William H Ryder Math & Science Specialty ES 8716 S Wallace St Chicago, IL 60620 This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Facility Assessment Report Building Name Year Constructed Building Area (Sq Ft) Assessed Need Number of Floors Campus Summary Main 1912 38,000 $2,812,290 3 Addition 1968 35,326 $1,820,433 3 SITE $366,311 Campus Total $4,999,035 73,326 Building: Main Category: Building Exterior Item - Type Quantity Unit Rank Cost Location Group Comments Entrance Entrance Control - Audio and Video Door 3.1 - Southwest Broken lens cover 5 EA 1 $1,567 Exterior Doors - Exterior Steel Door Door 3 - Southeast 6 EA 2 $961 Exterior Doors - Exterior Steel Door Door 3.1 - Southwest 6 EA 2 $961 Exterior Doors - Exterior Steel Door Door 3.2 - West center 6 EA 2 $961 Exterior Doors - Exterior Steel Door Door 3.3 - West center 7 EA 1 $0 Exterior Stairs - Concrete Door 3 - Southeast 6 LF 10 $818 Foundation Foundation - Concrete Entire Building 7 LF 526 $0 Superstructure - Steel with Clay Tile Arch Entire Building 7 SF 38,000 $0 Lighting Exterior Lighting - Wall Mounted Entire Building 6 EA 4 $1,155 Roof System Chimney - Brick Chimney- Stainless Steel Liner Roof 3 6 LF 70 $66,828 Coping - Clay Tile Roof 2 6 LF 55 $1,766 Coping - Metal Roof 1 5 LF 305 $12,893 Coping - Metal Roof 1 7 LF 51 $0 Coping - Metal Roof 2 7 LF 50 $0 Coping - Stone Roof 2 6 LF 130 $4,175 Page 1 of 37 RYDER Assessment Date: 11/2/15

Upload: others

Post on 06-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report.

Facility Assessment Report

Building Name Year Constructed Building Area (Sq Ft) Assessed Need Number of Floors

Campus Summary

Main 1912 38,000 $2,812,2903

Addition 1968 35,326 $1,820,4333

SITE $366,311

Campus Total $4,999,03573,326

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Entrance

Entrance Control - Audio and Video Door 3.1 - Southwest Broken lens cover5EA1 $1,567

Exterior Doors - Exterior Steel Door Door 3 - Southeast 6EA2 $961

Exterior Doors - Exterior Steel Door Door 3.1 - Southwest 6EA2 $961

Exterior Doors - Exterior Steel Door Door 3.2 - West center 6EA2 $961

Exterior Doors - Exterior Steel Door Door 3.3 - West center 7EA1 $0

Exterior Stairs - Concrete Door 3 - Southeast 6LF10 $818

Foundation

Foundation - Concrete Entire Building 7LF526 $0

Superstructure - Steel with Clay Tile Arch Entire Building 7SF38,000 $0

Lighting

Exterior Lighting - Wall Mounted Entire Building 6EA4 $1,155

Roof System

Chimney - Brick Chimney- Stainless Steel Liner Roof 3 6LF70 $66,828

Coping - Clay Tile Roof 2 6LF55 $1,766

Coping - Metal Roof 1 5LF305 $12,893

Coping - Metal Roof 1 7LF51 $0

Coping - Metal Roof 2 7LF50 $0

Coping - Stone Roof 2 6LF130 $4,175

Page 1 of 37RYDER Assessment Date: 11/2/15

Page 2: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Roof System

Coping - Stone Roof 3 6LF140 $4,496

Downspouts - Interior Downspouts Roof 1 7LF200 $0

Downspouts - Interior Downspouts Roof 2 7LF120 $0

Downspouts - Interior Downspouts Roof 3 7LF40 $0

Parapet - 16" - 30" Height Roof 1 6LF255 $10,188

Parapet - 16" - 30" Height Roof 2 6LF235 $9,389

Parapet - Parapet > 30" Roof 1 6LF50 $3,196

Parapet - Parapet > 30" Roof 3 6LF140 $8,949

Roof Structure - Steel / Metal Deck/ Concrete Topping Roof 1 7SF286 $0

Roof Structure - Steel with Clay Tile Arch Roof 1 7SF9,778 $0

Roof Structure - Steel with Clay Tile Arch Roof 2 7SF4,625 $0

Roof Structure - Steel with Clay Tile Arch Roof 3 7SF1,670 $0

Roof - Modified Bitumen Roof 1 7SF10,064 $0

Roof - Modified Bitumen Roof 2 7SF4,625 $0

Roof - Modified Bitumen Roof 3 7SF1,670 $0

Walls

Cornice - Metal Projecting Entire Building Heavily rusted4LF832 $719,686

Exterior Walls - Brick Entire Building 6SF19,811 $133,150

Exterior Walls - Prefabricated Metal Panel Wall Entire Building 5SF1,107 $7,187

Exterior Walls - Stone-Cast Entire Building 6SF2,148 $14,437

Windows

Guard - Guards perforated Entire Building Dented, damaged4SF300 $25,465

Guard - Guards perforated Entire Building 6SF894 $11,416

Guard - Guards wire guard Entire Building 5SF143 $2,192

Lintels - Steel Entire Building 7LF476 $0

Windows - Sash Aluminum Double-pane Entire Building Bad balances throughout4SF3,075 $403,624

Building Exterior Subtotal: $1,445,461

Building: Main

Category: Electrical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Emergency System

Automatic Transfer Switch Electrical Room also serves addition6EA1 $408

Emergency A/C Power - Corridors and Stairs Entire Building 6SF8,512 $2,556

Emergency A/C Power - Gym Entire Building / 1st Floor 6SF3,520 $1,309

Page 2 of 37RYDER Assessment Date: 11/2/15

Page 3: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Main

Category: Electrical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Emergency System

Emergency A/C Power - Students Toilets Entire Building 6SF1,280 $476

Emergency Generator- Outdoor- Diesel - Below 60 KW Site West Serves main and addition. 6EA1 $6,396

Exit Signs - Corridors and Stairs Entire Building 6EA12 $1,797

Exit Signs - Multipurpose Room Entire Building / 1st Floor 6EA4 $599

Security System - CCTV Entire Building 6SF38,000 $11,411

Security System - Intrusion Detection Entire Building 6SF38,000 $9,781

Main Service

Main Electrical Service - 2000 A 120/208/3PH Electrical Room Serves main and the addition. 6EA1 $8,232

PA System Entire Building Serves the main and addition. Control console

located in the addition.

6SF38,000 $12,498

Power Distribution

Lighting and Power Panels - 100 A Entire Building / Electrical Room 6EA1 $299

Lighting and Power Panels - 100 A Entire Building 6EA2 $598

Lighting and Power Panels - Above 100 A Entire Building / 1st Floor 6EA3 $1,491

Lighting and Power Panels - Above 100 A Entire Building 6EA3 $1,491

Main Distribution Panels - 400 - 600 amp Entire Building 6EA6 $3,166

Electrical System Subtotal: $62,509

Building: Main

Category: Safty System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Fire Alarm

Fire Alarm Panel Entire Building / Boiler Room Serves main and addition. No model number available.

6EA1 $6,406

Fire Alarm Strobe Lights Entire Building 6SF38,000 $13,585

Fire Alarm_System Entire Building 6SF38,000 $18,476

Safty System Subtotal: $38,466

Building: Main

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Air Conditioning

Condensing Unit- Roof Mounted - Less than 5 tons Roof Classroom split system.6EA1 $3,334

Condensing Unit- Roof Mounted - Less than 5 tons Roof Classroom split systems. 6EA13 $43,338

Page 3 of 37RYDER Assessment Date: 11/2/15

Page 4: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Main

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Air Conditioning

Air Handling Systems

Air Handling Unit- Built Up- Single Zone- Steam Coils - 8001 - 15000 cfm

Mechanical Room Serves the multipurpose room.5EA1 $34,007

Air Handling Unit- Built Up-Multi Zone- Steam Coils - 15001 - 25000 Mechanical Room Serves the classrooms. 5EA1 $66,438

Air Intake Mechanical Room / Roof 6EA1 $5,765

Air Intake Mechanical Room / Roof 6EA1 $5,765

Auxiliaries - 15001 - 25000 cfm Mechanical Room 5EA1 $14,899

Auxiliaries - 8001 - 15000 cfm Mechanical Room 6EA1 $4,341

Return Duct Work - Indoor- Vertical Shaft and Ducts Mechanical Room / 1st Floor 7LF50 $0

Return Duct Work - Indoor- Vertical Shaft and Ducts Mechanical Room / Entire Building 7LF300 $0

Zone Dampers Mechanical Room / 3rd Floor DDC controls not functioning properly due to software issues so controlled manually.

6EA6 $4,998

Zone Dampers Mechanical Room DDC controls not functioning properly due to software issues so controlled manually.

6EA17 $14,162

Boiler Systems

Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - 101 - 150

HP

Boiler Room 6EA2 $5,091

Chemical Feed System Boiler Room 6EA1 $1,078

Chemical Feeder Boiler Room 6EA1 $1,078

Combustion Dampers Boiler Room 6EA2 $818

Condensate Pump Boiler Room 6EA1 $2,021

Feed Water Pumps and Tank Boiler Room 3 pumps at 3/4 HP each.6EA1 $2,545

Non Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler - 101 - 150 HP

Boiler Room Serve main building and heat exchanger for addition.

6EA2 $5,091

Piping - Condensate Pipe- Steel Boiler Room / Entire Building 6LF200 $378

Piping - Steam Pipe- Steel Boiler Room / Entire Building 6LF200 $378

Steam Traps Boiler Room / 1st Floor (2) AHUs and (1) steam unit heater. 5EA15 $19,723

Heat Exchangers

Heat Exchanger - Steam to Hot Water Shell Type Boiler Room Serves the addition. 6EA1 $0

Heating Devices

Unit Heater - Electric Entire Building / Electrical Room 6EA1 $278

Unit Heater - Gas Entire Building / Boiler Room 6EA1 $278

Unit Heater - Steam Entire Building / Electrical Room 6EA1 $278

Wall Heater - Electric Entire Building 6EA15 $2,084

Mechanical Plumbing

Hot Water Pump - Less than 10 Boiler Room Serve the addition. 6EA2 $2,222

Page 4 of 37RYDER Assessment Date: 11/2/15

Page 5: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Main

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Mechanical Plumbing

Hydronic Supply and Return - Galvanized 1st Floor 6LF100 $7,732

Temperature Control

DDC System Entire Building Software issues at head-end causing system to be run manually.

