yes N/AEP125 2 9A 7 500 No N/A

EP126-1 2 9A 7 500 No N/AEP127 2 9A 7 500 No N/AEP128 2 9A 7 500 Yes N/AEP129 2 9A 7 500 Yes N/A

EP130-1 2 9A 7 500 No N/AEP131 2 9A 7 500 No 0

EP132-2 2 9A 7 500 Yes N/AEP134-1 2 9A 7 500 Yes N/AEP135 2 9A 7 500 Yes N/AEP136 2 9A 7 500 Yes N/AEP137 2 9A 7 500 Yes N/A

EP138-2 2 9A 7 500 Yes N/AEP139-1 2 9A 7 500 Yes N/AEP140 1 9A 7 500 Yes 0EP141 1 9B 7 500 No N/A

EP142-1 1 9B 6 500 Yes N/AEP143-1 1 9B 6 500 Yes N/AEP144 1 9B 6 500 Yes N/AEP145 1 9B 6 500 Yes N/AEP146 1 9B 6 500 Yes N/AEP147 1 9B 6 500 Yes N/A

EP148-1 1 9B 6 500 Yes N/AEP149-1 1 9B 6 500 Yes N/AEP150 1 9B 6 500 Yes N/A

TABLES - Well and Spring Survey REV 6-25-10.xlsx Page 5 of 9

TABLE 1Summary of Tower Assessments

Spring and Well SurveySunrise Powerlink

Structure Designation1 Link Section Segment Voltage

(kilovolts)Potential Helicopter

Only Sites2Number of

Wells and Springs3

EP151 1 9B 6 500 Yes N/AEP152-2 1 9B 6 500 Yes N/AEP170 1 9B 6 500 No 1EP171 1 9B 6 500 No N/AEP172 1 9B 6 500 No N/A

EP173-1 1 9B 6 500 No N/AEP174 1 9B 6 500 No N/AEP175 1 9B 6 500 No N/AEP176 1 9B 6 500 No N/AEP177 1 9B 6 500 No N/AEP178 1 9B 6 500 No N/AEP179 1 9B 6 500 No N/AEP180 1 9B 6 500 No N/AEP181 1 9B 6 500 No N/AEP182 1 9B 6 500 No 1EP183 1 9B 6 500 Yes N/A

EP184-1 1 9B 6 500 No 1EP185-1 1 9B 6 500 No 0EP186-1 1 9B 6 500 No 0EP187-2 1 9B 6 500 No 0EP188-1 1 9B 6 500 Yes N/AEP189-3 1 9B 6 500 Yes N/AEP190-2 1 9B 6 500 No 0EP191-1 1 9B 6 500 No 0EP192-1 1 9B 6 500 No 0EP193-1 1 9B 6 500 No 0EP194-2 1 9B 6 500 Yes N/AEP195-1 1 9B 6 500 Yes N/AEP196-1 1 9B 6 500 No 1EP197-2 1 9B 6 500 No 1EP198-3 1 9B 6 500 No 1EP199-3 1 9B 6 500 No 1EP200-3 1 9B 6 500 No 2

EP200A-1 1 9B 6 500 No N/AEP201-3 1 9B 6 500 No 2EP202-3 1 9B 6 500 No N/AEP203-3 1 9B 6 500 No N/AEP204-3 1 9B 6 500 No 4EP205-2 1 9B 6 500 No 4EP206-1 1 9B 6 500 No N/AEP207 1 9B 5 500 No 3EP208 1 9B 5 500 No 3

EP209-1 1 9B 5 500 No 4EP210 1 9B 5 500 No 3EP211 1 9B 5 500 No 2EP213 1 9B 5 500 No 1EP214 1 9B 5 500 No 3EP215 1 9B 5 500 No 7

EP217-1 1 9C 5 500 No 8EP218-1 1 9C 5 500 No 4EP219-1 1 9C 5 500 No 3

TABLES - Well and Spring Survey REV 6-25-10.xlsx Page 6 of 9

TABLE 1Summary of Tower Assessments

Spring and Well SurveySunrise Powerlink

Structure Designation1 Link Section Segment Voltage

(kilovolts)Potential Helicopter

Only Sites2Number of

Wells and Springs3

EP220-1 1 9C 5 500 No 10EP221-2 1 9C 5 500 Yes N/AEP221A 1 9C 5 500 Yes N/AEP223-1 1 9C 5 500 Yes N/AEP224-1 1 9C 5 500 Yes N/AEP225-1 1 9C 5 500 Yes N/AEP226-1 1 9C 5 500 Yes N/AEP227 1 9C 5 500 Yes N/AEP228 1 9C 5 500 Yes N/A

EP229-1 1 9C 5 500 Yes N/AEP230-1 1 9C 5 500 Yes N/AEP231-1 1 9C 5 500 Yes N/AEP231A 1 9C 5 500 Yes N/AEP232-1 1 9C 5 500 Yes N/AEP233-1 1 9C 5 500 Yes N/AEP234-1 1 9C 5 500 Yes N/AEP235-1 1 9C 5 500 Yes N/AEP236-1 1 9C 5 500 Yes N/AEP237-1 1 9C 5 500 Yes N/AEP238-1 1 9C 5 500 Yes N/AEP239-1 1 9C 5 500 No N/AEP240 1 9C 5 500 No N/AEP242 1 9C 5 500 No N/AEP243 1 9C 5 500 No N/AEP244 1 9C 5 500 No N/A

EP245-1 1 9C 5 500 No 0EP246 1 9C 5 500 No 0EP247 1 9C 5 500 No 0EP248 1 9C 5 500 No 0EP249 1 9C 5 500 No 0EP250 1 9C 5 500 No N/AEP251 1 9C 5 500 No N/A

EP252-1 1 9C 5 500 No N/AEP252A-1 1 9C 4 500 Yes N/AEP253-2 1 9C 4 500 Yes N/AEP254-3 1 9C 4 500 Yes N/AEP255-2 1 9C 4 500 No 0EP256 1 9C 4 500 No 0EP257 1 9C 4 500 No 0

EP258-3 1 9C 4 500 No N/AEP259-3 1 9C 4 500 Yes N/AEP259B 1 9C 4 500 Yes N/AEP261-2 1 9C 4 500 Yes N/AEP261A 1 9C 4 500 Yes N/AEP262-4 1 9C 4 500 Yes N/A

EP263A-2 1 9C 4 500 Yes N/AEP263B-2 1 9C 4 500 Yes N/AEP264-4 1 9C 4 500 Yes N/AEP265-2 1 9C 4 500 Yes N/AEP266-2 1 9C 4 500 Yes N/AEP267-2 1 9C 4 500 Yes N/A

TABLES - Well and Spring Survey REV 6-25-10.xlsx Page 7 of 9

TABLE 1Summary of Tower Assessments

Spring and Well SurveySunrise Powerlink

Structure Designation1 Link Section Segment Voltage

(kilovolts)Potential Helicopter

Only Sites2Number of

Wells and Springs3

EP269-1 1 9C 4 500 Yes N/AEP270-2 1 10A 4 500 Yes N/AEP271-2 1 10A 4 500 Yes N/AEP272-3 1 10A 4 500 Yes N/AEP273-1 1 10A 4 500 Yes N/AEP274-1 1 10A 4 500 Yes N/AEP275-1 1 10A 4 500 Yes N/AEP276-1 1 10A 4 500 Yes N/AEP277-1 1 10A 3 500 Yes N/AEP278-1 1 10A 3 500 Yes N/AEP279-1 1 10A 3 500 Yes N/AEP280-1 1 10A 3 500 Yes N/AEP281 1 10A 3 500 Yes N/AEP290 1 10B 3 500 No N/A

EP291-1 1 10B 3 500 No N/AEP292-1 1 10B 3 500 No N/AEP293 1 10B 3 500 No N/AEP294 1 10B 3 500 No N/AEP295 1 10B 3 500 No N/AEP296 1 10B 3 500 No N/AEP297 1 10B 3 500 No N/AEP298 1 10B 3 500 No N/AEP299 1 10B 3 500 No N/A

