The World Bank Dakar Diamniadio Toll Highway (P087304) REPORT NO.: RES31320 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF DAKAR DIAMNIADIO TOLL HIGHWAY APPROVED ON JUNE 2, 2009 TO REPUBLIC OF SENEGAL TRANSPORT & DIGITAL DEVELOPMENT AFRICA Regional Vice President: Makhtar Diop Country Director: Louise J. Cord Senior Global Practice Director: Jose Luis Irigoyen Practice Manager/Manager: Nicolas Peltier-Thiberge Task Team Leader: Eric R. Lancelot Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 10-Mar-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: World Bank Document...The World Bank Dakar Diamniadio Toll Highway (P087304) ABBREVIATIONS AND ACRONYMS AFD AIBD DDTH French Development Agency International Airport of Blaise Diagne

The World BankDakar Diamniadio Toll Highway (P087304)

REPORT NO.: RES31320

RESTRUCTURING PAPER

ON A

PROPOSED PROJECT RESTRUCTURING

OF

DAKAR DIAMNIADIO TOLL HIGHWAY

APPROVED ON JUNE 2, 2009

TO

REPUBLIC OF SENEGAL

TRANSPORT & DIGITAL DEVELOPMENT

AFRICA

Regional Vice President: Makhtar Diop Country Director: Louise J. Cord

Senior Global Practice Director: Jose Luis IrigoyenPractice Manager/Manager: Nicolas Peltier-Thiberge

Task Team Leader: Eric R. Lancelot

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: World Bank Document...The World Bank Dakar Diamniadio Toll Highway (P087304) ABBREVIATIONS AND ACRONYMS AFD AIBD DDTH French Development Agency International Airport of Blaise Diagne

The World BankDakar Diamniadio Toll Highway (P087304)

ABBREVIATIONS AND ACRONYMS

AFD

AIBD

DDTH

French Development Agency

International Airport of Blaise Diagne

Dakar Diamniadio Toll Highway

FA Financing Agreement

FY Fiscal Year

GD Greater Dakar

GoS Government of Senegal

IP Implementation Progress

MS Moderately Satisfactory

PAP Project Affected Persons

PIS Pikine Irrégulier Sud

PDO Project Development Objectives

RAP Resettlement Action Paper

RP Restructuring Paper

RoW Right of Way

TP Tivaouane Peuhl

Page 3: World Bank Document...The World Bank Dakar Diamniadio Toll Highway (P087304) ABBREVIATIONS AND ACRONYMS AFD AIBD DDTH French Development Agency International Airport of Blaise Diagne

The World BankDakar Diamniadio Toll Highway (P087304)

Note to Task Teams: The following sections are system generated and can only be edited online in the Portal.

BASIC DATA

Product Information

Project ID Financing Instrument

P087304 Investment Project Financing

Original EA Category Current EA Category

Full Assessment (A) Full Assessment (A)

Approval Date Current Closing Date

02-Jun-2009 31-Jan-2018

Organizations

Borrower Responsible Agency

Ministry of Finance APIX

Project Development Objective (PDO)

Original PDOThe Objective of the project is to : (i) improve mobility between Dakar and Diamniadio; and (ii) provide communities affected bytheconstruction of the highway access to basic social and economic services.OPS_TABLE_PDO_CURRENTPDOSummary Status of Financing

Ln/Cr/Tf Approval Signing Effectiveness ClosingNet

Commitment Disbursed Undisbursed

IDA-45790 02-Jun-2009 13-Oct-2009 13-Oct-2010 31-Jan-2018 105.00 97.44 9.91

Policy Waiver(s)

Does this restructuring trigger the need for any policy waiver(s)?No

Page 4: World Bank Document...The World Bank Dakar Diamniadio Toll Highway (P087304) ABBREVIATIONS AND ACRONYMS AFD AIBD DDTH French Development Agency International Airport of Blaise Diagne

The World BankDakar Diamniadio Toll Highway (P087304)

This Restructuring Paper (RP) seeks management approval for the cancellation of the Project unused funds by Project closing date in the amount of SDR 3,728,494. The current project closing date is January 31, 2018 and these canceled funds will remain in the country IDA basket.

The project, approved in June 2009 became effective on October 13, 2010 and was restructured five times throughout its life, including two extensions of the closing date for a total of 2.5 years. The entire cost of the Dakar Diamniadio Toll Highway Project is about US$760 million of which US$105 million financed by IDA (Credit number 4579-SN). To date, 90 percent of the IDA-funds have been disbursed and an additional 4 percent will be disbursed by the end of the grace period. Project performance is currently rated Moderately Satisfactory for progress towards achievement of project development objective (PDO) as most of the objectives of the project have been achieved. The project was in particular a key enabler for the construction, on time and below budget, of a 32-km urban motorway co-financed by several IFI’s and the private sector.

