WESTERN MICHIGAN UNIVERSITY

ALUMNI CENTER

Page 2: WMU Alumni Center Plans

From its humble beginnings in 1903 as a teachers college through its transition to a global public research institution, Western Michigan University has called Kalamazoo its home. The University’s location did not happen by accident, it was the community’s vision for and commitment to education that brought the new school to Kalamazoo. The University’s original building—a highly visible landmark atop Prospect Hill—was erected to represent the integral ties between a proud community and its school.

Today, Prospect Hill is undergoing a renewal that when complete will reaffirm the special and unique relationship between the citizens of Kalamazoo and WMU. The WMU Alumni Center project is committed to preserving and transforming the University’s birthplace into a facility that serves both the campus and community while showcasing the deeply rooted relationship between the two.

INTRODUCTION

Page 3: WMU Alumni Center Plans

• Serve as a home for all alumni• Become a community asset• Showcase the birthplace of the University in the context of the City of Kalamazoo• Serve as a touchstone for the WMU experience• Offer flexible and multipurpose gathering spaces open to the community • Illustrate the University’s commitment to sustainability

December 2012 Renovation of East Hall as the new WMU Alumni Center is announcedJune 2013 TowerPinkster is selected as the architectural firmOctober 2013 The WMU Alumni Association announced a $1 million contribution toward the renovation projectMarch 2014 Final design is unveiledMay 2014 Construction beganSeptember 2015 Construction is scheduled to be completeOctober 2015 Grand Opening Celebration

PROJECT TIMELINEPROJECT GOALS

Western Michigan University’s original building atop Prospect Hill

Page 4: WMU Alumni Center Plans

THE UNIVERSITY’S HOMEFaçade looking northeast

Page 5: WMU Alumni Center Plans

RETAINING WALL WITH GUARDRAILING

OAKLAND DRIVE

TOPSOIL AND SEED

NOT FOR CONSTRUCTION

PRELIMINARY

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200Kalamazoo, Michigan 49007-5828269.343.6133 PHONE 269.343.6633 FAX

4 East Fulton Street, Suite 200Grand Rapids, Michigan 49503616.456.9944 PHONE 616.456.5936 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2014©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

WMU PROJECT No.

FEBRUARY 7, 2014

EAST HALLALUMNI CENTER

WESTERNMICHIGANUNIVERSITYKalamazoo, MI

OVERALLLANDSCAPEPLAN

13-159.00L 002

ISSUED FOR DATE 1" = 40'-0" 1" = 40'-0" 1" = 40'-0" 1" = 40'-0"

OVERALL LANDSCAPE PLAN

Entry Stairway from Oakland Drive Plaza Gathering Points Grand Entrance Plaza Entry Doors Portico Plaza (“The Porch”)

SITE PLAN North Hall Façade Grand Lawn Naming Wall Bricks on “The Porch” Windows over Grand Entrance East Portico Window

Not Shown: Cupola Future Amphitheatre East and West Façade Windows

Page 6: WMU Alumni Center Plans

Board Room Office Suite Conference Room Ballroom Foyer and Entry Ballroom Ballroom Chandeliers

SECOND FLOOR

Page 7: WMU Alumni Center Plans

Ballroom

SECOND FLOOR

Page 8: WMU Alumni Center Plans

Board room

SECOND FLOOR

Page 9: WMU Alumni Center Plans

Entry Vestibule Lobby Donor Wall Office Suites The 1903 Room (“The Library”) North Hall Fireplace

FIRST FLOOR Café The Vault Laptop Bar Small Conference Rooms Grand Stairwells

Page 10: WMU Alumni Center Plans

Lobby looking west

FIRST FLOOR

Page 11: WMU Alumni Center Plans

Lobby looking east

FIRST FLOOR

Page 12: WMU Alumni Center Plans

1903 Room featuring fireplace salvaged from North Hall

FIRST FLOOR

Page 13: WMU Alumni Center Plans

Student Call Center Team Space Kitchen/Work Room

GARDEN OFFICE FLOOR

Page 14: WMU Alumni Center Plans

FAST FACTS

Construction Manager

Architect

Sustainability FeaturesSalvaged materials including bricks and other architectural elements

Locally sourced new materials

Geothermal heating and cooling

Designed to meet LEED Platinum certification

Sustainability

Public – Lobby, Café, 1903 Room, History displays in corridors

Meeting/Conference – 1 board room, 2 medium conference rooms, 2 small conference rooms

Event – Ballroom overlooking downtown Kalamazoo (Ballroom capacity: 200 table seating; 400 lecture)

Office – Home of the Office of Development and Alumni Relations

Support – New stairs, elevator, barrier free access throughout

Spaces

53,089 square feet

Ground Floor – 13, 772 square feet

First Floor – 13,885 square feet

Second Floor – 13,528 square feet

Mechanical Penthouse – 11,904 square feet

Building Areas

Site8.6 acres on Prospect Hill, the original campus of Western State Normal School