WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE
Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 1
Client: MODEC Ghana Ltd
Contract No.: MGL-KNK-SCON-2012002
PO No.: GH21-12/00112
Location: FPSO Kwame Nkrumah – Ghana - Africa
Subject: - UHP blasting and painting
Total surface area: More than 15.000m²
Total duration period: 24/12/2013 – 28/3/2015
AREA: HELI DECK
Duration: From 24 Dec 2013 to 02 Jan 2014
Before After
AREA: LIFEBOAT DECK PORT SIDE Duration: From 09 Dec 2013 to 11 Jan 2014
Before After
WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE
Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 2
Before After AREA: POOP DECK AFT Duration: From 12 Jan to 06 Feb 2014
Before After
Before After
WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE
Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 3
AREA: STBD MAIN DECK Duration: From 07 Feb to 17 Mar 2014
Before After
Before After
AREA: PORT LAY DOWN Duration: From 18 March to 06 April 2014
Before After
WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE
Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 4
AREA: STBD LAY DOWN Duration: From 07 April to 26 April 2015
Before After
AREA: STBD MAIN DEC (Below Crane) Duration: From 27 April to 01 May 2014
Before After
WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE
Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 5
AREA: PORT FWD MAIN DECK Duration: From 02 May to 17 June 2014
Before After
Before After
AREA: MAIN DECK –MID SHIP 4 CTR Duration: From 18 June to 30 July 2015
Before After
WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE
Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 6
Before After
AREA: ORCHARD ROAD (From Port Lay down to Sea water injection pump) Duration: From 31 July to 14 Aug 2015
Before After AREA: MAIN DECK MID SHIP 3 CTR Duration: From 15 Aug to 20 Sep 2015
Before After
WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE
Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 7
Before After
AREA: STBD FORWARD MAIN DECK (From Module 1) Duration: From 21 Sep to 20 Oct 2014
Before After
Before After
WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE
Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 8
AREA: PORT AFT MAIN DECK Duration: From 20 Oct to 01 Nov 2014
Before After
Before After
AREA: PORT MAIN DECK 3P CTR Duration: From 02 Nov to 09 Nov 2015
Before After
WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE
Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 9
AREA: TURRET DECK Duration: From 10 Nov to 09 Dec 2014
Before After
Before After
AREA: MODULE 1P DECK Duration: From 07 Dec to 14 Dec 2014
Before After
WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE
Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 10
Before After
AREA: STBD BOAT DECK (substantial corrosion area on davits and life raft area) Duration: From 14 Dec to 21 Dec 2014
Before After
Before After
WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE
Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 11
AREA: PORT SIDE MAINDECK (Outside pump room) Duration: From 22 Dec to 10 Jan 2015
Before After
Before After
AREA: PORT SIDE MAIN DECK (Outside accommodation trash compactor) Duration: From 10 Jan to 29 Jan 2015
Before After
WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE
Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 12
Before After
AREA: PORT MID-SHIP (Area of substantial corrosion) Duration: From 30 Jan to 28 Feb 2015
Before After
Before After
WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE
Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 13
1. HSE Performance:
Excellent Good Fair Acceptable Poor
2. Service Performance:
Excellent Good Fair Acceptable Poor
3. Other Comments:
……………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………
………………………… ….……………………….. Dinh Xuan Ngoc (VGCE) Mr. John Barnes
Country Manager Modec Ghana Ltd
CLIENT’S COMMENTS: