ws energy wind turbines

19
1.5 MW WTG

Upload: justwantin

Post on 27-Nov-2014

261 views

Category:

Documents


4 download

DESCRIPTION

Brochure of Dongfang Electronics large wind turbines

TRANSCRIPT

Page 1: WS Energy Wind Turbines

1.5 MW WTG

Page 2: WS Energy Wind Turbines

2.0 MW Wind Turbine General IntroductionDTC 2MW wind turbine was independently developed with intellectual property rights. It features modulardesign, simple structure, easy maintenance, low cost. And it inherited the advantages of FD77/FD70 controlstrategy, electrical system, yaw system, tower, frame ect. Innovative design was adopted on main shaft and hub.It is efficient and can meet the diversified customer needs.

Technical Features• Adopts horizontal axis, three blades, pitch adjustment, double supports at gearbox, double – fed asynchronous

generator.• Inherits FD77/FD70 advantages.• Independent blade electric – driven pitch. Air brake via blade feathering plus rotor brake.• Three – point – support drive train. Vibration damper between gearbox and frame.• Variable speed constant frequency system. When the wind turbine is operating under rated speed, the system can adjust

generator rotor slip ratio to operate at the best tip speed ratio to output maximum power. When the turbine is operating at rated speed, the system can control power output through pitching to realize constant output.

• Adopt optical fiber communication between the foot of tower and nacelle. And the electric system is powered by separate supply and the anti – interference is good.

• Nacelle is human engineered and room is big enough for maintenance. And it is equipped with electric lifting device.• Convertor adopts rotor circuit partial conversion technology. The generator adopts four – pole double – fed asynchronous

technology with slip ring.• Yaw system can determine the direction according to the signal provided by the vane.• Generator and converter uses air – cooling technology with high cooling efficiency, small size, light weight, and high

degree of protection.

Page 3: WS Energy Wind Turbines

Model FD93

Class IEC II b or IEC III a

Rated output 2000KW

Cut – in wind speed 3m/s

Rated wind speed 11.0m/s

Cut – out wind speed 25.0m/s

Gustwind 52.5m/s (3 seconds)

Operating Temperature Ambient Climate -20 ~ +40 ℃ ℃Cold Climate -30 ~ +40 ℃ ℃

Survival Temperature Ambient Climate -20 ~ +50 (below -20 not exceeding 9 days)℃ ℃ ℃Cold Climate -45 ~ +50 ℃ ℃

Altitude ≤ 2000m

Specification

2.0 MW WTG

Page 4: WS Energy Wind Turbines

2.0 MW WTG

Power curve

Page 5: WS Energy Wind Turbines

2.0 MW WTG

Model FD82E

Class IEC I a

Rated output 2000KW

Cut – in wind speed 3.5m/s

Rated wind speed 12.0m/s

Cut – out wind speed 25.0m/s

Gustwind 70m/s (3 seconds)

Operating Temperature Ambient Climate -20 ~ +40 ℃ ℃Cold Climate -30 ~ +40 ℃ ℃

Survival Temperature Ambient Climate -20 ~ +50 (below -20 not exceeding 9 days)℃ ℃ ℃Cold Climate -45 ~ +50 ℃ ℃

Altitude ≤ 2000m

Specification (IEC I)

Page 6: WS Energy Wind Turbines

2.0 MW WTG

Power curve (Typhoon Withstanding)

Page 7: WS Energy Wind Turbines

2.5 MW Wind Turbine General Introduction2.5 MW offshore wind turbine generator with GL certificate was joint developed by Dongfang Turbine CO. Ltd.And AMSC windtec GmbH. It adopts pitching, variable speed and double – fed constant technology. It alsoincludes ambient climate and cold climate types.

Model FD90A FD90B

Class IEC II a IEC II a

Rated output 2500KW 2500KW

Cut – in wind speed 3.5m/s 3.5m/s

Rated wind speed 12.0m/s 12.0m/s

Cut – out wind speed 25.0m/s 25.0m/s

Gustwind 59.5m/s (3 seconds) 59.5m/s (3 seconds)

Operating Temperature -20 ~ +40 ℃ ℃ -30 ~ +40 ℃ ℃

Survival Temperature -20 ~ +50 ℃ ℃ -45 ~ +50 ℃ ℃

Altitude ≤ 1000m ≤ 1000m

Technical Data

Page 8: WS Energy Wind Turbines

Model FD60

Class IEC II a

Rated output 1000KW

Cut – in wind speed 3.5m/s

Rated wind speed 12.0m/s

Cut – out wind speed 26.0m/s

Gustwind 59.5m/s (3 seconds)

Operating Temperature Ambient Climate -20 ~ +40 ℃ ℃Cold Climate -30 ~ +40 ℃ ℃

Survival Temperature Ambient Climate -20 ~ +50 (below -20 not exceeding 9 days)℃ ℃ ℃Cold Climate -45 ~ +50 ℃ ℃

Altitude ≤ 2000m

Specification

1.0 MW WTG

Page 9: WS Energy Wind Turbines

1.0 MW WTG

Power curve

Page 10: WS Energy Wind Turbines

• Joint development with windtec on offshore 2.5MW, 3MW and 5MW wind turbines.

• Adopts pitching, variable speed, double feed constant frequency technology.

• Ambient climate, cold climate and anti – salt types available.

Notes: Rotor diameter

1MW: 60m, 64m;

2MW: 82m(typhoon withstanding), 93m;

2.5MW: 90m, 100m.

Other WTG

Page 11: WS Energy Wind Turbines

Wind Project Solution• To meet the diversified needs from users all over the world, DEC could

provide our clients complete and individual solutions with high efficiency

in a flexible mode.• These different solutions will provide more choice for the Owner to

reduce the project investment and save the construction time so as to

benefit for the end user.• Conventional Supply ( Including the design of tower and basement; The

tower supply is not included);• Conventional Supply + Tower supply;• Conventional Supply + Tower Supply + The erection of wind turbine and

tower ;• Turkey contract of wind farm (EPC)• Project consultant services including micro-siting and whole plant design• Project financing

Page 12: WS Energy Wind Turbines

ManufacturingWe have four production bases located in Deyang city, Tianjin city, Jiuquan city (Gansu)

and Laizhou (Shandong) which is underconstruction and a service center in Tongliao city.

The total annual manufacture capacity reaches more than 3000. Critical components, such as

the control cabinet, generator, pitch system, blade, nacelle cover, hub and brake are

manufactured by our company.

Page 13: WS Energy Wind Turbines

ManufacturingDeyang Production Base:

Assembly workshop occupies 39,3000 ㎡ .

Tianjin Production Base:• Dongfang Electric Tianjin Wind power Technology Co.,Ltd. Assembly workshop occupies 23,000 ㎡ .Annual capacity is 600.

• Tianjin Dongqi Wind Turbine Blade Engineering Co.,Ltd. Assembly workshop occupies 80,000 ㎡ .Annual capacity of blade is 600.

Page 14: WS Energy Wind Turbines

Manufacturing

Page 15: WS Energy Wind Turbines

ServiceService StrategyFollowing integrated planning, effective and flexible working and innovative

service, we devote to forming the service network, optimizing service management, improving the service technologies, valuing the training of service stuff and setting up a remote monitor and information exchange network platform to build a stand – out btand identity.

Service Pattern• Administrative organization and resonable division of work – Our service

is based on wind power service center as the driving force, regional service centers as the mainstay and the assembly workshops as the backup.

• The role of regional service centers is prominent – We build regional service centers to provide our service locally, quickly and precisely.

Page 16: WS Energy Wind Turbines

Service framework

Wind Power Division

Wind Power R&D Center

Functioning Offices

Wind Power Service Center

In fo rm atio n C en ter

Service & Tech n o lo gy

C en ter

P ro ject M an agem en t

C en terStorage Cen ter

Deyang Production

Base

Regional Assembly

Workshops

Regional Service Centers

Victoria Service Center

Page 17: WS Energy Wind Turbines

ServiceQuick Response Mechanism• Three FrontlinesService organization management frontline,extra service frontline. And five spare partscenters shall be put into operation at the end ofthis year.• Localized managementClose to users, focused on user’s need and servicestuff work and life.• Quick response to users’s feedbackOpen 400 hotline and quick response management system. ( figure“DTC wind power service information quick response process”)• Spare parts management networkSpare parts center is located near the center of each regional area and the windpower plants concentration area. We have secondary spare parts center at windpower plants concentration area, in which common spare parts are stored. • More Advanced and integrated Information Management Platform - SCADA

Page 18: WS Energy Wind Turbines

Wind Power Service Information Quick Response Process

Page 19: WS Energy Wind Turbines

Contact US

Head Office Address:Telephone No.:Fax:Email:

Engineering TeamService Telephone No. (24 hours):Fax:Email: