work samples 2012
DESCRIPTION
Work samples by Arch. Jean Paul Garnier P.TRANSCRIPT
![Page 1: Work Samples 2012](https://reader031.vdocument.in/reader031/viewer/2022020423/568c348f1a28ab023590e588/html5/thumbnails/1.jpg)
t (506) 8841 96 24
m [email protected] [email protected]
Full Portfolio available at http://issuu.com/cleverstarck/docs/wp2012_jeanpaulgarnier
![Page 2: Work Samples 2012](https://reader031.vdocument.in/reader031/viewer/2022020423/568c348f1a28ab023590e588/html5/thumbnails/2.jpg)
CU
RR
ÍCU
LUM
VIT
AE
t (506) 8841 96 24
m [email protected] [email protected]
PERSONAL DATAName: Jean Paul Garnier Portela
Gender: Male
Nationality: Costarican (Costa Rica)American (USA)
Civil State: Single
Birth Date: September 11,1985
SKILLS & QUALITIESExperience working in diverse work platforms and design technologies.
Experience working in changing and diverse working environments.
Experience working with professionals from different branches of design and engineering.
Experience developing and executing architectural projects and construction for small and medium scaled projects.
Developed design skills and problem solving.
Special affinities towards exploration, critical thinking and research.
Passion, talent and commitment towards architecture, design and arts.
SPOKEN & WRITTEN WORD01. Spanish: Native02. English: Excellent (100%)
WORK PLATFORMSAutodesk AutocadAutodesk RevitNemetschek VectorworksRhinoceros Rhino 3dAdobe Design Suite
EDUCATION2009-2010Licentiate Degree in Architecture fromUniversidad Veritas (SJ, CR)
2003-2009Bachelors Degree in Architecture fromUniversidad Veritas (SJ, CR)
1998-2002Anglo American High School Graduate, (Sj, CR)
EXPERIENCE-ARCHITECT2012_With Arch. Julian Uribe, design for Montero House, Naranjo, CR.
2010-2012_ARS Architects & Engineers, architect in charge of design and execution for various accounts and projects, San José, CR.
2011-2012_A-AMT, cofounder.
2011_Aguacate Ping Pong, creative designer for corporate imaging and branding, Escazú, CR.
2011_With Arq. Cesar CarrascalGeometrical and structural studies for custom race car, San José, CR.
2008-2009_Intern at Sotolongo Salman Henderson Architects, Miami, EEUU, (For short periods between quarters).
2008-2009_With A Company, collaboration for various international projects and competitions.
2008_With Jaime Rouillón, collaborator in charge of various details and design components for house in Guanacaste, CR.
2007_With Jaime Rouillón, collaborator in design for multipurpose building “Pasaje Jimenez” in San José, CR.
2003-2004_With Jirón Beirute Architects, assistant for architecture department.
ASSISTANTSHIPS
2009_Veritas University, with Arch. Rashid Sauma Ruiz M.sc. Assistant for the“structures IV” course.
Full Portfolio available at http://issuu.com/cleverstarck/docs/wp2012_jeanpaulgarnier 2
![Page 3: Work Samples 2012](https://reader031.vdocument.in/reader031/viewer/2022020423/568c348f1a28ab023590e588/html5/thumbnails/3.jpg)
After the unfortunate events caused by the 2010 earthquake, Haiti launched several campaigns to help rebuild houses.Aside from the housing and shelter crisis, Haiti has one of the highest rate of infections of HIV, and also a very high rate of deaths from the same disease. This competition intended to address health as an integral solution, determined mostly by the quality of the living spaces.
“We created a compact housing solution consequent to our premises which encourage social integration and allow for families and inhabitants to remain economically active through agriculture and other forms of local production and exchange.”
AMTJean Paul GarnierMauricio Rodriguez
LOCATIONHaitI
TYPESocial Housing
STAGEProposal
YEAR2010
-ACCESSIBILITY TO BASIC NEEDS-PRODUCTION AND EDUCATION
-SOCIAL INTEGRATION AND INTERWEAVING
-SOCIAL ADAPTATION AND SPACIAL APPROPRIATION-ECONOMY, OPPORTUNITY AND EXCHANGE
-SPACIAL CONTROL AND HYGIENE-CLIMATE CONTROL AND SAFETY
-RESOURCE AND WASTE MANAGEMENT
-REPEATABILITY-FLEXIBILITY
-TECHNOLOGICAL COMPATIBILITY
-CONSTRUCTIVENESS AND SPEED-DURABILITY AND MAINTENANCE
-BUDGET EFFICIENCY
SOCIAL HEALTH
ARCHITECTONIC HEALTH
CONSTRUCTIVE HEALTH
KAY
E SA
NTE
NA
N A
YTI
3
![Page 4: Work Samples 2012](https://reader031.vdocument.in/reader031/viewer/2022020423/568c348f1a28ab023590e588/html5/thumbnails/4.jpg)
1. 2. 3. 4.KA
Y E
SAN
TE N
AN
AYT
I
A superficial soil substitution and the rammed earth base, replace the need for traditional foundations, and lifts the house from the ground helping humidity and flood control.
The specialized program is added atop the base. This program is characterized by controlled and determined spaces which require certain control of air pockets and contact to the rest of the house.This program is divided in two blocks: dormitories and services.
The main roof provides independent ventilation to each spatial component and room, achieving a air pocket control
which is very necessary for infection control.Its roof span creates a shaded air pocket (between the main roof and the secondary concrete roof of the blocks), meant to cool the air intake.The main roof is designed for water cultivation, emptying rainy waters into the atrium, where it’s taken into a vase shaped ceramic water filter. It purifies the water and stores them for domiciliary use or farming. In this way the vase is like a town well, meant as a central gathering space for exchange and social interaction.
“...The vase is like a town well, meant as a central
gathering space for exchange and social interaction.”
The blocks are taken apart, making room for a central common space.This generous space is an atrium characterized by it’s flexibility. It would serve the purpose for workshop as well as social areas of the house. It has excellent ventilation and climate control, due to its position.
Spatial continuity is obtained between the base and its context by the creation of access scalinattas. This would also lay grounds to the desired urban connections and bonds between units, once paired or set besides each other.
5.
4
![Page 5: Work Samples 2012](https://reader031.vdocument.in/reader031/viewer/2022020423/568c348f1a28ab023590e588/html5/thumbnails/5.jpg)
19%
A B C D E F G
A B C D E F G
1
2
3
4
5
6
7
1
2
3
4
5
6
7
2.70
1.50
1.30
1.40
1.40
2.70
5.5
05
.50
11.0
0
2.70
1.50
1.30
1.40
1.40
2.70
2.7
04
.20
4.1
0
11.0
0
1.90 2.05 2.05 1.50 80 1.60
1.90 4.10 3.90
9.90
1.90 2.05 2.05 1.50 80 1.60
1.90 4.10 3.90
9.90
A B C D E F G
0+0.5m0+0.6m
0+0.9m
0+2.7m
0+3.0m0+3.1m
0+3.4m
0+3.94m
KITCHEN
0+0.6m13.11 sq.m.
LIVING AREA
0+0.6m42.23 sq.m.
BEDROOM 1
0+0.6m10.53 sq.m.
BEDROOM 2
0+0.6m10.53 sq.m.
BEDROOM 3
0+0.6m10.53 sq.m.
BATHROOM
0+0.6m3.22 sq.m.
1/2 BATHROOM
0+0.6m2.25 sq.m.
CLEANING ROOM
0+0.6m5.13 sq.m.
A A'
B'
B
1 2 3 4 5 6 7
0+0.5m0+0.6m
0+0.9m
0+2.7m
0+3.0m0+3.1m
0+3.4m
0+3.94m
0+0.0m
0+0.0m
0 1 3 5 10m
KAY
E SA
NTE
NA
N A
YTI
“Each unit includes a garden and promotes the smart and sensitive use of resources by means of water cultivation and its further household
or gardening use.”
19%
A B C D E F G
A B C D E F G
1
2
3
4
5
6
7
1
2
3
4
5
6
7
2.70
1.50
1.30
1.40
1.40
2.70
5.5
05
.50
11.0
0
2.70
1.50
1.30
1.40
1.40
2.70
2.7
04
.20
4.1
0
11.0
0
1.90 2.05 2.05 1.50 80 1.60
1.90 4.10 3.90
9.90
1.90 2.05 2.05 1.50 80 1.60
1.90 4.10 3.90
9.90
A B C D E F G
0+0.5m0+0.6m
0+0.9m
0+2.7m
0+3.0m0+3.1m
0+3.4m
0+3.94m
KITCHEN
0+0.6m13.11 sq.m.
LIVING AREA
0+0.6m42.23 sq.m.
BEDROOM 1
0+0.6m10.53 sq.m.
BEDROOM 2
0+0.6m10.53 sq.m.
BEDROOM 3
0+0.6m10.53 sq.m.
BATHROOM
0+0.6m3.22 sq.m.
1/2 BATHROOM
0+0.6m2.25 sq.m.
CLEANING ROOM
0+0.6m5.13 sq.m.
A A'
B'
B
1 2 3 4 5 6 7
0+0.5m0+0.6m
0+0.9m
0+2.7m
0+3.0m0+3.1m
0+3.4m
0+3.94m
0+0.0m
0+0.0m
0 1 3 5 10m
“The constructive system is consists of four types of formwork, thus, it’s easy to learn, easily replicated, copied and built upon. It’s an open system, meant
to dialogue with it’s inhabitants and builders.”
