Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, 2008- ROS Action Plan Item 1e.

Upload: linette-potter

Post on 14-Jan-2016

225 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, 2008- ROS Action Plan Item 1e

Wind Generator Inertia and Governor Response Report

PDCWG Assignment in response to EECP Step #2 on February 26, 2008-

ROS Action Plan Item 1e.

Page 2: Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, 2008- ROS Action Plan Item 1e

Background • EECP Step 2 occurred on February 26, 2008• On March 11, the PDCWG presented a report to

ROS with analysis and recommendations.• The recommendations were:– ERCOT should try to improve the Short Term Load

Forecast to improve load/resource balancing– Wind only QSEs should be more effective in updating

Resource Plans to improve load/resource balancing.

• At the next TAC meeting, TAC directeded ROS and the PDCWG to study Wind Generator Inertia and Governor Response.

Page 3: Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, 2008- ROS Action Plan Item 1e

Outline of Topics• Ability to control versus willingness to control• Impact on ERCOT bulk power interconnection• Evolution of Wind Generator design to provide:– Good power regulation– Voltage Control Capability– Good voltage and frequency disturbance ride through

capability

• Lack of inertia parameters but there are technical designs for variable inertia Wind Generators

Page 4: Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, 2008- ROS Action Plan Item 1e

0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00

100.00

Ave

rage

SC

PS2

75 MW

80 MW 63 MW

200 MW

124 MW

914 MW

504 MW813 MW

202 MW

609 MW

335 MW

124 MW

120.5 MW

Six Month Average Wind-Only SCPS2 Scores

Page 5: Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, 2008- ROS Action Plan Item 1e
Page 6: Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, 2008- ROS Action Plan Item 1e
Page 7: Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, 2008- ROS Action Plan Item 1e
Page 8: Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, 2008- ROS Action Plan Item 1e

GE 1.5 MW5,000 in operation

Page 9: Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, 2008- ROS Action Plan Item 1e

SIEMENSSWT-2.3-82

Page 10: Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, 2008- ROS Action Plan Item 1e

Clipper 2.5 MWNEW

Page 11: Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, 2008- ROS Action Plan Item 1e

GE 2.5 MWNEW

Page 12: Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, 2008- ROS Action Plan Item 1e

Concluding Thoughts• Wind Turbines do not have classical governors,

but newer units with pitch control could “back down” under steady-state conditions and pick up generation when frequency is low to help with recovery from a major unit trip.

• Newer AC-DC-AC units do not supply additional MW from rotating inertia like shaft driven generators, but by rectifier/inverter variations. They may simulate inertia effects by electronic controls just like governor response could be simulated.