EP300-1 1 10B 3 500 No N/AEP301 1 10B 3 500 No N/A

EP302-1 1 10B 2 500 No N/AEP303-2 1 10B 2 500 No N/AEP304-2 1 10B 2 500 No 1EP305-3 1 10B 2 500 Yes N/AEP306-1 1 10B 2 500 No N/AEP307-1 1 10B 2 500 No N/AEP308 1 10B 2 500 No N/AEP309 1 10B 2 500 No N/AEP310 1 10B 2 500 Yes N/A

EP311-1 1 10B 2 500 Yes N/AEP312 1 10B 2 500 Yes N/AEP313 1 10B 2 500 No N/AEP314 1 10B 2 500 Yes N/A

EP315-1 1 10B 2 500 Yes N/AEP316-2 1 10B 2 500 No N/AEP317 1 10B 2 500 Yes N/A

EP318-1 1 10B 2 500 No N/AEP319 1 10B 2 500 No N/A

EP320-1 1 10B 2 500 No N/AEP321-1 1 10B 2 500 No N/AEP322-1 1 10B 2 500 No N/AEP323-1 1 10B 2 500 Yes N/AEP324 1 10B 2 500 Yes N/A

EP325-2 1 10B 2 500 No N/AEP326 1 10B 2 500 No N/AEP327 1 10B 2 500 No N/A

TABLES - Well and Spring Survey REV 6-25-10.xlsx Page 8 of 9

TABLE 1Summary of Tower Assessments

Spring and Well SurveySunrise Powerlink

Structure Designation1 Link Section Segment Voltage

(kilovolts)Potential Helicopter

Only Sites2Number of

Wells and Springs3

EP328-1 1 10B 2 500 No N/AEP329-1 1 10B 2 500 No N/AEP330-1 1 10B 2 500 No N/AEP331 1 10B 2 500 No N/AEP332 1 10B 2 500 No N/AEP333 1 10B 2 500 No N/AEP334 1 10B 2 500 No N/AEP335 1 10B 2 500 No N/AEP336 1 10B 2 500 No N/AEP337 1 10B 2 500 No N/AEP338 1 10B 2 500 No N/AEP339 1 10B 2 500 No N/AEP340 1 10B 2 500 No N/AEP341 1 10B 2 500 No N/AEP342 1 10B 2 500 No N/AEP343 1 10B 2 500 No N/AEP344 1 10B 2 500 No N/AEP345 1 10B 2 500 No N/AEP346 1 10B 2 500 No N/AEP347 1 10B 2 500 No N/AEP348 1 10B 2 500 No N/AEP349 1 10B 2 500 No N/AEP350 1 10B 2 500 No N/AEP351 1 10B 2 500 No N/AEP352 1 10B 2 500 No N/AEP353 1 10B 2 500 No N/AEP354 1 10B 2 500 No N/AEP355 1 10B 2 500 No N/AEP356 1 10B 2 500 No N/AEP357 1 10B 2 500 No N/AEP358 1 10B 2 500 No N/AEP359 1 10B 2 500 No N/AEP360 1 10B 2 500 No N/AEP361 1 10B 2 500 No N/A

EP362-1 1 10B 2 500 No N/AEP363-1 1 10B 2 500 No N/ASSDE5 1 10B 2 500 No N/A

Notes:1 - Structural tower designation as of May 20102 - List of helicopter only construction sites (provided by SDG&E, dated 5/1/10)3 - Number of wells and springs within 1/2 mile of designated tower location identified as potentially requiring blasting based on surficial geology and/or subsurface conditions

TABLES - Well and Spring Survey REV 6-25-10.xlsx Page 9 of 9

TABLE 2Summary of Grading Area Assessments

Spring and Well SurveySunrise Powerlink

Designated Grading Area1 Approximate Location of Designated Grading Area

Number of Wells and Springs2

CP6-1 Pad CP6-1 N/ACP7 Pad and Road CP7 N/ACP8-2 Pad CP8-2 N/ACP10 Pad and Road CP10 N/ACP11-1 Pad and Road CP11-1 N/ACP12-1 Pad and Road CP12-1 N/APull Site Pad and Road South of CP14 and CP15 N/APull Site Pad and Road North of CP23 N/ACP24-1 Pad CP24 N/APull Site Pad East of CP31-2 N/APull Site Pad and Road Southeast of CP40-2 N/APull Site Pad and Road West-southwest to CP49-1, CP50-1, CP51-2 62Pull Site Pad and Road East -southeast of CP55 32Pull Site Pad and Road South and east of CP64-2 N/ACP87-1 and CP88-1 Pad CP87-1 and CP88-1 N/APull Site Pad and Road Southwest of CP87-1 and CP88-1 N/AAccess Road Improvements Bauer Property off Peutz Valley Road N/APull Site Pad and Road North of CP95-1 and CP96-1 N/ACP95-1 and CP96-1 Access Road CP95-1 and CP96-1 N/ACP98-1 Pad and Road CP98-1 N/APull Site Pad East of CP109-1 N/APull Site Pad West of EP9-1 N/APull Site Pad and Road North and east of EP22-1 N/APull Site Pad and Road South and north of EP23-2 N/APull Site Pad South of EP36-1 14Pull Site Pad and Road North of EP-42 and west of EP40-1 and EP41 19EP-42 Pad EP42 N/APull Site Pad and Road East of 47-2 0Existing Road Improvement East of EP50 1EP52-1 Pad and Road EP52-1 5Pull Site Pad Southwest of EP67 N/APull Site Pad East of EP67 N/APull Site Pad East of EP78 N/APull Site Pad West of EP78A N/APull Site Pad and Road East of EP83 N/APull Site Pad and Road East of EP89-1 N/APull Site Pad South of EP89-1 N/APull Site Pad and Road Southwest of EP91 70Pull Site Pad and Road East of EP91 74EP98-1 Road Northeast of EP98-1 N/AEP99-2 Pad and Road EP99-2 N/APull Site Pad and Road Northeast of EP99-2 N/AEP105-2 EP105-2 N/APull Site Road West of EP106-3 N/APull Site Pad and Road West and southwest of EP108-2 and east of EP107-3 N/APull Site Pad and Road North and northeast of EP108-2 2Pull Site Pad and Road South of EP113-4 13Pull Site Pad East of EP113-4 13Pull Site Pad and Road Southwest of EP125 N/AEP125 Pad and Road EP125 N/AEP126-1 Pad and Road EP126-1 N/APull Site Pad and Road Southwest of EP131 N/A

TABLES ‐ Well and Spring Survey REV 6‐25‐10.xlsx Page 1 of 2

TABLE 2Summary of Grading Area Assessments

Spring and Well SurveySunrise Powerlink

Designated Grading Area1 Approximate Location of Designated Grading Area

Number of Wells and Springs2

Existing Road Improvement North of EP137 along Thing Valley Road N/APull Site Pad and Road West of EP141 N/AEP141 Pad and Road EP141 N/APull Site Pad and Road North of EP141 N/APull Site Pad West-northwest of EP170 5Pull Site Pad East of EP170 N/AEP176 Pad and Road EP176 N/APull Site Pad and Road Northwest of EP178 N/AEP185-1 Pad and Road EP185-1 0Pullsite Pad and Road Southeast of EP187-2 N/AEP192-1 Pad and Road EP 192-1 N/APull Site Pad South-southeast of EP192-1 N/APull Site Pad and Road South of EP193-1 0Pull Site Pad and Road South of EP203-3 N/APull Site Pad and Road North of EP204-3 N/AEP214 Pad and Road EP214 N/APull Site Pad and Road North of EP215 N/APull Site Pad and Road West of EP215 N/APull Site Pad and Road West of EP219-1 19Pull Site Pad and Road Northwest of EP219-1 20Pull Site Pad North-northwest of EP220-1 N/APull Site Pad and Road West of EP221-2 N/APull Site Pad Southeast of EP225-2 N/AEP246 Pad and Road EP246 and east of EP246 0Pull Site Pad and Road Southwest of 255-2 N/APull Site Pad and Road East of EP255-2 N/APull Site Pad and Road North-northeast of EP269-1 0Pull Site Pad and Road West of EP301 N/APull Site Pad and Road North-northeast of EP301 N/APull Site Pad East of EP313 N/APull Site Pad East of EP322-1 N/APull Site Pad and Road Southeast of EP338 N/APull Site Pad and Road Southeast of EP343 N/A

