wilson high school - pinnaclecad...structural engineer silman pinnacle's value addition ....

1
Copyright © 2017 Pinnacle Infotech, Inc. Global Leader in BIM Services www.pinnaclecad.com BIM End Date BIM Start Date September, 2017 October, 2017 216,487 sq ft Average Team Size Architect Project Area Leo A Daly Scope of Work Our scope of work for the project included: 1. 3D Model Creation of Plumbing (Level B2, G1- South, G1-North, 1, 2, 3, 4 & 5) & Mechanical Piping (Level B2, G1-South, 1, 2, 3, 4 & 5) for the entire building including Sanitary, Rain Water & Water Supply with associated fittings, accessories and hangers 2. Coordination as per the clash report provided by the client - Performed clash detection within MEP services along with Architecture & Structural models, resolving possible clashes WILSON HIGH SCHOOL [Educational] Arlington, Virginia, USA 3 Engineers Design Architect Bjarke Ingels Group Sub Contractor Shapiro & Duncan* Architectural BIM Model Challenges & Solutions 1. Challenge - Inadequate Space - Not enough space to place WC carrier in this shaft Solution - Raised RFIs to the client to review the problem 2. Challenge - Coordination Problem - Sanitary pipe going below ceiling, Pipe clashing with ceiling, Due to low ceiling space, mechanical pipes were clashing with ceiling, Vent pipes running below the ceiling Requested client to Solution - review and used our expertise to resolve the problem 1. Created “viewpoints” to identify individual clashes by running clashes in Naviswork 2. Updated the model & rerouted pipes to resolve clashes 3. Checked mismatch with input drawing, detailing & section problem (wrong connection, full length not matched, concentric reducer), wrong material selection (pipe was in steel), fixtures connected correctly to supply, waste and vent piping Owner/Developer Arlington Public Schools ilson High School is an educational W project in Arlington, Virginia, United States spread over a project area of 216487 sq. ft. The BIM model of “Wilson High School” of “Shapiro & Duncan” is a new construction at Level of Development 300. The one building consisted of 6 floors along with 1 basement & has been divided into two separate zones (north and south). Trades Covered: Plumbing, Mechanical Piping, Software Used: Autodesk Fab 2017, Newforma LOD: 300 Structural Engineer Silman Pinnacle's Value Addition

Upload: others

Post on 08-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WILSON HIGH SCHOOL - pinnaclecad...Structural Engineer Silman Pinnacle's Value Addition . Title: Wilson High School_Education_Arlington_Virginia_USA_Oct_2017.cdr Author: Bikram Chakraborty

Copyright © 2017 Pinnacle Infotech, Inc.

Global Leader in BIM Serviceswww.pinnaclecad.com

BIM End Date

BIM Start Date September, 2017

October, 2017

216,487 sq ft

Average Team Size

Architect

Project Area

Leo A Daly

Scope of Work

Our scope of work for the project included: 1. 3D Model Creation of Plumbing (Level B2, G1-South, G1-North, 1, 2, 3, 4 & 5) & Mechanical Piping (Level B2, G1-South, 1, 2, 3, 4 & 5) for the entire building including Sanitary, Rain Water & Water Supply with associated fittings, accessories and hangers 2. Coordination as per the clash report provided by the client - Performed clash detection within MEP services along with Architecture & Structural models, resolving possible clashes

WILSON HIGH

SCHOOL[Educational]

Arlington, Virginia, USA

3 Engineers

Design Architect Bjarke Ingels Group

Sub Contractor Shapiro & Duncan*

Architectural BIM Model

Challenges & Solutions

1. Challenge - Inadequate Space - Not enough space to place WC carrier in this shaft Solution -Raised RFIs to the client to review the problem 2. Challenge - Coordination Problem - Sanitary pipe going below ceiling, Pipe clashing with ceiling, Due to low ceiling space, mechanical pipes were clashing with ceiling, Vent pipes running below the ceiling Requested client to Solution -review and used our expertise to resolve the problem

1. Created “viewpoints” to identify individual clashes by running clashes in Naviswork 2. Updated the model & rerouted pipes to resolve clashes 3. Checked mismatch with input drawing, detailing & section problem (wrong connection, full length not matched, concentric reducer), wrong material selection (pipe was in steel), fixtures connected correctly to supply, waste and vent piping

Owner/Developer Arlington Public Schools

ilson High School is an educational

Wproject in Arlington, Virginia, United States spread over a project area of

216487 sq. ft. The BIM model of “Wilson High School” of “Shapiro & Duncan” is a new construction at Level of Development 300. The one building consisted of 6 floors along with 1 basement & has been divided into two separate zones (north and south).

Trades Covered: Plumbing,

Mechanical Piping,

Software Used: Autodesk Fab 2017,

Newforma

LOD: 300Structural Engineer Silman

Pinnacle's Value Addition