![Page 1: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/1.jpg)
' OFFICIALTHE WORLD BAQOCUMENTSIBRD * IDA I WORWANKOROUP
L4,-,L\.I , 2019
H.E. Ahmed ShideMinister of FinanceMinistry of FinanceAddis AbabaEthiopia
Re: Credit No. 6445-ET(One WASH-Consolidated Water Supply, Sanitation and Hygiene Account Project)
Additional Instructions: Disbursement and Financial Information Letter
Excellency:
I refer to the Financing Agreement between the Federal Democratic Republic of Ethiopia(the "Recipient") and the International Development Association (the "Association") for the above-referenced Project. The General Conditions, as defined in the Financing Agreement, provide thatthe Recipient may from time to time request withdrawals of Credit amounts from the CreditAccount in accordance with the Disbursement and Financial Information Letter, and suchadditional instructions as the Association may specify from time to time by notice to the Recipient.The General Conditions also provide that the Disbursement and Financial Information Letter mayset out Project specific financial reporting requirements. This letter constitutes such Disbursementand Financial Information Letter ("DFIL") and may be revised from time to time.
I. Disbursement Arrangements, Withdrawal of Grant and Credit Funds and Reportingof Uses of Grant and Credit Funds
The Disbursement Guidelines for Investment Project Financing, dated February 2017,("Disbursement Guidelines") are available in the Association's public website athttps://www.worldbank.org and its secure website "Client Connection" athttps://clientconnection.worldbank.org. The Disbursement Guidelines are an integral part of theDFIL, and the manner in which the provisions in the guidelines apply to the Grant and Credit isspecified below.
(i) Disbursement Arrangements
* General Provisions (Schedule 1). The table in Schedule I sets out thedisbursement methods which may be used by the Recipient, and conditions,information on registration of authorized signatures, processing of withdrawalapplications (including minimum value of applications and processing ofadvances), instructions on supporting documentation, and frequency of reportingon the Designated Account.
* For the reason set forth in subsection 5.2 of the Disbursement Guidelines, theadvancing of financing proceeds into a designated account is not a DisbursementMethod currently available under this Financing. Please send Applications only insupport of the Disbursement Methods listed in Schedule I of this letter.
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
![Page 2: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/2.jpg)
-2-
(ii) Electronic Delivery. Section 11.01(c) of the General Conditions. The Recipient willdeliver Withdrawal Applications (with supporting documents) electronically through theAssociation's web-based portal "Client Connection" athttps://clientconnection.worldbank.org. This option will be effected after the officialsdesignated in writing by the Recipient who are authorized to sign and deliver WithdrawalApplications have registered as users of "Client Connection". The designated officials willdeliver Applications electronically by completing the Form 2380, which is accessiblethrough "Client Connection". By signing the Authorized Signatory Letter, the Recipientconfirms that it is authorizing such persons to accept Secure Identification Credentials(SIDC) and to deliver the Applications and supporting documents to the Association byelectronic means. The Recipient may exercise the option of preparing and deliveringWithdrawal Applications in paper form on exceptional cases (including those where theBorrower encounters legal limitations), and which were previously agreed with theAssociation. By designating officials to use SIDC and by choosing to deliver theApplications electronically, the Recipient confirms through the authorized signatory letterits agreement to: (a) abide by the Terms and Conditions of Use of Secure IdentificationCredentials in connection with Use of Electronic Means to Process Applications andSupporting Documentation, available in the Association's public website athttps://worldbank.org and "Client Connection"; and (b) to cause such official to abide bythose terms and conditions.
II. Financial Reports and Audits
(i) Financial Reports. The Recipient must prepare and furnish to the Association not laterthan sixty (60) days after the end of each Ethiopian Fiscal calendar quarter, interimunaudited financial reports ("IFR") for the Project covering the quarter.
(ii) Audits. Each audit of the Financial Statements must cover the period of one fiscal year ofthe Recipient, commencing with the fiscal year in which the first withdrawal was made.The audited Financial Statements for each such period must be furnished to the Associationnot later than six (6) months after the end of such period.
III. Other Information
For additional information on disbursement arrangements, please refer to the LoanHandbook available on the Association's website (http://www.worldbank.org/) and "ClientConnection". The Association recommends that you register as a user of "Client Connection". Fromthis website you will be able to prepare and deliver Applications, monitor the near real-time statusof the Grant and Credit, and retrieve related policy, financial, and procurement information.
[remainder ofpage intentionally left blank]
![Page 3: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/3.jpg)
d -3-
For more information about the website and registration arrangements, or if you have anyqueries in relation to the above, please contact the Association by email atAskLoans(iWorldBank.org using the above reference.
Yours sincerely,
Carolyn TurkCountry Director for Ethiopia, Sudan and South Sud
Africa Region
Ountro
Attachments1. Form of Authorized Signatory Letter.2. Interim unaudited Financial Report (IFR).
![Page 4: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/4.jpg)
-4-
Schedule 1 : Disbursement Provisions
Country Federal Democratic Republic of Closing Date Section III.B.2. of Schedule 2 to theEthiopia Financing Agreement.
Credit Recipient Federal Democratic Republic ofNmerit 6445-ET Ethiopia
Name of the Project One WASH - Consolidated WASH Disbursement Four months after the closing date.Account (CWA) Project Deadline Date
Subsection 3.7 **
Disbursement Methods Methods Supporting DocumentationSection 2 (**) Subsections 4.3 and 4.4 (**)
Direct Payment Yes Copy of recordsReimbursement Yes Interim unaudited Financial Report (IFR) in the format provided in Attachment 2 of the DFILAdvance (into a Designated No Interim unaudited Financial Report (IFR) in the format provided in Attachment 2 of the DFILAccount) ISpecial Commitments Yes Coy of Letter of Credit
Type 2 Segregated accounts Ceiling Variable
Financial Institution - National Bank of Ethiopia (NBE) Currency USDNameFrequency of Reporting Same as IFR: Quarterly Amount Based on cash forecast for 2 quartersSubsection 6.3 (**)
The minimum value of applications for Reimbursement, Direct Payment and Special Commitment is USD 200,000 [equivalent].
(i) Authorized SignaturesA letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and specimensignature(s) of the official(s) authorized to sign Applications:
![Page 5: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/5.jpg)
-5- i
(ii) Applications. Please provide completed and signed (a) applications for withdrawal, together with supporting documents, to the address indicated below:
The World Bank, Loan Department,Delta Center, 13th Floor,Upper Hill, Menengai Road,Nairobi, Kenya.Tel: 254 20 2936 000Attention: Loan Department
A pooled project account denominated in Ethiopian birr will be opened- the CWA
** Sections and subsections relate to the "Disbursement Guidelines for Investment Project Financing", dated February 2017.
![Page 6: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/6.jpg)
-6-
Attachment 1Form of Authorized Signatory Letter
[Letterhead]Ministry of Finance
[Street address][City] [Country]
[DATE]
International Development Association1818 H Street, N.W.Washington, D.C. 20433United States of America
Re: Credit No. 6445-ET(One WASH-Consolidated Water Supply, Sanitation and Hygiene Account Project)
Attention: Country Director
I refer to the Financing Agreement ("Agreement") between the InternationalDevelopment Association (the "Association") and the Federal Democratic Republic ofEthiopia (the "Recipient"), dated . providing the above Credit. For the purposesof Section 2.03 of the General Conditions as defined in the Agreement, any 1[one] of thepersons whose authenticated specimen signatures appear below is authorized on behalfof the Recipient to sign applications for withdrawal [and applications for a specialcommitment] under this Credit.
For the purpose of delivering Applications to the Association, including byelectronic means, 2[each] of the persons whose authenticated specimen signatures appearsbelow is authorized on behalf of the Recipient, acting 3[individually] 4[jointly], to deliver
1 Instruction to the Recipient: stipulate if more than one person needs to sign Applications, and how manyor which positions, and if any thresholds apply. Please delete this footnote in final letter that is sent to theAssociation.
2 Instruction to the Recipient: stipulate if more than one person needs to jointly sign Applications, if so,please indicate the actual number. Please delete this footnote in final letter that is sent to the Association.
Instruction to the Recipient: use this bracket if any one of the authorized persons may sign; if this is notapplicable, please delete. Please delete this footnote in final letter that is sent to the Association.
4 Instruction to the Recipient: use this bracket only if several individuals must jointly sign each Application;if this is not applicable, please delete. Please delete this footnote in final letter that is sent to the Association.
![Page 7: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/7.jpg)
-7-
Applications, and evidence in support thereof on the terms and conditions specified bythe Association.
This confirms that the Recipient is authorizing such persons to accept SecureIdentification Credentials (SIDC) and to deliver the Applications and supportingdocuments to the Association by electronic means. In full recognition that the Associationshall rely upon such representations and warranties, including without limitation, therepresentations and warranties contained in the Terms and Conditions of Use of SecureIdentification Credentials in connection zoith Use of Electronic Means to Process Applications andSupporting Documentation ("Terms and Conditions of Use of SIDC"), the Recipientrepresents and warrants to the Association that it will cause such persons to abide by thoseterms and conditions.
This Authorization replaces and supersedes any Authorization currently in theAssociation records with respect to this Agreement.
[Name], [position] Specimen Signature:
[Name], [position] Specimen Signature:
[Name], [position] Specimen Signature:
Yours truly,
/ signed /
![Page 8: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/8.jpg)
-8-
Attachment 2
Interim Unaudited Financial Report
ONE WASH Project - Phase II
For the quarter ended......
Content
1 Notes to the IFR-Discussion of Financial performance, Notes & Explanations
2 Consolidated Statement of Sources and Uses of Fund
3 Statements of Uses of Funds by components and category- Statement of Use of Fund - Consolidated Expenditure Summary- Statement of Use of Fund-Consolidated Expenditure by Category- Statement of Use of Fund- Expenditure by Implementing entity/region
- Statement of budget allocations transfer and expenditures-by Woreda-Statement of budget allocation and fund transfer by regions
4 Statement of Sources and Uses of Fund- Statement of Sources and Use of Fund - Implementing Entity/region Summary- Statement of Sources and Use of Fund- by each implementing entity at Federal level
- Statement of Sources and Use of Fund- by each implementing region
5 Statement of Accounts - Designated Accounts and Local Account
5 Designated Account (DA) reconciliation
6 DA Documentation Schedule
7 Expenditure Forecast and Cash requirement summary for the next six months
8 Payments Against Contracts subject to the World Bank's Prior Review
4 Supporting Schedules and Documents- Schedules of Receivables and Payables with age analysis- Status of major Procurements- List and status of major Commitment- Bank reconciliation- Bank statements- etc
![Page 9: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/9.jpg)
-9-
One WASH Project- Phase IINotes to the IFRFor the quarter ended .......
Section 1: Background information about the project1.1 General information about the project (PDO, Components/sub-
components/activities, implementing entity, etc.)1.2 Financial Management (Accounting center, basis of accounting, major
accounting policies, currencies, etc.)Section 2: Project implementation
2.1 Sources of funds including detail breakdown by financier2.2 Uses of Fund -Overview of expenditures2.3 Status of budget utilization by project components/sub components/by
category/by region2.4 Variance analysis2.5 Reasons for the major variances including summary of actions taken
and/or planned to be taken2.6 Overview of closing balances including analysis of major outstanding
advances and payables2.7 Documentation of past advances2.8 Cash forecast and cash request2.9 Cash and Bank balances at all places as of the end of the quarter and as
of IFR submission date2.10 Exchange rates used2.11 Adjustments to the previous reports2.12 Staffing data and capacity building2.13 FM challenges and actions taken and/or planned to be taken
Section 3: Status of action plans3.1 FM assessment/ supervision action plans implementation status3.2 Status of action plan to address issues raised in the project audit reports3.3 Status of action plan to address issues raised in the internal auditors
Section 4: Other financial management and financial performance issues
![Page 10: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/10.jpg)
- 10-
One Water Supply, Sanitation and Hygiene Project - Second phaseConsolidated Statement of Source and Uses of Fund
As at quarter ended...Currency: BIRR
Current Cumulative Cumulativequarter current year to date
OPENING BALANCE:Project Account (BIRR)IDA (Designated USD)Donor XX (foreign currency account)Tigray RegionAmhara regionOromia RegionSNNP RegionSomali RegionBeni. Gumuz RegionAfar RegionGambella RegionHarar RegionDire Dawa AdministrationMoWIEWRDFMoEMoHMoF
Total Opening balanceAdd: INCOME
Government contributionIDA (Designated Account)IDA (Direct payment/Special commitment/reimbursement)Donor XXOther income (if any)
Total IncomeTotal Fund AvailableLess: EXPENDITURE
![Page 11: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/11.jpg)
- 11 -
1. Component 1: Rural and Pastoral Water Supply, Sanitation, andHygiene (Rural WASH)
1.1. Subcomponent 1.A-Increasing Rural & Pastoral Access toWater Supply & San. serv
1.2. Subcomponent 1.B-Enhancing Service Delivery Management
Capacity
2. Component 2: Urban Water Supply, Sanitation, and Hygiene (Urban
WASH)3. Component 3: Institutional Water Supply, Sanitation, and Hygiene
(Institutional WASH)
4. Component 4: Climate Resilient Water Supply, Sanitation, and
Hygiene (Climate Res. WASH)4.1. Sub-component 4.A-Water Resource Monitoring and Planning
4.2. Subcomponent 4.B-Climate-Adaptive Service Delivery
4.3. Subcomponent 4.C-Contingency Emergency Response
Component
5. Component 5: Institutional Strengthening and Project Mgt
5.1. Subcomponent 5.A-Operationalization of Sector MIS
5.2. Subcomponent 5.B-institutional Strengthening and ProjectManagement
Total ExpenditureNet BalanceExchange Rate Gain/LossCLOSING FUND BALANCE/ ENDING BALANCE
Closing balances represented by Cash on Cash at Payable Totalhand Bank Receivab
leProject Account (BIRR)IDA (Designated USD)Donor XX (foreign currency account)Tigray RegionAmhara regionOromia RegionSNNP RegionSomali Region
![Page 12: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/12.jpg)
- 12 -
Beni. Gumuz RegionAfar RegionGambella RegionHarar RegionDire Dawa AdministrationMoWIEWRDFMoEMoHMoF
TotalNote: - Exchange Rates used for the Opening Balance, closing balance, expenditures, income are listed here.
- Other Remarks are listed here as foot note as well
![Page 13: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/13.jpg)
- 13 -
One Water Supply, Sanitation and Hygiene Project - Second phaseConsolidated Statement of Source and Uses of Fund
As at quarter ended...Currency: USD
Current Cumulati Cumulatiquarter ve ve to
current dateyear
OPENING BALANCE:Project Account (BIRR)IDA (Designated (USD)Donor XX (foreign currency account)Tigray RegionAmhara regionOromia RegionSNNP RegionSomali RegionBeni. Gumuz RegionAfar RegionGambella RegionHarar RegionDire Dawa AdministrationMoWIEWRDFMoEMoHMoF
Total Opening balanceAdd: INCOME
Government contributionIDA (Designated Account)IDA (Direct payment/Special commitment/reimbursement)Donor XXOther income (if any)
Total IncomeTotal Fund Available
![Page 14: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/14.jpg)
- 14 -
Less: EXPENDITURE6. Component 1: Rural and Pastoral Water Supply, Sanitation, and
Hygiene (Rural WASH)
1.1. Subcomponent 1.A-Increasing Rural & Pastoral Access toWater Supply & San. serv
1.2. Subcomponent 1.B-Enhancing Service Delivery ManagementCapacity
7. Component 2: Urban Water Supply, Sanitation, and Hygiene (UrbanWASH)
8. Component 3: Institutional Water Supply, Sanitation, and Hygiene(Institutional WASH)
9. Component 4: Climate Resilient Water Supply, Sanitation, andHygiene (Climate Res. WASH)4.1. Sub-component 4.A-Water Resource Monitoring and Planning4.2. Subcomponent 4.B-Climate-Adaptive Service Delivery4.3. Subcomponent 4.C-Contingency Emergency Response
Component
10. Component 5: Institutional Strengthening and Project Mgt5.1. Subcomponent 5.A-Operationalization of Sector MIS5.2. Subcomponent 5.B-Institutional Strengthening and ProjectManagement
Total ExpenditureNet BalanceExchange Rate Gain/LossCLOSING FUND BALANCE/ ENDING BALANCE
Closing balances represented by Cash on Cash at Payable Totalhand Bank Receivab
leProject Account (BIRR)IDA (Designated USD)Donor XX (foreign currency account)Tigray RegionAmhara regionOromia RegionSNNP Region
![Page 15: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/15.jpg)
- 15 -
Somali RegionBeni. Gumuz RegionAfar RegionGambella RegionHarar RegionDire Dawa AdministrationMoWIEWRDFMoEMoHMoF
TotalNote: - Exchange Rates used for the Opening Balance, closing balance, expenditures, income are listed here.
- Other Remarks are listed here as foot note as well
![Page 16: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/16.jpg)
-16-
Water supply, sanitation and Hygiene projectStatement of Use of Fund - Consolidated Expenditure Summary (in Birr)
For the quarter ended ............Current Quarter Cumulative Current Year Cumulative Project Life Remark
Description Planned Actual Variance Planned Actual Variance Planned Actual Variance1 2 (1)-(2) 3 4 (3)-(4) 3 4 (3)-(4)
1. Component 1: Rural and Pastoral Water Supply, Sanitation, andHygiene (Rural WASH)1.1. Subcomponent 1.A-Increasing Rural & Pastoral Access to
Water Supply & San. serv1.2. Subcomponent 1.B-Enhancing Service Delivery Management
Capacity2. Component 2: Urban Water Supply, Sanitation, and Hygiene (Urban
WASH)
3. Component 3: Institutional Water Supply, Sanitation, and Hygiene(Institutional WASH)
4. Component 4: Climate Resilient Water Supply, Sanitation, and Hygiene(Climate Res. WASH)4.1. Sub-component 4.A-Water Resource Monitoring and Planning
4.2. Subcomponent 4.B-Climate-Adaptive Service Delivery
4.3. Subcomponent 4.C-Contingency Emergency ResponseComponent
5. Component 5: Institutional Strengthening and Project Mgt
5.1. Subcomponent 5.A-Operationalization of Sector MIS
5.2. Subcomponent 5.B-Institutional Strengthening and ProjectManagement
Total Expenditure
![Page 17: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/17.jpg)
- 17-
One Water Supply, Sanitation and Hygiene project- Second phaseStatement of Use of Fund-Consolidated Expenditure by Category (in Birr)
For the quarter ended ............
Current Quarter Cumulative Current Year Cumulative ProJect Life
Description Planned Actual Variance Planned Actual Variance Planned Actual Variance1 2 (1)-(2) 3 4 (3)-(4) 3 4 (3)-(4)
Component 1: Rural and Pastoral Water Supply, Sanitation, and Hygiene (Rural WASH)
Works
Goods
Consulting Services
Non-consultancy servicesTraining and workshop
Operating costs
TOTAL
Component 2: Urban Water Supply, Sanitation, and Hygiene (Urban WASH)
Works
Goods
Consulting Services
Non-consultancy services
Training and workshop
Operating costs
TOTAL
Component 3: Institutional Water Supply, Sanitation, and Hygiene (Institutional WASH)
Works
Goods
Consulting Services
Non-consultancy servicesTraining and workshop
Operating costs
TOTALComponent 4: Climate Resilient Water Supply, Sanitation, and Hygiene (Climate Res.WASH)
Works
Goods
Consulting Services
Non-consultancy services
Training and workshop
CER- Contingency Emergency Response
Operating costsTOTAL
![Page 18: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/18.jpg)
- 18-
One Water Supply, Sanitation and Hygiene project- Second phaseStatement of Use of Fund-Consolidated Expenditure by Category (in Birr)
For the quarter ended ............Current Quar er Cumuative Current Year Cumulative Project Life
Description Planned Actual Variance Planned Actual Variance Planned Actual Variance1 2 (1)-(2) 3 4 (3)-(4) 3 4 (3)-(4)
Component 5: Institutional Strengthening and Project Mgt
Works
Goods
Consulting Services
Non-consultancy services
Training and workshop
Operating costs
TOTAL
GRAND TOTAL EXPENDITURES
NOTE:
![Page 19: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/19.jpg)
-19-
One Water Supply, Sanitation and Hygiene project- Second phaseStatement of Use of Fund- Expenditure by Implementing entity/region (in Birr)
For the quarter ended ............