Notes:1 - Proposed grading area designation as of May 2010 with planned cuts greater than five feet2 - Number of wells and springs within 1/2 mile of designated grading areas identified as potentially requiring blasting based on surficial geology and/or subsurface conditions

TABLES ‐ Well and Spring Survey REV 6‐25‐10.xlsx Page 2 of 2

FIGURES

10 0 105 Miles

Figure

1San Diego June 2010

Site Location

Milepost 117.2

Environmentally Superior Southern RouteSunrise Powerlink

Milepost 0

RouteSurveyed Tower 0.5 Mile Buffer

MP-9

MP-8

MP-7

MP-6

MP-5

MP-4

MP-3

MP-2

MP-1

MP-0

MP-17MP-16

MP-15MP-14

MP-13 MP-12

MP-11

MP-10EP309

EP314 EP331EP332

EP333EP334

EP335

EP336EP337

EP338

EP339EP340

EP341EP342

EP343EP344

EP345EP346

EP347EP348

EP349EP350

EP351

EP352EP353

EP354

EP355EP356

EP357

EP358EP359

EP360

EP361

SSDE5

EP311-1

EP318-1

EP325-2

EP363-1EP362-1

EP330-1

EP329-1EP328-1

EP323-1EP322-1

EP321-1

EP320-1

EP316-2

EP315-1 EP327EP326EP324EP319EP317EP313

EP312EP310

EP308

80

8

98

JacumbaWilderness Area

Coyote MountainsWilderness Area

Spring and Well SurveyMile Post 0 Through 17

Environmentally Superior Southern RouteSunrise Powerlink

Figure

2

S:\G

IS\S

C05

25\W

ella

ndSp

ring

Surv

ey\

June

2010

\Sp

ring

_We

lls_0

17fJ

une

2010

.mxd

San Diego June 2010

1 0 10.5 Miles

Ocotillo-Coyote Wells

Legend

Interstate

Major Road

Southern Route

SpringWellMilepostTower (Not Surveyed)Tower (Surveyed)Tower Surveyed 0.5 Mile BufferSole Source Aquifer

Environmentally Superior

National Forest

Wilderness Area

BLM

State Land Dept

USFS

Homeland Security

Military

Federal

Indian Reservation

Agency Jurisdiction

MP-19

P3

P272 3

EP281

EP290

EP293

EP294

EP295

EP296

EP297

EP298

EP299

EP301

EP308EP310

EP273-1

EP274-1

EP275-1

EP276-1

EP277-1

EP278-1

EP279-1

EP280-1

EP291-1

EP292-1

EP300-1

EP302-1EP304-2

EP305-3

EP307-1

EP311-1

EP306-1

EP303-2

EP309

MP-25

MP-18

MP-17

2

80

8

8

98

JacumbaWilderness Area

Coyote MountainsWilderness Area

Anza-BorregoDesert State

Park

Spring and Well SurveyMile Post 17 Through 25

Environmentally Superior Southern RouteSunrise Powerlink

Figure

3

S:\G

IS\S

C05

25\S

prin

g_W

ells

_172

5.m

xd

San Diego June 2010

0.5 0 0.50.25 Miles

Legend

Interstate

Major Road

Southern Route

SpringWellMilepostTower (Not Surveyed)Tower (Surveyed)Tower Surveyed 0.5 Mile BufferSole Source Aquifer

Environmentally Superior

National Forest

Wilderness Area

BLM

State Land Dept

USFS

Homeland Security

Military

Federal

Indian Reservation

Agency Jurisdiction

Ocotillo-Coyote Wells

P278 2

MP-43

MP-42

MP-41

MP-40

MP-37MP-36

MP-34 MP-32

MP-28

MP-26

MP-25

MP-39

MP-38

MP-35 MP-33 MP-31 MP-30

MP-29

EP207

EP208

EP210EP211

EP213

EP215

EP228

EP243EP251

EP257

EP221A

EP259B

EP261A

EP202-3EP203-3

EP204-3

EP206-1

EP218-1

EP220-1

EP223-1

EP224-1

EP226-1

EP230-1

EP233-1

EP235-1EP255-2

EP258-3EP259-3

EP262-4

EP264-4EP265-2

EP266-2EP267-2

EP269-1

EP270-2

EP272-3

EP273-1

EP275-1

EP276-1

EP263A-2

EP263B-2

EP252A-1

EP277-1

EP274-1

EP271-2

EP261-2

EP254-3EP253-2

EP252-1

EP245-1EP239-1EP238-1

EP237-1

EP236-1

EP234-1EP232-1

EP231-1

EP229-1

EP225-1

EP221-2

EP219-1

EP217-1

EP209-1

EP205-2

EP231AEP256

EP250

EP249EP248

EP247EP246

EP244EP242EP240

EP227

EP214

8

8

8

94

JacumbaWilderness Area

Carrizo GorgeWilderness Area

CampoReservation

Anza-BorregoDesert State

Park

Spring and Well SurveyMile Post 25 Through 42

Environmentally Superior Southern RouteSunrise Powerlink

Figure

4San Diego June 2010

0.5 0 0.50.25 Miles

S:\G

IS\S

C05

25\S

prin

g_W

ells

_172

5.m

xd

Ocotillo-Coyote Wells

Legend

Interstate

Major Road

Southern Route

SpringWellMilepostTower (Not Surveyed)Tower (Surveyed)Tower Surveyed 0.5 Mile BufferGrading Area Surveyed

Sole Source AquiferEnvironmentally Superior

National Forest

Wilderness Area

BLM

State Land Dept

USFS

Homeland Security

Military

Federal

Indian Reservation

Agency Jurisdiction

P97

P96

P95

P94

P93P92

P91

P84

P83

P99-2

P98-1

P90-1

P89-1

P87-1

P223-1

P101-2

P88-2

P86-1P85-2MP-64

MP-63

MP-61

MP-59

MP-58

MP-57

MP-56

MP-55

MP-54

MP-53

MP-49

MP-48

MP-47

MP-46

MP-45

MP-44

MP-43

MP-42

MP-41

MP-40

MP-66

MP-65

MP-62

MP-52 MP-51 MP-50

MP-39

MP-38

EP124EP125

EP128

EP129

EP131

EP135EP136

EP137

EP140EP141

EP174EP175

EP177

EP179

EP181

EP183

EP207

EP208

EP210EP211

EP213

EP215

EP120A

EP221A

EP104-2

EP105-2EP106-3

EP107-3

EP109-1

EP111-4EP115-1

EP116-1

EP118-2EP119-2

EP120-4

EP126-1

EP132-2EP134-1

EP186-1EP187-2

EP189-3

EP190-2

EP191-1

EP193-1

EP194-2EP195-1

EP197-2

EP199-3

EP200-3

EP202-3

EP203-3

EP204-3

EP206-1

EP218-1

EP220-1

EP223-1

EP200A-1

EP121A-1

EP102A-1

EP221-2

EP219-1EP217-1

EP209-1

EP205-2

EP201-3

EP198-3

EP196-1

EP192-1

EP188-1

EP185-1

EP184-1

EP173-1

EP152-2

EP149-1

EP148-1

EP143-1

EP142-1

EP139-1

EP138-2

EP130-1

EP123-1EP122-1

EP121-3

EP117-2

EP114-2EP113-4

EP112-3

EP110-2

EP108-2

EP103-2

EP101-2

EP112A

EP103A

EP99-2

EP98-1

EP90-1EP89-1EP88-2

EP87-1EP86-1EP85-2

EP214

EP182

EP180

EP178

EP176

EP172

EP171EP170

EP151EP150

EP147EP146

EP145EP144

EP127

EP97

EP96EP95

EP94

EP93EP92

EP91

EP8483

1

1

8

94

Carrizo GorgeWilderness Area

CampoReservation

ManzanitaReservation

La PostaReservation

ClevelandNational Forest

ClevelandNational Forest

Spring and Well SurveyMile Post 42 Through 62

Environmentally Superior Southern RouteSunrise Powerlink

Figure

5San Diego June 2010

0.5 0 0.50.25 Miles

Campo-Cottonwood

Legend

Interstate

Major Road

Southern Route

SpringWellMilepostTower (Not Surveyed)Tower (Surveyed)Tower Surveyed 0.5 Mile BufferGrading Area Surveyed

Sole Source AquiferEnvironmentally Superior

National Forest

Wilderness Area

BLM

State Land Dept

USFS

Homeland Security

Military

Federal

Indian Reservation

Agency Jurisdiction

EP30-2

EP97

EP96EP95

EP94

EP93EP92

EP91

EP84

EP83EP82EP81EP80

EP79EP78EP77EP73

EP72

EP71

EP70

EP69

EP68

EP67EP66EP64

EP63

EP54EP50EP49EP48EP44

EP42

EP78A

EP103A

EP99-2

EP98-1

EP90-1EP89-1

EP87-1EP76-2

EP75-2EP74-1

EP65-1

EP58-2

EP57-1EP56-3

EP53-2EP52-1

EP51-1

EP47-2EP45-1EP43-1

EP40-1EP39-1

EP37-2

EP36-1

EP35-1

EP34-1

EP33-1

EP32-1

EP31-1

EP107-3

EP106-3

EP105-2

EP104-2

EP103-2

EP102-3EP101-2

EP102A-1

EP41

EP88-2

EP86-1EP85-2

EP62A-1

MP-64

MP-63

MP-61

MP-66

MP-65

MP-62MP-80

MP-79

MP-78

MP-77 MP-74MP-73

MP-71MP-69

MP-76 MP-75

MP-72MP-70 MP-68

MP-67

MP-64

MP-63

1

94

94

94

HauserWilderness Area

CampoReservation

ClevelandNational Forest

ClevelandNational Forest

Spring and Well SurveyMile Post 62 Through 80

Environmentally Superior Southern RouteSunrise Powerlink

Figure

6San Diego June 2010

0.5 0 0.50.25 Miles

S:\G

IS\S

C05

25\S

prin

g_W

ells

_628

0.m

xd

Campo-Cottonwood

Legend

Interstate

Major Road

Southern Route

SpringWellMilepostTower (Not Surveyed)Tower (Surveyed)Tower Surveyed 0.5 Mile BufferGrading Area Surveyed

Sole Source AquiferEnvironmentally Superior

National Forest

Wilderness Area

BLM

State Land Dept

USFS

Homeland Security

Military

Federal

Indian Reservation

Agency Jurisdiction

CP103-2

MP 94MP-92

MP-91

MP-89

MP-88

MP-87

MP-85

MP-84

MP-83

MP-82

MP-81

MP-80

MP-90

MP-86

EP15

EP17EP18

CP107

EP1-3EP2-3

EP3-3

EP4-3

EP5-2

EP7-1

CP98-1

CP99-2

EP10-2EP11-3

EP14-1

EP19-1

EP22-1EP23-2

EP24-1

EP25-2EP26-1

EP27-1

EP29-2

EP30-2

EP31-1

EP33-1EP34-1EP35-1

CP100-1

CP104-1

CP109-1CP106-1CP105-1

CP101-1

EP32-1

EP28-3

EP21-1EP20-2

EP16-1

EP13-3

EP12-3

CP95-1CP96-1

EP9-1EP8-2

EP6-1

SSDE4SSDE3 SSDE2

CP108

8

8

94

79

Pine CreekWilderness Area

HauserWilderness Area

SycuanReservation

ClevelandNational Forest

Spring and Well SurveyMile Post 80 Through 92

Environmentally Superior Southern RouteSunrise Powerlink

Figure

7San Diego June 2010

0.5 0 0.50.25 Miles

S:\G

IS\S

C05

25\S

prin

g_W

ells

_809

2.m

xd

Legend

Interstate

Major Road

Southern Route

SpringWellMilepostTower (Not Surveyed)Tower (Surveyed)Tower Surveyed 0.5 Mile BufferSole Source Aquifer

