Page 2: World bank mission may 5 6, 2014

Expenditure Status of Central Implementing Agencies Under Hydrology Project-II

Sl. No. IAs Allocation as per revised Cost

Tables 2013

Cumulative exp. up to March 31,

2013

Exp. up to March31, in FY

2013-14

Cum. Exp up to March31,

2014

1 BBMB 39.24 19.02 5.02 24.04

2 CWC 24.71 15.43 1.95 17.38

3 CGWB 66.33 26.80 11.65 38.45

4 CPCB 10.11 6.18 0.31 6.49

5 CWPRS 4.64 2.79 1.37 4.16

6 IMD 0.09 0.09 0.00 0.09

7 NIH 48.15 34.55 11.88 46.43

8 PCS 42.99 26.51 5.90 32.41

Total of Central IAs 236.26 131.37 38.08 169.45

Page 3: World bank mission may 5 6, 2014

Expenditure Status of State Implementing Agencies Under Hydrology Project-II

Sl. No. IAs Allocation as per revised Cost Tables

2013

Cumulative exp. up to March 31,

2013

Exp. up to March31, in FY

2013-14

Cum. Exp up to March31,

2014

9 AP- SW 8.92 4.78 0.22 5.00

10 AP - GW 23.69 9.69 4.73 14.42

11 Chh- SW 4.12 3.64 0.30 3.94

12 Chh- GW 5.82 4.55 0.68 5.23

13 Guj- SW 7.83 5.58 1.96 7.54

14 Guj- GW 17.63 15.36 1.55 16.91

15 KN- SW 11.40 6.97 2.65 9.62

16 KN- GW 10.90 7.07 0.76 7.83

17 Kerala - SW 14.04 7.57 2.89 10.46

18 Kerala - GW 16.71 10.30 3.60 13.90

Page 4: World bank mission may 5 6, 2014

Sl. No. IAs Allocation as per revised Cost

Tables 2013

Cumulative exp. up to March 31,

2013

Exp. up to March31, in FY

2013-14

Cum. Exp up to March31,

2014

19 Mah- SW 40.38 23.08 7.42 30.50

20 Mah- GW 12.73 12.55 0.15 12.70

21 MP- SW 11.37 6.28 0.98 7.26

22 MP- GW 4.32 3.08 0.27 3.35

23 Orissa - SW 13.46 8.45 0.45 8.90

24 Orissa -GW 9.22 7.46 1.23 8.69

25 Tamil Nadu 36.82 23.35 6.11 29.46

26 HP 58.33 42.10 12.14 54.24

27 Goa 22.50 16.25 2.46 18.71

28 Pondicherry 14.69 9.25 2.45 11.70

29 Punjab 46.65 22.36 5.21 27.57

  Total of State IAs 391.53 249.72 58.21 307.93

  Total of All IAs 627.79 381.09 96.29 477.38

Page 5: World bank mission may 5 6, 2014

Rs. in crore

Loan Utilization Projection

Disbursement Category

Amount of loan

allocated

Disbursed amount (upto 31st

March, 2014)

Likely Utilization and

Proposed reallocation of Loan Amount

Likely Unutilized

Loan Amount

Civil Works 22,526,000 15,293,107 19,768,913 2,757,087

Goods 31,753,000 21,336,597 27,920,468 3,832,532

Consultancy Services 22,115,000 14,847,782 18,433,266 3,681,734

Training 4,161,100 3,232,821 3,555,402 605,698

Operating Costs 23,900,000 21,664,689 23,900,000 00

Front End Fee 524,900 524,900 524,900 00

Total 104,980,000 76,899,896 94,102,949 10,877,051

Page 6: World bank mission may 5 6, 2014

BBMB Rs. in crore

Total allocation under HP-II 39.60

Exp. incurred upto March 31, 2014 24.05 (62%)

Expenditure to be incurred April to May 31, 2014

Ongoing contracts 10.54

Contracts for which bids to be floated 2.77

Recurrent cost 0.01

Trainings, workshops, study tour 0.01

Total 13.33

Total expenditure under the project 37.38

Likely saving 2.22

Page 7: World bank mission may 5 6, 2014

CGWB Rs. in crore

Total allocation under HP-II 66.32

Exp. incurred upto August 31, 2013 38.46 (58%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 10.53

Contracts for which bids to be floated 3.04

Recurrent cost 0.0

Trainings, workshops, study tour 0.08

Total 13.65

Total expenditure under the project 52.11

Likely saving 14.21

Page 8: World bank mission may 5 6, 2014

CPCB Rs. in crore

Total allocation under HP-II 15.03

Exp. incurred upto August 31, 2013 6.48 (43%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 2.59