5
![Page 6: Work Samples 2012](https://reader031.vdocument.in/reader031/viewer/2022020423/568c348f1a28ab023590e588/html5/thumbnails/6.jpg)
19%
A B C D E F G
A B C D E F G
1
2
3
4
5
6
7
1
2
3
4
5
6
7
2.70
1.50
1.30
1.40
1.40
2.70
5.5
05
.50
11.0
0
2.70
1.50
1.30
1.40
1.40
2.70
2.7
04
.20
4.1
0
11.0
01.90 2.05 2.05 1.50 80 1.60
1.90 4.10 3.90
9.90
1.90 2.05 2.05 1.50 80 1.60
1.90 4.10 3.90
9.90
A B C D E F G
0+0.5m0+0.6m
0+0.9m
0+2.7m
0+3.0m0+3.1m
0+3.4m
0+3.94m
KITCHEN
0+0.6m13.11 sq.m.
LIVING AREA
0+0.6m42.23 sq.m.
BEDROOM 1
0+0.6m10.53 sq.m.
BEDROOM 2
0+0.6m10.53 sq.m.
BEDROOM 3
0+0.6m10.53 sq.m.
BATHROOM
0+0.6m3.22 sq.m.
1/2 BATHROOM
0+0.6m2.25 sq.m.
CLEANING ROOM
0+0.6m5.13 sq.m.
A A'
B'
B
1 2 3 4 5 6 7
0+0.5m0+0.6m
0+0.9m
0+2.7m
0+3.0m0+3.1m
0+3.4m
0+3.94m
0+0.0m
0+0.0m
0 1 3 5 10m
Our design approach was to integrate the concept for health in each aspect of the design, acting upon mayor concerns and the most frequent afflictions from the very conceptions of space.The final aim is to significantly create lasting improvements on the quality of life of the user, and to ensure the usage and learning of sustainable living practices which could, in term, be applied elsewhere.The use of certain technologies and strategies could render into an important legacy for the architecture’s occupants.KA
Y E
SAN
TE N
AN
AYT
I
6
![Page 7: Work Samples 2012](https://reader031.vdocument.in/reader031/viewer/2022020423/568c348f1a28ab023590e588/html5/thumbnails/7.jpg)
JPGJean Paul Garnier
LOCATIONGuachipelín, Escazú, CR
TYPEHousing/office
STAGEProposal
YEAR2010
The project is located at Guachipelín, an urban satellite for Escazú City. It’s an urban formation fragmented by its linearity and its urban model. Most of its programmatic composition is housing and its usual derivatives. This is one of the mayor urban issues, its programmatic exclusion and lack of variety.
The project is constituted architecturally of two parts, each a main programmatic phase. The first, the office plaza, is built from the terrain, from its excavation. The result is a horizontal space which, in its continuity and length, promotes exchange and communicative richness sought in modern office spaces. Over this space overhangs the main roof which
offers protection, light and ventilation. The roof is designed to allow visual amplitude from the main street, allowing people to see the landscape, rendering the project invisible.The second phase is the housing tower, built upon principles opposite from phase one. Its disjoined from the ground. Each of its living units has its own floor level and elevator level. This gesture emphasizes on privacy and generates a better appropriation of the spaces.
The architectural model is proposed contains the inclusion of economical program to the site, promoting greater urban richness, exchange and economical sustentability, as well as density.
PROGRAMMATIC INCLUSION
N 0 .2 .5 1 Centro educativo
Espacio público recreativo
Centro comercial
Centro de negocios
Area industrial
Vertice del area de estudio
N 0 .2 .5 1 Zona no-urbanizada (rural)
Zona urbanizada (alta plusvalía)
Zona urbanizada (baja plusvalía)
N 0 .2 .5 1
3271128
586
577
Aglomeración de comercio
Aglomeración de servicios educativos
Aglomeración de espacios públicos
Radios de 500 mts (Jan Gehl)
Vértice de area de estudio
MH
L_M
ULT
IPU
RPO
SE
7
![Page 8: Work Samples 2012](https://reader031.vdocument.in/reader031/viewer/2022020423/568c348f1a28ab023590e588/html5/thumbnails/8.jpg)
MH
L_M
ULT
IPU
RPO
SE
0+950mm
evap
orad
or
5%
15%
A
C
A
C
CC
DD
EE
calle lastre
NPT 0+000cm
10%
10%
V18.27m²
0+58cm0+000cm
0+148cm
10%
10%
V18.27m²
0+58cm0+000cm
0+148cm
3%
A' B B' C D E' E F G G' G'' H K L M' Ñ' P' P Q'A4.88 3.18 1.40 6.38 3.50 2.38 1.40 1.40 3.35 3.388 3.39 3.98 6.15 3.35 1.40 1.40 2.38 3.50 6.38 1.40 3.18 5.48 7.801.40
I I' I'' M N Q RJ Ñ O
2
3
4
5
6
7
8
9
10
11
12
13
14
1
4.48
2.79
2.79
2.79
2.79
2.79
2.79
2.79
1.44
1.60
1.19
1.44
3.82
2
3
4
5
6
7
8
9
10
11
12
13
2.79
2.79
2.79
2.79
2.79
2.79
2.79
1.44
1.60
1.19
1.44
A' B B' C D E' E F G G' G'' H K L M' Ñ' P' P Q'A4.88 3.18 1.40 6.38 3.50 2.38 1.40 1.40 3.35 3.388 3.39 3.98 6.15 3.35 1.40 1.40 2.38 3.50 6.38 1.40 3.18 5.48 7.801.40
I I' I'' M N Q RJ Ñ O
CPMOD. OFIC B
38.43m²0+148cm
CPMOD. OFIC B
38.43m²0+148cm
CPMOD. OFIC B
38.43m²0+148cm
CPMOD. OFIC B
47.97m²0+148cm
CPS. REUNION
13.39m²0+148cm
CPS. REUNION
16.35m²0+148cm
CPS. REUNION
13.39m²0+148cm
INDICADA 09-10 A1/2
PLANTA ARQUITECTONICA DE SEGUNDO NIVEL
222°
1 105 20
PLANTA ARQUITECTONICA DE SEGUNDO NIVELESC 1:100
23
45
67
89
1011
121
13
1516
1718
1920
2122
2324
2526
2714
2930
3132
3334
3536
3738
3940
4142
28
4445
4647
4849
5051
5253
5455
43
57 58 59 60 61 62 63 64 65 66 67 6856 70 71 72 73 74 75 7669 78 79 80 81 82 83 84 85 8677
8889
9091
9293
9495
9697
9887
CECP
COCINA/COMEDOR60.01m²0+260cm
CPTERRAZA
43.58m²0+260cm
CPPLAZA PÚBLICA
137.65m²0+148cm
CPPLAZA PÚBLICA
62.66m²0+148cm
N. DE PERMISO
SELLOS
APROBACION COMISION REVISORA DE PERMISOS DE CONSTRUCCION
PROYECTO:
LHMPROPIETARIO:
XXXXXXXXXXXXXXXXXXXXXXXXXXX
PROVINCIA CANTON DISTRITO
SAN JOSE ESCAZU SAN RAFAEL
DISEÑO:Jean Paul Garnier P
DIBUJANTE:
JEAN PAUL GARNIER P
PROFESIONAL RESPONSABLE:
NOMBRE:
FIRMA: N. REGISTRO:XX-00000
PROFESIONAL RESPONSABLE DIRECCION TECNICA:
NOMBRE:
FIRMA: N. REGISTRO:XX-00000
INFORMACION REGISTRO PUBLICO
PROPIETARIO:N. CATASTRO: X-0000000-0000CED. JURIDICA N.: 0-000-0000000SILLAS: FOLIO REAL N. 0000000
CONTENIDO:
ESCALA FECHA N. DE LAMINA
8
![Page 9: Work Samples 2012](https://reader031.vdocument.in/reader031/viewer/2022020423/568c348f1a28ab023590e588/html5/thumbnails/9.jpg)
MH
L_M
ULT
IPU
RPO
SE
The tower is designed as a slender, elegant concrete volume which is positioned to allow (like phase one) the landscape to be seen from the street.
9
![Page 10: Work Samples 2012](https://reader031.vdocument.in/reader031/viewer/2022020423/568c348f1a28ab023590e588/html5/thumbnails/10.jpg)
MH
L_M
ULT
IPU
RPO
SE
“The central atrium has a glass roofing system that allows light to flood the building. Natural light takes over the work spaces, allowing for an unconstricting sensation and awareness of the context.”
N. DE PERMISO
SELLOS
APROBACION COMISION REVISORA DE PERMISOS DE CONSTRUCCION
PROYECTO:
LHMPROPIETARIO:
XXXXXXXXXXXXXXXXXXXXXXXXXXX
PROVINCIA CANTON DISTRITO
SAN JOSE ESCAZU SAN RAFAEL
DISEÑO:Jean Paul Garnier P
DIBUJANTE:
JEAN PAUL GARNIER P
PROFESIONAL RESPONSABLE:
NOMBRE:
FIRMA: N. REGISTRO:XX-00000
PROFESIONAL RESPONSABLE DIRECCION TECNICA:
NOMBRE:
FIRMA: N. REGISTRO:XX-00000
INFORMACION REGISTRO PUBLICO
PROPIETARIO:N. CATASTRO: X-0000000-0000CED. JURIDICA N.: 0-000-0000000SILLAS: FOLIO REAL N. 0000000
CONTENIDO:
ESCALA FECHA N. DE LAMINA
4#6 A40
ARO#3@15cmA33
4#6 A40
5 1.10 51.20
540
550
ARO#3@15cmA33
4#6 A40
SELLO DE 10cm ESPESOR DECONCRETO POBRE
RELLENO DE LASTRECOMPACTADO 95% CON CBR>30
SEGUN ESTUDIO DE SUELOS
MALLA #5@15cm A40
4.21
6035
5
NPT 0-253cm
4.81
405.
