where we are, and how we got here somersworth school district november 27, 2007
TRANSCRIPT
Where We Are, And How We Got Here
Where We Are, And How We Got Here
Somersworth School DistrictNovember 27, 2007
3 Reasons for School Improvement
Increasing Enrollment This is not a problem in Somersworth.
Facilities are old, outdated and do not meet new laws and regulations.
“Program Crowding” – New mandates and programs have been added due to new laws, expectations, or changes in society.
Current Facilities Current Enrollment Current Capacity
Hilltop (1927) 135 167 1 addition Maple Wood (1980) 496 414
Kindergarten addition Middle School (1962) 549 540 2 additions High School (1956) 606 - 3 additions
Studies 1999-Engineering study by Team Design
concluded that Hilltop would need plumbing, electrical and HVAC systems replaced if used longer than 5 years
2000 – Space Needs Analysis of All Buildings- Supt’s Report
2001 –New Hampshire School Administrators’ Association- Assessment of educational facility needs K-8
Studies (cont.) 2001 –First Space Needs Committee formed 2004 – Architect experienced in historic school
renovations toured Hilltop with the approval of the Space Needs Task Force. Recommended incremental renovations to Hilltop
Fall 2004 – Second Space Needs Committee recommended incremental improvements to HT and an addition of 4 classrooms to HS for SMS students.
2005 – Water pipes froze and broke at Hilltop and the superintendent withdrew the above proposal which was to be submitted to the School Board and City Council.
Studies (cont.) February 2005 – Superintendent
recommended to the City Council that Hilltop be renovated and a new elementary school be built.
Spring 2005 – Joint Building Committee was formed to explore incremental renovations to Hilltop and construction of a new school. No action taken.
Studies (cont.) January 2006 –Second Joint Building Committee
formed and directed to explore potential land and construction options for a new elementary school, and to form a committee to identify alternative uses for Hilltop.
August 2006 – Second Joint Building CommitteeRecommended that a new elementary school be built
March 2007 – Needs analysis done on the 2 elementary schools
Hilltop Needs Substandard classroom spaces-less than
900 sq. ft. Lack of accessibility-elevator, ramps, door
handles, bathrooms wheelchair accessible, bubblers
No ventilation in some areas Crowded hallways Old, unvented bathrooms Limited parking
Hilltop Needs (cont.) Smaller work/instructional spaces lacking 2 egresses Replace heating system Replace electrical system-additional amperage
required for elevator Replace plumbing system Window replacement Lack of storage More library space needed Computer lab space needed Lacks space for kindergarten
Hilltop Needs (cont.) Sprinkler system needed Fire walls needed School security system needed Doors open into corridors Need to meet BOCA codes First graders need to be on the first floor
Maple Wood Needs Maple Wood Deficiencies – March 2007 Lobby entrance and many corridors are filled
with storage and instructional spaces. Special ed students with mobility handicaps
are all sent to MW due to HT’s lack of accessibility.
No computer lab or computer instructional space available.
Maple Wood Needs (cont.)
What was once a conference room, now contains student files, the computer server and guidance office
The nurse’s office is too small, filled with a cot, clothing, and equipment, no waiting area and very limited privacy
Principal’s office is small and used as the facility’s only conference room
Maple Wood Needs (cont.)
Receptionist/Secretaries’ Area- Contains 3 desks, mail room, student waiting area-very tight
Title I room in open area – shared by 4 tutors – should have dedicated space
OT and PT use space in the corridor and closet for student instruction and storage of equipment
Maple Wood Needs (cont.)
PE office is used for paper storage, no shelving, needs dedicated space
Sprinkler room used for storage – Fire violation
Spec. ed, Speech and Language, and ESOL use little rooms off the library where they deal with up to 6 children at a time – too small to function properly
Maple Wood Needs (cont.)
There are 3 desks for the building aides in the library. There should be dedicated space.
The stage is used for music teaching and storage of music stands and equipment. Acoustics are not good when students are in the cafeteria
Maple Wood Needs (cont.)
Up until this year the art teacher went from classroom to classroom, because there was no dedicated space. No room to put projects that students are working on or that require drying. This was changed because a teacher was cut out of the budget. If that position is restored, the art program is back on a cart.
Maple Wood Needs (cont.)