Current Quarter Cumulative Current Year C mulative Project Life
Description Planned Actual Variance Planned Actual Variance Planned Actual Variance1 2 (1)-(2) 3 4 (3)-(4) 3 4 (3)-(4)
Tigray RegionComponent 1: Rural and Pastoral Water Supply, Sanitation, and Hygiene (Rural WASH)
Subcomponent I A-Increasing Rural & Pastoral Access to Water Supply & San. serv
Subcomponent I.B-Enhancing Service Delivery Management Capacity
Component 2. Urban Water Supply, Sanitation, and Hygiene
Component 3: Institutional Water Supply, Sanitation, and Hygiene (Institutional WASH)
Component 4: Climate Resilient Water Supply, Sanitation, and Hygiene (Climate Res. WASH)
Sub-component 4.A-Water Resource Monitoring and Planning
Subcomponent 4.B-linate-Adaptive Service Delivery
Subcomponent 4.C ontingency Emergency Response Component
Component 5: Institutional Strengthening and Project Mgt
Subcomponent 5.A-Operationalization of Sector MIS
Subcomponent 5 B-Institutional Strengthening and Project Management
Total Tigray Region
Afar Reaion
Component 1. Rural and Pastoral Water Supply, Sanitation, and Hygiene (Rural WASH)
Subcomponent I.A-Increasing Rural & Pastoral Access to Water Supply & San. serv
Subcomponent IB-Enhancing Service Delivery Management Capacity
Component 2: Urban Water Supply, Sanitation, and Hygiene
Component 3: Institutional Water Supply, Sanitation, and Hygiene (Institutional WASH)
Component 4. Climate Resilient Water Supply, Sanitation, and Hygiene (Climate Res. WASH)
Sub-component 4.A-Water Resource Monitoring and Planning
Subcomponent 4.B-Climate-Adaptive Service Delivery
Subcomponent 4.C-Contingency EmErgency Response Component
Component 5: Institutional Strengthening and Project Mgt
Subcomponent 5 A-Operationalization of Sector MIS
Subcomponent 53B-Institutional Strengthenmng and Project Management
Total Afar Reaion
Component 1 Rural and Pastoral Water Supply, Sanitation, and Hygiene (Rural WASH)
Subcomponent 1.A-Increasmng Rural & Pastoral Access to Water Supply & San. serv
Subcomponent 13B-Enhancing Service Delivery Management Capacity
Complonent 2: Urban Water Supply, Sanitation, and Hygiene
![Page 20: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/20.jpg)
- 20 -
One Water Supply, Sanitation and Hygiene project- Second phaseStatement of Use of Fund- Expenditure by Implementing entity/region (in Birr)
F r the quarter ended ............
Current Quarter Cumulative Current Year C mulative Project Life
Description Planned Actual Variance Planned Actual Variance Planned Actual Variance
1 2 (1)-(2) 3 4 (3)-(4) 3 4 (3)-(4)
Component 3: Institutional Water Supply, Sanitation, and Hygiene (Institutional WASH)
Component 4: Climate Resilient Water Supply, Sanitation, and Hygiene (Climate Res. WASH)
Sub-component 4 A-Water Resource Monitoring and Planning
Subcomponent 4.B-Climate-Adaptive Service Delivery
Subcomponent 4.C-Contingency Emergency Response Component
Component 5: Institutional Strengthening and Project Mgt
Subcomponent 5.A-OperzaonRstion of Sector MIS
Subcomponent 5B-Institutional Strengthening and Project Management
Total Amhara Region
Gouda Region_ _ _ _ __ _ _ _ _
Component I Rural and Pastoral Water Supply, Sanitation, and Hygiene (Rural WASH)
Subcomponent ILA-Increasing Rural & Pastoral Access to Water Supply & San serv
Subcomponent ILB-Enhancing Service Delivery Management Capacity
Component 2 Urban Water Supply, Sanitation, and Hygiene
Component 3 Institutional Water Supply, Sanitation, and Hygiene (Institutional WASH)
Component 4 Climate Resilient Water Supply, Sanitation, and Hygiene (Climate Res. WASH)
Sub-component 4.A-Water Resource Monitoring and Planning
Subcomponent 4B-Climate-Adaptive Service Delivery
Subcomponent 4.C-Contingency Emergency Response Component
-Component 5. Institutional Strengthening and Project Mgt
Subcomponent 5.A-4)perationalization of Sector MIS
Subcomponent 5.B-Instrtutional Strengthening and Project Management
-Total Oromia Region
-Component 1 Rural and Pastoral Water Supply, Sanitation, and Hygiene (Rural WASH)
Subcomponent 1LA-Increasmng Rural & Pastoral Access to Water Supply & San. serv
Subcomponent 1.B-Enhancmng Service Delivery Management Capacity
-Component 2 Urban Water Supply, Sanitation, and Hygiene
Component 3- Institutional Water Supply, Sanitation, and Hygiene (Institutional WASH)
-Component 4: Climate Resilient Water Supply, Sanitation, and Hygiene (Climate Res. WASH)
Sub-component 4.A-Water Resource Monitoring and Planning
Subcomponent 4 B-Climate-Adaptive Service Delivery
Subcomponent 4.C-Contingency Emergency Response Component
![Page 21: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/21.jpg)
-21-
One Water Supply, Sanitation and Hygiene project- Second phaseStatement of Use of Fund- Expenditure by Implementing entity/region (in Birr)
F r the quarter ended ............