Environmentally Superior

National Forest

Wilderness Area

BLM

State Land Dept

USFS

Homeland Security

Military

Federal

Indian Reservation

Agency Jurisdiction

Campo-Cottonwood

P99-2

P1

P104-1

P101-1

P105-1

P103-2

P100-1

MP-99

MP-98

MP-97MP-96

MP-95 MP-94 MP-93MP-92

MP-91

MP-111

MP-110

MP-109

MP-108

MP-107 MP-106

MP-105

MP-104MP-102

MP-101

MP-100

MP-103

CP39

CP52

CP55

CP57CP59

CP60

CP71

CP77

CP83CP84

CP86

CP62A

CP96-1

CP36-1

CP37-2

CP40-2CP41-2

CP42-1

CP43-1

CP44-1

CP45-1CP46-2

CP47-2

CP48-2CP49-1

CP63-3CP64-2

CP65-1CP66-2

CP68-1CP69-2

CP70-3

CP73-2CP75-1

CP78-2CP79-1CP80-1

CP81-1

CP87-1

CP104-1CP103-2

CP101-1CP100-1

CP47A-1

CP99-2

CP98-1

CP95-1

CP88-1

CP85-1

CP82-1

CP76-1

CP74-2

CP72-2

CP67-3

CP62-2

CP61-1CP58-1

CP56-1

CP54-1

CP53-1

CP51-2

CP50-1

CP35-2

8

67

Capitan GrandeReservation

BaronaReservation

ViejasReservation

SycuanReservation

EwiiaapaaypReservation

ClevelandNational Forest

Spring and Well SurveyMile Post 92 Through 111

Environmentally Superior Southern RouteSunrise Powerlink

Figure

8San Diego June 2010

0.5 0 0.50.25 Miles

S:\G

IS\S

C05

25\S

prin

g_W

ells

_921

11.m

xd

Legend

Interstate

Major Road

Southern Route

SpringWellMilepostTower (Not Surveyed)Tower (Surveyed)Tower Surveyed 0.5 Mile BufferGrading Area Surveyed

Sole Source AquiferEnvironmentally Superior

National Forest

Wilderness Area

BLM

State Land Dept

USFS

Homeland Security

Military

Federal

Indian Reservation

Agency Jurisdiction

MP-117.2

P46-

MP-115

MP-114

MP-112

MP-111

MP-110

MP-109

MP-117

MP-116

MP-113

CP2CP3

CP7 CP10 CP14

CP21

CP23 CP27

CP39

CP33A

CP12-1

CP16-1

CP17-1

CP18-1

CP19-1

CP22-1CP28-1

CP32-2

CP33-2

CP34-2

CP36-1

CP37-2

CP40-2

CP41-2CP42-1

CP44-1

CP43-1

CP35-2

CP31-2CP29-1

CP25-2

CP24-1

CP15-1CP13-2CP11-1CP9-1

CP8-2CP6-1

SSDE1

CP26

CP20

67

Spring and Well SurveyMile Post 109 Through 117.2Environmentally Superior Southern Route

Sunrise Powerlink

Figure

9San Diego June 2010

0.5 0 0.50.25 Miles

S:\G

IS\S

C05

25\S

prin

g_W

ells

_109

117.

2.m

xd

Legend

Interstate

Major Road

Southern Route

Spring

Well

Milepost

Tower (Not Surveyed)

Tower (Surveyed)

Tower Surveyed 0.5 Mile Buffer

Environmentally Superior

National Forest

Wilderness Area

BLM

State Land Dept

USFS

Homeland Security

Military

Federal

Indian Reservation

Agency Jurisdiction

APPENDIX A

GIS Shape Files (Compact Disk)