WIND PLANT SITING ISSUES Sam Enfield Atlantic Renewable Energy Corporation Wind Powering America 2 nd Mid-Atlantic Regional Workshop February 26, 2003 Philadelphia, Pennsylvania

Upload: pierce-bradford

Post on 18-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WIND PLANT SITING ISSUES Sam Enfield Atlantic Renewable Energy Corporation Wind Powering America 2 nd Mid-Atlantic Regional Workshop February 26, 2003

WIND PLANT SITING ISSUES

Sam EnfieldAtlantic Renewable Energy Corporation

Wind Powering America2nd Mid-Atlantic Regional Workshop

February 26, 2003Philadelphia, Pennsylvania

Page 2: WIND PLANT SITING ISSUES Sam Enfield Atlantic Renewable Energy Corporation Wind Powering America 2 nd Mid-Atlantic Regional Workshop February 26, 2003

ATLANTIC RENEWABLE

Atlantic Renewable

Developer of wind projects in the EasternUnited States:

•2000: 11.5 MW Madison (NY) PG&E Generating

•2001: 15.0 MW Mill Run (PA)9.0 MW Somerset (PA)30.0 MW Fenner (NY) CHI Energy

•2002: 66 MW Mountaineer (WV) FPL Energy•2003 & Beyond: >350 MW of projects under

development in NY, PA and WV

Page 3: WIND PLANT SITING ISSUES Sam Enfield Atlantic Renewable Energy Corporation Wind Powering America 2 nd Mid-Atlantic Regional Workshop February 26, 2003

The Mill Run Wind Power Project

• Ten 1.5 MW GE turbines

• Operational October 2001

ATLANTIC RENEWABLE

Page 4: WIND PLANT SITING ISSUES Sam Enfield Atlantic Renewable Energy Corporation Wind Powering America 2 nd Mid-Atlantic Regional Workshop February 26, 2003

ATLANTIC RENEWABLE

The Somerset Wind Power Project

• Six 1.5 MW GE turbines

• Operational October 2001

Page 5: WIND PLANT SITING ISSUES Sam Enfield Atlantic Renewable Energy Corporation Wind Powering America 2 nd Mid-Atlantic Regional Workshop February 26, 2003

• Distinct Ridgelines

• Forest Cover

• Population Density

• Previously Mined

Wind Plant Site Characteristics in

the Mid-Atlantic Region(Allegeheny Plateau)

ATLANTIC RENEWABLE

Page 6: WIND PLANT SITING ISSUES Sam Enfield Atlantic Renewable Energy Corporation Wind Powering America 2 nd Mid-Atlantic Regional Workshop February 26, 2003

• Aesthetics

• Sound & Flicker

• Wildlife Impacts

• Avian Impacts

• Radio/TV Interference

• Sedimentation

Wind Plant Siting Issues

ATLANTIC RENEWABLE

Page 7: WIND PLANT SITING ISSUES Sam Enfield Atlantic Renewable Energy Corporation Wind Powering America 2 nd Mid-Atlantic Regional Workshop February 26, 2003

• Subjective – Most Do Not Find Them Objectionable, Some Do

• Use of Prominent Ridgelines Increases Visibility

• Visual Impact of Tree Clearing

• Aviation Warning Lights

• Haze – Visibility 1/3 to 1/4 of Historical – Sulfates the Major Factor

Aesthetics

ATLANTIC RENEWABLE

Page 8: WIND PLANT SITING ISSUES Sam Enfield Atlantic Renewable Energy Corporation Wind Powering America 2 nd Mid-Atlantic Regional Workshop February 26, 2003

The Mill Run Wind Power Project

ATLANTIC RENEWABLE

Page 9: WIND PLANT SITING ISSUES Sam Enfield Atlantic Renewable Energy Corporation Wind Powering America 2 nd Mid-Atlantic Regional Workshop February 26, 2003

The Mill Run Wind Power Project

ATLANTIC RENEWABLE

Page 10: WIND PLANT SITING ISSUES Sam Enfield Atlantic Renewable Energy Corporation Wind Powering America 2 nd Mid-Atlantic Regional Workshop February 26, 2003

Sound & Flicker

• Typically an Issue Only for Receptors (Homes) Within 1500 Feet of Turbines

• Background Sound Levels Typically Low in Rural Areas

• Topography Can Shelter Receptors from Wind, Increasing Relative Contribution by Turbines

ATLANTIC RENEWABLE

Page 11: WIND PLANT SITING ISSUES Sam Enfield Atlantic Renewable Energy Corporation Wind Powering America 2 nd Mid-Atlantic Regional Workshop February 26, 2003

Wildlife Impacts

Several Species of Possible Concern

• Indiana Bat

• Northern Flying Squirrel

• Others

ATLANTIC RENEWABLE

Page 12: WIND PLANT SITING ISSUES Sam Enfield Atlantic Renewable Energy Corporation Wind Powering America 2 nd Mid-Atlantic Regional Workshop February 26, 2003

Avian Impacts

• Little Experience with Wind/Avian Issue in Region

• Concern that Appalachian Ridges Constitute Major Migration Pathways, thus Pose Risk to Migrating Raptors and Songbirds

• Studies Do Not Indicate Major Migration Use

• Migration Not Correlated with Risk

ATLANTIC RENEWABLE

Page 13: WIND PLANT SITING ISSUES Sam Enfield Atlantic Renewable Energy Corporation Wind Powering America 2 nd Mid-Atlantic Regional Workshop February 26, 2003

Radio/TV Interference

• Licensed Transmission Pathways Legally Protected

• Greater Population Density (than West) Increases Likelihood of

Interference

• Competition for Elevated Sites

ATLANTIC RENEWABLE

Page 14: WIND PLANT SITING ISSUES Sam Enfield Atlantic Renewable Energy Corporation Wind Powering America 2 nd Mid-Atlantic Regional Workshop February 26, 2003

Sedimentation

• “Most serious form of water pollution in mountainous West Virginia”

• Greater rainfall (than West) generates more runoff, but also supports more vegetation

ATLANTIC RENEWABLE

Page 15: WIND PLANT SITING ISSUES Sam Enfield Atlantic Renewable Energy Corporation Wind Powering America 2 nd Mid-Atlantic Regional Workshop February 26, 2003

…Questions?ATLANTIC RENEWABLE