Current Quarter Cumulative Current Year C mulative Project Life
Description Planned Actual Variance Planned Actual Variance Planned Actual Variance1 2 (1)-(2) 3 4 (3)-(4) 3 4 (3)-(4)
Component 5: Institutional Strengthening and Project Mgt
Subcomponent 5 A-Operationalization of Sector MIS
Subcomponent 5.B-Institutional Strengthening and Project Management
Total Somali Region
B. Gtunus Region
Component 1: Rural and Pastoral Water Supply, Sanitation, and Hygiene (Rural WASH)
Subcomponent 1.A-Increasing Rural & Pastoral Access to Water Supply & San serv
Subcomponent LB-Enhancing Servic Delivery Management Capacity
Component 2: Urban Water Supply, Sanitation, and Hygiene
Component 3: Institutional Water Supply, Sanitation, and Hygiene (Institutional WASH)
Component 4 Climate Resilient Water Supply, Sanitation, and Hygiene (Climate Res. WASH)
Sub-component 4.A-Water Resource Monitoring and Planning
Subcomponent 4.B-Climate-Adaptive Service Delivery
Subcomponent 4 C-Contingency Emergency Response Component
Component 5: Institutional Strengthening and Project Mgt
Subcomponent 5 A-Operationalization of Sector MIS
Total B. Gumuz Region
Component 1. Rural and Pastoral Water Supply, Sanitation, and Hygiene (Rural WASH)
Subcomponent 1LA-Increasing Rural & Pastoral Access to Water Supply & San. serv
Subcomponent 1.B-Enhancing Service Delivery Management Capacity
Component 2: Urban Water Supply, Sanitation, and Hygiene
Component 3 Institutional Water Supply, Sanitation, and Hygiene (Institutional WASH)
Component 4: Climate Resilhent Water Supply, Sanitation, and Hygiene (Climate Res. WASH)
Sub-component 4.A-Water Resource Monitoring and Planning
Subcomponent 4 B-Climate-Adaptive Service Dehivery
Subcomponent 4 C-Contingency Emergency Response Component
Component 5: Institutional Strengtheming and Project Mgt
Subcomponent 5.A-Operationalization of Sector MIS
Subcomponent 5.B-Institutional Strengthening and Project Management
Total SNNP Region
Gambellt RegionComponent]1 Rural and Pastoral Water Supply, Sanitation, and Hygiene (Rural WASH)
![Page 22: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/22.jpg)
- 22 -
One Water Supply, Sanitation and Hygiene project- Second phaseStatement of Use of Fund- Expenditure by Implementing entity/region (in Birr)
For the quarter ended ............
Current Quarter Cumulative Current Year C mulative Project Life
Description Planned Actual Variance Planned Actual Variance Planned Actual Variance1 2 (1)-(2) 3 4 (3)-(4) 3 4 (3)-(4)
Subcomponent 1LA-Increasing Rural & Pastoral Access to Water Supply & San. serv
Subcomponent 1.B-Enhancing Service Delivery Management Capacity
Component 2: Urban Water , upplhSanitation, and Hygiene
Component 3 Institutional Water Supply, Sanitation, and Hygiene (Institutional WASH)
Component 4. Climate Resilient Water Supply, Sanitation, and Hygiene (Climate Res. WASH)
Sub-component 4 A-Water Resource Monitoralg and Planning
Subcomponent 4.B-Climate-Adaptive Service Delivery
Subcomponent 4C-Contingency Emergency Response Component
Component 5 Institutional Strengthening and Project Mgt
Subcomponent 5.A-Operationalization of Sector MIS
Subcomponent 5 B-Institutional Strengthening and Project Management
Total Gambella Region
HA Reioln
Component 1. Rural and Pastoral Water Supply, Sanitation, and Hygiene (Rural WASH)
Subcomponent LA-Increasing Rural & Pastoral Access to Water Supply & San. serv
Subcomponent I.B-Enhancing Service Delivery Management Capacity
Component 2: Urban Water Supply, Sanitation, and Hygiene
Component 3 Institutional Water Supply, Sanitation, and Hygiene (Institutional WASH)
Component 4 Climate Resilient Water Supply, Sanitation, and Hygiene (Climate Res. WASH)
Sub-component 4.A-Water Resource Monitoring and Planning
Subcomponent 43B-Chimate-Adaptive Service Delivery
Subcomponent 4.C-Contingency Emergency Response Component
Component 5. Institutional Strengthenmng and Project Mgt
Subcomponent 5.A-Operationalization of Sector MIS
Subcomponent 5.B-Institutional Strengthenmng and Project Management
Total Harari Region
Dire Daws Admibaltatommousl
Component 1: Rural and Pastoral Water Supply, Sanitation, and Hygiene (Rural WASH)
Subcomponent 1.A-Increasing Rural & Pastoral Access to Water Supply & San. serv
Subcomponent 1.B3-Enhancing Service Delivery Management Capacity
Component 2: Urban Water Supply, Sanitation, and Hygiene
Component 3: Institutional Water Supply, Sanitation, and Hygiene (Institutional WASH)
Component 4: Climate Resilient Water Supply, Samitation, and Hygiene (Climate Res. WASH)
![Page 23: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/23.jpg)
- 23 -
One Water Supply, Sanitation and Hygiene project- Second phaseStatement of Use of Fund- Expenditure by Implementing entity/region (in Birr)
F r the quarter ended ............Current Quarter Cumulative Current Year C mulative Project Life
Description Planned Actual Variance Planned Actual Variance Planned Actual Variance
1 2 (1)-2) 3 4 (3)-(4) 3 4 (3)-(4)Sub-component 4.A-Water Resource Monitoring and Planning
Subcomponent 4 B-Climate-Adaptive Service Delivery
Subcomponent 4 C-Contingency Emergency Response Component
Component 5: Institutional Strengthening and Project Mgt
Subcomponent 5.A-Operationalization of Sector MIS
Subcomponent 5B-Institutional Strengthening and Project Management
Total Dire Dawa Administration counsel
Component 1: Rural and Pastoral Water Supply, Sanitation, and Hygiene (Rural WASH)
Subcomponent 1.A-Increasing Rural & Pastoral Access to Water Supply & San. serv
Subcomponent 1B-Enhancig Service Delivery Management Capacity
Component 2 Urban WaterInt, upplhSanitation, and Hygiene
Component 3. Institutional Water Supply, Sanitation, and Hygiene (Institutional WASH)
Component 4: Climate Resilient Water Supply, Sanitation, and Hygiene (Climate Res. WASH)
Sub-component 4 A-Water Resource Monitoring and Planning
Subcomponent 4.B-Chmate-Adaptive Service Delivery
Subcomponent 4.C-Contingency Emergency Response Component
Component 5: Institutional Strengthening and Project Mgt
Subcomponent 5 A-Operationalization of Sector MIS
Subcomponent 5.B3-Institutional Strengthening and Project Management
Total MoWIE
Component 1: Rural and Pastoral Water Supply, Samitation, and Hygiene (Rural WASH)
Subcomponent 1LA-Increasing Rural & Pastoral Access to Water Supply & San. serv
Subcomponent I B-Enhancing Service Delivery Management Capacity
Component 2: Urban Water Suapply, Sanitation, and Hygiene
Component 3 Institutional Water Supply, Sanitation, and Hygiene (institutional WASH)
Component 4: Climate Resilhent Water Supply, Samitation, and Hygiene (Climate Res. WASH)
Sub-component 4.A-Water Resource Momitoring and Planning
Subcomponent 4.B-Clhmate-Adaptive Service Delivery
Subcomponent 4.C-Contingency Emergency Response Component
Component 5: Institutional Strengthening and Project Mgt
Subcomponent 5 A-Operationalization of Sector MIS
![Page 24: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/24.jpg)
- 24 -
One Water Supply, Sanitation and Hygiene project- Second phaseStatement of Use of Fund- Expenditure by Implementing entity/region (in Birr)
F r the quarter ended ............
