WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

Upload: brice-curtis

Post on 23-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1

What needs to be Commissioned in Zero Energy Buildings?

Jorge Torres Coto

Page 2: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 2

What is a Zero Energy Building?

• A building that creates as much energy as it uses in a year:– At the site– At the source

Page 3: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 3

What can we find in ZEB?

• Ancestral design methods• Integrated design process• Passive systems

– Slow reaction time– Flat interior loads (int. offices, libraries, etc.)

• Active systems (usual suspects)– Fast reaction time– Varying interior loads (meeting rooms, etc.)

Page 4: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 4

Ancestral design methods

• Learn from the way we designed before “technology” or remind designers

• Let the building itself do the work.

• Nature can help with the building needs.

• Building simulation can assist the design team.

Page 5: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 5

Integrated design process

• The whole building as an engineered system.

• System interactions are more important than individual systems.– How will they work

together?– When will they work

together?– Will they fight each

other?

Page 6: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 6

Passive Systems

• Slow reaction time• Flat daily range• Constant interior loads• As CxP we need to understand and evaluate

the building (the system) throughout the whole Cx process.– Pre-design, design, construction, occupancy &

operations

Page 7: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 7

Passive Systems

• Solar heating– Thermal mass– Trombe walls

• Passive cooling– Thermal mass– Natural ventilation

• Daylighting• Etc.

Page 8: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 8

Passive Systems & Tools

• Start at the Envelope– NIBS Guideline 3

• Evaluate:– Energy models– CFD– Solar Exposures– Sun path diagrams– Wind roses– Siting, etc.

Page 9: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 9

Passive Systems & Tools

• Solar heating systems– Orientation– Siting– Obstacles (shading,

buildings, topography, landscape, etc.)

– Building materials (mass, glazing, etc)

Page 10: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 10

Passive Systems & Tools

• Solar heating tools– Sun paths– CFD– Thermal imagery– Training

Page 11: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 11

Passive Systems & Tools

• Passive cooling– Stop the heat at the

source (int. or ext.)– Orientation– Siting– Obstacles (shading,

buildings, topography, landscape, etc.)

– Building materials (mass, glazing, etc)

Page 12: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 12

Passive Systems & Tools

• Natural ventilation– Opening sizing– Opening orientation– Opening type– Interior obstacles

Page 13: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 13

Passive Systems & Tools

• Passive cooling tools– Sun paths– Wind rose– CFD– Training (adaptive

lifestyles)

Page 14: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 14

Passive Systems & Tools

• Insulation & glazing– Proper selection for

climate and design strategies.

– Proper construction details.

– Construction matches drawings, specs, energy calculations, etc.

Page 15: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 15

Passive Systems & Tools

• Thermal mass– Proper selection of

materials (response time)

– Proper construction details (avoid thermal bridging)

– Adequate location of mass.

Page 16: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 16

Passive Systems & Tools

• Insulation, glazing, & thermal mass tools– NIBS Guideline 3– Thermal Imaging

Page 17: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 17

Passive Systems & Tools

• Daylighting– Glazing selection– Glazing orientation– Glazing size and

location– Light shelves– Siting– Interior color scheme

Page 18: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 18

Passive Systems & Tools

• Daylighting tools– Sun paths– Software simulation

Page 19: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 19

Cx Process for ZEB in brief

• Energy should be controlled at the source:– Lighting– Exterior environmental extremes– Massing of people (proper zoning)– The basis for this is in the OPR– Design team should do building program, basis of

design to meet or exceed OPR– The CxP should assist the design team (we are

considered the experts), through design phase commissioning.

Page 20: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 20

Key Cx tasks to insure a ZEB

• Envelope• Siting• Orientation• Landscape• Controls and interactions between passive

and active systems• Training

Page 21: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 21

Add to the CxP’s Toolbelt

• Computer simulation– CFD– Energy Models– Etc.

• Sun paths• Thermal Imaging

Page 22: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 22

Good references• http://www.wbdg.org/ccb/NIBS/nibs_gl3.pdf

• http://www.wbdg.org/ccb/DOD/UFC/ufc_3_440_06n.pdf

• http://btech.lbl.gov/pub/designguide/dlg.pdf

• http://repositories.cdlib.org/cgi/viewcontent.cgi?article=1091&context=cedr/cbe

• http://www.wbdg.org/ccb/AF/AFH/pshbk_v1.pdf

• http://www.wbdg.org/ccb/DOD/UFC/ufc_3_440_03n.pdf

• http://www.nibs.org/JBED/

Page 23: WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto

WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 23