मौसम विज्ञान के...

14
- 1 - मौसम विान के उपमहावनदेशक का काा ाल ादेवशक मौसम केर, कोलकाता 700027 OFFICE OF THE DEPUTY DIRECTOR GENERAL OF METEOROLOGY REGIONAL METEOROLOGICAL CENTRE, ALIPORE KOLKATA -700027 गवत वििरणी - मई 2016 PROGRESS REPORT FOR THE MONTH OF JUNE2016 1. घटनाएँ (MAIN EVENTS) : 1.1 Name of the Institution/ Division in MOES : IMD, RMC K OLKATA 1.2 Period (Month / Duration/Year) : JUNE 01 JUNE 30 1.3 Important policy decision taken during the month : Nil 1.4 New Projects / Schemes / Programmes approved / initiated during the month (with brief details) : GPS based RS/RW System was installed successfully at M.O.Gangtok on 05.05.2016. 1.5 Important events / meeting held during the month : 1. i) Dr.G.C Debnath, DDGM visited Training Centre Kolkata PAC Salt Lake on 01.06.16 regarding Evaluation of Training Programme and prospect of covering syllabu ii) Dr. G. C. Debnath, DDGM was on inspection tour to MO Balasore on 02.06.16 to visit Observatory & DWR site Balasore. iii) Dr. G. C. Debnath, DDGM attended AMO Kolkata on 07.06.16 for inspection. iv) Dr. G. C. Debnath, DDGM attended meeting on 16.06.16 with Hon'ble Mayor, kolkata for discussing on Forecast of Weather and expecting rainfall in the ensuing monsoon 2016 and preparatory measure taking to removal of water logging and to combat flood during the period ensuing monsoon. v) Dr. G C Debnath, DDGM attended meeting on 17.06.16 with Hon'ble Minister in-charge at Jalasampad Bhawan Salt Lake regarding Flood preparedness during the ensuring monsoon. vi) Dr. G.C.Debnath, DDGM was on tour to FMO Jalpaiguri from 19.06.16-21.06.16 to attend Hindi Parliamentary committee inspection. vii) Dr. G C Debnath, DDGM attended a talk show at Doordarshan kendra Kolkata on 28.06.16 conducted by Disaster Management named "Durjog Mokabila" on Subject Lightning and generating awareness among community.

Upload: buitu

Post on 28-Mar-2018

246 views

Category:

Documents


11 download

TRANSCRIPT

Page 1: मौसम विज्ञान के ...metnet.imd.gov.in/progressreports/1999112016-06PRJUNE2016.pdf · show at Doordarshan kendra Kolkata on ... competency assessment training

- 1 -

मौसम विज्ञान के उपमहावनदेशक का कार्ाालर्

प्रादेवशक मौसम केन्द्र, कोलकाता 700027

OFFICE OF THE DEPUTY DIRECTOR GENERAL OF METEOROLOGY REGIONAL METEOROLOGICAL CENTRE, ALIPORE KOLKATA -700027

प्रगवत वििरणी - मई 2016

PROGRESS REPORT FOR THE MONTH OF JUNE’

2016

1.

मुख्र् घटनाए ँ (MAIN EVENTS) :

1.1 Name of the Institution/ Division in MOES : IMD, RMC KOLKATA

1.2 Period (Month / Duration/Year) : JUNE 01 – JUNE 30

1.3 Important policy decision taken during the month

: Nil

1.4 New Projects / Schemes / Programmes approved / initiated during the month (with brief details)

: GPS based RS/RW System was installed successfully at M.O.Gangtok on 05.05.2016.

1.5 Important events / meeting held during the month

: 1. i) Dr.G.C Debnath, DDGM visited Training Centre Kolkata PAC Salt Lake on 01.06.16 regarding Evaluation of Training Programme and prospect of covering syllabu ii) Dr. G. C. Debnath, DDGM was on inspection tour to MO Balasore on 02.06.16 to visit Observatory & DWR site Balasore. iii) Dr. G. C. Debnath, DDGM attended AMO Kolkata on 07.06.16 for inspection. iv) Dr. G. C. Debnath, DDGM attended meeting on 16.06.16 with Hon'ble Mayor, kolkata for discussing on Forecast of Weather and expecting rainfall in the ensuing monsoon 2016 and preparatory measure taking to removal of water logging and to combat flood during the period ensuing monsoon. v) Dr. G C Debnath, DDGM attended meeting on 17.06.16 with Hon'ble Minister in-charge at Jalasampad Bhawan Salt Lake regarding Flood preparedness during the ensuring monsoon. vi) Dr. G.C.Debnath, DDGM was on tour to FMO Jalpaiguri from 19.06.16-21.06.16 to attend Hindi Parliamentary committee inspection. vii) Dr. G C Debnath, DDGM attended a talk show at Doordarshan kendra Kolkata on 28.06.16 conducted by Disaster Management named "Durjog Mokabila" on Subject Lightning and generating awareness among community.

Page 2: मौसम विज्ञान के ...metnet.imd.gov.in/progressreports/1999112016-06PRJUNE2016.pdf · show at Doordarshan kendra Kolkata on ... competency assessment training

- 2 -

viii) Dr. G C Debnath, DDGM was on tour to Pune from 29.06.16-01.07.16 to attend Brainstorming meeting on lightning network expansion over NE India and foot hills of Himalayas.

2. 1. Sh. G.K. Das, Sc.-D, delivered a lecture

to the Disaster Management Officers, Govt. of West Bengal on “Tropical Cyclone- Genesis, Evaluation, Tracking, Intensity Prediction and Warning Dissemination Mechanism” at Administrative Training Institute, Kolkata on 2nd June 2016. 2. Sh. P.K. Mandal, AM-I, has participated in a planning conference for Coastal Security Exercise ‘Hamla WB-01/16’ organised by Coast Guard & Govt. of West Bengal at Nabanna, Howrah on 24.06.16.

3. 1. Dr S.C.Sahu, Director In-Charge MC Bhubaneswar Participated in Crop Weather Watch meeting in the department of Agriculture, Govt. of Odisha on 13th and 20th June 2016. 2. Workshop / Seminar:-. Dr. S.C. Sahu, Director-in-Charge, M.C. Bhubaneswar, attended following Seminars / Meetings: a. Delivered lecture at Gopabandhu Academy of Administration, Bhubaneswar on 01.06.2016.. b. Attended meeting at Directorate of Agriculture , Bhubaneswar on 02.06.2016. c. Attended meeting at Directorate of Agriculture and Food production on 04.06.2016. d. Attended meeting of the State Executive Committee constituted under the Disaster Management Act 2015 at Secretariat, Bhubaneswar on 09.06.2016. e. Delivered lecture on “ Flood early warning systems , warning receive and warning dissemination “ at Gopabandhu Academy of Administration, Bhubaneswar on 09.06.2016. f. Attended meeting at Water resource Department , Bhubaneswar on 18.06.2016. g. Attended preparatory meeting by Chief Secretary, Govt. of Odisha on review of “PRAGATI” issues through Video Conference by Hon’ble Prime Minister on 22.06.2016. h. Delivered lecture on “ Building awareness on climate change and its impacts the Global and Indian Perspective “ at Gopabandhu Academy of Administration , Bhubaneswar on 25.06.2016.. i. Visited Gunupur Krishi Vigyan Kendra in Rayagada district to start DAMU under GKMS during 26.06.2016 to 28.06.2016. j. Attended meeting of the state level committee on natural calamities at Secretariat , Bhubaneswar on 29.06.2016.

Page 3: मौसम विज्ञान के ...metnet.imd.gov.in/progressreports/1999112016-06PRJUNE2016.pdf · show at Doordarshan kendra Kolkata on ... competency assessment training

- 3 -

4 (i) Ms Mamta Yadav, Sc-B undergone competency assessment training during 20th to 22nd June 2016 at New Delhi. (ii) Ms Mamta Yadav, Sc-B participated in Crop Weather Watch meeting in the department of Agriculture, Govt. of Odisha on 27th June 2016.