Current Quarter Cumulative Current Year Cumulative Project Life
Description Planned Actual Variance Planned Actual Variance Planned Actual Variance
1 2 (1)-(2) 3 4 (3)-(4) 3 1 4 (3)-(4)
Subcomponent 5.B-Institutional Strengthening and Project Management
Total MoH
MoE
Component 1: Rural and Pastoral Water Supply, Sanitation, and Hygiene (Rural WASH)
Subcomponent LA-Increasing Rural & Pastoral Access to Water Supply & San serv
Subcomponent I.B-Enhancing Service Delivery Management Capacity
Component 2: Urban Water Supply, Sanitation, and Hygiene
Component 3: Institutional Water Supply, Sanitation, and Hygiene (Institutional WASH)
Component 4: Climate Resilient Water Supply, Sanitation, and Hygiene (Climate Res. WASH)
Sub-component 4.A-Water Resource Monitoring and Planning
Subcomponent 4.B-Climate-Adaptive Service Delivery
Subcomponent 4.C-Contingency Emergency Response Component
Component 5: Institutional Strengthening and Project Mgt
Subcomponent 5.A-Operationalization of Sector MIS
Subcomponent 5B-Institutional Strengthening and Project Management
Total MoE
MoF
Component 1: Rural and Pastoral Water Supply, Sanitation, and Hygiene (Rural WASH)
Subcomponent 1.A-Increasing Rural & Pastoral Access to Water Supply & San. serv
Subcomponent I B-Enhancing Service Delivery Management Capacity
Component 2. Urban Water Supply, Sanitation, and Hygiene
Component 3. Institutional Water Supply, Sanitation, and Hygiene (Institutional WASH)
Component 4: Climate Resilient Water Supply, Sanitation, and Hygiene (Climate Res. WASH)
Sub-component 4.A-Water Resource Monitoring and Planning
Subcomponent 4.B-Climate-Adaptive Service Delivery
Subcomponent 4.C-Contingency Emergency Response Component
Component 5: Institutional Strengthening and Project Mgt
Subcomponent 5.A-Operationalization of Sector MIS
Subcomponent 5.B-Institutional Strengthening and Project Management
Total MoF
WRDF
Component 1: Rural and Pastoral Water Supply, Sanitation, and Hygiene (Rural WASH)
Subcomponent LA-Increasing Rural & Pastoral Access to Water Supply & San. serv
![Page 25: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/25.jpg)
-25-
One Water Supply, Sanitation and Hygiene project- Second phaseStatement of Use of Fund- Expenditure by Implementing entity/region (in Birr)
F r the quarter ended ............
Current Quar er Cumulative Current Year Curmulative Project Life
Description Planned Actual Variance Planned Actual Variance Planned Actual Variance1 2 (1)-(2) 3 4 (3)-(4) 3 4 (3)-(4)
Subcomponent I.B-Enhancing Service Delivery Management Capacity
Component 2: Urban Water Supply, Sanitation, and Hygiene
Component 3: Institutional Water Supply, Sanitation, and Hygiene (Institutional WASH)
Component 4. Climate Resilient Water Supply, Sanitation, and Hygiene (Climate Res. WASH)
Sub-component 4 A-Water Resource Monitoring and Planning
Subcomponent 4.B-Climate-Adaptive Service Delivery
Subcomponent 4.C-Contingency Emergency Response Component
Component 5: Institutional Strengthening and Project Mgt
Subcomponent 5.A-Operationalization of Sector MIS
Subcomponent 5 B-Institutional Strengthening and Project Management
Total WRDF
GRAND TOTAL EXPENDITURES
NOTES:
![Page 26: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/26.jpg)
-26-
One Water Supply and Satiation and Hygiene Project -Second phase
Statement of budget allocations transfers and expenditures-by Woreda
For the quarter ended....... (BIRR)
ImplementingWoreda Approved
Program Program Approved TransferComponent Life life Annual of the Non TraiTotal
Woreda Office Budget transfer Budget year Works Goods Consulting Consulting and g Operating Others Expenditurename Allocation Services Services Workshop Costs ofuthe
quarter
Comp I
Comp 2
Water Comp 3Office Comp 4
Comp 5
total
Comp I
Comp 2
Health Comp 3Xxxx Office Comp 4Woreda
Comp 5
total
Comp 1
Comp 2
Education Comp 3
office Comp 4
Comp 5
total
_ TOTAL
![Page 27: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/27.jpg)
-27-
One Water Supply, Sanitation and Hygiene Project- Phase IIFund Transfer Statement (From Birr Account)
From xxxxxxxx to xxxxxxKxAnnual Budget allocation Fund Transfer
S/No. Regions/Ministries (Birr) Current Quarter (Birr) Cumulative (Birr)
Regions
Tigray
Afar
Amhara
Oromia
Somali
B.G.