6SF38,000 $21,736

Thermostats - DDC Entire Building / 1st Floor Damaged and missing cover. 4EA1 $819

Thermostats - DDC Entire Building 6EA23 $0

Ventilation

Exhaust Fans- Roof Mounted - 1501 - 8000 CFM Roof 6EA2 $1,185

Mechanical System Subtotal: $271,858

Building: Main

Category: Plumbing System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Hot Water

Gas Heater - 150000 - 300000 BTU/HR Boiler Room Serves the main and addition. 6EA3 $930

Piping

Domestic Piping-Cold Water from Risers to Fixtures Entire Building 6SF38,000 $7,608

Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF38,000 $9,238

Domestic Piping-Cold Water Risers Entire Building 6SF38,000 $7,064

Domestic Piping-Hot Water from Risers to Fixtures Entire Building 6SF38,000 $5,977

Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF38,000 $7,064

Domestic Piping-Hot Water Return Lines Entire Building 6SF38,000 $5,434

Domestic Piping-Hot Water Return Risers Entire Building 6SF38,000 $5,434

Sanitary Piping Entire Building 6SF38,000 $34,778

Storm Piping Entire Building 6SF38,000 $33,147

Vent Piping Entire Building 6SF38,000 $25,540

Pumps

Pumps - Domestic Booster Pump-Simplex Entire Building / Boiler Room Serves the main and addition. 6EA1 $1,446

Pumps - Sump-Simplex Entire Building / 1st Floor Elevator sump pump. 6EA1 $745

Plumbing System Subtotal: $144,404

Building: Main

Page 5 of 37RYDER Assessment Date: 11/2/15

Page 6: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #100 (Kindergarten)

AC Units 1st Floor on the lighting panel3EA1 $6,086

Casework 1st Floor 6LF6 $152

Ceiling - Plaster/Drywall 1st Floor 6SF919 $3,180

Chalk Board 1st Floor 4LF24 $2,203

Doors - Side-lite 1st Floor 6SF24 $401

Doors - Transom Window 1st Floor 6SF24 $406

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor damaged5SF9 $52

Floor - Tile 1st Floor 6SF910 $1,991

Lighting - Pendent/Surface 1st Floor 7EA14 $0

Marker Board 1st Floor 7LF20 $0

Storage/ Closet 1st Floor 6SF64 $464

Walls - Plaster/Drywall 1st Floor 6SF1,481 $4,087

Classroom #101 (Special Education)

AC Units 1st Floor on the lighting panel3EA1 $6,086

Casework 1st Floor 6LF6 $152

Ceiling - Plaster/Drywall 1st Floor 6SF919 $3,180

Chalk Board 1st Floor 4LF24 $2,203

Doors - Side-lite 1st Floor 6SF24 $401

Doors - Transom Window 1st Floor 6SF24 $406

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor damaged5SF4 $23

Floor - Tile 1st Floor 6SF915 $2,002

Lighting - Pendent/Surface 1st Floor 7EA14 $0

Marker Board 1st Floor 7LF20 $0

Storage/ Closet 1st Floor 6SF64 $464

Walls - Plaster/Drywall 1st Floor 6SF1,481 $4,087

Classroom #102 (Special Education)

AC Units 1st Floor on the lighting panel3EA1 $6,086

Casework 1st Floor damaged5LF2 $418

Casework 1st Floor 6LF44 $1,111

Ceiling - Plaster/Drywall 1st Floor 6SF919 $3,180

Chalk Board 1st Floor 4LF4 $367

Doors - Side-lite 1st Floor 6SF24 $401

Doors - Transom Window 1st Floor 6SF24 $406

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF919 $2,011

Lighting - Pendent/Surface 1st Floor 7EA14 $0

Page 6 of 37RYDER Assessment Date: 11/2/15

Page 7: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #102 (Special Education)

Marker Board 1st Floor 7LF20 $0

Storage/ Closet 1st Floor 6SF64 $464

Walls - Plaster/Drywall 1st Floor water damage4SF10 $147

Walls - Plaster/Drywall 1st Floor 6SF1,471 $4,060

Classroom #103 (Pre School)

AC Units 1st Floor on the lighting panel3EA1 $6,086

Ceiling - Plaster/Drywall 1st Floor 6SF919 $3,180

Doors - Side-lite 1st Floor 6SF12 $201

Doors - Transom Window 1st Floor 6SF12 $203

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Wood 1st Floor 6SF919 $6,479

Lighting - Pendent/Surface 1st Floor 7EA14 $0

Marker Board 1st Floor 7LF16 $0

Storage/ Closet 1st Floor 6SF64 $464

Walls - Plaster/Drywall 1st Floor water damage4SF10 $147

Walls - Plaster/Drywall 1st Floor 6SF1,471 $4,060

Classroom #200 (Computer Lab)

AC Units 2nd Floor on the lighting panel3EA1 $6,086

Casework 2nd Floor 6LF8 $202

Ceiling - Plaster/Drywall 2nd Floor 6SF919 $3,180

Chalk Board 2nd Floor 4LF16 $1,469

Charging Station 2nd Floor 6EA2 $969

Doors - Transom Window 2nd Floor 6SF24 $406

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Wood 2nd Floor Sub-floor popping and warping, needs replacing5SF919 $13,444

Lighting - Pendent/Surface 2nd Floor 7EA14 $0

Marker Board 2nd Floor 7LF22 $0

Storage/ Closet 2nd Floor 6SF64 $464

Walls - Plaster/Drywall 2nd Floor 6SF1,400 $3,864

Walls - Plaster/Drywall 2nd Floor water damage4SF10 $147

Wireless System 2nd Floor 6EA1 $372

Classroom #201 (Regular Classroom)

AC Units 2nd Floor on the lighting panel3EA1 $6,086

Casework 2nd Floor 6LF6 $152

Ceiling - Plaster/Drywall 2nd Floor 6SF919 $3,180

Chalk Board 2nd Floor 4LF20 $1,836

Page 7 of 37RYDER Assessment Date: 11/2/15

Page 8: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #201 (Regular Classroom)

Doors - Transom Window 2nd Floor 6SF24 $406

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Wood 2nd Floor Sub-floor popping and warping5SF919 $13,444

Lighting - Pendent/Surface 2nd Floor 7EA14 $0

Marker Board 2nd Floor 7LF22 $0

Storage/ Closet 2nd Floor Missing door for storage closet5SF6 $97

Storage/ Closet 2nd Floor 6SF58 $421

Walls - Plaster/Drywall 2nd Floor 6SF1,470 $4,057

Walls - Plaster/Drywall 2nd Floor water damage5SF12 $61

Classroom #202 (Store Room)

AC Units 2nd Floor on the lighting panel3EA1 $6,086

Casework 2nd Floor damage to door frame on closet5LF6 $1,254

Ceiling - Plaster/Drywall 2nd Floor 6SF919 $3,180

Chalk Board 2nd Floor 4LF16 $1,469

Doors - Transom Window 2nd Floor 6SF24 $406

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Wood 2nd Floor Subfloor popping and warping, needs replacement.

5SF919 $13,444

Lighting - Pendent/Surface 2nd Floor 7EA13 $0

Lighting - Pendent/Surface 2nd Floor Missing cover6EA1 $124

Marker Board 2nd Floor 7LF12 $0

Storage/ Closet 2nd Floor 6SF64 $464

Walls - Plaster/Drywall 2nd Floor 6SF1,481 $4,087

Classroom #203 (Regular Classroom)

AC Units 2nd Floor on the lighting panel3EA1 $6,086

Casework 2nd Floor 6LF6 $152

Ceiling - Plaster/Drywall 2nd Floor 6SF919 $3,180

Chalk Board 2nd Floor 4LF14 $1,285

Doors - Transom Window 2nd Floor 6SF24 $406

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Wood 2nd Floor 6SF919 $6,479

Lighting - Pendent/Surface 2nd Floor 7EA15 $0

Marker Board 2nd Floor 7LF22 $0

Storage/ Closet 2nd Floor 6SF64 $464

Walls - Plaster/Drywall 2nd Floor water damage, 1 window broken (5 ft)4SF20 $294

Walls - Plaster/Drywall 2nd Floor 6SF1,460 $4,029

Page 8 of 37RYDER Assessment Date: 11/2/15

Page 9: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #204 (Computer Lab)

AC Units 2nd Floor on the lighting panel3EA1 $6,086

Casework 2nd Floor 6LF6 $152

Ceiling - Plaster/Drywall 2nd Floor 6SF919 $3,180

Chalk Board 2nd Floor 4LF24 $2,203

Charging Station 2nd Floor 6EA1 $485

Doors - Transom Window 2nd Floor 6SF6 $102

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Wood 2nd Floor Sub-floor popping and warping, needs replacing5SF919 $13,444

Lighting - Pendent/Surface 2nd Floor 7EA12 $0

Marker Board 2nd Floor 7LF20 $0

Storage/ Closet 2nd Floor 6SF64 $464

Walls - Plaster/Drywall 2nd Floor 6SF1,415 $3,905

Walls - Plaster/Drywall 2nd Floor water damage4SF65 $956

Wireless System 2nd Floor 6EA1 $372

Classroom #205 (Faculty Lounge)

AC Units 2nd Floor on the lighting panel3EA1 $6,086

Ceiling - Plaster/Drywall 2nd Floor 6SF919 $3,180

Chalk Board 2nd Floor 4LF20 $1,836

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor - Tile 2nd Floor 6SF915 $2,002

Floor - Tile 2nd Floor tile damaged5SF4 $23

Lighting - Pendent/Surface 2nd Floor 7EA7 $0

Walls - Plaster/Drywall 2nd Floor 6SF1,180 $3,257

Walls - Plaster/Drywall 2nd Floor water damage4SF4 $59

Classroom #300 (Regular Classroom)

AC Units 3rd Floor on the lighting panel3EA1 $6,086

Casework 3rd Floor 6LF6 $152

Ceiling - Plaster/Drywall 3rd Floor 6SF919 $3,180

Doors - Transom Window 3rd Floor 6SF24 $406

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Wood 3rd Floor Sub-floor popping and warping, needs replacing5SF919 $13,444

Lighting - Pendent/Surface 3rd Floor 7EA14 $0

Marker Board 3rd Floor 7LF15 $0

Storage/ Closet 3rd Floor 6SF64 $464

Walls - Plaster/Drywall 3rd Floor 6SF1,417 $3,911

Page 9 of 37RYDER Assessment Date: 11/2/15

Page 10: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #301 (Regular Classroom)

AC Units 3rd Floor on the lighting panel3EA1 $6,086

Casework 3rd Floor 6LF6 $152

Ceiling - Plaster/Drywall 3rd Floor 6SF919 $3,180

Doors - Transom Window 3rd Floor 6SF24 $406

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Wood 3rd Floor 6SF919 $6,479

Lighting - Pendent/Surface 3rd Floor 7EA14 $0

Marker Board 3rd Floor 7LF15 $0

Storage/ Closet 3rd Floor 6SF64 $464

Walls - Plaster/Drywall 3rd Floor 6SF1,417 $3,911

Classroom #302 (Music Room)

AC Units 3rd Floor on the lighting panel3EA1 $6,086

Casework 3rd Floor 6LF6 $152

Ceiling - Plaster/Drywall 3rd Floor 6SF919 $3,180

Doors - Transom Window 3rd Floor 6SF24 $406

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Wood 3rd Floor Sub-floor popping and warping, needs replacing5SF919 $13,444

Lighting - Pendent/Surface 3rd Floor 7EA14 $0

Marker Board 3rd Floor 7LF15 $0

Storage/ Closet 3rd Floor 6SF64 $464

Walls - Plaster/Drywall 3rd Floor 6SF1,417 $3,911

Classroom #303 (Regular Classroom)