21
4050
401.
30
40 1.20 40
2.00
PLACA AISLADA, MALLA#4@15cm A40
A
A
1.18 82
78 42
DC2 COLUMNA Y PLACA AISLADAESC 1:25
SELLO DE 10cm ESPESOR DECONCRETO POBRE
RELLENO DE LASTRECOMPACTADO 95% CON CBR>30
SEGUN ESTUDIO DE SUELOS
ARO #4@20cm A40
NPT 0-253cm
MALLA #4@15cm A40
ARO #4@15cm A406#5 A40
5#5@ A40
RELLENO DE PIEDRACUARTA PARA CONTROL DE
HUMEDAD
DOS CAPAS DE IMPERMEABILIZANTEURETANIZER DE LANCO Y PLASTICO
NEGRO APLICADO SOBRE MURO
335
3.14
530
53.
5240
3.92
5 1.87 3 15 31.92 20
2.12
5 75 20 35 580 20 40
1.40
A
A
58 82
1.70 42
DM1 MURO DE CONTENCIONESC 1:25
INDICADA 09-10 A5/5
DISEÑO DE COLUMNA MURO DE JARDINERAS-CONTENSIONDETALLE DE CUBIERTA SOBRE PLAZA CENTRAL
51.
505
1.60
135 3 135
30
EJE DE SIMETRIA
VIGA DE ACERO PERFIL I DE30*60cm*50*30mm, SEGUN
CRITERIO ESTRCTURAL, PINTADACON DOBLE MANO DE PINTURA
ANTICORROSIVA AMARILLAAUTOMOTRIZ A SELECCIONARREFUERZO DE CORTANTE EN
LAMINA DE ACERO DE 10mmESPESOR, SOLDADO CON HILO
CONTINUO SEGUN NOTAS DESOLDADURA
NOTA: LA VIGA MANTENDRA LOS MISMOS CALIBRES Y CARACTERISTICAS DEL ACERO A LO LARGO DE SU EXTENSION, INCLUSIVE EL HABER CAMBIOS EN SU CONFIGURACION.
TENSOR EN VARILLA#6 LISA A40, SOLDADA A VIGA I
BOTAGUAS HG#22ARTICULACION DE VIGA LARGUEO A VIGA I
CON PERNO DE 12mm DIAM. CON DOBLEARANDELA DE 2mm SEGUN ESTRUCTURAL
LARGUERO EN ANGULARESTRUCTURAL DE 75*75*5mm A40
CUBIERTA DE VIDRIO ESTRUCTURALTEMPERADO Y AHUMADO, VER DETALLE DE
EMPALMET ESRUCTURAL ENSAMBLADA DE PERIL
RECTANGULAR DE 75*10mm y 100mm*10mmVIDRIO ESTRUCTURAL
TEMPERADO Y AHUMADOEMPAQUE DE HULE SELLADO
CON SILICON LIQUIDOLARGUERO EN ANGULAR
ESTRUCTURAL DE 75*75*5mm A40
PLETINA DE 100*6mm SOLDADA A LAGUERO ESTRUCTURAL
EMPALME DE CANOA INTERNA EN ANGULAR DE 5*5cm*6mm
ESCALERILLA EN PERFIL ESTRUCTURAL DE 1/2*1/2"*2,4mm
PERNO AUTOMOTRIZ INSTALADO CONDOBLE ROSCA Y ARANDELA EN AMBOS
EXTREMOS SEGUN CRITERIO ESTRUCTURALCANOA INTERNA EN HG#24 CUBIERA EN FIBRA DEVIDRIO, PINTADA CON DOBLE MANO DE PINTURA
ANTICORROSIVA NEGRA A SELECCIONAR
BASE DE APOYO DE CANOA (ALTURA REGULADASEGUN PENDIENTE) EN PERFIL ESTRUCTURAL DE
2.5*2.5cm*2,4mm
PLETINA DE 10*10cm*10mm SOLDADA A VIGA AMERICANA(LONGITUDINAL)
VIGA AMERICANA EN PERFIL ESTRUCTURAL DE 5*10cm*2,4mm
PLETINA DE ACERO DE 6mm A40
EMPALME EN PLETINAS DE ACERO DE 5*12.5cm*6mm A40 SOLDADO A VIGAAMERICANA, ARTICUALDO A PLETINA, SEGUN CRITERIO ESTRUCTURAL
55
560
1010
35
8013
98
1881
6
2.77
5
6
2.82
10
3
10
3
2-2 SECCION DE CUBIERTA DE PLAZA CENTRALESC 1:10
10
![Page 11: Work Samples 2012](https://reader031.vdocument.in/reader031/viewer/2022020423/568c348f1a28ab023590e588/html5/thumbnails/11.jpg)