SNNPR
Gambella
Harari
Dire Dawa
Addis Ababa
Ministries
MoF
MoWIE
WRDF
MoH
MoE
GRAND TOTAL
![Page 28: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/28.jpg)
- 28 -
One Water Supply and Saitation and Hygine Project -Second phase
Statement of Source and Uses of Fund-by implementing entity summary
For the quarter ended....... (BIRR)
Expenditure
Gain/Loss onSer. Beginning Prior Year/Qrt Collection Counterpart Transfer Exchange Total Fund Comp. 2. Comp. 4. Comp. 5. EndingNo. Name of Region Balance Adjustment from Donors contribution from MoF Rate Available Comp. 1. Urban Comp. 3. Climate Res. Inst Total Balance
Difference Rural WASH WASH Inst. WASH WASH Stegthen and Expenditureproj. mgt
I Tigray
2 Afar
3 Amhara
4 Ommia
5 Somali
6 B.G
7 SNNPR
8 Gambella
9 Harari
10 Dire Dawa
11 MoWIE
12 MoE
13 MoH
14 WRDF
15 MoFAdmin
16 MoF- Held A/C
Grand Total
![Page 29: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/29.jpg)
-29-
ONE WATER SUPPLY, SANITATION AND HYGIENE PROJECT-Second phaseStatement of Sources and Uses of Fund by implementing entity/region -
xxxx REGIONFor the quarter ended. (BIRR)
Opening BalanceAt Woreda LevelAt Regional Level
Total Opening Balance
Add: Collection
Transfer from MoF
Counterpart Contribution (if any)
Total collection
Total Fund Available
Less: Expenditure
At Woreda At Region TotalComponent 1: Rural and Pastoral Water Supply, Sanitation, and Hygiene (Rural WASH)
Subcomponent 1.A-Increasing Rural & Pastoral Access to Water Supply & San. servSubcomponent 1.B-Enhancing Service Delivery Management Capacity
Component 2: Urban Water Supply, Sanitation, and Hygiene
Component 3: Institutional Water Supply, Sanitation, and Hygiene (institutional WASH)Component 4: Climate Resilient Water Supply, Sanitation, and Hygiene (Climate Res.WASH)
Sub-component 4.A-Water Resource Monitoring and PlanningSubcomponent 4.B-Climate-Adaptive Service Delivery
Subcomponent 4.C-Contingency Emergency Response ComponentComponent 5: Institutional Strengthening and Project Mgt
Subcomponent 5.A-Operationalization of Sector MISSubcomponent 5.B-Institutional Strengthening and Project Management
Total Expenditure
Total Ending Balance
Break Down of EndinR BalanceAt Region At Woreda Total
Cash on Hand
Cash at BankTotal Cash on Hand and at BankAdvance PaymentPayables
Total Ending Balance
![Page 30: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/30.jpg)
-30-
ONE WATER SUPPLY, SANITATION AND HYGIENE PROJECT-Second phaseStatement of Sources and Uses of Fund by implementing entity/region -
MoH/MoE/WRDFFor the quarter ended. (BIRR)
Opening Balance
Cash on handCash at Bank
Receivables
PayablesTotal Opening Balance
Add: Collection
Transfer from MoF
Counterpart Contribution (if any)Total collection
Total Fund Available
Less: ExpenditureComponent 1: Rural and Pastoral Water Supply, Sanitation, and Hygiene (Rural WASH)
Subcomponent 1.A-Increasing Rural & Pastoral Access to Water Supply & San. servSubcomponent l.B-Enhancing Service Delivery Management Capacity
Component 2: Urban Water Supply, Sanitation, and HygieneComponent 3: Institutional Water Supply, Sanitation, and Hygiene (Institutional WASH)Component 4: Climate Resilient Water Supply, Sanitation, and Hygiene (Climate Res.WASH)
Sub-component 4.A-Water Resource Monitoring and Planning
Subcomponent 4.B-Climate-Adaptive Service DeliverySubcomponent 4.C-Contingency Emergency Response Component
Component 5: Institutional Strengthening and Project MgtSubcomponent 5.A-Operationalization of Sector MISSubcomponent 5.B-Institutional Strengthening and Project Management
Total Expenditure
Ending Balance
Break Down of Ending Balance
Cash on Hand
Cash at Bank
Total Cash on Hand and at Bank
Receivables
Payables
Total Ending Balance
![Page 31: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/31.jpg)
-31-
ONE WATER SUPPLY, SANITATION AND HYGIENE PROJECT Phase IISTATEMENT OF DESIGNATED ACCOUNT- World Bank
Period covered -From ........ to...........Loan/ Credit Number ----------------------------
USD USD USDAccount Number: ------------- with National Bank of Ethiopia
OPENING BALANCE:
ADD RECEIPTS:* IDA
Sub total
LESS PAYMENTS* Transfer to Birr a/c* Travel advance* Bank service chargeSub totalCLOSING BALANCE:
DESIGNATED ACCOUNT (SPECIAL ACCOUNT) RECONCILIATION STATEMENTLoan/ Credit Number IDA:.....................
Account Number: ..................................... with National Bank of Ethiopia
1 Total Advance by World Bank
2 Less total amount recovered by World Bank
3 Equals present outstanding amount advanced to theSpecial Account (No. 1 less No. 2)
4 Amount in Special Account at July 7,2011 as per Bank Statement
5 Add amount of eligible expenditure documented in attached IFR6 Plus: amount claimed in previous application not yet credited
at date of Bank Statement7 Total advanced accounted for8 Explanation of any discrepancy between total appearing on line 3 & 7 above
1. Local account2.Advance to Region3.Advance to Others
![Page 32: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/32.jpg)
- 32 -
4.Payable to Others5.Loss on exchange rateSubtotal:
Total
![Page 33: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/33.jpg)
-33 -
ONE WATER SUPPLY, SANITATION AND HYGIENE PROJECT Phase II
STATEMENT OF DESIGNATED ACCOUNT- DFID
Period covered -From . toEURO/GBP BIRR
OPENING BALANCE
Add: ReceiptGrant fund -Received as atGrant fund -Received as at
Fund Available for useLess Transfer and Expenditure
Transfer to pool CWA birr account as atExpenditures-Bank Services Charges
Total transfer & expenditure
CLOSING BALANCEActual exchange rate of.closing balance /Leger birr account/Add gain or (Loss) on Foreign exchange GainFinal Balance After Gain or loss of foreign exchange
![Page 34: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/34.jpg)
-34-
ONE WATER SUPPLY, SANITATION AND HYGIENE PROJECT Phase II
STATEMENT OF DESIGNATED ACCOUNT- AfDBPeriod covered -From ....... to......
USD BIRROPENING BALANCEAdd: Receipt
Grant fund -Received as atGrant fund -Received as at
Fund Available for useLess Transfer and Expenditure
Transfer to pool CWA birr account as atExpenditures-Bank Services Charges
Total transfer & expenditure
CLOSING BALANCEActual exchange rate of .........closing balance /Leger birr account/Add gain or (Loss) on Foreign exchange GainFinal Balance After Gain or loss of foreign exchange
![Page 35: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/35.jpg)
- 35 -
ONE WATER SUPPLY, SANITATION AND HYGINE PROJECT
STATEMENT OF FUND FLOW - BIRR
CWA POOLED BIRR ACCOUNT No
For the quarter ended
For the Quarter (birr) Cumulative for the Year (birr)
OPENING BALANCE
Add: Transfer from Donor designated accountsTransfer from IDATransfer from Donor xxTransfer from Donor yy
Total transfer from Donor designated accountsFund Available for use
Less: Transfer and Expenditure
Transfers
Tigray
AfarAmharaOromiaSomaliB. GSNNPRGambellaHarariDire DawaMinistry of Water & EnergyMinistry of HealthMinistry of EducationWRDFMoF
Total transferExpenditures
Bank Services Charges Incoming
Bank Services Charges Outgoing
Audit FeeTotal transfer & expenditure
CLOSING BALANCE
![Page 36: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/36.jpg)
- 36 -
One Water supply, sanitation and Hygiene Project-Phase II
Statement of Cash Forecastfor the next six months from -------- to-----------
Particulars Annual QRT1 (Birr) QRT2 (Birr) Six-month amount Six-month amountApproved Birr USD
Budget (Birr)Expenditure for the next Six month
Component 1: Rural and Pastoral Water Supply, Sanitation, and Hygiene (Rural WASH)
Subcomponent L.A-Increasing Rural & Pastoral Access to Water Supply & San. serv
Subcomponent 1.B-Enhancing Service Delivery Management Capacity
Component 2: Urban Water Supply, Sanitation, and HygieneComponent 3: Institutional Water Supply, Sanitation, and Hygiene (Institutional WASH)
Component 4: Climate Resilient Water Supply, Sanitation, and Hygiene (Climate Res. WASH)
Sub-component 4.A-Water Resource Monitoring and Planning
Subcomponent 4.B-Climate-Adaptive Service Delivery
Subcomponent 4.C-Contingency Emergency Response Component
Component 5: Institutional Strengthening and Project Mgt
Subcomponent 5.A-Operationalization of Sector MIS
Subcomponent S.B-Institutional Strengthening and Project Management
Grand Total Expenditure for the next 6 months
Less Direct payments
Expenditure for the next 6 months to be financed by DA
Less Ending balances
Ending balance Designated account
Ending balance Local account
Ending balance Receivable from region
Ending balance Receivable from other
Ending balance Payable to other
Net Amount Requested to be paid in to Designated Account
Net cash requirement to be requested from financiers:
IDA (Credit no..........