5. i) Shri A.K. Sen,Sc-E attended a meeting of Crisis Management Group (CMG) of Bihar Govt., Chaired by Hon’ble C.M of Bihar on 22nd June and made a brief presentation on current weather situation and prospects of S.W. Monsoon of this year in Bihar, in the meeting when all District Magistrates of the state were in video- conference mode (ii)Meteorological briefings were provided for Landing / take off of aircraft withVVIP on board at Patna Airport on 24th and with VIP on board at Gaya Airport on 18th June 16.

1.6 Visits abroad : Nil 1.7 Participation in National Conference /

Symposium / Seminar : NIL

1.8 Papers published / accepted / sent for publication during the period

: Nil

1.9 Most important achievement during the month

: Nil

1.10 Any other important matter which you might like to report, say

(i) Project/Programme(s) completed during the month, if any

: Original Lease deed and Possession certificate were

obtained in respect of acquisition of Govt land at

Chandbali for M O Chandbali.

(ii) Patent filed / accepted : Nil

(iii) Interaction between academic, R&D and industry(transfer of technology)

: Nil.

(iv) Joint venture / Programme coordinated at the regional /national / international level.

: Nil

(v) Future prospects of culminating it into an inter-sectoral and/ or inter-institutional projects/ programme, if

: Nil

Page 4: मौसम विज्ञान के ...metnet.imd.gov.in/progressreports/1999112016-06PRJUNE2016.pdf · show at Doordarshan kendra Kolkata on ... competency assessment training

- 4 -

any

(vi) Any other item : 9 Nos. of AAS Bulletins and 9 Nos. of Composite AAS

Bulletins issued from SAMC Kolkata, and 9 Nos. of

AAS Bulletins and 9 Nos. of Composite AAS Bulletins

issued from MC Gangtok.

Inspection of observatories by Inspectorate Section:

Nil

Inspection of observatories under DVC Met. Scheme:

Nil

Inspection of part time observatories under FMO Asansol: In progress

1.11 Significant Weather & Forecast : 39 Nos. Sig. Wx F/c issued from ACWC Kolkata, 21 realized 33 Nos. Sig. Wx reported at MC Bhubaneswar 7 Nos. Sig. Wx F/c issued from MC Gangtok, 4 Nos. Sig. Wx F/c issued from AMO Kolkata ,

1.12 Progress Report on ISO Certification work. : RMC Kolkata: Under process. MC Gangtok: Process has already been initiated. MC Bhubaneswar: Under process.

1.13 Action taken on Minimum Government Maximum Governance.

: RMC Kolkata Adverse weather SMS warnings are sent through mobile to all State Govt. Officials, Disaster Management Officials and Other Central Govt Organisations on real time basis.

MC Bhubaneswar (i) Mobile numbers of state government Officials

and other disaster related officials are sent to CWD, IMD New Delhi.

(ii) SMS for adverse weather are sent through mobile to all users.

(iii) Daily forecast along with warning and city forecast for 16 cities are disseminated through email to all users including state authorities, electronic and print media.

(iv) Nowcasting based on DWR products of Kolkata and Visakhapatnam and CTT of IMD site are, disseminated to all users including SRC, OSDMA, concerned collectors and both electronic and print media.

MC Gangtok

All the sections of this office are running smoothly with the existing limited number of staff and officers which are much lower than the sanctioned strength.

2. अंतर-विभागीर् सहर्ोग (INTER DEPARTMENTAL CO-OPERATION) :

M.C. RanchiDaily Weather bulletin for Jharkhand state issued & supplied to state govt. & other agencies.

Briefing provifled to the representatives from press/ electronic media on prevailing weather

Scenario & forecast of Jharkhand - 25 occasions.

FMO Jalpaiguri

Page 5: मौसम विज्ञान के ...metnet.imd.gov.in/progressreports/1999112016-06PRJUNE2016.pdf · show at Doordarshan kendra Kolkata on ... competency assessment training

- 5 -

This office is in touch with CWC office, Jalpaiguri and rainfall data of fifteen stations of North Bengal & Sikkim have

been received from them daily.

M.C.Gangtok

This office is in constant touch with the following offices and data are passed to them:

i) Food Security & Agriculture Development Department, Govt. of Sikkim.

ii) Relief Commissioner, Govt. of Sikkim.

iii) District Collectorate of four districts of Sikkim.

iv) Spices Board of India (R & D), Gangtok.

v) Geological Survey of India, Gangtok.

vi) Sikkim State Disaster Management Department, Gangtok.

vii) Various state and central govt. agencies.

3. कार्ाशाला / संगोष्ठी / भाषण (WORKSHOP/ SEMINAR/ LECTURE) :

NIL

4. अनुसंधान एबं प्रकाशन (RESEARCH AND PUBLICATION) : NIL

5. विशेष सेिाए ँएबं आंकडे प्रदान (SPECIAL SERVICES AND DATA SUPPLY) :

Name of the Station Revenue Earned in Rs. Remarks

RMC Alipore (TS) 14100/- Data supplied to 6

parties

MC Patna 8849/-

Data supplied to 2

parties

M.C Gangtok 16438/- Rainfall Data Supplied

Total 39387/-

6. पूिाानुमान सेिाए ँ (FORECASTING SERVICES) :

6.1. AVIATION:

Name Of The Station Scheduled Flights

Non-Scheduled

Flights

VVIP Flights

Oral Briefing / Route

Forecast/Trend Forecast

Aerodrome / Sigmet

Warning Issued

(Thunder / Lightning)

Chart (T3/T4) Chart (T3/T4)

AMO Kolkata 186 81/31 -- -- 12/27/02

M.C. Bhubaneswar -- 22/06 -- -- 29/04

M.C. Patna 630 -- -- 24 --

6.2. NON-AVIATION:

i. Forecasting:- a) Day to days Point Forecast of Temperature and Spatial Weather Forecast and warning of Severe Weather Parameters for five days over GWB, SHWB & Sikkim, Andaman and Nicobar Islands and Bay of Bengal and High seas of Indian Ocean under its jurisdiction and its updating in Websites in real time

Page 6: मौसम विज्ञान के ...metnet.imd.gov.in/progressreports/1999112016-06PRJUNE2016.pdf · show at Doordarshan kendra Kolkata on ... competency assessment training

- 6 -

basis and its dissemination to various GOVT./ NGOs/ AIR/TV/ Press/Media. b) City/ Tourist Forecast over West Bengal c) Now cast d) Press and Media briefing in real time basis by Director, ACWC Kolkata / DOs, as and when required.

ii. PPT(Rainfall, its Spatial & Intensity) and NOWCAST of scheduled twelve stations and its verification and updating in ‘’METNET’’ website & e-mailed to NOWCAST Division, New Delhi and City Forecast of fifteen Stations of West Bengal and its dissemination in real time basis. Precipitation: Collection, Preparation and Dissemination of station wise Daily Rainfall data, Preparation of district wise rainfall data under Daily Rainfall Monitoring Scheme (DRMS) of three subdivisions under its control , were sent by FAX / E-mail to : a) NHAC, New Delhi and DGM (Hydrology) New Delhi. b) DDGM (WF) Pune, LRF Pune and NCC, Pune and all concerned. c) Monthly surface climate broadcast data issued to ADGM ®Pune by M.C.PatnaDDGM (WF), Pune

iii. District wise weekly and monthly rainfall data were sent by E-mail to:- a) DDGM (H) New Delhi, b) ADGM ® Pune, c) Agrimet, Pune, and d) DDGM(WF) Pune and all concerned. Preparation and updating of daily weather report and weekly weather report and its updating in websites .

iv. Communication:- a) HPCS & MFI server are working satisfactorily. b) WRF model output is being utilized for forecasting point of view. c) Weather Reports were sent to various Govt. and NGOs. d) Disastrous Weather & Extreme Weather events reports were sent to RMC

Kolkata respectively for the month of May 2016.

v. Port Met Office: - INCLI Message for April 2016 sent to DDGM (Marine) Pune .