N. DE PERMISO
SELLOS
APROBACION COMISION REVISORA DE PERMISOS DE CONSTRUCCION
PROYECTO:
LHMPROPIETARIO:
XXXXXXXXXXXXXXXXXXXXXXXXXXX
PROVINCIA CANTON DISTRITO
SAN JOSE ESCAZU SAN RAFAEL
DISEÑO:Jean Paul Garnier P
DIBUJANTE:
JEAN PAUL GARNIER P
PROFESIONAL RESPONSABLE:
NOMBRE:
FIRMA: N. REGISTRO:XX-00000
PROFESIONAL RESPONSABLE DIRECCION TECNICA:
NOMBRE:
FIRMA: N. REGISTRO:XX-00000
INFORMACION REGISTRO PUBLICO
PROPIETARIO:N. CATASTRO: X-0000000-0000CED. JURIDICA N.: 0-000-0000000SILLAS: FOLIO REAL N. 0000000
CONTENIDO:
ESCALA FECHA N. DE LAMINA
INDICADA 09-10 A4/1
DISEÑO DE JARDINERA-CONTENSION
ACABADO DE CIELOS
ACABADO DE PAREDES
Piso de Loceta de Concreto Colada en Obra de 60x120 cm
ACABADO DE PISOS
TABLA DE ACABADOS
Piso en Ladrillo de Arcilla Sólido de 5x10cm
Cielo en Gypsum densglass 12mm
lb
gy
Pared en bloques de concreto repellada, af inada y pintada con dos manos de pintura color blanco/crema a seleccionar
r
Pared en bloques de concreto repellada, af inada y pintada con dos manos de pintura color blanco/crema a seleccionar, a partir de 80cm S.N.P.T.
b
Piso en Concreto Vistoc
lc
Pared en concreto vistoc
Cielo Expuestoce
Pared en Bloques de Concreto enchapada en azulejos 8*16cm azules a seleccionara
Pared liviana en madera machimbrada a seleccionarl
Piso de loza Concreto Pulido con Piedra Blanca Colada en Obra de 60x120 cmcp
Piso enchapado con azulejos 8*16cm azules a seleccionara
Piso en vinil antideslizante a seleccionarv
RELLENO DE LASTRECOMPACTADO 95% CON CBR>30
SELLO DE 10cm DECONCRETO POBRE
Z1
NPT 0-164cm
NPT 0-141cm
NPT 0+000cm
NPT 0+148cm
NCT 0+393cm
NPT 0+533cm
NPT 0-253cm
NCT 0+128cm
3066
302.
391.
2810
2.82
1050
401.
262.
391.
282.
921.
003.
654.
207.
85
301.
1077
1.68
2043
1.86
4060
1515
1.40
2.45
632.
263.
852.
88
COLUMNA DE CONCRETO COLADO EN SITIO,CONCRETO FC'210, PREPARADO CON HIDROMAX,
VER DETALLE.
DOS CAPAS DE IMPERMEABILIZANTEURETANIZER DE LANCO Y PLASTICO NEGRO
APLICADO SOBRE MURO
ARRIOSTRES (VER DETALLE)
CANOA DE CONCRETO DE 5cmDE ESPESOR MALLA#2@15cm
MURO DE CONTENCION DE 20cm DEESPESOR, MALLA #4@15cm, COLADO EN SITIO
PREPARADO CON HIDROMAX
RELLENO DE PIDRACUARTA PARA CONTROL DE
HUMEDAD
PROYECCION DE MURO DEARRIOSTRE
MURO DE CONRETO DE 15cm DEESPESOR, MALLA#4@15cm
Z2
CONTRAPISO DE CONCRETO,MALLA#2@15cm (VER DETALLE)
VENTANERIA DE MADERA TIPO(VER DETALLE)
VM
DET.1
JARDIN
DM1
DC2
SECCION 2-2 DETALLE DE JARDINERA NORTEESC 1:50
CC
C C
L
DV1
L
RELLENO DE LASTRE COMPACTADO 95%CON CBR>30
SELLO DE 10cm DECONCRETO POBRE
Z1
NPT 0-164cm
NPT 0-141cm
NPT 0+000cm
NPT 0+148cm
NCT 0+393cm
NPT 0+533cm
NPT 0-253cm
NCT 0+128cm
301.
