Challenge Cold Climate Winterwind 2008 December 10th, Norrköping, Sweden Authors: Rüdiger Gawrisch, Martin von Mutius Repower Systems AG

Upload: others

Post on 20-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

Challenge Cold Climate

Winterwind 2008

December 10th, Norrköping, Sweden

Authors:

Rüdiger Gawrisch, Martin von Mutius

Repower Systems AG

Page 2: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

2Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Agenda

Definition of Cold Climate

Market potential in Cold Climates

MM82 CCV – 2MW Turbine

New challenges in Canada

Experiences in China

Conclusion

Page 3: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

3Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Definition of Cold Climate

GL Wind-Technical Note 067:

If minimum temperatures of below -20°C have been obser vedduring long term measurements on an average of more thannine days a year, the site is defined as a cold climate site.

Standard Conditions of Use for REpower MM CCV:

Ambient temperature range for operation: -30°C to + 35°C

Ambient temperature range for structure: -40°C to +50°C

Page 4: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

4Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Cold Climate Areas

Mean minimum temperature in °C in January (1961-1990)

Page 5: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

5Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Agenda

Definition of Cold Climate

Market potential in Cold Climates

MM82 CCV – 2MW Turbine

New challenges in Canada

Experiences in China

Conclusion

Page 6: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

6Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Market potential in Cold Climates

China:

Target by 2020: 30,000 MW in total, 70% in cold climates.

Project plans from Honiton Energy* Group: approx. 5,000 MW in Inner Mongolia*Honiton Energy is Partner of REpower in JV REpower North (China)

Canada:

Target by 2020: >10,000 MW in total, 90 % in cold climates

Quebec Tender in total 2,000 MW

Contract of 954 MW for REpower turbines, 100% CCV

Page 7: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

7Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Hydro Quebec Tender

Page 8: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

8Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Agenda

Definition of Cold Climate

Market potential in Cold Climates

MM82 CCV – 2MW Turbine

New challenges in Canada

Experiences in China

Conclusion

Page 9: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

9Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

MM82 CCV - 2 MW Turbine

CCV adaptions :

� Low temperature steel

� Oil and grease

� Reinforced heaters

� Addtional heaters

� Start up procedure

Special requirements for site in Inner Mongolia:

� Dust filter for tower ventilation

� Increased ventilation system due to low air density

Page 10: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

10Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

MM82 CCV - 2 MW Turbine

Verification of Design and Certification :

� on the basis of GL Wind ‚Technical Note 067‘

� Steel structures according to REpower internal guidelinesbased on expert‘s knowledge with the underlyingguideline DAST Richtlinie 009

� Details of load and component certification have beenagreed between REpower and certification body

� Approval for Design assessment S-Class CCV isongoing and planned to be finished in 2009

Page 11: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

11Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Agenda

Definition of Cold Climate

Market potential in Cold Climates

MM82 CCV – 2MW Turbine

New challenges in Canada

Experiences in China

Conclusion

Page 12: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

12Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Experience in Inner Mongolia / China

Waiting for erection

Page 13: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

13Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Experience in Inner Mongolia / China

Preperation of erection

Page 14: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

14Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Experience in Inner Mongolia / China

Teamwork

Page 15: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

15Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Experience in Inner Mongolia / China

Work interrupted

Page 16: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

16Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Experience in Inner Mongolia / China

Erection starts

Page 17: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

17Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Experience in Inner Mongolia / China

Erection continues

Page 18: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

18Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Experience in Inner Mongolia / China

Erection continues

Page 19: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

19Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Experience in Inner Mongolia / China

Erection nearly finished

Page 20: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

20Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Experience in Inner Mongolia / China

Waiting for grid

Page 21: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

21Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Experience in Inner Mongolia / China

Turbine running

Page 22: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

22Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Experience in Inner Mongolia / China

First experiences from 2 MW turbine operation in China:

� heaters performed very satisfactory

� no icing conditiones occurred up to now

� ventilation system with special filters works reliable

� full CCV test period will be in this winter

Page 23: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

23Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Agenda

Definition of Cold Climate

Market potential in Cold Climates

MM82 CCV – 2MW Turbine

New challenges in Canada

Experiences in China

Conclusion

Page 24: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

24Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

New Challenge Canada

A metmast in Quebec, Canada

Page 25: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

25Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

New Challenge Canada

A metmast in Quebec, Canada

Page 26: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

26Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Agenda

Definition of Cold Climate

Market potential in Cold Climates

MM82 CCV – 2MW Turbine

New challenges in Canada

Experiences in China

Conclusion

Page 27: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

27Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Conclusion

� Executed concept for low temperatures

� Validation in winter 2008/2009

� Further development is required for sites withicing conditiones

� Components in focus:

Blades and measurement instrumentation

Page 28: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

28Winterwind 2008, December 10th, Norrköping, Sweden © 2008 Repower Systems AG

Thank you for your attention!

Page 29: Winterwind 2008 publishedwinterwind.se/2008/presentationer/15_Gawrisch_Winterwind...3 Winterwind 2008, December 10 th, Norrköping, Sweden © 2008 Repower Systems AG Definition of

© 2008 Repower Systems AG

All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photography, recording, or any information storage and retrieval system, without permission from Repower Systems AG.