Boiler and electric rooms are used for storage
Kitchen has very limited space for storage. Security System
Middle School Needs 4 programs are held at the high school
due to lack of space Nurse’s office is too small Bathrooms need renovating No conference area for meetings Very small spaces for specialists where
they meet with up to 6 students
Middle School Needs (cont.)
Tutoring is done in the hallways HVAC units on the roof need to be
replaced No common areas for large groups to
meet The library/media center is undersized
and under equipped Security System
Cost Estimates Team Design 1999 Engineering
Study Assessment of Educational Facility
Needs K-8 2001 First Space Needs Committee Second Space Needs Committee Second Joint Building Committee
Cost Estimates
Team Design 1999 StudyHilltop Elementary School
Addition $834,000(elevators, toilet, stairs)Renovate Existing $1,677,600Kindergarten Addition $272,400
TOTAL $3,084,000
NHSAA Assessment of Educational Facility Needs
K-8 2001Alternative 1
Renovate Hilltop School $3,000,000
Build new 4/5 school $6,512,000(14 core classrooms)
TOTAL $9,512,385
NHSAA Assessment of Educational Facility Needs
K-8 2001 Alternative 2
Build a new elementary school
Discontinue use of Hilltop
TOTAL $8,089,260
NHSAA Assessment of Educational Facility Needs
K-8 2001 Alternative 3
Renovate HilltopAdd portables to Hilltop, Maple Wood and Somersworth Middle School
Only emergency or temporary, not deemed appropriate at time of Assessment
First Space NeedsCommittee May 2001
Three Scenarios Scenario A
Renovate Hilltop- add (2) classrooms
($3,546,600)Build new K-5 School($8,510,400)
Total Building Costs: $12,057,000
First Space NeedsCommittee May 2001
Three Scenarios Scenario A (cont.)
Total Cost $18,065,483 includes principal, interest, less building aid (2001)
First Space NeedsCommittee May 2001
Three Scenarios Scenario B
Close HilltopMaple Wood grades k-2New 3-5 facility Somersworth Middle School 6-8
$11,433,252 construction costs$17,162,209 total project costs
First Space NeedsCommittee May 2001
Three Scenarios Scenario C
Renovate Hilltop ($3,546,600)Build new 4-6 School ($11,433,252)
$14,979,852 construction costs$22,581,854 total project costs
First Space Needs Committee 2001
Final Recommendation Scenario A
Renovate Hilltop- add (2) classrooms
($3,546,600)Build new K-5 School($8,510,400)
Total Building Costs: $12,057,000
First Space Needs Committee 2001
Final Recommendation Scenario A (cont.)
Total Cost $18,065,483 includes principal, interest, less building aid (2001)
Second Space Needs Committee 2004
Report to Somersworth School Board October 2004
Critical Capital Improvements to schools$394,850
Incremental Improvements Hilltop(first yr.) $203,410
Report to Somersworth School Board October
2004
Add four additional classrooms to Somersworth High School
for middle school programs $532,410
(deducted 58% building aid from 4 classrooms, other costs $26,624)
Total $828,824
Revised Second Space Needs Committee Report
February 2005Initial Report withdrawn new
recommendation:Adopt Scenario A from 2001 Space Needs Committee
Renovate HilltopBuild new elementary School
Total $18,065,483
Somersworth School Board
Recommendation November 14,2006
School Board voted to build an elementary school with a core capacity of 425 students
Est. costs based on 2008 Dept of Education maximum allowable costs
(not including land)Total $9,971,000
*Eligible for 55%building aid
Hilltop Costs
1999 Building Facility Analysis Team DesignAddition with elevatorRenovate existing
Restructure siteKindergarten addition
Total $3,084,000
2008 Updated Projected costs
Total $6,118,385
Building Aid RenovationsFormula
To qualify at least 25% of cost to replace building
If cost of renovation exceeds 60% of cost of replacing building district must meet all codes and explain why renovation is superior to new construction
Department of Education
Building Aid Information
Minimum Standards for School Sites
5 acres of contiguous buildable land, plus an additional acre for each one hundred students or fraction thereof.
• Maximum Standards for School Sites
20 Acres plus one acre per 100 Pupils elementary
Initial Land Studies
Site Inspection Geotechnical/Environmental site
inspection Archeological Reconnaissance Land Survey Boundary Survey