3
2%1%4%
5%
4%
36%12%
1%
2%1%
1%
5%1%
23%
Aphyxiation/inhalationCaught in stationary eqpt.Collapse of structureCrush in betweenElectric shockDrown,non-lethal fallFall from heightFall of objectfire/explosion
hyper thermia/hypothermiaLifting operationTrench collapseManual liftingOther
Causes Wise Construction Fatalities, 1999 (USA)
4
2%1%
8%
4%
3%
6%
1%
1%
46%
10%9%
9%
Fall of PersonFall of objectLifting eqpt.Non rail transportMachineryExcavationElectrical
TunnelingFire/ExplosionStricking an objectPoisoning & GassingOthers
Causes Wise Construction Fatalities, 1999(INDIA)
5
Fall of Person
Fall of object
Crush in between
Burn injury
Struck by object
Causes Wise Construction Fatalities, L & T E & C Division
8%
8%
33%
8%
42%
6
Activities
Roof work
Material shifting / Removal
Painting Insulation
Hot work
Equipment / Structural erection
10
Time(Seconds)
Distance(meters)
Distance(feet)
0.51
1.52
2.534
1.25
1120314478
4163664
100144256
TIME TAKEN BY MATERIAL TO FALL
11
ITEM WEIGHT STRIKING FORCE
WHEN DROPPED FROM
10 Meter 15 Meter
SQUARE WASHER 0.099 Kgs. 0.990 Kg.mt. 1.48 Kg.mt.
13.5 Kv INSULATOR 1.15 Kg. 11.15 Kg.mt. 17.25Kg.mt.
LAG SCREW 0.099 Kg. 0.990 Kg.mt. 1.48 Kg.mt.
5/8” BOLT 0.737 Kg. 7.370 Kg.mt. 11.05Kg.mt.
12” WRENCH 0.6849 Kg. 6.849 Kg.mt. 10.27Kg.mt.
9” PLIER 0.4249 Kg. 4.249 Kg.mt. 6.37 Kg.mt.
STRIKING FORCE ON HEADSTRIKING FORCE ON HEAD
38
RiserHeight = 19cm
75 - 85 cm
Slope :- 30 - 350
Staircase WidthMin. - 100cm
No. of Riser shall be limited to 12 per flight
Toe BoardHeight to be 150mm
Statutory Requirements for Staircase
39
• To be secured/tied to the structure or wall at the proper interval.
• Safe means of access to be provided by ladder or stairways• Working surface, guardrails, access/egress should be maintain in clean & non slippery condition• Ensure that scaffold system is not overloaded.
• Defective scaffold component to be repaired or destroyed.
Things to do ...
44
Ladd
ers
• 20 % of accident occurs due to defective ladders.
• 80 % of accidents are due to thoughtlessness & foolishness of ladder users
62
Safe procedure for lifting tubular to higher elevation
• Check all lifting tools & tackles• Shall be certified by competent person
• Cordon area• Ensure that material is secured prior to lift.
76
Safety Net System
8 feet
Up to 5 feet...More than
5 feet up to 10feet
To 10 feet
More than10feet
13 feet
Working Surface
Safety Net