Despite these remarkable achievements, and while the Project execution had been satisfactory in the first years of implementation, continuous delays in the finalization of the resettlement processes and conclusion of remaining works in the past months led the Project Implementation Progress (IP) rating to be downgraded to moderately unsatisfactory in September 2017. As the project’s reaching its end, the Government of Senegal (GoS) is currently considering putting in place a train of measures to ensure that remaining activities are properly and timely addressed beyond project’s closing date.

Note to Task Teams: End of system generated content, document is editable from here.

I. PROJECT STATUS AND RATIONALE FOR RESTRUCTURING

Component A: Road infrastructure

The toll highway between Dakar and Diamniadio, opened to traffic on August 1, 2013, has been built on time and under budget. An average of 60,000 vehicles travel the toll road daily, a substantial increase in comparison to the initial forecast demonstrating the success of the toll road. As a result of opening the highway, the average travel time between downtown Dakar and Diamniadio has decreased from about 90 minutes to less than 25 minutes.

Of the 10179 PAPs in the ten RAPs (and some addenda) covering the road works on the Malick Sy (Dakar) to Diamniadio highway, 9463 have been compensated. 344 PAPs, mostly informal vendors have not yet been found and compensation could not be paid before the end of the project. Other pending cases include incomplete supporting documentation, litigation, etc. The Government indicated its intention to continue and conclude the compensation processes after the Project closing date.

Component B: Clearing of right of way and urban development of Resettlement Site

Page 5: World Bank Document...The World Bank Dakar Diamniadio Toll Highway (P087304) ABBREVIATIONS AND ACRONYMS AFD AIBD DDTH French Development Agency International Airport of Blaise Diagne

The World BankDakar Diamniadio Toll Highway (P087304)

Construction of resettlement site. The construction of the Tivaouane Peulh (TP) resettlement site has been completed including paved roads, a drainage/sewer system, electricity and water network distribution systems, schools, health centers, a market place, and a sewage treatment plant. The resettlement site has a surface area of about 165 hectares, and includes 2000 plots of which about 1547 have been attributed. 215 families are now living in the TP resettlement site and 602 houses are under construction. The pace with which PAPs have been resettling in Tivaouane Peulh is slower than originally expected traducing an overall limited success of the approach. This could be explained by a variety of reasons such as: (a) the need for PAPs to construct their own houses; (b) a number of PAPs who chose to resettle elsewhere and keeping the plots for future development; (c) PAPs who are interested in reselling their lots and were awaiting the lifting of the five year ban for resale; and (d) delayed transport links and means between the TP resettlement site and other parts of the GD area.

Out of the 928 PAPs of TP, 744 have been compensated. The Government indicated its intention to continue and conclude the compensation processes for the pending cases after the Project closing date. The PAPs who relocated in TP are still expecting their land titles. The Government indicated its intention to establish the land titles in the shortest delays.

Rehabilitation of Mbeubeuss landfill site. The closure of the Mbeubeuss landfill site was conditioned to the opening of the sanitary landfill at Sindia. The populations living in and around Sindia finally strongly objected to the opening of the new landfill despite the thorough communication undertaken within the Project. As a result, the Mbeubess Landfill could not be closed. In fact, this is such a complex and sensitive issue that a new Project dedicated to the management of solid waste in the Great Dakar has been launched (Board planned in December 2018). Although this activity was not formally canceled in the FA and while the Government continued discussions with the concerned populations, the remaining funds previously allocated for it were used to develop a new strategy/approach to better manage solid waste in the GD area.

Although the closing of Mbeumbeuss landfill did not materialize, 52 out of the 61 PAPs that were identified have been compensated and the vacant sites were secured to prevent occupation. The Government indicated its intention to continue and conclude the treatment of the remaining PAPs after the Project closing date.

Implementation of Mbao Forest Action Plan. Activities financed under the project in the Mbao Forest Action Plan have been completed. These activities include a compensatory reforestation, a support to vegetables gardening and pastoralism, solid waste collection, and capacity building.