AC Units 3rd Floor on the lighting panel3EA2 $12,173

Casework 3rd Floor 6LF6 $152

Ceiling - Plaster/Drywall 3rd Floor 6SF919 $3,180

Doors - Transom Window 3rd Floor 6SF24 $406

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Wood 3rd Floor 6SF919 $6,479

Lighting - Pendent/Surface 3rd Floor 7EA14 $0

Marker Board 3rd Floor 7LF20 $0

Storage/ Closet 3rd Floor 6SF64 $464

Walls - Plaster/Drywall 3rd Floor 6SF1,417 $3,911

Classroom #304 (Regular Classroom)

AC Units 3rd Floor on the lighting panel3EA2 $12,173

Casework 3rd Floor 6LF6 $152

Ceiling - Plaster/Drywall 3rd Floor 6SF919 $3,180

Page 10 of 37RYDER Assessment Date: 11/2/15

Page 11: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #304 (Regular Classroom)

Chalk Board 3rd Floor 4LF30 $2,754

Doors - Transom Window 3rd Floor 6SF24 $406

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Wood 3rd Floor Sub-floor popping and warping, needs replacing5SF919 $13,444

Lighting - Pendent/Surface 3rd Floor 7EA14 $0

Marker Board 3rd Floor 7LF8 $0

Storage/ Closet 3rd Floor 6SF64 $464

Walls - Plaster/Drywall 3rd Floor 6SF1,417 $3,911

Classrooms Subtotal: $382,556

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Ceiling - Lay-in 1st Fl Engineers Office, next to Boiler Room

6SF161 $483

Doors - Wood Doors inclu hw 1st Fl Engineers Office, next to Boiler

Room

6EA1 $301

Floor - Tile 1st Fl Engineers Office, next to Boiler

Room

6SF161 $352

Lighting - Pendent/Surface 1st Fl Engineers Office, next to Boiler Room

7EA2 $0

Power Distribution 1st Fl Engineers Office, next to Boiler Room

7EA12 $0

Walls - Masonry 1st Fl Engineers Office, next to Boiler Room

6SF438 $1,378

Gymnasia

Ceiling - Plaster/Drywall 1st Floor 6SF3,520 $19,430

Doors - Wood Doors inclu hw 1st Floor 6EA8 $2,408

Floor - Concrete 1st Floor asphalt- at door5SF67 $115

Floor - Wood 1st Floor 6SF3,453 $24,343

Lighting - Metal Halide/Sodium Vapor 1st Floor 7EA12 $0

Lighting - Pendent/Surface 1st Floor 7EA1 $0

Lighting - Wall Mounted 1st Floor 7EA7 $0

Sound System 1st Floor 6EA1 $41,654

Stage 1st Floor 6SF500 $2,889

Stage Curtain 1st Floor 6EA4 $0

Page 11 of 37RYDER Assessment Date: 11/2/15

Page 12: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Gymnasia

Stage Lift 1st Floor 6EA1 $6,510

Stage Lighting System 1st Floor 7EA1 $0

Stage-Stairs - Wood 1st Floor 6LF10 $117

Storage/ Closet 1st Floor 6SF80 $580

Walls - Plaster/Drywall 1st Floor 6SF2,246 $6,199

Walls - Structural Glazed Tile 1st Floor 6SF2,246 $7,066

Mechanical/ Service Rooms

Air Intake Plenums 1st Floor efflorescence on wall of North Warm Air Chamber5SF60 $799

Air Intake Plenums 1st Floor warm air chamber6SF1,224 $7,579

Boiler Room 1st Floor 6SF1,027 $7,358

Janitor's Closet 1st Floor Water damage on walls5SF12 $194

Janitor's Closet 1st Floor 6SF12 $86

Mechanical/ Service Rooms 1st Floor 6SF1,650 $11,821

Janitor's Closet 2nd Floor Wall damaged due to water damage5SF26 $419

Janitor's Closet 2nd Floor 6SF26 $186

Storage Room 2nd Floor 6SF42 $301

Janitor's Closet 3rd Floor 6SF48 $344

Storage Room 3rd Floor 6SF222 $1,590

Restroom

Accessories 1st Floor Boys- next to Tank Room 6SF290 $2,675

Ceiling - Plaster/Drywall 1st Floor Boys- next to Tank Room 6SF290 $1,004

Doors - Wood Doors inclu hw 1st Floor Boys- next to Tank Room 6EA1 $301

Floor Drain 1st Floor Boys- next to Tank Room 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 1st Floor Boys- next to Tank Room 6SF290 $614

Hand Dryer 1st Floor Boys- next to Tank Room 6EA1 $230

Lavatory 1st Floor Boys- next to Tank Room 6EA2 $639

Lighting - Pendent/Surface 1st Floor Boys- next to Tank Room 7EA5 $0

Partitions 1st Floor Boys- next to Tank Room 6EA3 $891

Urinals 1st Floor Boys- next to Tank Room 6EA4 $1,344

Walls - Plaster/Drywall 1st Floor Boys- next to Tank Room 6SF455 $1,256

Walls - Plaster/Drywall 1st Floor Boys- next to Tank Room cracking5SF5 $26

Walls - Structural Glazed Tile 1st Floor Boys- next to Tank Room 6SF460 $1,447

Water Closet 1st Floor Boys- next to Tank Room 6EA3 $1,008

Accessories 1st Floor Girls- next to 103 6SF470 $4,335

Ceiling - Plaster/Drywall 1st Floor Girls- next to 103 6SF470 $1,626

Doors - Side-lite 1st Floor Girls- next to 103 6SF18 $301

Page 12 of 37RYDER Assessment Date: 11/2/15

Page 13: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Doors - Wood Doors inclu hw 1st Floor Girls- next to 103 6EA1 $301

Floor Drain 1st Floor Girls- next to 103 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 1st Floor Girls- next to 103 6SF470 $995

Hand Dryer 1st Floor Girls- next to 103 6EA1 $230

Lavatory 1st Floor Girls- next to 103 6EA2 $639

Lighting - Pendent/Surface 1st Floor Girls- next to 103 7EA4 $0

Partitions 1st Floor Girls- next to 103 6EA4 $1,188

Walls - Masonry 1st Floor Girls- next to 103 6SF400 $1,258

Walls - Plaster/Drywall 1st Floor Girls- next to 103 6SF425 $1,173

Walls - Structural Glazed Tile 1st Floor Girls- next to 103 6SF325 $1,022

Water Closet 1st Floor Girls- next to 103 6EA3 $1,008

Accessories 1st Floor inside Room 102 6SF144 $1,328

Ceiling - Plaster/Drywall 1st Floor inside Room 102 6SF144 $498

Doors - Wood Doors inclu hw 1st Floor inside Room 102 6EA1 $301

Floor Drain 1st Floor inside Room 102 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 1st Floor inside Room 102 6SF144 $305

Hand Dryer 1st Floor inside Room 102 6EA1 $230

Lavatory 1st Floor inside Room 102 6EA1 $320

Lighting - Pendent/Surface 1st Floor inside Room 102 7EA3 $0

Walls - Plaster/Drywall 1st Floor inside Room 102 6SF300 $828

Walls - Plaster/Drywall 1st Floor inside Room 102 water damage4SF8 $118

Accessories 1st Floor next to 103 6SF42 $387

Doors - Wood Doors inclu hw 1st Floor next to 103 6EA1 $301

Floor Drain 1st Floor next to 103 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 1st Floor next to 103 6SF42 $89

Hand Dryer 1st Floor next to 103 6EA1 $230

Lavatory 1st Floor next to 103 6EA1 $320

Lighting - Pendent/Surface 1st Floor next to 103 7EA1 $0

Walls - Plaster/Drywall 1st Floor next to 103 6SF324 $894

Walls - Structural Glazed Tile 1st Floor next to 103 6SF46 $145

Water Closet 1st Floor next to 103 6EA1 $336

Accessories 1st Flr -In Engineers Office 6SF20 $184

Ceiling - Lay-in 1st Flr -In Engineers Office missing the tiles5SF20 $119

Doors - Wood Doors inclu hw 1st Flr -In Engineers Office old & in poor condition5EA1 $1,174

Floor - Concrete 1st Flr -In Engineers Office 6SF20 $11

Lavatory 1st Flr -In Engineers Office 6EA1 $320

Lighting - Lay-in 1st Flr -In Engineers Office 7EA1 $0

Page 13 of 37RYDER Assessment Date: 11/2/15

Page 14: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Walls - Masonry 1st Flr -In Engineers Office 6SF108 $340

Walls - Plaster/Drywall 1st Flr -In Engineers Office 6SF108 $298

Water Closet 1st Flr -In Engineers Office 6EA1 $336

Accessories 2nd Floor Boys- next to 205 6SF290 $2,675

Ceiling - Plaster/Drywall 2nd Floor Boys- next to 205 6SF290 $1,004

Doors - Wood Doors inclu hw 2nd Floor Boys- next to 205 6EA1 $301

Floor Drain 2nd Floor Boys- next to 205 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 2nd Floor Boys- next to 205 6SF290 $614

Hand Dryer 2nd Floor Boys- next to 205 6EA1 $230

Lavatory 2nd Floor Boys- next to 205 6EA2 $639

Lighting - Pendent/Surface 2nd Floor Boys- next to 205 7EA3 $0

Partitions 2nd Floor Boys- next to 205 6EA2 $594

Urinals 2nd Floor Boys- next to 205 6EA4 $1,344

Walls - Plaster/Drywall 2nd Floor Boys- next to 205 5SF460 $3,486

Walls - Structural Glazed Tile 2nd Floor Boys- next to 205 6SF460 $1,447

Water Closet 2nd Floor Boys- next to 205 6EA2 $672

Accessories 2nd Floor Girls- next to 203 6SF470 $4,335

Ceiling - Plaster/Drywall 2nd Floor Girls- next to 203 6SF470 $1,626

Doors - Side-lite 2nd Floor Girls- next to 203 6SF12 $201

Doors - Wood Doors inclu hw 2nd Floor Girls- next to 203 6EA1 $301

Floor Drain 2nd Floor Girls- next to 203 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 2nd Floor Girls- next to 203 6SF465 $984

Floor - Tile Ceramic/ Porcelain 2nd Floor Girls- next to 203 broken tile5SF5 $104

Hand Dryer 2nd Floor Girls- next to 203 6EA1 $230

Lavatory 2nd Floor Girls- next to 203 6EA3 $959

Lighting - Pendent/Surface 2nd Floor Girls- next to 203 7EA4 $0

Partitions 2nd Floor Girls- next to 203 6EA4 $1,188

Walls - Masonry 2nd Floor Girls- next to 203 6SF300 $944

Walls - Plaster/Drywall 2nd Floor Girls- next to 203 6SF400 $1,104

Walls - Structural Glazed Tile 2nd Floor Girls- next to 203 6SF325 $1,022

Water Closet 2nd Floor Girls- next to 203 6EA3 $1,008

Accessories 2nd Floor next to 205 6SF42 $387

Ceiling - Plaster/Drywall 2nd Floor next to 205 6SF42 $145

Doors - Wood Doors inclu hw 2nd Floor next to 205 6EA1 $301

Floor Drain 2nd Floor next to 205 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 2nd Floor next to 205 6SF42 $89