1077
1.68
2043
1.86
4060
1515
1.40
2.45
632.
263.
852.
88
COLUMNA DE CONCRETO COLADO ENSITIO, CONCRETO FC'210, PREPARADO CON
HIDROMAX, VER DETALLE.
ARRIOSTRES (VER DETALLE)
CANOA DE CONCRETO DE 5cmDE ESPESOR MALLA#2@15cm
Z2
CONTRAPISO DE CONCRETO,MALLA#2@15cm (VER DETALLE)
DM2
PROYECCION DE MURO DEARRIOSTRE
RELLENO DE PIEDRA CUARTA PARACONTROL DE HUMEDAD
MURO DE CONTENCION DE 20cm DEESPESOR, MALLA #4@15cm, COLADO EN SITIO
PREPARADO CON HIDROMAX
DOS CAPAS DE IMPERMEABILIZANTEURETANIZER DE LANCO Y PLASTICO NEGRO
APLICADO SOBRE MURO
VIGA DE AMARRE DE ESTRUCTURAPRINCIPAL
CANOA DE CONCRETO DE 5cm DEESPESOR MALLA#2@15cm
RAMPA DE CONCRETO,MALLA#2@15cm
3.65
4.20
7.85
JARDIN
3066
302.
391.
2810
2.82
1050
401.
262.
391.
282.
921.
00
DM1
SECCION 1-1 DETALLE DE JARDINERA NORTEESC 1:50
CC
DC2
22
11
NPT 0-141cmNPT 0-252cm
2
3
4
5
6
7
8
9
10
11
13
2.79
2.79
2.79
2.79
2.79
2.79
2.12
2.12
2.10
2.14
10%
10%
10%
10%
10%
2
3
4
5
6
7
8
9
10
11
13
2.79
2.79
2.79
2.79
2.79
2.79
2.12
2.12
2.10
2.14
BA4.88
A'A4.88
2.79
5.59
5.59
4.91
4.22
3.65
502.
2950
5.09
505.
0950
4.41
503.
7250
1.89
1.52
23.0
93.
65
C2
C2
C2
C2
C2
C2
M1
M1
M1
M1
M1
PLANTA ARQUITECTONICA DE JARDINERA NORTEESC 1:50
MURO DE CONRETO DE 15cm DE ESPESOR, MALLA#4@15cm
CANOA DE CONCRETO DE 5cm DE ESPESOR MALLA#2@15cm
MURO BAJO CON BANCA (DM2)
CANOA DE CONCRETO DE 5cm DE ESPESOR MALLA#2@15cm
MURO BAJO CON BANCA (DM2)
MURO ARRIOSTRE DE CONCRETO COLADO DE 15cm DE ESPESOR MALLA#4@15cmA40
MURO ARRIOSTRE DE CONCRETO COLADO DE 15cm DE ESPESOR MALLA#4@15cmA40
MURO ARRIOSTRE DE CONCRETO COLADO DE 15cm DE ESPESOR MALLA#4@15cmA40
MURO DE CONTENCION DE 20cm DE ESPESOR, MALLA #4@15cm, COLADO EN SITIO PREPARADO CON HIDROMAX (DM1)
MURO DE CONTENCION DE 20cm DE ESPESOR, MALLA #4@15cm, COLADO EN SITIO PREPARADO CON HIDROMAX (DM1)
MURO DE CONTENCION DE 20cm DE ESPESOR, MALLA #4@15cm, COLADO EN SITIO PREPARADO CON HIDROMAX (DM1)
MURO DE CONTENCION DE 20cm DE ESPESOR, MALLA #4@15cm, COLADO EN SITIO PREPARADO CON HIDROMAX (DM1)
MURO DE CONTENCION DE 20cm DE ESPESOR, MALLA #4@15cm, COLADO EN SITIO PREPARADO CON HIDROMAX (DM1)
JARDINERA RELLENA DE TIERRA SUELTA
REJILLA DE PLETINA DE 2mm@3,5cm
ANGULAR DE 2,5*2,5cm*2mm
CORONA DE MURO BAJO 4#3, ARO#2@15cm
CANOA DE CONCRETO DE 5cm DEESPESOR MALLA#2@15cm
MURO BAJO BLOCK DE 15*20*40cm CELDASRELLENAS, #3@20cm VERTICAL, #3@20cm
HORIZONTAL
CONTRAPISO DE CONCRETO,MALLA#2@15cm (VER DETALLE)
Z2
SELLO DE 5cm DE CONCRETO POBRE
RELLENO DE PIDRA CUARTA PARACONTROL DE HUMEDAD
RELLENO DE LASTRE COMPACTADO 95%CON CBR>30 SEGUN ESTUDIO DE SUELOS
1010
2060
1515
2020
6030
4090
5 15 14 26
25 15 25
DM1 MURO DE CONTENCION BAJOESC 1:10
MH
L_M
ULT
IPU
RPO
SE
The concrete roof cantilevers over the buildings edge, covering the plazas, yet allowing water to rain down over the gardens that separate the inner private spaces from the public spaces. The roof hangs low, allowing in its compression, a spatial awareness that bonds man to landscape.