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.00

Recurrent cost 0.06

Trainings, workshops, study tour 0.06

Total 2.71

Total expenditure under the project 9.19

Likely saving 5.84

Page 9: World bank mission may 5 6, 2014

CWC Rs. in crore

Total allocation under HP-II 26.72

Exp. incurred upto August 31, 2013 17.39 (65%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 1.59

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.00

Recurrent cost 0.05

Trainings, workshops, study tour 0.04

total 1.68

Total expenditure under the project 19.07

Likely saving 7.65

Page 10: World bank mission may 5 6, 2014

CWPRS Rs. in crore

Total allocation under HP-II 5.33

Exp. incurred upto August 31, 2013 4.16 (78%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 0.14

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.02

Recurrent cost 0.06

Trainings, workshops, study tour 0.02

Total 0.24

Total expenditure under the project 4.40

Likely saving 0.93

Page 11: World bank mission may 5 6, 2014

NIH Rs. in crore

Total allocation under HP-II 44.70

Exp. incurred upto August 31, 2013 46.84

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 0.00

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.00

Recurrent cost 0.49

Trainings, workshops, study tour 0.00

Total 0.49

Total expenditure under the project 47.33

Likely saving -2.63

Page 12: World bank mission may 5 6, 2014

PCS Rs. in crore

Total allocation under HP-II 37.90

Exp. incurred upto August 31, 2013 32.41 (86%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 4.50

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.00

Recurrent cost 0.70

Trainings, workshops, study tour 0.00

Total 5.20

Total expenditure under the project 37.61

Likely saving 0.29

Page 13: World bank mission may 5 6, 2014

Andhra Pradesh-SW Rs. in crore

Total allocation under HP-II 8.83

Exp. incurred upto August 31, 2013 5.06 (57%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 0.30

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.00

Recurrent cost 0.09

Trainings, workshops, study tour 0.04

Total 0.43

Total expenditure under the project 5.49

Likely saving 3.34

Page 14: World bank mission may 5 6, 2014

Chhattisgarh-SW Rs. in crore

Total allocation under HP-II 4.12

Exp. incurred upto August 31, 2013 3.94 (96%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 0.17

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.00

Recurrent cost 0.03

Trainings, workshops, study tour 0.00

Total 0.20

Total expenditure under the project 4.14

Likely saving -0.02

Page 15: World bank mission may 5 6, 2014

Chhattisgarh-GW Rs. in crore

Total allocation under HP-II 6.16

Exp. incurred upto August 31, 2013 5.23 (85%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 0.00

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.00

Recurrent cost 0.05

Trainings, workshops, study tour 0.00

Total 0.05

Total expenditure under the project 5.28

Likely saving 0.88

Page 16: World bank mission may 5 6, 2014

Gujarat-SW Rs. in crore

Total allocation under HP-II 5.59

Exp. incurred upto August 31, 2013 7.59 (136%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 0.00

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.00

Recurrent cost 0.00

Trainings, workshops, study tour 0.00

Total 0.00

Total expenditure under the project 7.59

Likely saving -2.00

Page 17: World bank mission may 5 6, 2014

Gujarat-GW Rs. in crore

Total allocation under HP-II 17.22

Exp. incurred upto August 31, 2013 16.91 (98%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 0.20

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.00

Recurrent cost 0.03

Trainings, workshops, study tour 0.00

Total 0.23

Total expenditure under the project 17.14

Likely saving 0.08

Page 18: World bank mission may 5 6, 2014

Karnataka-SW Rs. in crore

Total allocation under HP-II 11.13

Exp. incurred upto August 31, 2013 9.61 (86%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 0.33

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.00

Recurrent cost 0.20

Trainings, workshops, study tour 0.00

Total 0.53

Total expenditure under the project 10.14

Likely saving 0.99

Page 19: World bank mission may 5 6, 2014

Karnataka-GW Rs. in crore

Total allocation under HP-II 13.78

Exp. incurred upto August 31, 2013 7.84 (57%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 0.50

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.99

Recurrent cost 0.01

Trainings, workshops, study tour 0.00

Total 1.50

Total expenditure under the project 9.34

Likely saving 4.44

Page 20: World bank mission may 5 6, 2014

Kerala-SW Rs. in crore

Total allocation under HP-II 13.09

Exp. incurred upto August 31, 2013 10.46 (80%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 0.33