Donor xx
Donoryy
Government
Total
![Page 37: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/37.jpg)
-37- *
One Water Supply, Sanitation and Hygiene Project Phase II
Payments Made during Reporting Period Against Contracts Subject to the World Bank's Prior Review
Contract Supplier Contract Date Contract Amount Date of WB's No Objection to Amount Paid to Supplier WB's Share of Amt Paid to SupplierNumber Contract during Period during Period
![Page 38: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/38.jpg)
-38-
One Water Supply, Sanitation and Hygiene Project Phase IIEXPENDITURE APPORTIONMENT
For the quarter ended .........Expenditure Apportionments of Expenditures to Financiers (USD)
Component Category Birr USD Government IDA DFID AfDB Donor xx Total
Component 1: Rural and Pastoral Water Supply,Sanitation, and Hygiene (Rural WASH)
Component 2: Urban Water Supply, Sanitation, andHygiene
Component 3: Institutional Water Supply,Sanitation, and Hygiene (Institutional WASH)
Component 4 (A) & 4 (B): Climate Resilient WaterSupply, Sanitation, and Hygiene (Climate Res.WASH) except CERC
Component 4 (C): Climate Resilient Water Supply,Sanitation, and Hygiene (Climate Res. WASH) -Contingency Emergency Response Component
Component 5: Institutional Strengthening andProject Mgt
Note:- ex rate 1 USD= Birr xxxx- basis of allocation to financiers is described here
![Page 39: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/39.jpg)
- 39 -
One Water Supply, Sanitation and Hygiene Project- Phase H
Expenditure Apportionment
For the quarter ended..........
Allocation per Disbursed to the Prior Period Current quarter Cumulative Remaining
Agreement Project Documentations expenditure Documentation Documentation
Component Category USD USD USD USD USD USD
1.Flancier: World BankComponent 1: Rural and Pastoral Water Supply, Sanitation, and Hygiene (RuralWASH)
Component 2 Urban Water Supply, Sanitation, and Hygiene
Component 3 Institutional Water Supply, Sanitation, and Hygiene (InstitutionalWASH)
Component 4 (A) & 4 (B) Climate Resilient Water Supply, Sanitation, and Hygiene(Climate Res. WASH) except CERC
Component 4 (C) Climate Resilient Water Supply, Sanitation, and Hygiene(Climate Res. WASH) -Contingency Emergency Response
Component 5. Institutional Strengthening and Project Mgt
TOTAL
2.Financier: DFIDComponent 1: Rural and Pastoral Water Supply, Sanitation, and Hygiene (RuralWASH)
Component 2 Urban Water Supply, Sanitation, and HygieneComponent 3 Institutional Water Supply, Sanitation, and Hygiene (InstitutionalWASH)
Component 4 (A) & 4 (B) Climate Resilient Water Supply, Sanitation, and Hygiene(Climate Res. WASH) except CERC
Component 4 (C) Climate Resilient Water Supply, Sanitation, and Hygiene(Climate Res WASH) -Contingency Emergency Response
Component 5 institutional Strengthening and Project Mgt
TOTAL
3financier' AfDBComponent 1: Rural and Pastoral Water Supply, Sanitation, and Hygiene (RuralWASH)
Component 2 Urban Water Supply, Sanitation, and Hygiene
Component 3 Institutional Water Supply, Sanitation, and Hygiene (InstitutionalWASH)
Component 4 (A) & 4 (B) Climate Resilient Water Supply, Sanitation, and Hygiene(Cinmate Res WASH) except CERCComponent 4 (C): Clinate Resilent Water Supply, Sanitation, and Hygiene(Climate Res WASH) -Contingency Emergency Response
Component 5 Institutional Strengthening and Project Mgt
TOTAL
4.Finanier: Donor XXComponent t Rural and Pastoral Water Supply, Sanitation, and Hygiene (RuralWASH)
Component 2: Urban Water Supply, Sanitation. and HygieneComponent 3 Institutional Water Supply, Sanitation, and Hygiene (InstitutionalWASH)
Component 4 (A) & 4 (B) Climate Resilient Water Supply, Sanitation, and Hygiene(Climate Res. WASH) except CERC
Component 4 (C) Climate Resihent Water Supply, Sanitation, and Hygiene(Climate Res WASH) -Contingency Emergency Response
Component 5 Institutional Strengthening and Project Mgt
TOTAL
![Page 40: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/40.jpg)
-40-
One Water Supply, Sanitation and Hygiene Project- Phase II
RECEIVABLE / PAYABLE AGE ANALYSIS
For Implementing Entity/Region......
For the quarter ended..........
Receivables
Ending %age of Total Aging of Un Settled Advances/Receivables (Ending Balance)Description Advance
receivable A<3 m 3m>A<6m 6m>A<9m 12m<A<24m A>24m REMARK
Total TPayables
Ending %age of Total Aging of Un Settled Payables (Ending Balance)Description Balance Payable
balance A<3 m 3m>A<6m 6m>A<9m 12m<A<24m A>24m REMARK
Total
One Water Supply, Sanitation and Hygiene Project- Phase II
![Page 41: World Bank Document · 2019. 7. 10. · A letter in the Form attached (Attachment 1) should be furnished to the World Bank at the address indicated below providing the name(s) and](https://reader034.vdocument.in/reader034/viewer/2022052101/603b5eb33e6fcd1a733ea556/html5/thumbnails/41.jpg)
-41 -
List/Status of Commitments
For Implementing Entity/Region......
For the quarter ended..........
List of Commitments Amount (Birr) Remark
One Water Supply, Sanitation and Hygiene Project- Phase II
Status of Major Procurements
For Implementing Entity/Region......
For the quarter ended..........Procurement Package No. Description Current Status Remark