WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 1 Client: MODEC Ghana Ltd Contract No.: MGL-KNK-SCON-2012002 PO No.: GH21-12/00112 Location: FPSO Kwame Nkrumah – Ghana - Africa Subject: - UHP blasting and painting Total surface area: More than 15.000m² Total duration period: 24/12/2013 – 28/3/2015 AREA: HELI DECK Duration: From 24 Dec 2013 to 02 Jan 2014 Before After AREA: LIFEBOAT DECK PORT SIDE Duration: From 09 Dec 2013 to 11 Jan 2014 Before After

Upload: others

Post on 21-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE€¦ · WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE Vietnam GloCoating Engineering JSC An engineering approach to corrosion

WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE

Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 1

Client: MODEC Ghana Ltd

Contract No.: MGL-KNK-SCON-2012002

PO No.: GH21-12/00112

Location: FPSO Kwame Nkrumah – Ghana - Africa

Subject: - UHP blasting and painting

Total surface area: More than 15.000m²

Total duration period: 24/12/2013 – 28/3/2015

AREA: HELI DECK

Duration: From 24 Dec 2013 to 02 Jan 2014

Before After

AREA: LIFEBOAT DECK PORT SIDE Duration: From 09 Dec 2013 to 11 Jan 2014

Before After

Page 2: WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE€¦ · WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE Vietnam GloCoating Engineering JSC An engineering approach to corrosion

WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE

Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 2

Before After AREA: POOP DECK AFT Duration: From 12 Jan to 06 Feb 2014

Before After

Before After

Page 3: WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE€¦ · WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE Vietnam GloCoating Engineering JSC An engineering approach to corrosion

WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE

Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 3

AREA: STBD MAIN DECK Duration: From 07 Feb to 17 Mar 2014

Before After

Before After

AREA: PORT LAY DOWN Duration: From 18 March to 06 April 2014

Before After

Page 4: WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE€¦ · WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE Vietnam GloCoating Engineering JSC An engineering approach to corrosion

WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE

Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 4

AREA: STBD LAY DOWN Duration: From 07 April to 26 April 2015

Before After

AREA: STBD MAIN DEC (Below Crane) Duration: From 27 April to 01 May 2014

Before After

Page 5: WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE€¦ · WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE Vietnam GloCoating Engineering JSC An engineering approach to corrosion

WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE

Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 5

AREA: PORT FWD MAIN DECK Duration: From 02 May to 17 June 2014

Before After

Before After

AREA: MAIN DECK –MID SHIP 4 CTR Duration: From 18 June to 30 July 2015

Before After

Page 6: WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE€¦ · WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE Vietnam GloCoating Engineering JSC An engineering approach to corrosion

WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE

Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 6

Before After

AREA: ORCHARD ROAD (From Port Lay down to Sea water injection pump) Duration: From 31 July to 14 Aug 2015

Before After AREA: MAIN DECK MID SHIP 3 CTR Duration: From 15 Aug to 20 Sep 2015

Before After

Page 7: WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE€¦ · WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE Vietnam GloCoating Engineering JSC An engineering approach to corrosion

WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE

Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 7

Before After

AREA: STBD FORWARD MAIN DECK (From Module 1) Duration: From 21 Sep to 20 Oct 2014

Before After

Before After

Page 8: WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE€¦ · WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE Vietnam GloCoating Engineering JSC An engineering approach to corrosion

WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE

Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 8

AREA: PORT AFT MAIN DECK Duration: From 20 Oct to 01 Nov 2014

Before After

Before After

AREA: PORT MAIN DECK 3P CTR Duration: From 02 Nov to 09 Nov 2015

Before After

Page 9: WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE€¦ · WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE Vietnam GloCoating Engineering JSC An engineering approach to corrosion

WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE

Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 9

AREA: TURRET DECK Duration: From 10 Nov to 09 Dec 2014

Before After

Before After

AREA: MODULE 1P DECK Duration: From 07 Dec to 14 Dec 2014

Before After

Page 10: WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE€¦ · WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE Vietnam GloCoating Engineering JSC An engineering approach to corrosion

WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE

Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 10

Before After

AREA: STBD BOAT DECK (substantial corrosion area on davits and life raft area) Duration: From 14 Dec to 21 Dec 2014

Before After

Before After

Page 11: WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE€¦ · WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE Vietnam GloCoating Engineering JSC An engineering approach to corrosion

WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE

Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 11

AREA: PORT SIDE MAINDECK (Outside pump room) Duration: From 22 Dec to 10 Jan 2015

Before After

Before After

AREA: PORT SIDE MAIN DECK (Outside accommodation trash compactor) Duration: From 10 Jan to 29 Jan 2015

Before After

Page 12: WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE€¦ · WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE Vietnam GloCoating Engineering JSC An engineering approach to corrosion

WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE

Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 12

Before After

AREA: PORT MID-SHIP (Area of substantial corrosion) Duration: From 30 Jan to 28 Feb 2015

Before After

Before After

Page 13: WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE€¦ · WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE Vietnam GloCoating Engineering JSC An engineering approach to corrosion

WORK COMPLETION REPORT FOR THE FABRIC MAINTENANCE

Vietnam GloCoating Engineering JSC An engineering approach to corrosion problems 13

1. HSE Performance:

Excellent Good Fair Acceptable Poor

2. Service Performance:

Excellent Good Fair Acceptable Poor

3. Other Comments:

……………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………

………………………… ….……………………….. Dinh Xuan Ngoc (VGCE) Mr. John Barnes

Country Manager Modec Ghana Ltd

CLIENT’S COMMENTS:

JBarnes
Stamp
JBarnes
Stamp
JBarnes
Typewritten Text
Really excellent job - recommend for future projects with Modec