Lavatory 2nd Floor next to 205 6EA1 $320

Page 14 of 37RYDER Assessment Date: 11/2/15

Page 15: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Lighting - Pendent/Surface 2nd Floor next to 205 7EA1 $0

Walls - Plaster/Drywall 2nd Floor next to 205 6SF324 $894

Walls - Structural Glazed Tile 2nd Floor next to 205 6SF46 $145

Water Closet 2nd Floor next to 205 6EA1 $336

Accessories 3rd Floor Boys- Across from 300 6SF290 $2,675

Ceiling - Plaster/Drywall 3rd Floor Boys- Across from 300 6SF290 $1,004

Doors - Wood Doors inclu hw 3rd Floor Boys- Across from 300 6EA1 $301

Floor Drain 3rd Floor Boys- Across from 300 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 3rd Floor Boys- Across from 300 cracked tile5SF4 $84

Floor - Tile Ceramic/ Porcelain 3rd Floor Boys- Across from 300 6SF286 $605

Hand Dryer 3rd Floor Boys- Across from 300 6EA1 $230

Lavatory 3rd Floor Boys- Across from 300 6EA2 $639

Lighting - Pendent/Surface 3rd Floor Boys- Across from 300 7EA3 $0

Partitions 3rd Floor Boys- Across from 300 6EA3 $891

Urinals 3rd Floor Boys- Across from 300 6EA4 $1,344

Walls - Plaster/Drywall 3rd Floor Boys- Across from 300 6SF450 $1,242

Walls - Plaster/Drywall 3rd Floor Boys- Across from 300 water damage, cracking4SF10 $147

Walls - Structural Glazed Tile 3rd Floor Boys- Across from 300 6SF460 $1,447

Water Closet 3rd Floor Boys- Across from 300 6EA2 $672

Accessories 3rd Floor Girls- next to 303 6SF470 $4,335

Ceiling - Plaster/Drywall 3rd Floor Girls- next to 303 6SF470 $1,626

Doors - Wood Doors inclu hw 3rd Floor Girls- next to 303 6EA1 $301

Floor Drain 3rd Floor Girls- next to 303 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 3rd Floor Girls- next to 303 6SF470 $995

Hand Dryer 3rd Floor Girls- next to 303 6EA1 $230

Lavatory 3rd Floor Girls- next to 303 6EA3 $959

Lighting - Pendent/Surface 3rd Floor Girls- next to 303 7EA4 $0

Partitions 3rd Floor Girls- next to 303 6EA6 $1,782

Walls - Plaster/Drywall 3rd Floor Girls- next to 303 6SF627 $1,730

Walls - Structural Glazed Tile 3rd Floor Girls- next to 303 6SF627 $1,973

Water Closet 3rd Floor Girls- next to 303 6EA5 $1,680

Accessories 3rd Floor next to 304 6SF42 $387

Ceiling - Plaster/Drywall 3rd Floor next to 304 6SF42 $145

Doors - Wood Doors inclu hw 3rd Floor next to 304 6EA1 $301

Floor Drain 3rd Floor next to 304 6EA1 $1,059

Floor - Tile 3rd Floor next to 304 6SF38 $83

Floor - Tile 3rd Floor next to 304 broken tile5SF4 $23

Page 15 of 37RYDER Assessment Date: 11/2/15

Page 16: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Hand Dryer 3rd Floor next to 304 6EA1 $230

Lavatory 3rd Floor next to 304 6EA1 $320

Lighting - Pendent/Surface 3rd Floor next to 304 7EA1 $0

Walls - Plaster/Drywall 3rd Floor next to 304 6SF324 $894

Walls - Structural Glazed Tile 3rd Floor next to 304 6SF46 $145

Water Closet 3rd Floor next to 304 6EA1 $336

Rooms (Other Than Classrooms) Subtotal: $249,399

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Corridor

Ceiling - Plaster/Drywall 1st Floor damaged ceiling along door frame between main and addition

5SF7 $122

Ceiling - Plaster/Drywall 1st Floor 6SF3,280 $20,309

Drinking Fountains - Single Water Cooler 1st Floor 6EA1 $317

Floor - Tile/Sheet 1st Floor damaged tile5SF7 $40

Floor - Tile/Sheet 1st Floor 6SF3,280 $1,782

Doors - Steel Doors incl hw 1st Floor by elevator6EA2 $602

Lighting - Pendent/Surface 1st Floor 7EA15 $0

Walls - Concrete Block 1st Floor 6SF400 $1,173

Walls - Plaster/Drywall 1st Floor 6SF4,031 $17,869

Ceiling - Plaster/Drywall 2nd Floor 6SF3,600 $22,291

Drinking Fountains - Single Water Cooler 2nd Floor 6EA2 $633

Floor - Asphalt Floor 2nd Floor 5SF3,230 $11,455

Floor - Terrazzo 2nd Floor terrazzo section between addition and main6SF370 $3,106

Lighting - Pendent/Surface 2nd Floor 7EA15 $0

Stairs - Terrazzo 2nd Floor 6LF3 $28

Walls - Plaster/Drywall 2nd Floor cracking along north wall adjacent to north stairwell

6SF6 $37

Walls - Plaster/Drywall 2nd Floor 6SF6,206 $27,511

Ceiling - Plaster/Drywall 3rd Floor 6SF3,037 $18,805

Drinking Fountains - Single Water Cooler 3rd Floor 6EA2 $633

Floor - Asphalt Floor 3rd Floor 5SF3,037 $10,770

Lighting - Pendent/Surface 3rd Floor 7EA12 $0

Walls - Plaster/Drywall 3rd Floor 6SF5,157 $22,861

Page 16 of 37RYDER Assessment Date: 11/2/15

Page 17: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Safety

Metal Dedector sitting in tank room. pulled out when school needs

to use.

6EA1 $881

Security Cameras 6EA2 $388

Stairs

Ceiling - Plaster/Drywall North 6SF487 $3,566

Floor - Asphalt North 5SF294 $4,629

Handrails North 6LF128 $1,109

Lighting - Pendent/Surface North 7EA15 $0

Stairs - Asphalt North 5LF64 $2,708

Walls - Plaster/Drywall North 6SF1,100 $3,036

Ceiling - Plaster/Drywall South 6SF487 $3,566

Floor - Asphalt South 5SF294 $4,629

Handrails South 6LF128 $1,109

Lighting - Pendent/Surface South 7EA15 $0

Stairs - Asphalt South 5LF64 $2,708

Walls - Plaster/Drywall South 6SF1,100 $3,036

Vertical Conveyance

Elevator - Hydraulic Elevator 6EA1 $19,238

Wheelchair Lift - Platform Lift 6EA1 $6,690

Building Interior Subtotal: $217,637

Total Building Cost $2,812,290

Building: Addition

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Entrance

Entrance Control - Audio and Video Door 1 - East 6EA1 $702

Entrance Control - Audio and Video Door 4 - North 6EA1 $702

Exterior Doors - Exterior Steel Door Door 1 - East 6EA6 $2,883

Exterior Doors - Exterior Steel Door Door 1.5 - Southeast 6EA2 $961

Exterior Doors - Exterior Steel Door Door 2 - Southeast 6EA2 $961

Exterior Doors - Exterior Steel Door Door 3.4 5EA1 $1,341

Exterior Doors - Exterior Steel Door Door 4 - North 6EA3 $1,442

Exterior Stairs - Concrete Door 4 - North 6LF36 $2,944

Page 17 of 37RYDER Assessment Date: 11/2/15

Page 18: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Addition

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Entrance

Exterior Stairs - Stone Door 1 - East 6LF10 $1,130

Ramp Handrail - Steel_Ramp Handrail Door 1.5 - Southeast 6LF15 $130

Ramps - Concrete Door 1.5 - Southeast 6LF20 $3,005

Stair Handrail - Steel_Stair Handrail Door 4 - North 6LF25 $217

Foundation

Foundation - Concrete Entire Building 7LF409 $0

Superstructure - Metal Deck/ Concrete Topping Entire Building 7SF35,326 $0

Lighting

Exterior Lighting - Parapet or Roof Mounted Entire Building 6EA3 $1,610

Exterior Lighting - Parapet or Roof Mounted Entire Building 4EA1 $5,095

Exterior Lighting - Wall Mounted Entire Building 6EA3 $866

Roof System

Coping - Metal Roof 1 6LF450 $14,453

Coping - Metal Roof 2 6LF75 $2,409

Coping - Metal Roof 3 7LF165 $0

Coping - Metal Roof 4 6LF75 $2,409

Coping - Stone Roof 3 6LF15 $482

Downspouts - Exterior Downspouts Roof 4 7LF3 $0

Downspouts - Interior Downspouts Roof 1 7LF105 $0

Downspouts - Interior Downspouts Roof 2 7LF15 $0

Downspouts - Interior Downspouts Roof 3 7LF30 $0

Parapet - 16" - 30" Height Roof 4 6LF75 $2,997

Parapet - Parapet < 16" Height Roof 3 6LF65 $1,385

Roof Structure - Steel / Metal Deck/ Concrete Topping Roof 1 7SF9,920 $0

Roof Structure - Steel / Metal Deck/ Concrete Topping Roof 2 7SF1,242 $0

Roof Structure - Steel / Metal Deck/ Concrete Topping Roof 3 7SF1,700 $0

Roof Structure - Steel / Metal Deck/ Concrete Topping Roof 4 7SF294 $0

Roof - Asphalt Gravel Ballast Roof 1 6SF9,920 $100,860

Roof - Modified Bitumen Roof 2 6SF1,242 $11,686

Roof - Modified Bitumen Roof 3 Ponding causing surface deterioration5SF50 $1,428

Roof - Modified Bitumen Roof 3 6SF1,650 $15,526

Roof - Modified Bitumen Roof 4 Ponding4SF294 $8,059

Walls

Exterior Walls - Brick Entire Building 6SF16,499 $110,890

Page 18 of 37RYDER Assessment Date: 11/2/15

Page 19: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Addition

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Windows

Guard - Guards perforated Entire Building 6SF1,795 $22,922

Lintels - Steel Entire Building 7LF852 $0

Windows - Sash Aluminum Double-pane Entire Building 5SF4,986 $268,586

Building Exterior Subtotal: $588,079

Building: Addition

Category: Electrical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Emergency System

Emergency A/C Power - Corridors and Stairs Entire Building 6SF9,168 $2,753

Emergency A/C Power - Lunchrooms Entire Building / 1st Floor 6SF1,749 $650

Emergency A/C Power - Students Toilets Entire Building 6SF1,598 $594

Exit Signs - Corridors and Stairs Entire Building 6EA12 $1,797

Exit Signs - Lunchroom Entire Building / 1st Floor 6EA3 $449

Security System - CCTV Entire Building 6SF35,326 $10,608

Security System - Intrusion Detection Entire Building 6SF35,326 $9,093

UPS - Less than 30 KW MDF Room 7EA1 $0

Main Service

PA System Entire Building Serves the main and addition. Control console located in the addition.

6SF35,326 $11,619

Power Distribution

Lighting and Power Panels - 100 A Entire Building / 1st Floor 6EA1 $299

Lighting and Power Panels - Above 100 A Entire Building / 1st Floor 6EA1 $497

Lighting and Power Panels - Above 100 A Entire Building 6EA4 $1,988

Electrical System Subtotal: $40,348

Building: Addition

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Heating Devices

Cabinet Heaters - With Hot Water Coil Entire Building Wall mounted thermostats. 6EA15 $5,315

Fin Tube - Hot Water Stairwell 6LF24 $227

Unit Heater - Electric Entire Building / 1st Floor Boy's Toilet Room. Integral thermostat.6EA1 $278

Page 19 of 37RYDER Assessment Date: 11/2/15

Page 20: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Addition

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Heating Devices

Unit Heater - Electric Entire Building / 3rd Floor Kitchen. Integral thermostat. 6EA1 $278

Wall Heater - Electric Entire Building 6EA2 $278

Mechanical Plumbing

Hydronic Supply and Return - Galvanized Entire Building 6LF800 $61,856

Temperature Control

Pneumatic System Entire Building 6SF35,326 $18,691

Thermostats - Pneumatic Entire Building / 1st Floor Unit ventilator thermostat.4EA1 $737

Thermostats - Pneumatic Entire Building / 1st Floor Cabinet heater thermostat. 4EA1 $737

Thermostats - Pneumatic Entire Building / 3rd Floor Unit ventilator thermostats.4EA2 $1,474

Thermostats - Pneumatic Entire Building for unit ventilators and for cabinet heaters. 6EA30 $0

Unit Ventilation

Unit Ventilators- Floor Mounted- Hot Water Heating Coils Only Entire Building / 1st Floor Serve the lunchroom. 5EA2 $17,126

Unit Ventilators- Floor Mounted- Hot Water Heating Coils Only Entire Building Serve the classrooms and some offices. 5EA25 $214,072

Ventilation

Exhaust Fans- Roof Mounted - 1501 - 8000 CFM Entire Building / Lower Roof 6EA1 $592

Exhaust Fans- Roof Mounted - 1501 - 8000 CFM Entire Building / Roof 6EA3 $1,777

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Entire Building / Roof 6EA1 $592

Exhaust Fans- Roof Mounted - Less than 500 CFM Entire Building / Roof 6EA2 $592

Type I Exhaust Hood- Kitchen Entire Building / 1st Floor No fire suppression system and equipment did not fit under the hood.

2EA1 $28,265

Type II Exhaust Hood- Warming Kitchen Entire Building / 1st Floor Dishwasher hood. 6EA1 $920

Mechanical System Subtotal: $353,807

Building: Addition

Category: Plumbing System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Hot Water

Electric Heater - Less than 20 KW Kitchen Serves the dishwasher. 6EA1 $682

Piping

Domestic Piping-Cold Water from Risers to Fixtures Entire Building 6SF35,326 $7,072

Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF35,326 $8,588

Domestic Piping-Cold Water Risers Entire Building 6SF35,326 $6,567

Domestic Piping-Hot Water from Risers to Fixtures Entire Building 6SF35,326 $5,557

Page 20 of 37RYDER Assessment Date: 11/2/15

Page 21: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Addition

Category: Plumbing System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Piping

Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF35,326 $6,567

Domestic Piping-Hot Water Return Lines Entire Building 6SF35,326 $5,052

Domestic Piping-Hot Water Return Risers Entire Building 6SF35,326 $5,052

Sanitary Piping Entire Building 6SF35,326 $32,330

Storm Piping Entire Building 6SF35,326 $30,815

Vent Piping Entire Building 6SF35,326 $23,743

Pumps

Pumps - Sump-Simplex 1st Floor Elevator sump pump. 6EA1 $745

Plumbing System Subtotal: $132,769

Building: Addition

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #109 (Kindergarten)

AC Units 1st Floor on the lighting panel3EA2 $12,173

Casework 1st Floor 6LF43 $1,086

Ceiling - Plaster/Drywall 1st Floor 6SF1,043 $3,609

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor 6SF1,043 $2,282

Lighting - Pendent/Surface 1st Floor 7EA22 $0

Storage/ Closet 1st Floor 6SF47 $341

Walls - Concrete Block 1st Floor 6SF1,059 $3,104

Work Sink 1st Floor 6EA1 $379

Classroom #113 (Pre School)

AC Units 1st Floor on the lighting panel3EA2 $12,173

Casework 1st Floor 6LF43 $1,086

Ceiling - Plaster/Drywall 1st Floor 6SF1,043 $3,609

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Floor - Tile 1st Floor old & lifting5SF1,043 $4,683

Lighting - Pendent/Surface 1st Floor 7EA17 $0

Storage/ Closet 1st Floor 6SF47 $341

Walls - Concrete Block 1st Floor crack 5SF3 $42

Walls - Concrete Block 1st Floor 6SF1,056 $3,096

Work Sink 1st Floor 6EA1 $379

Page 21 of 37RYDER Assessment Date: 11/2/15

Page 22: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Addition

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #207 (Other Instructional Use)

AC Units 2nd Floor on the lighting panel3EA1 $6,086

Casework 2nd Floor 6LF17 $429

Ceiling - Plaster/Drywall 2nd Floor 6SF788 $2,727

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Tile 2nd Floor old5SF788 $3,538

Lighting - Pendent/Surface 2nd Floor 7EA16 $0

Marker Board 2nd Floor 7LF18 $0

Walls - Concrete Block 2nd Floor 6SF916 $2,685

Classroom #208 (Regular Classroom)

AC Units 2nd Floor on the lighting panel3EA1 $6,086

Casework 2nd Floor 6LF14 $354

Ceiling - Plaster/Drywall 2nd Floor 6SF788 $2,727

Chalk Board 2nd Floor 4LF28 $2,571

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Tile 2nd Floor old5SF788 $3,538

Lighting - Pendent/Surface 2nd Floor 7EA16 $0

Marker Board 2nd Floor 7LF16 $0

Walls - Concrete Block 2nd Floor 6SF916 $2,685

Classroom #209 (Store Room)

AC Units 2nd Floor on the lighting panel3EA1 $6,086

Casework 2nd Floor 6LF14 $354

Ceiling - Plaster/Drywall 2nd Floor 6SF810 $2,803

Chalk Board 2nd Floor 4LF28 $2,571

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Tile 2nd Floor old5SF810 $3,637

Lighting - Pendent/Surface 2nd Floor 7EA16 $0

Marker Board 2nd Floor 7LF16 $0

Walls - Concrete Block 2nd Floor 6SF928 $2,720

Work Sink 2nd Floor does not appear to be working5EA1 $1,508

Classroom #210 (Other Instructional Use)

AC Units 2nd Floor on the lighting panel3EA1 $6,086

Casework 2nd Floor 6LF14 $354

Ceiling - Plaster/Drywall 2nd Floor 6SF810 $2,803

Chalk Board 2nd Floor 4LF28 $2,571

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Tile 2nd Floor 6SF810 $1,772

Page 22 of 37RYDER Assessment Date: 11/2/15

Page 23: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Addition

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #210 (Other Instructional Use)

Lighting - Pendent/Surface 2nd Floor 7EA16 $0

Marker Board 2nd Floor 7LF16 $0

Walls - Concrete Block 2nd Floor 6SF928 $2,720

Classroom #211 (Regular Classroom)

AC Units 2nd Floor on the lighting panel3EA1 $6,086

Casework 2nd Floor 6LF14 $354

Ceiling - Plaster/Drywall 2nd Floor 6SF810 $2,803

Chalk Board 2nd Floor 4LF28 $2,571

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Tile 2nd Floor old5SF810 $3,637

Lighting - Pendent/Surface 2nd Floor 7EA16 $0

Marker Board 2nd Floor 7LF16 $0

Walls - Concrete Block 2nd Floor 6SF928 $2,720

Classroom #212 (Office)

AC Units 2nd Floor on the lighting panel3EA1 $6,086

Casework 2nd Floor 6LF14 $354

Ceiling - Plaster/Drywall 2nd Floor 6SF788 $2,727

Chalk Board 2nd Floor 4LF18 $1,653

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Tile 2nd Floor old5SF788 $3,538

Lighting - Pendent/Surface 2nd Floor 7EA16 $0

Marker Board 2nd Floor 7LF26 $0

Walls - Concrete Block 2nd Floor 6SF916 $2,685

Classroom #213 (Art Room)

AC Units 2nd Floor on the lighting panel3EA1 $6,086

Casework 2nd Floor 6LF14 $354

Ceiling - Plaster/Drywall 2nd Floor 6SF788 $2,727

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Tile 2nd Floor 6SF788 $1,724

Lighting - Pendent/Surface 2nd Floor 7EA16 $0

Marker Board 2nd Floor 7LF6 $0

Walls - Concrete Block 2nd Floor 6SF916 $2,685

Classroom #307 (Regular Classroom)

AC Units 3rd Floor on the lighting panel3EA1 $6,086

Casework 3rd Floor 6LF14 $354

Page 23 of 37RYDER Assessment Date: 11/2/15

Page 24: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Addition

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #307 (Regular Classroom)

Ceiling - Plaster/Drywall 3rd Floor 6SF788 $2,727

Chalk Board 3rd Floor 4LF24 $2,203

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Tile 3rd Floor old5SF788 $3,538

Lighting - Pendent/Surface 3rd Floor covers missing6EA3 $372

Lighting - Pendent/Surface 3rd Floor 7EA13 $0

Marker Board 3rd Floor 7LF18 $0

Walls - Concrete Block 3rd Floor crack5SF3 $42

Walls - Concrete Block 3rd Floor 6SF913 $2,676

Classroom #308 (Regular Classroom)

AC Units on the lighting panel3EA1 $6,086

Casework 6LF17 $429

Ceiling - Plaster/Drywall damaged5SF3 $37

Ceiling - Plaster/Drywall 6SF789 $2,730

Chalk Board 4LF16 $1,469

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Tile old5SF792 $3,556

Lighting - Pendent/Surface 7EA16 $0

Marker Board 7LF16 $0

Walls - Concrete Block 6SF916 $2,685

Classroom #309 (Science Classroom)

AC Units 3rd Floor on the lighting panel3EA1 $6,086

Casework 3rd Floor 6LF17 $429

Ceiling - Plaster/Drywall 3rd Floor 6SF810 $2,803

Chalk Board 3rd Floor 4LF16 $1,469

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Tile 3rd Floor old5SF810 $3,637

Lighting - Pendent/Surface 3rd Floor 7EA16 $0

Marker Board 3rd Floor 7LF18 $0

Walls - Concrete Block 3rd Floor crack5SF5 $70

Walls - Concrete Block 3rd Floor 6SF923 $2,706

Work Sink 3rd Floor 6EA1 $379

Classroom #310 (Regular Classroom)

AC Units 3rd Floor on the lighting panel3EA1 $6,086

Casework 3rd Floor 6LF14 $354

Ceiling - Plaster/Drywall 3rd Floor 6SF792 $2,741

Page 24 of 37RYDER Assessment Date: 11/2/15

Page 25: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Addition

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #310 (Regular Classroom)

Chalk Board 3rd Floor 4LF16 $1,469

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Tile 3rd Floor 6SF792 $1,733

