working like fred flintstone in a george jetson world?

62
Working Like Fred Flintstone in a George Jetson World? 27 April 2016 016 InEight Inc. All rights reserved.

Upload: michelle-scifers-mba

Post on 15-Apr-2017

243 views

Category:

Software


0 download

TRANSCRIPT

Page 1: Working Like Fred Flintstone in a George Jetson World?

Working Like Fred Flintstone in aGeorge Jetson World?27 April 2016

© 2016 InEight Inc. All rights reserved.

Page 2: Working Like Fred Flintstone in a George Jetson World?

Agenda

• Introductions

• User Challenges

• The 3 Age-Old Project Execution Challenges

• Solutions Across the Project Lifecycle

Page 3: Working Like Fred Flintstone in a George Jetson World?

Introductions

Page 4: Working Like Fred Flintstone in a George Jetson World?

InEight Introduction

InEight combines proven ability with a unified vision to help companies visualize, estimate, control and connect all aspects of their capital and maintenance projects, from the back office to the jobsite, across the project lifecycle.

• Helping project-driven companies since 1989• More than 20,000 active users in more than 500 companies across 33 countries

Page 5: Working Like Fred Flintstone in a George Jetson World?

Sample Customers

Mining Oil & Gas UtilitiesInfrastructureBuilding

Page 6: Working Like Fred Flintstone in a George Jetson World?

Speaker Introduction

AJ WatersHD Field Product Manager• Over 12 years in the construction industry• Mobility focused development and training for the last 5 years

2005 20152011

Page 7: Working Like Fred Flintstone in a George Jetson World?

Let’s set the stage

20 Years 10 Years 5 Years Today

Page 8: Working Like Fred Flintstone in a George Jetson World?

User Challenges

Page 9: Working Like Fred Flintstone in a George Jetson World?

Can you relate?

Personal Phone CallsWork Phone Calls

THE FULINTSTONES™ and THE JETSONS™ and all related characters and elements are trademarks of ©Hanna-Barbera.

Page 10: Working Like Fred Flintstone in a George Jetson World?

Can you relate?

Work Presentations Personal Presentations

THE FULINTSTONES™ and THE JETSONS™ and all related characters and elements are trademarks of ©Hanna-Barbera.

Page 11: Working Like Fred Flintstone in a George Jetson World?

Can you relate?

Personal Budget TrackingWork Budget Tracking

THE FULINTSTONES™ and THE JETSONS™ and all related characters and elements are trademarks of ©Hanna-Barbera.

Page 12: Working Like Fred Flintstone in a George Jetson World?

Can you relate?

Personal Drawing ReviewWork Drawing Review

THE FULINTSTONES™ and THE JETSONS™ and all related characters and elements are trademarks of ©Hanna-Barbera.

Page 13: Working Like Fred Flintstone in a George Jetson World?

Can you relate?

The Paper ProblemTHE FULINTSTONES™ and THE JETSONS™ and all related characters and elements are trademarks of ©Hanna-Barbera.

Page 14: Working Like Fred Flintstone in a George Jetson World?

Can you relate?

Of 2,044 construction industry respondents,

77% claim mobility capabilities are

important for their software solutions,

up from 59% in 2012.

However, less than half of the

respondents report using software in

their role that offers mobile applications.

JBKnowledge, 2015

Page 15: Working Like Fred Flintstone in a George Jetson World?

The 3 Age-Old Project Execution Challenges

Page 16: Working Like Fred Flintstone in a George Jetson World?

Methodology

• 25+ years of providing solutions to project-driven companies

• Engagement with more than 500 customers

• Daily discussions with new companies

• Consultation with InEight Industry Advisory Group (IAG) members:

Page 17: Working Like Fred Flintstone in a George Jetson World?

The 3 Age-Old Project Execution Challenges

1. Communication gaps between the office and field

2. Disorganized daily planning

3. Slow and error-prone capture of work progress and timesheet data

Page 18: Working Like Fred Flintstone in a George Jetson World?

Poll #1: What is your top challenge?

Page 19: Working Like Fred Flintstone in a George Jetson World?

Challenge #1:Communication Gaps Between the Office and Field

THE FULINTSTONES™ and THE JETSONS™ and all related characters and elements are trademarks of ©Hanna-Barbera.

Page 20: Working Like Fred Flintstone in a George Jetson World?

#1 Communication Gaps Between the Office and Field

What we hear:“What’s going on in the field doesn’t match the plan!• Crews are not doing the most critical tasks• We only learn of problems after they happen”

Causes include:• Slow and inaccurate paper processes• Point timesheet solutions that lack integration

Issues include:• Project delays• Cost overruns• Inefficiencies• Project surprises

Page 21: Working Like Fred Flintstone in a George Jetson World?

#1 Communication Gaps Between the Office and Field Sample Case

“The greatest gap in the world is the gap between knowing and doing” - Leadership author John Maxwell

The most critical moment of a great plan is when details are communicated to the people responsible for executing the work.

Gaps in the communication between Superintendents and Foreman often lead to hidden inefficiencies that don't surface until cost reports are printed a week or more later.

Page 22: Working Like Fred Flintstone in a George Jetson World?

#1 Communication Gaps Between the Office and Field

John Smith, Superintendent

Responsibility: • Manage all day to day project activities

Problems: • Lack of visibility into jobsite activity• Misalignment between office and field• Hidden inefficiencies

Superintendent

Page 23: Working Like Fred Flintstone in a George Jetson World?

#1 Communication Gaps Between the Office and Field

Frank Williams, Foreman

Responsibility: • Assign daily tasks to crew• Document what has been

completed

Problems: • Inefficient paper-based timesheets• Documenting jobsite issues

Foreman

Page 24: Working Like Fred Flintstone in a George Jetson World?

The Disconnect

ForemanSuperintendent

Page 25: Working Like Fred Flintstone in a George Jetson World?

Time Tracking

Page 26: Working Like Fred Flintstone in a George Jetson World?

Quantity Tracking

Claiming Codes

Page 27: Working Like Fred Flintstone in a George Jetson World?

Current Solutions

Page 28: Working Like Fred Flintstone in a George Jetson World?

Historical Data Research

Page 29: Working Like Fred Flintstone in a George Jetson World?

Challenge #1:Communication Gaps Between the Office and Field

THE FULINTSTONES™ and THE JETSONS™ and all related characters and elements are trademarks of ©Hanna-Barbera.

Page 30: Working Like Fred Flintstone in a George Jetson World?

#1 Communication Gaps Between the Office and Field Solution

• Project Cost Management system that extends to the jobsite

• Ruggedized and “intrinsically safe” tablets

• Management dashboards and reports

Page 31: Working Like Fred Flintstone in a George Jetson World?

Extended Cost Management Process Flow

Estimators and project planners create the WBS structure and budget for the project.

Project engineers create crew plans by assigning foremen, employees, and equipment to tasks, validating expected results against the budget.

Foremen receive their daily crew plans and make adjustments if necessary based on jobsite conditions and resource availability.

At the end of the shift (or throughout the day), foremen record quantities completed, hours worked, and notes, then submit for approval.

Project engineers and company managers review and approve the executed crew plans submitted from the field.

Results are imported into the ERP system to drive payroll, and project managers can update their projects with the latest as-built hours and quantities to get updated earned values.

Page 32: Working Like Fred Flintstone in a George Jetson World?

Ruggedized and Intrinsically-Safe Tablets

Apple Android WindowsConsumerBuilt for home and office use

RuggedizedBuilt to handle the more demandingjobsite environment

Intrinsically Safe(Zone 1 Division 1)Specifically designedand certified to operatesafely in hazardousenvironments

Page 33: Working Like Fred Flintstone in a George Jetson World?

Management Dashboards and Reports

Dashboards Reports

Page 34: Working Like Fred Flintstone in a George Jetson World?

#1 Communication Gaps Between the Office and Field Solution

• Eliminate manual paper processes for greater efficiency and accuracy

• Align jobsite work with the plan to optimize project execution

• Maximize equipment uptime with tablets designed for tough project conditions

• Make better decisions based upon current information

Page 35: Working Like Fred Flintstone in a George Jetson World?

Poll #2: Are you utilizing mobile applications?

Page 36: Working Like Fred Flintstone in a George Jetson World?

Challenge #2:Disorganized Daily Planning

THE FULINTSTONES™ and THE JETSONS™ and all related characters and elements are trademarks of ©Hanna-Barbera.

Page 37: Working Like Fred Flintstone in a George Jetson World?

#2 Disorganized Daily Planning

What we hear:“Pre-planning of work is consistently overlooked by superintendents and foremen.”

Causes include:• The paper problem• Poorly documented changes• Inefficient processes

Issues include:• Inefficient work sequences• Lost time awaiting proper direction• Lower productivity and profits

Page 38: Working Like Fred Flintstone in a George Jetson World?

#2 Disorganized Daily Planning Sample Case

“No battle plan survives contact with the enemy” - Prussian military strategist Helmuth von Moltke

What happens on the computer screen often does not match actual jobsite activity as initial plans quickly give way to the reality of the field.

Managers and superintendents need to ensure foremen and their crews are working on the right things, and that quantity completion and timesheet hours are tracked easily, accurately and efficiently.

Page 39: Working Like Fred Flintstone in a George Jetson World?

Challenge #2:Disorganized Daily Planning

THE FULINTSTONES™ and THE JETSONS™ and all related characters and elements are trademarks of ©Hanna-Barbera.

Page 40: Working Like Fred Flintstone in a George Jetson World?

#2 Disorganized Daily Planning Solution

• Effective daily planning

• Streamlined electronic communication

• Comprehensive note categorization

Page 41: Working Like Fred Flintstone in a George Jetson World?

• Create a daily plan for each foreman and their crew

• Select specific tasks and assign a goal for completion that day

• View real-time metrics on the plan vs. budget for individual tasks

Effective Daily Planning

Page 42: Working Like Fred Flintstone in a George Jetson World?

• Daily plans created in the office are transferred to the foreman’s tablet• Tasks, people, equipment and goals are visible to the foreman• Detailed notes alert the field team to any necessary information

Streamlined Electronic Communication

Page 43: Working Like Fred Flintstone in a George Jetson World?

Comprehensive Note Categorization

• Quickly enter notes as situations occur throughout the day via voice dictation• Categorize notes with different tags and associations• Follow the history of each note with time stamps

Page 44: Working Like Fred Flintstone in a George Jetson World?

Result: Jobsite Visibility

“…[We] make better project execution decisions because we’re working from the most accurate and

up-to-date information from the project site”

Better Decisions

Page 45: Working Like Fred Flintstone in a George Jetson World?

Poll #3: What kind of mobile solution(s) are you using for your business?

Page 46: Working Like Fred Flintstone in a George Jetson World?

Challenge #3:Slow and Error-Prone Capture of Work Progress and Timesheet Data

THE FULINTSTONES™ and THE JETSONS™ and all related characters and elements are trademarks of ©Hanna-Barbera.

Page 47: Working Like Fred Flintstone in a George Jetson World?

#3 Slow and Error-Prone Capture of Work Progress and Timesheet Data

What we hear:“We know we have to get off the paper trails, but we don’t know how. Timesheets continue to get lost or entered incorrectly causing errors in reporting.”

Causes include:• Lost or inaccurate data• Double and triple entry of data into systems• Lack of tracking across the project lifecycle• No accounting and payroll integration

Issues include:• Slower forecasting• Inaccurate cost reporting• Less confidence• Inconsistencies• Duplicative effort

Page 48: Working Like Fred Flintstone in a George Jetson World?

#3 Slow and Error-Prone Capture of Work Progress and Timesheet Data Sample Case

“In God we trust; all others bring data.” - Father of modern quality management W. Edwards Deming

Managers need performance visibility to identify problems sooner and make changes that keep everything moving forward.

Also need to understand relative performance to know where to focus for significant improvement.

A significant number of businesses have very little idea on how their business is performing; and more importantly identifying ways to improve it.

Page 49: Working Like Fred Flintstone in a George Jetson World?

Challenge #3:Slow and Error-Prone Capture of Work Progress and Timesheet Data

THE FULINTSTONES™ and THE JETSONS™ and all related characters and elements are trademarks of ©Hanna-Barbera.

Page 50: Working Like Fred Flintstone in a George Jetson World?

#3 Slow and Error-Prone Capture of Work Progress and Timesheet Data Solution

• Efficient quantity capture

• Detailed timesheet review

• Real-time productivity reporting

Page 51: Working Like Fred Flintstone in a George Jetson World?

Efficient Quantity Capture

• Complete electronic capture of task quantities

• Document changes or issues that impacted the days work

• Add/modify tasks as changes arise on the jobsite

Page 52: Working Like Fred Flintstone in a George Jetson World?

Detailed Timesheet Review

• Detailed electronic time card with resource hours by task

• Report hours worked for each week• Customized compliance questionnaire• Sign out employees at the end of each

shift to submit data back to the office

Page 53: Working Like Fred Flintstone in a George Jetson World?

Real-Time Productivity Reporting

• Report daily productivity• Understand areas that need focus• Drive quantity claiming

Page 54: Working Like Fred Flintstone in a George Jetson World?

#3 Slow and Error-Prone Capture of Work Progress and Timesheet Data Solution

• Capture timesheet hours and flowing them directly into payroll

• Save time each timesheet cycle (~10 minutes)

• Capture quantities performed to drive billing and improve cash flow

Page 55: Working Like Fred Flintstone in a George Jetson World?

Summary

Page 56: Working Like Fred Flintstone in a George Jetson World?

The 3 Age-Old Project Execution Challenges

1. Communication gaps between the office and field locations:

Extended solution, ruggedized tablets, reporting

2. Disorganized daily planning: Daily planning, electronic communication, note categorization

3. Slow and error-prone capture of work progress and timesheet data:

Quantities, timesheets, productivity reporting

THE FULINTSTONES™ and THE JETSONS™ and all related characters and elements are trademarks of ©Hanna-Barbera.

Page 57: Working Like Fred Flintstone in a George Jetson World?

Poll #4: What mobile platform are you using?

Page 58: Working Like Fred Flintstone in a George Jetson World?

InEight Solutions Across the Project Lifecycle

Page 59: Working Like Fred Flintstone in a George Jetson World?

Integrated Project Lifecycle

• Bi-directional integration with Primavera P6 schedules enables time-phased estimates and schedule analysis

• Integrations available across leading project accounting and ERP platforms

• Create quantity-based estimates and budgets• Change order costing• Benchmarking

• Short interval planning, claiming and commissioning

• Plan progress and quantities consumed

• Equipment inspection and maintenance

• Establish resource plans in preparation for interval planning

• Quantity-based planning and execution• Quantity-based measurement and reporting

• Comprehensive 4D,5D, and nD visual reporting• All as-built details captured in single viewer• Owner benefits from unified visual model with

complete as-built details and documentation

Visualize, estimate, control and connect all aspects of capital and maintenance projects, from the back office to the jobsite, across the project lifecycle

• Enterprise reports and dashboards across the project lifecycle

• Various design models leveraged to create unified model

Page 60: Working Like Fred Flintstone in a George Jetson World?

The HD Field SolutionTrusted for More than 25 Years• 3 Strategic Wins

– Office to Field Communication– Daily Planning– Electronic Capture of Progress and

Timesheets

• Save Time– Speeds the entire timesheet process

• Single System – Extension of the HD platform with single

source for support– Ensures alignment of jobsite activity

• Drive Payroll– Quantities flow into payroll via HD

platform integrations

• Compatibility – Support for full range of modern tablets

(Apple, Android, and Windows)

Page 61: Working Like Fred Flintstone in a George Jetson World?

Next Steps

1. Respond to the post-webinar survey

2. Contact us for more [email protected](800) 637-7496(480) 776-2900www.ineight.com

Page 62: Working Like Fred Flintstone in a George Jetson World?

Thank you!