workstudy new ppt
TRANSCRIPT
-
8/19/2019 Workstudy New ppt
1/11
WORKSTUDY
-
8/19/2019 Workstudy New ppt
2/11
INTRODUCTION
With increasing complexities of thetechnological world, need to simplify the
work system has been increasing day by day.
Work study is an area of knowledge that
addresses the problem of work simplification
with the basic objectives of
PRODUCTIVITY ENHANCEMENT,PRODUCTIVITY ENHANCEMENT,
HUMAN COMFORT & SAFETYHUMAN COMFORT & SAFETY
-
8/19/2019 Workstudy New ppt
3/11
DEFINITION
“Work study is defned asthat body o knowledge
concerned with the analysiso the work methods and theequipment used in
perorming a job, the designo an optimum work methodand the standardization o
proposed work methods.”
-
8/19/2019 Workstudy New ppt
4/11
Objectives of Wo! St"#$
1. To analyze the present method of doing a job,systematically in order to develop a new and better
method.
. To measure the work content of a job by measuring
the time re!uired to do the job for a !ualified workerand hence to establish standard time.
". To increase the productivity by ensuring the best
possible use of human, machine and material
resources and to achieve best !uality product#service
at minimum possible cost.
$. To improve operational efficiency.
-
8/19/2019 Workstudy New ppt
5/11
-
8/19/2019 Workstudy New ppt
6/11
METHOD STUDY (MOTION STUDY)
%Work methods analysis or
ðod 'tudy is a scientific techni!ue of
observing, recording and criticallyexamining the present method of
performing a task or job or operation
with the aim of improving the present
method and developing a new and
cheaper method.(
-
8/19/2019 Workstudy New ppt
7/11
METHOD STUDYPROCEDURE
-
8/19/2019 Workstudy New ppt
8/11
WORK
MEASUREMENT
(TIME STUDY) % )t is defined as the application of
techni!ues designed to establish the work
content of a specified task by
determining the time re!uired for
carrying out the task at a defined
standard of performance by a !ualifiedworker(
WORK MEASUREMENT
-
8/19/2019 Workstudy New ppt
9/11
WORK MEASUREMENTPROCEDURE
-
8/19/2019 Workstudy New ppt
10/11
RECORDING
SYMBOLSSt%#%# S$'bo( N%'e of Activit$
*peration
Transportation#&ovement)nspection
+elay# Temporary storage
'torage
ombined -ctivity
-
8/19/2019 Workstudy New ppt
11/11
THANK YOU