Wind Mill Tower Production
Company Profile
Wind Mill Tower Production Procedure
Our Equipment Proposals
Alternative Production Equipment
Welding Processes: Our recommendations / Alternatives
Our Customers / Reference List
Table of Content
-
8/20/2019 Wind Mill Towers Manufacturing machines
2/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
The KISTLER Machine Company, founded in 1966 by Roland Kistler,
is a long established family business engaged in engineering and manufacturing of
welding positioning and cutting systems for the welding industry, especially for pipe
welding and cutting.
It is the intent of KISTLER to provide quality welding positioning equipment to thewelding trade at a reasonable price to a mutually acceptable schedule.
Service after the sale insures that our customers will realize full value from the
equipment procured from KISTLER
Company profile
-
8/20/2019 Wind Mill Towers Manufacturing machines
3/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
The location of the KISTLER factory and engineering facility is in Bad Saulgau, in the
south of Germany, near the Lake of Constance. New workshop facilities have been
completed in 2007.
Company profile
-
8/20/2019 Wind Mill Towers Manufacturing machines
4/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Kistler Cutting and Welding currently employs a team of 34.
The main customers of the KISTLER products are doing business in the following sectors
of industry:
ShipyardsOil exploration and oil refineries
Chemical industry
Mechanical contractors
Wind mill tower manufacturing
Pipe mills
Steel construction
Company profile
-
8/20/2019 Wind Mill Towers Manufacturing machines
5/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Since 2001, F.Bode & Sons Ltd, Preston UK, being Europe´s largest manufacturer of
welding positioning equipment is a sister company of Kistler and since 2008, UP Helfert,
Kreuztal Germany, a company specialized in submerged arc welding is also part of the
Kistler group.
The Kistler group nowadays is the only supplier being able to offer complete solutions for cutting and welding automation from a single source.
The Kistler group in 2012 includes the following companies:
Kistler Maschinen- und Anlagenbau GmbH, Bad Saulgau, Germany
F. Bode & Sons Ltd., Preston, UKUP Helfert GmbH, Kreuztal, Germany
Kistler Middle East FZ LLC, Ras-al-Khaimah, UAE
Company profile
-
8/20/2019 Wind Mill Towers Manufacturing machines
6/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Production Procedure: Plate Cutting
-
8/20/2019 Wind Mill Towers Manufacturing machines
7/67Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Production Procedure: Welding of Plates
-
8/20/2019 Wind Mill Towers Manufacturing machines
8/67Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Production Procedure: Bending
-
8/20/2019 Wind Mill Towers Manufacturing machines
9/67Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Production Procedure: Longitudinal Welding
-
8/20/2019 Wind Mill Towers Manufacturing machines
10/67Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Production Procedure: Longitudinal Welding
-
8/20/2019 Wind Mill Towers Manufacturing machines
11/67Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Production Procedure: Additional Bending
-
8/20/2019 Wind Mill Towers Manufacturing machines
12/67Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Production Procedure: Tack Welding / Assy.
-
8/20/2019 Wind Mill Towers Manufacturing machines
13/67Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Production Procedure: Flange Assembly
-
8/20/2019 Wind Mill Towers Manufacturing machines
14/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Production Procedure: Internal
Circumferential
-
8/20/2019 Wind Mill Towers Manufacturing machines
15/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Production Procedure: Flange Welding
-
8/20/2019 Wind Mill Towers Manufacturing machines
16/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Production Procedure: External
Circumferential
-
8/20/2019 Wind Mill Towers Manufacturing machines
17/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Production Procedure: External
Circumferential
-
8/20/2019 Wind Mill Towers Manufacturing machines
18/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Production Procedure: Welding of Built-in Parts
-
8/20/2019 Wind Mill Towers Manufacturing machines
19/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Production Procedure: Cutting/Welding of Door
-
8/20/2019 Wind Mill Towers Manufacturing machines
20/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Production Procedure: Cutting/Welding of Door
-
8/20/2019 Wind Mill Towers Manufacturing machines
21/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Production Procedure: Shotblasting
-
8/20/2019 Wind Mill Towers Manufacturing machines
22/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Production Procedure: Painting
-
8/20/2019 Wind Mill Towers Manufacturing machines
23/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Production Procedure: Final Assembly (Ladders
etc.)