Lighting - Pendent/Surface 3rd Floor 7EA16 $0

Marker Board 3rd Floor 7LF10 $0

Walls - Concrete Block 3rd Floor 6SF916 $2,685

Classroom #311 (Regular Classroom)

AC Units 3rd Floor on the lighting panel3EA1 $6,086

Casework 3rd Floor 6LF17 $429

Ceiling - Plaster/Drywall 3rd Floor 6SF810 $2,803

Chalk Board 3rd Floor 4LF16 $1,469

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Tile 3rd Floor old5SF810 $3,637

Lighting - Pendent/Surface 3rd Floor 7EA16 $0

Marker Board 3rd Floor 7LF10 $0

Walls - Concrete Block 3rd Floor crack5SF2 $28

Walls - Concrete Block 3rd Floor 6SF926 $2,715

Classroom #312 (Regular Classroom)

AC Units 3rd Floor on the lighting panel3EA1 $6,086

Casework 3rd Floor 6LF7 $177

Ceiling - Plaster/Drywall 3rd Floor 6SF788 $2,727

Chalk Board 3rd Floor 4LF12 $1,102

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Tile 3rd Floor old5SF788 $3,538

Lighting - Pendent/Surface 3rd Floor 7EA16 $0

Marker Board 3rd Floor 7LF28 $0

Walls - Concrete Block 3rd Floor 6SF916 $2,685

Classroom #313 (Multi Purpose Room)

AC Units 3rd Floor on the lighting panel3EA1 $6,086

Casework 3rd Floor 6LF14 $354

Ceiling - Plaster/Drywall 3rd Floor 6SF787 $2,723

Ceiling - Plaster/Drywall 3rd Floor damaged5SF1 $12

Chalk Board 3rd Floor 4LF42 $3,856

Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301

Floor - Tile 3rd Floor old5SF788 $3,538

Lighting - Pendent/Surface 3rd Floor 7EA16 $0

Page 25 of 37RYDER Assessment Date: 11/2/15

Page 26: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Addition

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #313 (Multi Purpose Room)

Marker Board 3rd Floor 7LF48 $0

Walls - Concrete Block 3rd Floor 6SF916 $2,685

Classrooms Subtotal: $291,778

Building: Addition

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

AC Unit 1st Floor - Principal on lighting panel & improper bracing3EA1 $6,086

Ceiling - Plaster/Drywall 1st Floor - Principal 6SF163 $564

Doors - Wood Doors inclu hw 1st Floor - Principal 6EA1 $301

Floor - Carpet 1st Floor - Principal old 5SF163 $837

Lighting - Pendent/Surface 1st Floor - Principal 7EA4 $0

Power Distribution 1st Floor - Principal 7EA6 $0

Storage/ Closet 1st Floor - Principal 6SF9 $65

Walls - Concrete Block 1st Floor - Principal 6SF492 $1,442

AC Unit 1st Floor Main Office on the lighting panel & improper bracing3EA1 $6,086

Ceiling - Plaster/Drywall 1st Floor Main Office 6SF411 $1,422

Doors - Side-lite 1st Floor Main Office 6SF11 $184

Doors - Wood Doors inclu hw 1st Floor Main Office 6EA2 $602

Floor - Carpet 1st Floor Main Office runs, stained, old4SF271 $2,492

Floor - Tile Ceramic/ Porcelain 1st Floor Main Office 6SF140 $296

Lighting - Pendent/Surface 1st Floor Main Office 7EA7 $0

Power Distribution 1st Floor Main Office 7EA14 $0

Walls - Concrete Block 1st Floor Main Office 6SF549 $1,609

Walls - Plaster/Drywall 1st Floor Main Office 6SF183 $505

AC Unit 1st Flr- Conference Rm in Main Office on the lighting panel & improper bracing3EA1 $6,086

Ceiling - Plaster/Drywall 1st Flr- Conference Rm in Main Office 6SF360 $1,246

Doors - Wood Doors inclu hw 1st Flr- Conference Rm in Main Office 6EA2 $602

Floor - Carpet 1st Flr- Conference Rm in Main Office runs, stained, old4SF340 $3,126

Floor - Tile Ceramic/ Porcelain 1st Flr- Conference Rm in Main Office 6SF20 $42

Lighting - Pendent/Surface 1st Flr- Conference Rm in Main Office 7EA8 $0

Power Distribution 1st Flr- Conference Rm in Main Office 7EA10 $0

Storage/ Closet 1st Flr- Conference Rm in Main Office 6SF29 $210

Walls - Concrete Block 1st Flr- Conference Rm in Main Office 6SF549 $1,609

Walls - Plaster/Drywall 1st Flr- Conference Rm in Main Office 6SF183 $505

Page 26 of 37RYDER Assessment Date: 11/2/15

Page 27: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Addition

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Ceiling - Plaster/Drywall 1st Flr- Kitchen Office 6SF66 $228

Doors - Wood Doors inclu hw 1st Flr- Kitchen Office 6EA1 $301

Floor - Tile Ceramic/ Porcelain 1st Flr- Kitchen Office 6SF66 $140

Lighting - Lay-in 1st Flr- Kitchen Office 7EA1 $0

Power Distribution 1st Flr- Kitchen Office 7EA4 $0

Walls - Concrete Block 1st Flr- Kitchen Office 6SF278 $815

Ceiling - Plaster/Drywall 2nd Floor Rm 212B- Counselor's Office 6SF243 $841

Doors - Wood Doors inclu hw 2nd Floor Rm 212B- Counselor's Office 6EA2 $602

Floor - Tile 2nd Floor Rm 212B- Counselor's Office 6SF242 $529

Floor - Tile 2nd Floor Rm 212B- Counselor's Office damaged5SF1 $6

Lighting - Pendent/Surface 2nd Floor Rm 212B- Counselor's Office 7EA4 $0

Power Distribution 2nd Floor Rm 212B- Counselor's Office 7EA6 $0

Walls - Concrete Block 2nd Floor Rm 212B- Counselor's Office 6SF612 $1,794

Ceiling - Plaster/Drywall 3rd Floor Rm 312B- Asst Principal 6SF243 $841

Doors - Wood Doors inclu hw 3rd Floor Rm 312B- Asst Principal 6EA2 $602

Floor - Tile 3rd Floor Rm 312B- Asst Principal 6SF243 $532

Lighting - Pendent/Surface 3rd Floor Rm 312B- Asst Principal 7EA4 $0

Power Distribution 3rd Floor Rm 312B- Asst Principal 7EA6 $0

Walls - Concrete Block 3rd Floor Rm 312B- Asst Principal 6SF612 $1,794

Kitchen

Ceiling - Plaster/Drywall 1st Floor 6SF494 $1,710

Doors - Wood Doors inclu hw 1st Floor 6EA2 $602

Floor - Tile Ceramic/ Porcelain 1st Floor 6SF494 $1,046

Lighting - Lay-in 1st Floor 7EA12 $0

Serving Line 1st Floor 6LF18 $1,071

Storage/ Closet 1st Floor door is scraping at top & ruining veneer5SF72 $1,161

Walls - Structural Glazed Tile 1st Floor 6SF1,008 $3,171

Library

AC Unit 1st Flr- Rm 108 on lighting panel, improper bracing & very old units3EA2 $12,173

Casework 1st Flr- Rm 108 6LF90 $2,273

Ceiling - Plaster/Drywall 1st Flr- Rm 108 6SF1,161 $4,018

Ceiling - Plaster/Drywall 1st Flr- Rm 108 damaged5SF2 $25

Doors - Wood Doors inclu hw 1st Flr- Rm 108 6EA2 $602

Floor - Tile 1st Flr- Rm 108 old 5SF1,163 $5,222

Lighting - Pendent/Surface 1st Flr- Rm 108 7EA24 $0

Walls - Concrete Block 1st Flr- Rm 108 6SF1,356 $3,975

Page 27 of 37RYDER Assessment Date: 11/2/15

Page 28: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Addition

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Locker/Shower Room

Accessories 1st Flr- Kitchen Staff Locker Rm-

Across from kitchen

6SF62 $243

Ceiling - Plaster/ Drywall 1st Flr- Kitchen Staff Locker Rm- Across from kitchen

6SF62 $215

Doors - Wood Doors inclu hw 1st Flr- Kitchen Staff Locker Rm- Across from kitchen

6EA1 $301

Floor - Tile Ceramic/ Porcelain 1st Flr- Kitchen Staff Locker Rm- Across from kitchen

6SF62 $131

Lavatory 1st Flr- Kitchen Staff Locker Rm- Across from kitchen

6EA1 $320

Lighting - Lay-in 1st Flr- Kitchen Staff Locker Rm-

Across from kitchen

6EA1 $119

Lighting - Wall Mounted 1st Flr- Kitchen Staff Locker Rm- Across from kitchen

7EA1 $0

Partitions 1st Flr- Kitchen Staff Locker Rm- Across from kitchen

7EA1 $0

Student Lockers - One Tier 1st Flr- Kitchen Staff Locker Rm- Across from kitchen

6EA3 $279

Walls - Concrete Block 1st Flr- Kitchen Staff Locker Rm- Across from kitchen

6SF252 $739

Water Closet 1st Flr- Kitchen Staff Locker Rm-

Across from kitchen

6EA1 $336

Lunch & Multipurpose Room

AC Unit 1st Floor on lighting panel3EA2 $12,173

Ceiling - Plaster/Drywall 1st Floor 6SF1,749 $6,053

Doors - Wood Doors inclu hw 1st Floor 6EA2 $602

Floor - Tile 1st Floor 6SF1,749 $3,827

Lighting - Pendent/Surface 1st Floor 7EA41 $0

Walls - Concrete Block 1st Floor 6SF1,760 $5,159

MDF_IDF

AC Unit 1st Floor unsure if on a dedicated circuit or lighting panel,

so assumption is made based on all other ACs

3EA1 $6,086

Doors - Wood Doors inclu hw 1st Floor 6EA1 $301

Finishes 1st Floor 6SF196 $1,399

Mechanical/ Service Rooms

Janitor's Closet 1st Floor floor tiles missing & door can't close, warped5SF59 $952

Mechanical/ Service Rooms 1st Floor 6SF44 $315

Storage Room 1st Floor 6SF95 $681

Vaults 1st Floor In Main6SF66 $473

Page 28 of 37RYDER Assessment Date: 11/2/15

Page 29: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Addition

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Mechanical/ Service Rooms

Janitor's Closet 2nd Floor 6SF59 $423

Storage Room 2nd Floor 10' of tile damaged6SF443 $3,174

Janitor's Closet 3rd Floor no floor tiles5SF59 $952

Mechanical/ Service Rooms 3rd Floor 6SF43 $308

Storage Room 3rd Floor book room6SF136 $974

Restroom

Accessories 1st Floor Boys- Next to library 6SF244 $2,251

Ceiling - Plaster/Drywall 1st Floor Boys- Next to library water damaged throughout4SF244 $3,674

Doors - Wood Doors inclu hw 1st Floor Boys- Next to library 6EA2 $602

Floor Drain 1st Floor Boys- Next to library 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 1st Floor Boys- Next to library 6SF244 $516