Component C: Urban Restructuring of PIS

Despite major delays in clearing the necessary right of way (ROW) especially for the road works, most civil works targeting improving the slum areas of the Pikine Irregulier Sud (PIS) have been completed including improvement of the pluvial water drainage through the construction of canals, 6 retention basins and improvement of about 3.4 km of urban roads within PIS and the construction of 10 socio-economic infrastructures such as schools, markets, community centers, etc. Limited remaining works on drainage infrastructure could not be concluded by the Project closing and the contracts are being terminated. The Government has secured and cleaned all the sites, while also taking measures to avoid reoccupation of the vacant right of way. It also indicated its intention to conclude the remaining works with financing that remain to be determined.

Out of the 2761 PAPs (initial and complementary RAPs for PIS), 2125 have been compensated. The Government indicated its intention to continue and conclude the compensation processes for the pending cases after the Project closing date.

Page 6: World Bank Document...The World Bank Dakar Diamniadio Toll Highway (P087304) ABBREVIATIONS AND ACRONYMS AFD AIBD DDTH French Development Agency International Airport of Blaise Diagne

The World BankDakar Diamniadio Toll Highway (P087304)

II. DESCRIPTION OF PROPOSED CHANGES

The proposed changes are the cancellation of funds that would not be disbursed by the end of the grace period per category and the reallocation between disbursement categories to take stock of the final Project implementation per component and activity.

Note to Task Teams: The following sections are system generated and can only be edited online in the Portal.

III. SUMMARY OF CHANGES

Changed Not Changed

Cancellations Proposed ✔

Reallocation between Disbursement Categories ✔

Change in Implementing Agency ✔

Change in DDO Status ✔

Change in Project's Development Objectives ✔

Change in Results Framework ✔

Change in Components and Cost ✔

Change in Loan Closing Date(s) ✔

Change in Disbursements Arrangements ✔

Change in Disbursement Estimates ✔

Change in Overall Risk Rating ✔

Change in Safeguard Policies Triggered ✔

Change of EA category ✔

Change in Legal Covenants ✔

Change in Institutional Arrangements ✔

Change in Financial Management ✔

Change in Procurement ✔

Change in Implementation Schedule ✔

Other Change(s) ✔

Change in Economic and Financial Analysis ✔

Page 7: World Bank Document...The World Bank Dakar Diamniadio Toll Highway (P087304) ABBREVIATIONS AND ACRONYMS AFD AIBD DDTH French Development Agency International Airport of Blaise Diagne

The World BankDakar Diamniadio Toll Highway (P087304)

Change in Technical Analysis ✔

Change in Social Analysis ✔

Change in Environmental Analysis ✔

IV. DETAILED CHANGE(S)

OPS_DETAILEDCHANGES_CANCELLATIONS_TABLE

CANCELLATIONS

Ln/Cr/Tf Status Currency Current Amount

Cancellation Amount

Value Date of

Cancellation

New Amount

Reason for

Cancellation

IDA-45790-001

Disbursing XDR 71,200,000.00 3,728,494.00 26-Jan-2018 67,471,506.00

UNDISBURSED BALANCE

AT CLOSING

OPS_DETAILEDCHANGES_REALLOCATION _TABLE

REALLOCATION BETWEEN DISBURSEMENT CATEGORIES

Current Allocation Actuals + Committed Proposed Allocation Financing %(Type Total)

Current Proposed

IDA-45790-001 | Currency: XDR

iLap Category Sequence No: 1 Current Expenditure Category: GD/WK/TR&CS Part B

30,256,000.00 30,255,193.75 30,256,000.00 90.00 90.00

iLap Category Sequence No: 2 Current Expenditure Category: GD/WK/TR&CS Part C

0.00 0.00 0.00 90.00 90.00

iLap Category Sequence No: 3 Current Expenditure Category: Road & Drainage Work Pt. C

0.00 0.00 0.00 90.00 90.00

iLap Category Sequence No: 4 Current Expenditure Category: GD/TR/OpCost/AUD/CS Pt. D

10,915,000.00 10,354,296.20 10,870,425.00 100.00 100.00

Page 8: World Bank Document...The World Bank Dakar Diamniadio Toll Highway (P087304) ABBREVIATIONS AND ACRONYMS AFD AIBD DDTH French Development Agency International Airport of Blaise Diagne

The World BankDakar Diamniadio Toll Highway (P087304)

iLap Category Sequence No: 5 Current Expenditure Category: PPF REFINANCING

941,000.00 940,026.06 941,000.00

iLap Category Sequence No: 6 Current Expenditure Category: UNALLOCATED

0.00 0.00 0.00

iLap Category Sequence No: 7 Current Expenditure Category: GD/WK/TR/CS & Road & Drainage Pt C

29,088,000.00 19,553,914.07 25,404,081.00 90.00 90.00

Total 71,200,000.00 61,103,430.08 67,471,506.00