-
8/20/2019 Wind Mill Towers Manufacturing machines
24/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Production Procedure: Dispatch
-
8/20/2019 Wind Mill Towers Manufacturing machines
25/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Production Procedure: Dispatch
-
8/20/2019 Wind Mill Towers Manufacturing machines
26/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Our proposal for Welding of Plates: PJU
-
8/20/2019 Wind Mill Towers Manufacturing machines
27/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Our proposal: Complete Layout for Customer
-
8/20/2019 Wind Mill Towers Manufacturing machines
28/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Our proposal: Longitudinal Welding C B
-
8/20/2019 Wind Mill Towers Manufacturing machines
29/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Our proposal: Longitudinal Welding C B
-
8/20/2019 Wind Mill Towers Manufacturing machines
30/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Our proposal: Rotators for Tacking
Sections
-
8/20/2019 Wind Mill Towers Manufacturing machines
31/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Our proposal: Rotators for Tacking
Sections
-
8/20/2019 Wind Mill Towers Manufacturing machines
32/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Our proposal: Rotators for Tacking
Sections
-
8/20/2019 Wind Mill Towers Manufacturing machines
33/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Our proposal: Internal Boom for Circumferential
-
8/20/2019 Wind Mill Towers Manufacturing machines
34/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Our proposal: Internal Boom for Circumferential
-
8/20/2019 Wind Mill Towers Manufacturing machines
35/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Our proposal: Internal Boom for Circumferential
-
8/20/2019 Wind Mill Towers Manufacturing machines
36/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Our proposal: Flange Welding Unit
-
8/20/2019 Wind Mill Towers Manufacturing machines
37/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Our proposal: Platform for external
circumferential
-
8/20/2019 Wind Mill Towers Manufacturing machines
38/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Our proposal: Rotators for Built-ins,
Brackets
-
8/20/2019 Wind Mill Towers Manufacturing machines
39/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Our proposal: Rotators for door cutting and
Welding
-
8/20/2019 Wind Mill Towers Manufacturing machines
40/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Our proposal: Explosionproof Rotators for Blasting
-
8/20/2019 Wind Mill Towers Manufacturing machines
41/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Our proposal: Explosionproof Rotators for Painting
-
8/20/2019 Wind Mill Towers Manufacturing machines
42/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Our proposal: Rotators for Assembly
-
8/20/2019 Wind Mill Towers Manufacturing machines
43/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Alt. Approach for Longitudinal Welding
-
8/20/2019 Wind Mill Towers Manufacturing machines
44/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Alt. Approach for Longitudinal Welding
-
8/20/2019 Wind Mill Towers Manufacturing machines
45/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Alt. Approach for Longitudinal Welding
-
8/20/2019 Wind Mill Towers Manufacturing machines
46/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Alt. Approach for Longitudinal Welding
-
8/20/2019 Wind Mill Towers Manufacturing machines
47/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Alt. Approach for Longitudinal Welding
-
8/20/2019 Wind Mill Towers Manufacturing machines
48/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Alt. Approach for Longitudinal Welding
-
8/20/2019 Wind Mill Towers Manufacturing machines
49/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Alt. Approaches for Tacking: Jackup
Rollers
-
8/20/2019 Wind Mill Towers Manufacturing machines
50/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Alt. approach for internal circumferential:
Tractor
-
8/20/2019 Wind Mill Towers Manufacturing machines
51/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Alt. approach for flange welding: Tractor
-
8/20/2019 Wind Mill Towers Manufacturing machines
52/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Alt. approach for external circumferential: C B
-
8/20/2019 Wind Mill Towers Manufacturing machines
53/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Alt. approach for external circumferential:
Special
-
8/20/2019 Wind Mill Towers Manufacturing machines
54/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Alt. approach for external circumferential:
Special
-
8/20/2019 Wind Mill Towers Manufacturing machines
55/67
Kistler GmbH • www.kistler-machine.de
Wind Mill Tower Production
Alt. approach for external circumferential:
Special
Wind Mill Tower Production
-
8/20/2019 Wind Mill Towers Manufacturing machines
56/67
Kistler GmbH • www.kistler-machine.de
Process Proposal Alternatives
Internal and external longitudinal
seamwelding Three wire SAW Single wire, twin wire SAW
Tack Welding of Cans toachieve sections Manual CO2
Assembly of flanges to sections Manual CO2
Internal circumferential welding, Four wire SAW Single wire SAW (tractor)
(and flange welding) Twin wire SAW (tractor)
Four wire SAW
Welding process (our proposal /
alternatives)
Wind Mill Tower Production
-
8/20/2019 Wind Mill Towers Manufacturing machines
57/67
Kistler GmbH • www.kistler-machine.de
Process Proposal Alternatives
Flange welding Tandem SAW Single wire SAW (Tractor)
Twin wire (Tractor)
Tandem SAW (C&B)
External circumferential welding Three wire SAW Single wire, Twin wire
Welding of Built-in parts, brackets Manual CO2
for ladders...
Cutting Welding of door architrave Manual CO2
Welding process (our proposal /
alternatives)
Wind Mill Tower Production
-
8/20/2019 Wind Mill Towers Manufacturing machines
58/67
Kistler GmbH • www.kistler-machine.de
Our customers / References:
Customer Year Type Qty. Method
Max Bögl, Neumarkt 2011 Column & Boom for 1 Single wire
Germany External/Internal/
Circumferential/Longitudinal
Max Bögl, Neumarkt 2012 Conversion Column & Boom 1 Tandem
Max Bögl, Neumarkt 2013 Column & Boom for 1 Tandem
Germany External/Internal Circumferential
PBS Industry a.s. 2009 Column & Boom for 1 Tandem
Czech Republic External/Internal/
Circumferential/Longitudinal
CSC 2008 Special installation for 2 Single wire
Germany Horizontal welding of tripod central pipe
CSC 2010 Special installation for 2 Single wire
Germany Horizontal welding of
Wind Mill Tower Production
-
8/20/2019 Wind Mill Towers Manufacturing machines
59/67
Kistler GmbH • www.kistler-machine.de
Our customers / References:
Customer Year Type Qty. Method
Weserwind 2005 Column & Boom for 1 Single wire
Germany External/Internal/
Circumferential/Longitudinal
SIAG 2004 Column & Boom for 1 Tandem
France External / Circumferential/
Longitudinal
SIAG 2004 Internal Boom for Internal/ 1 Tandem
France Circumferential
2004 Column & Boom for 1 Single wire
External/Internal/
Longitudinal
SIAG 2004 Internal Boom for Internal/ 1 Tandem
Czech Republic Circumferential/Longitudinal
SIAG 2004 Column & Boom for 1 Single wire
Czech Republic Internal/Circumferential
Wind Mill Tower Production
-
8/20/2019 Wind Mill Towers Manufacturing machines
60/67
Kistler GmbH • www.kistler-machine.de
Our customers / References:
Customer Year Type Qty. Method
SIAG 2004 Column & Boom for 2 Single wire
CZ Chrudim External / Circumferential/
Longitudinal
2005 Conversion Column & Boom 2 Tandem
SIAG Finsterwalde 2001 Internal Boom for Internal/ 1 Tandem
Germany Circumferential/Longitudinal
2008 Internal Boom for Internal/ 2 Three wires
Circumferential
SIAG Leipzig 2002 Column & Boom for 1 Tandem
Germany Internal/Circumferential
2005 Conversion Column & Boom 3 Tandem
2007 Conversion Column & Boom 4 Tandem
Wind Mill Tower Production
-
8/20/2019 Wind Mill Towers Manufacturing machines
61/67
Kistler GmbH • www.kistler-machine.de
Our customers / References:
Customer Year Type Qty. Method
EEW Rostock 2007 Column & Boom for 1 Three wires
Germany External/Internal/
Circumferential/Longitudinal
2008 Column & Boom for 2 Three wires
Internal/Longitudinal
2008 Column & Boom for 2 MIG
Tack Welding Internal/Longitudinal
2008 Internal Boom for Internal/ 2 Three wires
Circumferential/Longitudinal
2008 Ext. Longitudinal welding station 2 Two welding heads
each with three wires
2008 Ext. Circumferential welding station 1 Three welding heads
each with three wires
Wind Mill Tower Production
-
8/20/2019 Wind Mill Towers Manufacturing machines
62/67
Kistler GmbH • www.kistler-machine.de
Our customers / References:
Customer Year Type Qty. Method
EEW Rostock 2008 Welding tractor for Internal/ 1 Tandem
Circumferential
AMBAU Gräfen- 2002 Column & Boom for 1 Tandem
hainichen External/Internal/
Germany Circumferential/Longitudinal
2011 Column & Boom for 3 Tandem
External/Internal/
Circumferential/Longitudinal
2011 Column & Boom for 1 Tandem
External/Circumferential
2011 Column & Boom 1 TandemInternal/External/Circumf.
2012 Column & Boom for 1 Tandem
External/Circumferential
Wind Mill Tower Production
-
8/20/2019 Wind Mill Towers Manufacturing machines
63/67
Kistler GmbH • www.kistler-machine.de
Our customers / References:
Customer Year Type Qty. Method
AMBAU Gräfen- 2012 Column & Boom 1 Tandem
hainichen Internal Circumferential
AMBAU Dessau 2011 Column & Boom for 1 Tandem
Germany Internal/Circumferential
AMBAU Cuxhaven 2008 Column & Boom for 1 Three wires
Germany Internal/Longitudinal
2008 Column & Boom for 1 Three wires
External/Longitudinal
2008 Plate Joining Station 1 Three wires
2008 Internal Boom for Internal 2 Four wiresCircumferential
2008 Column & Boom for 2 Three wires
External/Circumferential
Wind Mill Tower Production
-
8/20/2019 Wind Mill Towers Manufacturing machines
64/67
Kistler GmbH • www.kistler-machine.de
Our customers / References:
Customer Year Type Qty. Method
AMBAU Cuxhaven 2010 Internal boom for 2 Two heads with four wires each
Germany internal circumferential
2010 Column & Boom for 2 Three wires
External/Circumferential
2012 Plate Joining Station 2 Four wires
2011 Column & Boom for 1 Three wires
External/Longitudinal
2012 Column & Boom for 1 Three wires
External/Circumferential
2012 Welding tractor 1 Tandem
AMBAU Bremen 2006 Installation of subarc 1 Tandem
Germany equipment (existing Esab boom)
Wind Mill Tower Production
-
8/20/2019 Wind Mill Towers Manufacturing machines
65/67
Kistler GmbH • www.kistler-machine.de
Our customers / References:
Customer Year Type Qty. Method
AMBAU Bremen 2006 Internal boom for internal circumf. 1 Three wires
Germany
2006 Column & Boom for 1 Three wires
External/Circumferential
2006 Column & Boom for 1 Tandem
Foundation parts
2007 Column & Boom for 1 Three wires
External/Circumferential
2007 Column & Boom for 1 Tandem
External/Internal/Longitudinal
2010 Internal Boom for Internal circumf. 1 Three wires
2010 Column & Boom for 1 Tandem
External/Internal/Longitudinal
Wind Mill Tower Production
-
8/20/2019 Wind Mill Towers Manufacturing machines
66/67
Kistler GmbH • www.kistler-machine.de
Our customers / References:
Customer Year Type Qty. Method
AMBAU Bremen 2011 Plate joining station 2 Three wires
Germany
2011 Column & Boom for 1 Three wires
External & Internal circumf.
CRIST Gdansk 2011 Column & Boom for 1 Tandem
Poland External&Internal longitudinal
2011 Column & Boom for 1 Four wires
Internal/Circumferential
2011 Welding Station for External 1 Four wires
Circumferential
Steelwind 2013/14 Internal Longitudinal 2 Four wiresGermany welding station
2013/14 External Longitudinal 2 Four wires
welding station for
Cylindrical Workpieces
Wind Mill Tower Production
-
8/20/2019 Wind Mill Towers Manufacturing machines
67/67
Our customers / References:
Customer Year Type Qty. Method
Steelwind 2013/14 External Longitudinal 1 Four wires
Germany welding station for
cyl. & conical work pieces
2013/14 External Circumferential 1 Four wires
welding station for flanges
2013/14 Internal Circumferential 3 Two heads four wires
welding station with assembly each
Unit “varanus”
2013/14 External Circumferential 15 Four wires
welding station
2013/14 Internal Circumferential 3 Four wireswelding station with long boom