Lavatory 1st Floor Boys- Next to library 6EA3 $959

Lighting - Pendent/Surface 1st Floor Boys- Next to library 7EA4 $0

Partitions 1st Floor Boys- Next to library 6EA2 $594

Urinals 1st Floor Boys- Next to library 1 urinal is continually running6EA5 $1,680

Walls - Concrete Block 1st Floor Boys- Next to library 6SF611 $1,791

Water Closet 1st Floor Boys- Next to library 6EA2 $672

Accessories 1st Floor Girls- Across from Lunchroom 6SF272 $2,509

Ceiling - Plaster/Drywall 1st Floor Girls- Across from Lunchroom 6SF272 $941

Doors - Wood Doors inclu hw 1st Floor Girls- Across from Lunchroom 6EA3 $903

Floor Drain 1st Floor Girls- Across from Lunchroom 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 1st Floor Girls- Across from Lunchroom 6SF272 $576

Lavatory 1st Floor Girls- Across from Lunchroom 6EA3 $959

Lighting - Pendent/Surface 1st Floor Girls- Across from Lunchroom 7EA4 $0

Partitions 1st Floor Girls- Across from Lunchroom 6EA6 $1,782

Walls - Structural Glazed Tile 1st Floor Girls- Across from Lunchroom 6SF708 $2,227

Water Closet 1st Floor Girls- Across from Lunchroom 6EA7 $2,352

Accessories 1st Floor, Unisex Staff In MDF Rm 6SF29 $267

Ceiling - Plaster/Drywall 1st Floor, Unisex Staff In MDF Rm 6SF29 $100

Doors - Wood Doors inclu hw 1st Floor, Unisex Staff In MDF Rm 6EA1 $301

Floor - Tile Ceramic/ Porcelain 1st Floor, Unisex Staff In MDF Rm 6SF29 $61

Lavatory 1st Floor, Unisex Staff In MDF Rm 6EA1 $320

Lighting - Lay-in 1st Floor, Unisex Staff In MDF Rm 7EA1 $0

Walls - Concrete Block 1st Floor, Unisex Staff In MDF Rm 6SF172 $504

Water Closet 1st Floor, Unisex Staff In MDF Rm 6EA1 $336

Accessories 1st Flr- In 113 6SF25 $231

Ceiling - Plaster/Drywall 1st Flr- In 113 6SF25 $87

Page 29 of 37RYDER Assessment Date: 11/2/15

Page 30: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Addition

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Doors - Wood Doors inclu hw 1st Flr- In 113 6EA1 $301

Floor Drain 1st Flr- In 113 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 1st Flr- In 113 6SF25 $53

Lavatory 1st Flr- In 113 6EA1 $320

Lighting - Lay-in 1st Flr- In 113 7EA1 $0

Walls - Concrete Block 1st Flr- In 113 6SF160 $469

Water Closet 1st Flr- In 113 6EA1 $336

Accessories 1st Flr- In Main Office 6SF42 $387

Ceiling - Plaster/Drywall 1st Flr- In Main Office 6SF42 $145

Doors - Wood Doors inclu hw 1st Flr- In Main Office 6EA1 $301

Floor - Tile Ceramic/ Porcelain 1st Flr- In Main Office 6SF42 $89

Lavatory 1st Flr- In Main Office cracked porcelain5EA1 $1,590

Lighting - Pendent/Surface 1st Flr- In Main Office 7EA1 $0

Lighting - Wall Mounted 1st Flr- In Main Office not working4EA1 $393

Walls - Concrete Block 1st Flr- In Main Office 6SF186 $545

Water Closet 1st Flr- In Main Office 6EA1 $336

Accessories 1st Flr- In Rm 109 6SF25 $231

Ceiling - Plaster/Drywall 1st Flr- In Rm 109 6SF25 $87

Doors - Wood Doors inclu hw 1st Flr- In Rm 109 6EA1 $301

Floor Drain 1st Flr- In Rm 109 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 1st Flr- In Rm 109 6SF25 $53

Lavatory 1st Flr- In Rm 109 6EA1 $320

Lighting - Lay-in 1st Flr- In Rm 109 7EA1 $0

Walls - Concrete Block 1st Flr- In Rm 109 6SF160 $469

Water Closet 1st Flr- In Rm 109 6EA1 $336

Accessories 2nd Floor Boys- Across from 209 6SF244 $2,251

Ceiling - Plaster/Drywall 2nd Floor Boys- Across from 209 water damaged5SF5 $62

Ceiling - Plaster/Drywall 2nd Floor Boys- Across from 209 6SF239 $827

Doors - Wood Doors inclu hw 2nd Floor Boys- Across from 209 6EA4 $1,204

Floor Drain 2nd Floor Boys- Across from 209 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 2nd Floor Boys- Across from 209 6SF244 $516

Lavatory 2nd Floor Boys- Across from 209 6EA3 $959

Lighting - Pendent/Surface 2nd Floor Boys- Across from 209 7EA4 $0

Partitions 2nd Floor Boys- Across from 209 6EA2 $594

Urinals 2nd Floor Boys- Across from 209 6EA5 $1,680

Walls - Concrete Block 2nd Floor Boys- Across from 209 6SF611 $1,791

Water Closet 2nd Floor Boys- Across from 209 6EA2 $672

Page 30 of 37RYDER Assessment Date: 11/2/15

Page 31: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Addition

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Accessories 2nd Floor Girls- Across from 207 6SF272 $2,509

Ceiling - Plaster/Drywall 2nd Floor Girls- Across from 207 6SF272 $941

Doors - Wood Doors inclu hw 2nd Floor Girls- Across from 207 6EA4 $1,204

Floor Drain 2nd Floor Girls- Across from 207 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 2nd Floor Girls- Across from 207 6SF272 $576

Lavatory 2nd Floor Girls- Across from 207 6EA3 $959

Lighting - Pendent/Surface 2nd Floor Girls- Across from 207 7EA4 $0

Partitions 2nd Floor Girls- Across from 207 1 partition falling over 5EA1 $751

Partitions 2nd Floor Girls- Across from 207 6EA6 $1,782

Walls - Concrete Block 2nd Floor Girls- Across from 207 6SF708 $2,076

Water Closet 2nd Floor Girls- Across from 207 6EA7 $2,352

Accessories 2nd Floor, Staff- Across from 207 6SF60 $553

Ceiling - Plaster/Drywall 2nd Floor, Staff- Across from 207 6SF60 $208

Doors - Wood Doors inclu hw 2nd Floor, Staff- Across from 207 6EA1 $301

Floor - Tile Ceramic/ Porcelain 2nd Floor, Staff- Across from 207 6SF60 $127

Lavatory 2nd Floor, Staff- Across from 207 6EA1 $320

Lighting - Lay-in 2nd Floor, Staff- Across from 207 7EA1 $0

Lighting - Wall Mounted 2nd Floor, Staff- Across from 207 7EA1 $0

Walls - Concrete Block 2nd Floor, Staff- Across from 207 crack in cmu5SF4 $56

Walls - Concrete Block 2nd Floor, Staff- Across from 207 6SF266 $780

Water Closet 2nd Floor, Staff- Across from 207 6EA1 $336

Accessories 2nd Floor, Women's Next to 211 6SF82 $756

Ceiling - Plaster/Drywall 2nd Floor, Women's Next to 211 6SF83 $287

Doors - Wood Doors inclu hw 2nd Floor, Women's Next to 211 6EA1 $301

Floor Drain 2nd Floor, Women's Next to 211 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 2nd Floor, Women's Next to 211 6SF83 $176

Hand Dryer 2nd Floor, Women's Next to 211 6EA1 $230

Lavatory 2nd Floor, Women's Next to 211 6EA1 $320

Lighting - Lay-in 2nd Floor, Women's Next to 211 7EA1 $0

Walls - Concrete Block 2nd Floor, Women's Next to 211 6SF310 $909

Water Closet 2nd Floor, Women's Next to 211 6EA1 $336

Accessories 3rd Floor Boys- across from 309 6SF244 $2,251

Ceiling - Plaster/Drywall 3rd Floor Boys- across from 309 6SF244 $844

Doors - Wood Doors inclu hw 3rd Floor Boys- across from 309 6EA4 $1,204

Floor Drain 3rd Floor Boys- across from 309 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 3rd Floor Boys- across from 309 6SF232 $491

Floor - Tile Ceramic/ Porcelain 3rd Floor Boys- across from 309 cracked tile5SF12 $251

Page 31 of 37RYDER Assessment Date: 11/2/15

Page 32: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Addition

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Lavatory 3rd Floor Boys- across from 309 6EA3 $959

Lighting - Pendent/Surface 3rd Floor Boys- across from 309 7EA4 $0

Partitions 3rd Floor Boys- across from 309 6EA2 $594

Urinals 3rd Floor Boys- across from 309 6EA5 $1,680

Walls - Structural Glazed Tile 3rd Floor Boys- across from 309 6SF611 $1,922

Walls - Structural Glazed Tile 3rd Floor Boys- across from 309 damaged5SF1 $64

Water Closet 3rd Floor Boys- across from 309 6EA2 $672

Accessories 3rd Floor Girls- Across from 307 6SF272 $2,509

Ceiling - Plaster/Drywall 3rd Floor Girls- Across from 307 6SF272 $941

Doors - Wood Doors inclu hw 3rd Floor Girls- Across from 307 6EA4 $1,204

Floor Drain 3rd Floor Girls- Across from 307 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 3rd Floor Girls- Across from 307 6SF272 $576

Lavatory 3rd Floor Girls- Across from 307 6EA3 $959

Lighting - Pendent/Surface 3rd Floor Girls- Across from 307 7EA4 $0

Partitions 3rd Floor Girls- Across from 307 6EA6 $1,782

Walls - Structural Glazed Tile 3rd Floor Girls- Across from 307 6SF708 $2,227

Water Closet 3rd Floor Girls- Across from 307 6EA7 $2,352

Accessories 3rd Floor Staff- Across from 307 6SF60 $553

Ceiling - Plaster/Drywall 3rd Floor Staff- Across from 307 6SF60 $208

Doors - Wood Doors inclu hw 3rd Floor Staff- Across from 307 6EA1 $301

Floor - Tile Ceramic/ Porcelain 3rd Floor Staff- Across from 307 6SF60 $127

Lavatory 3rd Floor Staff- Across from 307 cracks in porcelian5EA1 $1,590

Lighting - Lay-in 3rd Floor Staff- Across from 307 7EA1 $0

Lighting - Wall Mounted 3rd Floor Staff- Across from 307 7EA1 $0

Walls - Concrete Block 3rd Floor Staff- Across from 307 6SF270 $792

Walls - Concrete Block 3rd Floor Staff- Across from 307 cracks5SF5 $70

Water Closet 3rd Floor Staff- Across from 307 6EA1 $336

Accessories 3rd Floor, Women's Next to 311 There was no key to 312B, where this room is located. Asst Principal has only key & she was off for next 2 days. So rankings are assumed, based on identical restroom below (2nd Flr, Women's next to 211).

6SF82 $756

Ceiling - Plaster/Drywall 3rd Floor, Women's Next to 311 6SF82 $284

Doors - Wood Doors inclu hw 3rd Floor, Women's Next to 311 6EA1 $301

Floor Drain 3rd Floor, Women's Next to 311 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 3rd Floor, Women's Next to 311 6SF82 $174

Hand Dryer 3rd Floor, Women's Next to 311 6EA1 $230

Lavatory 3rd Floor, Women's Next to 311 6EA1 $320

Page 32 of 37RYDER Assessment Date: 11/2/15

Page 33: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Addition

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Lighting - Lay-in 3rd Floor, Women's Next to 311 7EA1 $0

Walls - Concrete Block 3rd Floor, Women's Next to 311 6SF310 $909

Water Closet 3rd Floor, Women's Next to 311 6EA1 $336

Rooms (Other Than Classrooms) Subtotal: $233,837

Building: Addition

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Corridor

Ceiling - Lay-in 1st Floor in elevator hall6SF149 $447

Ceiling - Plaster/Drywall 1st Floor damaged- cracks & water damage5SF25 $436

Ceiling - Plaster/Drywall 1st Floor 6SF3,268 $20,235

Doors - Wood Doors include hw 1st Floor 6EA2 $602

Drinking Fountains - Single Fountain 1st Floor 6EA2 $551

Floor - Asphalt Floor 1st Floor by Gym5SF30 $106

Floor - Terrazzo 1st Floor 6SF1,862 $15,630

Floor - Tile Ceramic/ Porcelain 1st Floor in vestibule6SF72 $201

Floor - Tile/Sheet 1st Floor old tiles5SF1,329 $5,967

Floor - Tile/Sheet 1st Floor in elevator hall6SF149 $158

Lighting - Lay-in 1st Floor 7EA3 $0

Lighting - Pendent/Surface 1st Floor 7EA36 $0

Lighting - Wall Mounted 1st Floor 7EA2 $0

Walls - Concrete Block 1st Floor 6SF3,003 $8,803

Walls - Structural Glazed Tile 1st Floor 6SF2,491 $7,837

Ceiling - Lay-in 2nd Floor 6SF149 $447

Ceiling - Plaster/Drywall 2nd Floor cracks5SF25 $436

Ceiling - Plaster/Drywall 2nd Floor 6SF3,268 $20,235

Drinking Fountains - Single Fountain 2nd Floor 6EA3 $827

Floor - Terrazzo 2nd Floor 6SF200 $1,679

Floor - Tile/Sheet 2nd Floor new7SF3,242 $0

Lighting - Lay-in 2nd Floor 7EA3 $0

Lighting - Pendent/Surface 2nd Floor 7EA36 $0

Lighting - Wall Mounted 2nd Floor 7EA2 $0

Walls - Concrete Block 2nd Floor 6SF3,003 $8,803

Walls - Structural Glazed Tile 2nd Floor 6SF2,491 $7,837

Ceiling - Lay-in 3rd Floor in elevator hall6SF378 $1,135

Page 33 of 37RYDER Assessment Date: 11/2/15

Page 34: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Addition

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Corridor

Ceiling - Plaster/Drywall 3rd Floor cracked5SF30 $523

Ceiling - Plaster/Drywall 3rd Floor 6SF1,642 $10,167

Doors - Steel Doors incl hw 3rd Floor 6EA2 $602

Drinking Fountains - Single Fountain 3rd Floor 6EA3 $827

Floor - Terrazzo 3rd Floor at North Stairs6SF100 $839

Floor - Tile/Sheet 3rd Floor new in elevator hall6SF378 $243

Floor - Tile/Sheet 3rd Floor Old tiles- down main hall5SF1,572 $7,059

Lighting - Lay-in 3rd Floor in elevator hall7EA6 $0

Lighting - Pendent/Surface 3rd Floor 7EA22 $0

Student Lockers - One Tier 3rd Floor 6EA101 $9,376

Walls - Concrete Block 3rd Floor 6SF1,656 $4,855

Walls - Concrete Block 3rd Floor cracked5SF4 $56

Walls - Structural Glazed Tile 3rd Floor 6SF1,611 $5,068

Safety

Camera Viewing Station Viewed in the Main office only6EA1 $683

Security Cameras 6EA3 $582

Security Cameras 6EA6 $1,164

Stairs

Ceiling - Plaster/Drywall North 6SF390 $2,855

Floor - Terrazzo North 6SF160 $1,343

Handrails North 6LF88 $763

Lighting - Pendent/Surface North 7EA4 $0

Stairs - Terrazzo North damaged nosing5LF10 $542

Stairs - Terrazzo North 6LF30 $278

Walls - Concrete Block North 6SF1,363 $3,996

Walls - Structural Glazed Tile North 6SF273 $859

Ceiling - Plaster/Drywall South 6SF150 $1,098

Floor - Terrazzo South 6SF74 $621

Handrails South 6LF48 $416

Lighting - Pendent/Surface South 7EA4 $0

Stairs - Terrazzo South nosing damaged5LF20 $1,085

Stairs - Terrazzo South 6LF20 $186

Walls - Concrete Block South 6SF594 $1,741

Walls - Structural Glazed Tile South 6SF119 $374

Vertical Conveyance

Elevator - Hydraulic Elevator 6EA1 $19,238

Page 34 of 37RYDER Assessment Date: 11/2/15

Page 35: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Building: Addition

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Vertical Conveyance

Building Interior Subtotal: $179,815

Total Building Cost $1,820,433

SITE

Category: Site

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Athletic

Lighting Entire Site 5EA4 $22,936

Surface - Asphalt Entire Site 6SF12,143 $29,346

Civil/Drainage

Civil/ Drainage - Catch Basin Entire Site Location: Basket ball court, doesn't drain well5EA1 $2,570

Civil/ Drainage - Catch Basin Entire Site 6EA6 $6,563

Civil/ Drainage - Site Manhole Entire Site 7EA3 $0

Fencing

Fencing - Chain Link Entire Site 6LF248 $4,656

Fencing - New Standard Ornamental Entire Site 6LF1,502 $47,919

Landscape

Landscape - Grass Entire Site 6SF1,951 $1,618

Landscape - Hardscape- Asphalt Entire Site 6SF14,404 $34,810

Landscape - Hardscape- Concrete Entire Site 7SF773 $0

Parkway trees Entire Site 7EA44 $0

Planting Beds/ Area Entire Site 6SF4,549 $7,481

Play Area - Asphalt/ Hardscape Entire Site 6SF45,185 $109,199

Parking Lot

Surface - Asphalt NE Parking Lot 6SF19,484 $47,087

Surface - Concrete NE Parking Lot 6SF694 $1,677

Trash Enclosure - Chain Links NE Parking Lot 6SF636 $11,159

Playground

Equipment - School Age 5-12 Entire Site 7EA1 $0

Surface - Poured Surface Entire Site 6SF2,129 $15,588

Page 35 of 37RYDER Assessment Date: 11/2/15

Page 36: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

SITE

Category: Site

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Sidewalks

Sidewalks - Internal Walks Entire Site 6LF167 $2,006

Sidewalks - Perimeter Sidewalks Entire Site 6SF10,915 $21,696

Signage

Flag Pole - Flag Pole Entire Site / Site - East 7EA1 $0

Marquee - Free Standing Back Lighted Entire Site / North West 7EA1 $0

Site Subtotal: $366,311

Total Site Cost $366,311

Campus Total ² ³

² As stated above, Total Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space

reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus Need includes current deficiencies and is based on current unit cost estimates;

it does not reflect a complete project cost.

³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are

estimates only and are based solely on the data that was collected as of the assessment date in the footer below.

¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked “1” in this report; by the time the report is compiled, they have been resolved.

$4,999,035

Definitions

● Quantity

● Unit

means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because,

depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and

additional work triggered by building codes.

means, for each item, the total number (or amount) of that item that exists and was evaluated.

means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement “EA” for “each.” Other items, like

chimneys, are measured in terms of linear feet (“LF”). Still other items, like flooring, are generally measured in square feet (“SF”).

● Cost

● For the same reason, the Total Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features.

● Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to

alleviate overcrowding; these are viewed as separate capital needs.

Page 36 of 37RYDER Assessment Date: 11/2/15

Page 37: William H Ryder Math & Science Specialty ESschoolreports.cps.edu/Assessment_PDF_Detail_2015/5670D.pdfNov 02, 2015  · William H Ryder Math & Science Specialty ES 8716 S Wallace St

William H Ryder Math & Science Specialty ES8716 S Wallace St Chicago, IL 60620

Classroom Summary

Smart-

Board

Power

Strip

Window

Stop

Operable

Window

Area

Glazed

Window

Area

Noise

Level

Elect.

Outlets

Data

Outlets

Voice

Outlets

Area (SF)Floor Plan

Room

Number

Room

Number

Intended UsageCurrent Usage Room

Location

Main

YYY406090811919200200Regular ClassroomComputer Lab 2nd Floor

YYY4060901261919204204Regular ClassroomComputer Lab 2nd Floor

NYY404060811555205205Regular ClassroomFaculty Lounge 2nd Floor

NYY406090811919100100Regular ClassroomKindergarten 1st Floor

YYY4045904211919302302Regular ClassroomMusic Room 3rd Floor

NYY406090811919103103Regular ClassroomPre School 1st Floor

YYY406090811919201201Regular ClassroomRegular Classroom 2nd Floor

YYY406090811919203203Regular ClassroomRegular Classroom 2nd Floor

NYY404590811919300300Regular ClassroomRegular Classroom 3rd Floor

YYY404590811919301301Regular ClassroomRegular Classroom 3rd Floor

NYY4045904211919303303Regular ClassroomRegular Classroom 3rd Floor

YYY404590811919304304Regular ClassroomRegular Classroom 3rd Floor

YYY406090811919101101Regular ClassroomSpecial Education 1st Floor

YYY406090811919102102KindergartenSpecial Education 1st Floor

YYY406090811919202202Regular ClassroomStore Room 2nd Floor

Addition

YNY4044109641788213213Regular ClassroomArt Room 2nd Floor

NNY40571538511,043109109KindergartenKindergarten 1st Floor

YNY4044109662788313313Regular ClassroomMulti Purpose Room 3rd Floor

NYY4044109654788212212Regular ClassroomOffice 2nd Floor

YNY4044109651788207207Regular ClassroomOther Instructional Use 2nd Floor

YNY4044109652810210210Regular ClassroomOther Instructional Use 2nd Floor

NNY40571538511,043113113KindergartenPre School 1st Floor

YNY4044109651788208208Regular ClassroomRegular Classroom 2nd Floor

NNY4044109651810211211Regular ClassroomRegular Classroom 2nd Floor

YNY4044109641788307307Regular ClassroomRegular Classroom 3rd Floor

YNY4044109641792308308Regular ClassroomRegular Classroom

YNY4044109641792310310Regular ClassroomRegular Classroom 3rd Floor

YNY4044109641810311311Regular ClassroomRegular Classroom 3rd Floor

YNY40441092261788312312Regular ClassroomRegular Classroom 3rd Floor

YNY4044109641810309309Regular ClassroomScience Classroom 3rd Floor

YNY4044109641810209209Regular ClassroomStore Room 2nd Floor

Page 37 of 37RYDER Assessment Date: 11/2/15