11
![Page 12: Work Samples 2012](https://reader031.vdocument.in/reader031/viewer/2022020423/568c348f1a28ab023590e588/html5/thumbnails/12.jpg)
MH
L_M
ULT
IPU
RPO
SE
12
![Page 13: Work Samples 2012](https://reader031.vdocument.in/reader031/viewer/2022020423/568c348f1a28ab023590e588/html5/thumbnails/13.jpg)
“What matters is the correspondence of the house (...) with its inhabitant(...). The Minotaur justifies, in full, the existence of the labyrinth.”
Jorge Luis Borges, Abenjacán el bojarí, muerto en su laberinto
Architects Lair
AMTJean Paul Garnier
LOCATIONEscazú, SJ, CR
TYPEHousing Unit
STAGEProposal
YEAR2011-2012
When faced with the challenge of designing a house for an architect, instead of turning to design as the key, I turned to literature for inspiration.I was certainly inspired by Heidegger and Bachelard, but it was only after reading J.L.Borges that the house became clear: a house as the condensed synthesis of character. The architects lair would be a small efficient structure, with techtonics derived from the abstract conception of volume, form and space, nevertheless grossly constructive and material driven. The lair would fit into the site without interrupting its nature, rather it would be a space from which to observe the context.V0
1 R
ESID
ENC
E
13
![Page 14: Work Samples 2012](https://reader031.vdocument.in/reader031/viewer/2022020423/568c348f1a28ab023590e588/html5/thumbnails/14.jpg)
V01
RES
IDEN
CE
The architecture unfolds space from the terrain, it brings man closer to earth.It’s from this basic operation that derives the hole architecture for the house. Its space develops from the void, giving each component an individual space and character, hence forming a rich and detailed object, that manages to penetrate and sink in to the memory of whom inhabits, the architect.
14
![Page 15: Work Samples 2012](https://reader031.vdocument.in/reader031/viewer/2022020423/568c348f1a28ab023590e588/html5/thumbnails/15.jpg)
V01
RES
IDEN
CE
This house is designed to emphasize that essential bond between man, space and matter. That’s why its architecture derives from the most basic of spacial principles: the simple enclosure, a haven. This is why detail and efficiency are taken into account: the architect would inhabit this space closely, using the same space to take on multiple tasks and moments.
15
![Page 16: Work Samples 2012](https://reader031.vdocument.in/reader031/viewer/2022020423/568c348f1a28ab023590e588/html5/thumbnails/16.jpg)
C D E F G H I J KA
C D E F G H I J KA
33
A1
V01
RES
IDEN
CE
16
![Page 17: Work Samples 2012](https://reader031.vdocument.in/reader031/viewer/2022020423/568c348f1a28ab023590e588/html5/thumbnails/17.jpg)
V01
RES
IDEN
CE
3 3A 1
3 3A 1
0+30cm
0+15cm 0+30cm 0+45cm 0+60cm 0+45cm
0+150cm
0+90cm
0+90cm
0+75cm
B C D E F G H I J KA
C D E F G H I J KA
01
02
03
04
05
06
07
08
01
02
03
04
05
06
07
08
0+45cm
33
A1
33
A1 17
![Page 18: Work Samples 2012](https://reader031.vdocument.in/reader031/viewer/2022020423/568c348f1a28ab023590e588/html5/thumbnails/18.jpg)
“Architecture was attempted as a bold, raw and efficient object that bonds man to memory, man to landscape and that gives man a place.”
18
![Page 19: Work Samples 2012](https://reader031.vdocument.in/reader031/viewer/2022020423/568c348f1a28ab023590e588/html5/thumbnails/19.jpg)
Other skills
“Sol”Acrylic on canvas
YEAR2010
FORMAT84*118cm
19
![Page 20: Work Samples 2012](https://reader031.vdocument.in/reader031/viewer/2022020423/568c348f1a28ab023590e588/html5/thumbnails/20.jpg)
“Laura”Acrylic on wood panel
YEAR2009
FORMAT100*36cm
AMTJean Paul Garnier
PROJECTMinimal House
TYPEHousing Unit
YEAR2008
20