wind load ins tallation ins tr uctions pella® garage...
TRANSCRIPT
102 Main Street, Pella, IA 50219
www.pellagaragedoors.com
WL Supplement
Pella® Garage DoorsWIND LOAD INS T A L L A T ION INS T R UC T IONS
Wind Load ModelsPage 1 of 2
©AGD 04.2014 FORM #878 PRINTED IN USA
1Typical Bottom Bracket
7/16” Bolt Retainers(1) Installed Per Roller
STRUT INSTALLED ABOVEBOTTOM FIXTURE
2”-20 ga. Struts Attached with(2) 1/4-20 x 3/4”
Hex Head Screwsat End & Center Stiles
1
23
2Typical End Hinge
3Typical Center Hinge
3”-20 ga. Struts Attached with(2) 1/4-20 x 3/4”
Hex Head Screwsat End & Center Stiles
2”-20 ga. Struts Attached with(2) 1/4-20 x 3/4”
Hex Head Screwsat End & Center Stiles
Hex Head Screws
Strut
Strut
These Instructions are in addition to the Basic Instructions included with your door.
The Jamb Brackets, Struts and Bolt Retainers, illustrated below, must be installed exactly as shown to conform to Wind Load regulations.
Failure to install the Jamb Brackets, Struts and Bolt Retainers exactly as shown, will result in your door not passing local inspection.
Strut Installation
Note: Perform Strut Installation prior to installing sections into the opening.
Step 1:Place Bottom Section on padded sawhorses.
Step 2:Determine the correct Strut and location from the Section and Strut Location chart below.
Note: To determine whether your strut is 2” or 3“ measure the height of the Strut (Figure A).
Example: Bottom Section requires (1) 2” Strut at the bottom of the section (Figure 1) and (1) 3“ Strut at the top of the section (Figure 2&3)
Step 3: Install each Strut using (2) 1/4-20 x 3/4” Hex Head Screwsinto each Center and End Stile (Figure B & C). A total of (6) 1/4-20 x 3/4” Hex Head Screws per Strut.
Step 4: Repeat for each section as required.
C
B
Hex Head Screws
End Stile
Center Stile
A
Strut
2” or 3”
Sec onTop Sec on Int. Sec on 2" Strut & 3" Strut - TopInt. Sec on
Bo om Sec on 2" Strut & 3" Strut - Top
Section and Strut Location Chart
STRUT INSTALLED ON ROLLER CARRIER
STRUT INSTALLED ABOVE END HINGE
CORRECT STRUT LOCATIONAFTER INSTALLATION
Rollerswith 5” Stems
7/16” Bolt Retainers(1) Installed Per Roller
3”-20 ga. Struts Attached with(2) 1/4-20 x 3/4”
Hex Head Screwsat End & Center Stiles
2”-20 ga. Struts Attached with(2) 1/4-20 x 3/4”
Hex Head Screwsat End & Center Stiles
These Installation Instructions are in addition to the Basic Instructions included with your door.
The Jamb Brackets, Struts and Bolt Retainers, illustratedbelow, must be installed exactly as shown to conformto Wind Load regulations.
Failure to install the Jamb Brackets, Struts and BoltRetainers exactly as shown, will result in your door not passing local inspection.
Strut Installations
Note: Perform Strut Installation prior to installingsections into the opening.
Step 1 :Place Bottom Section on padded sawhorses.
Step 2:Determine the correct Strut and location from the Sectionand Strut Location chart below.
Note: To determine whether your strut is 2” or 3” measure the height of the Stut (Figure A).
Example: Bottom Section requires (1) 2”Strut at the bottom of the section (Figure 1) and (1) 3” Strut at the top of the section (Figure 2 & 3).
Step 3:Install each Strut using (2) 1/4-20 x 3/4” Hex Head Screwsinto each Center and End Stile (Figure B & C). A total of (6) 1/4-20 x 3/4” Hex Head Screws per Strut.
Step 4:Repeat for each section as required.
2" Strut & 3" Strut - Top
2" Strut & 3" Strut - Top
WL Supplement
Pella® Garage DoorsWIND LOAD INS T A L L A T ION INS T R UC T IONS
Wind Load ModelsPage 2 of 2
©AGD 04.2014 FORM #878 PRINTED IN USA
Bottom Bracket
Jamb Bracket
Vertical Track
Roller Carrier Top Fixture
Bolt Retainer Installation
Step 1:Insert Roller into Roller Carrier (Figure A).
Step 2: Hammer the 7/16“ Bolt Retainer onto the Roller Shaft, using a 9/16” socket or 9/16” Closed End Wrench (shown) and a hammer (Figure A). Once the Bolt Retainer has been installed it will be virtually impossible to remove without damaging the retainer.
Note: Bolt Retainers will need to be installed on Rollers in both Bottom Fixtures (Figure B), all Roller Carriers (Figure C) and both Top Fixtures (Figure D) as well.
Step 3: Repeat for each Roller as required
Additional Jamb Bracket Attachment (Figure E)
Continued from the Basic Instructions, Page 3, Step 11.
Step 1: Starting with the slot at 10“ from the bottom of the vertical
of the track as shown in Figure F.
Step 2:Attach the Jamb Bracket with (1) 1/4” x 5/8” Track Splice Bolt and (1) 1/4”-20 Hex Nut. Hand tighten. Repeat this step attaching the three other Jamb Brackets into the slots at 21”, 42” & 63“ from the bottom of the track.
Note: Failure to install the Jamb Brackets in the correct slots will result in your door not passing local inspection.
Note: This will allow for slight adjustments during the installation.
Note: 1/4”-20 Hex Nuts always go on the outside of the track.
Continue with Step 12 of the Basic Instructions.
B C D
10”
21”
42”
63”
E
F
A
7/16” Bolt Retainer
Hex Nut to outsideof track
Right Side AssemblyShown
to Middle of Slot
Right
Right Side Assembly
Track Splice Bolt
102 Main Street, Pella, IA 50219
www.pellagaragedoors.com