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.26

Recurrent cost 0.33

Trainings, workshops, study tour 0.02

Total 0.92

Total expenditure under the project 11.38

Likely saving 1.71

Page 21: World bank mission may 5 6, 2014

Kerala-GW Rs. in crore

Total allocation under HP-II 16.52

Exp. incurred upto August 31, 2013 13.72 (83%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 1.58

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.03

Recurrent cost 0.30

Trainings, workshops, study tour 0.01

Total 1.92

Total expenditure under the project 15.64

Likely saving 0.88

Page 22: World bank mission may 5 6, 2014

Maharashtra-SW Rs. in crore

Total allocation under HP-II 37.48

Exp. incurred upto August 31, 2013 30.50 (81%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 7.44

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.00

Recurrent cost 0.07

Trainings, workshops, study tour 0.23

Total 7.74

Total expenditure under the project 38.24

Likely saving -0.76

Page 23: World bank mission may 5 6, 2014

Maharashtra-GW Rs. in crore

Total allocation under HP-II 13.11

Exp. incurred upto August 31, 2013 12.70 (97%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 0.00

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.00

Recurrent cost 0.00

Trainings, workshops, study tour 0.00

Total 0.00

Total expenditure under the project 12.70

Likely saving 0.41

Page 24: World bank mission may 5 6, 2014

Madhya Pradesh-SW Rs. in crore

Total allocation under HP-II 10.58

Exp. incurred upto August 31, 2013 7.29 (69%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 2.05

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.00

Recurrent cost 0.13

Trainings, workshops, study tour 0.00

Total 2.18

Total expenditure under the project 9.47

Likely saving 1.11

Page 25: World bank mission may 5 6, 2014

Madhya Pradesh-GW Rs. in crore

Total allocation under HP-II 4.32

Exp. incurred upto August 31, 2013 3.33 (77%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 0.49

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.10

Recurrent cost 0.00

Trainings, workshops, study tour 0.00

Total 0.59

Total expenditure under the project 3.92

Likely saving 0.40

Page 26: World bank mission may 5 6, 2014

Orissa-SW Rs. in crore

Total allocation under HP-II 13.46

Exp. incurred upto August 31, 2013 8.90 (66%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 0.00

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.95

Recurrent cost 0.02

Trainings, workshops, study tour 0.01

Total 0.98

Total expenditure under the project 9.88

Likely saving 3.58

Page 27: World bank mission may 5 6, 2014

Orissa-GW Rs. in crore

Total allocation under HP-II 9.20

Exp. incurred upto August 31, 2013 8.69 (94%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 0.12

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.00

Recurrent cost 0.05

Trainings, workshops, study tour 0.03

Total 0.20

Total expenditure under the project 8.89

Likely saving 0.31

Page 28: World bank mission may 5 6, 2014

Tamilnadu Rs. in crore

Total allocation under HP-II 32.81

Exp. incurred upto August 31, 2013 24.38 (74%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 0.35

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 1.74

Recurrent cost 1.07

Trainings, workshops, study tour 0.20

Total 3.36

Total expenditure under the project 32.55

Likely saving ???

Page 29: World bank mission may 5 6, 2014

Himachal Pradesh Rs. in crore

Total allocation under HP-II 59.49

Exp. incurred upto August 31, 2013 54.20 (91%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 0.98

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.34

Recurrent cost 0.95

Trainings, workshops, study tour 0.01

Total 2.28

Total expenditure under the project 56.48

Likely saving 3.01

Page 30: World bank mission may 5 6, 2014

Goa Rs. in crore

Total allocation under HP-II 22.19

Exp. incurred upto August 31, 2013 18.71 (84%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 2.66

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 1.18

Recurrent cost 0.12

Trainings, workshops, study tour 0.00

Total 3.96

Total expenditure under the project 22.67

Likely saving -0.48

Page 31: World bank mission may 5 6, 2014

Pondicherry Rs. in crore

Total allocation under HP-II 14.61

Exp. incurred upto August 31, 2013 11.70 (80%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 1.13

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.38

Recurrent cost 0.15

Trainings, workshops, study tour 0.01

Total 1.67

Total expenditure under the project 13.37

Likely saving 1.24

Page 32: World bank mission may 5 6, 2014

Punjab Rs. in crore

Total allocation under HP-II 44.62

Exp. incurred upto August 31, 2013 27.55 (62%)

Expenditure to be incurred during April to May 31, 2014

Ongoing contracts 20.53

Contracts for which bids have been floated 0.00

Contracts for which bids to be floated 0.00

Recurrent cost 0.03

Trainings, workshops, study tour 0.00

Total 20.56

Total expenditure under the project 48.11

Likely saving -3.49