Page 1: ZEKE Presentation1

ASG - ZEKEIntroduction to the Scheduling Package

Page 2: ZEKE Presentation1

ASG-ZEKE

• What is ZEKE?– Product from Allen Systems Group– ZEKE is a automation package to schedule tasks.– ZEKE can run on MVS and VSE.– ZEKE has direct interface for Open Systems– Can directly schedule:

• Batch Jobs• Messages to console operator.• System commands• ZEKE commands• Manual tasks (called work center events)• VM/370 control program

Page 3: ZEKE Presentation1

ASG-ZEKE

• How ZEKE works– Triggers a task based on time and/or predecessors

• Same Run Date predecessor will trigger– Monitors using SMF data.

• Allows you to start a ZEKE event based on “tasks” outside of itself.• Requires care! It doesn’t care who caused the trigger.

Page 4: ZEKE Presentation1

ASG-ZEKE

• How ZEKE works– 48 hour clock (AKA DaySpan)

• Allows events to be scheduled into the next day.• Have to imagine today and tomorrow on one clock.• Night Shift is example (19:00 to 07:00 or 19:00 to 31:00)• 48:00 like 24:00 doesn’t exist, so 48:00 is a permanent hold.

Page 5: ZEKE Presentation1

ASG-ZEKE

• How ZEKE works

– EMR (Event Master Record)

• Where all information on event lives (database).

• Contains General Information, OCCURS, and WHEN clauses

• Also contains Documentation, Condition Code checking, and resource requirements

Page 6: ZEKE Presentation1

ASG-ZEKE

Page 7: ZEKE Presentation1

ASG-ZEKE

Page 8: ZEKE Presentation1

ASG-ZEKE

Page 9: ZEKE Presentation1

ASG-ZEKE

• Setting Up for SCHEDVIEW– Control (=C or Option C on Primary Menu) to access changes to your personal

options.– Controls Colors, Display, Sort, and Date Format.– Colors and Date Format are up to you.– Suggestions for Display and Sort

Page 10: ZEKE Presentation1

ASG-ZEKE

Page 11: ZEKE Presentation1

ASG-ZEKE

• Select option 2 (Display)– By entering a number in the “nnn” field, you can alter the order fields will appear

on the SCHEDVIEW screen.– By entering 0 in the “nnn” field, that description will not be shown. – Handout has suggestions.

Page 12: ZEKE Presentation1

ASG-ZEKE

• Select option 3 (Sort)– Enter the Order and “A” in front of the field descriptions below.

Order A/D Field Description --------- ------------------- 10 A Run Date 20 A Schedule Time 30 A Event Name 40 A Job Name

– This will sort SCHEDVIEW in order by job name.

Page 13: ZEKE Presentation1

ASG-ZEKE

• How it works

– SCHEDVIEW

• Shows SQR(Schedule Queue Record)

• What is happening today (i.e, Current Schedule).

• Allows you a real time view of what ZEKE is doing.

Page 14: ZEKE Presentation1

ASG-ZEKE

Page 15: ZEKE Presentation1

ASG-ZEKE

• Note on previous slide the fields set to N– Sched– Done– ABOK– FBOK– FSucc

These will allow you to monitor all events requiring your attention from one screen.

Page 16: ZEKE Presentation1

ASG-ZEKE

Page 17: ZEKE Presentation1

ASG-ZEKE

• Event Reason & Status Code– Scheduled (On Schedule to be run)– Dispatched (released to run)– Success– Failed– When OK (When Clause satisfied)– Time OK (Time is satisfied)– Late– Pending– AEOJ– ABOK or FBOK– FEOJ– SJCL HOLD– Operator HOLD

Page 18: ZEKE Presentation1

ASG-ZEKE

• Operator Commands (Primary Commands)– ZH SYS– ZREL SYS– ADD– AUTO and INT– EDIT and BROWSE– EMR– DOC– SORT– WORK

Page 19: ZEKE Presentation1

ASG-ZEKE

• Operator Commands (Line Commands)– Hold and ADDOK– RELease and OKay– DISable and ENable– REBuild and REFresh– PATH, PREDecessor, and SUCCessor– WHY, WHen, and RESOurce– WOK, TOK, RUN, FDONE and DEL– FDEL, FREB, and FREF– EMR, and Zoom– WORK and NOTE

Page 20: ZEKE Presentation1

ASG-ZEKE

• Questions???