7. कृवष मौसम विज्ञान सेिाए ँ (AGRO-METEOROLOGICAL ADVISORY SERVICES) :

Details of Bulletins issued:

Name of the station

No. of bulletins (Composite) issued

No of bulletin(AAS) sent to DDGM (Agrimet), Pune

Broadcast / Telecast of the bulletin

RMC Kolkata 8 9 AIR & DD Kolkata

MC Gangtok 8 8 AIR Gangtok

MC Bhubaneswar 8 8 AIR Cuttack / DD

MC Patna 8 --

Activities: On every Tuesday and Friday, district level ensemble forecast of NHAC downloaded from imd.gov.in website and value added forecast along with realized weather were sent to AMFUs in this state and M.O. Port Blair (value added forecast sent in excel format that is being downloaded from the moderated report generated by farmers portal). Also online moderation of district level ensemble forecast for WB and A&N Islands done in NeGPA (Govt. of India) software module named as farmers portal. After receiving district wise advisories from each AMFUs, Composite English Bulletins were issued on every Tuesday and Friday & Bengali Bulletin on Wednesday. The composite bulletins are uploaded in imd.agrimet.gov.in along with value added forecast(moderated forecast) on the date of their issue for display in the website .This unit also sends weather forecast and warnings by SMS to farmers through mKisan portal. Work done by SRF posted in SAMC, Kol. during the month of June’16 – Data arrangement for the coming Crop yield forecast of West Bengal M.C. Patna Medium range weather forecast for 38 districts of Bihar issued and disseminated to AMFU’S on every

Tuesday and Friday

Page 7: मौसम विज्ञान के ...metnet.imd.gov.in/progressreports/1999112016-06PRJUNE2016.pdf · show at Doordarshan kendra Kolkata on ... competency assessment training

- 7 -

8. जल मौसम विज्ञान (HYDROMETEOROLOGY) :

8.1 FLOOD METEOROLOGY

1.. Weekly Hydromet data in respect of Gangtok & Tadong sent to Agrimet, Pune regularly during

the month.

2. Weekly Rainfall Statistics in respect of all four districts of Sikkim sent to Sikkim State Disaster

Management Authority, Gangtok Agrimet, Pune regularly during the month.

3. Daily and weekly rainfall statistics of Bihar State computed and sent to H.Q regularly.

4. District wise Weekly Actual / Normal / Percentage of departure from normal with updated Rainfall for the month of March 2016 of Sub-Division of Odisha was supplied to DDGM (HY) New Delhi / ADGM ( R ) Pune / RMC Kolkata by M.C.Bhubaneswar 5. Weekly Flood Situation Report for the week ending on 02.09.2015, 09.09.2015,16.09.2015, 23.09.2015 and 30.09.2015 was prepared and was sent to DGM ( Hydrology) , New Delhi / FMO Hyderabad / RMC Kolkata by M.C. Bhubaneswar M.C. Patna (i) Daily and weekly rainfall statistics of Bihar State computed and sent to H.Q regula (ii) Daily rainfall data of different stations have been received and recorded in the register (iii) Weekly rainfall summary of Bihar generated on every Wednesday sent DGM(Hydromet) & other users. (iv) Rainfall data of Bihar for March’2016 updated on 21st April & sent to DGM ( Hydromet ) New Delhi & destinations (v) District wise cumulative rainfall of Bihar upto 25th April’2016 generated and sent to DGM (Hydromet) New Delhi and other designations FMO Asansol: (i) 0300 UTC, 0600 UTC, 0900 UTC and 1200UTC Surface observation have been taken during the month. (ii) Sri K.Ghosh, S.A attained mkrain software training at New Delhi on 26.05.16 & 27.5.16

8.2 SCRUTINY / HEAVY RAINFALL ANALYSIS (HRA) / TABULATION OF SR CHART

Name of station / Unit

HRA TABULATION

No of stations Month(s) No of stations

Month(s)

HMU Alipore 9 16 9 16

FMO Jalpaiguri Nil --- Nil --

DVC Met Unit 2 3 1 3

FMO Asansol -- -- -- --

9. रेडार मौसम विज्ञान (RADAR METEOROLOGY) :

1. Doppler weather radar Kolkata was operated round the clock.

2. DWR Kolkata generated raw data at 10 minutes interval was disseminated to central server, New

Delhi, and to Nowcasting system server at ACWC Kolkata in NETCDF format.

3. DWR Kolkata observations were disseminated to the respective users on routine basis and uploaded

to IMD New Delhi and RMC Kolkata (ACWC) websites at every 10 minutes intervals.

4. Radar was serviceable at M.C.Patna throughout the month.

10. उपग्रह मौसम विज्ञान (SATELLITE METEOROLOGY) :

CWDS : Nil

Page 8: मौसम विज्ञान के ...metnet.imd.gov.in/progressreports/1999112016-06PRJUNE2016.pdf · show at Doordarshan kendra Kolkata on ... competency assessment training

- 8 -

DMDD : Nil

Name of the Stations Nos. of Pictures received

MC Bhubaneswar Nil

MC Gangtok Nil

FMO Jalpaiguri Nil

AMO Kolkata Nil

MC Patna Nil

FMO Asansol Nil

11. आंकडे प्रबंधन रर वनरी्षणण (DATA MANAGEMENT AND INSPECTION) :

11.1 DATA MANAGEMENT (Scrutiny / Tabulation/ Entry in PC)

Name of the station

Data Scrutinized

P.B. Flight sheets Checked

Data keyed in PC

MMR

Day

summary

Autographic data(R/F/Humidity/Temp)

MM

R

Da

ys

su

mm

ary

Su

rfa

ce

Ho

urly d

ata

He

avy

R/F

data

in y

ear

RMC Alipore (TS) 11 09 SRRG:06 -- -- -- 36 --

Alipore Observatory -- -- 07 -- -- -- -- --

MC Bhubaneswar -- -- -- -- -- -- -- --

MC Gangtok Yes Yes Yes Yes Yes Yes Yes --

MC Patna 1 -- -- -- -- -- -- --

DVC Met Unit 04 -- -- -- 04 -- -- 3

FMO Jalpaiguri 02 -- -- -- -- -- -- --

FMO Asansol -- -- -- -- -- -- -- --

1. Data supplied by M.C.Bhubaneswar to party free of cost with prior permission from DGM, New Delhi /ADGM ( R ), Pune : two 2. Preparation and uploading of extreme weather events of 15 stations under M.C. Bhubaneswar for May 2016 on 01.05.2016 in IMD Web site . 3. Preparation and Transmission of Surface Climate of M.C. Bhubaneswar for the month of April 2016 on 01.05. 2016 . 4. Preparation and Transmission of Checked Surface Climate Report of M.C. Bhubaneswar for the month of April 2016 on 05.05.2016 5. The keyed surface data in Idesk Software under M.C. Bhubaneswar was sent to ADGM ( R ) , Pune through E-Mail on dated 31.05.2016 . 6. The keyed Autographic Data in Idesk software under M.C. Bhubaneswar was sent to ADGM( R ) , Pune through E-Mail on dated 31.05.2016 7. No. of Idesk data (outstations) scrutinized and transmitted to NDC by TS, Alipore =96 months. 8. No. of surface, Evaporation & sunshine observations recorded and reported by Alipore observatory=390

Page 9: मौसम विज्ञान के ...metnet.imd.gov.in/progressreports/1999112016-06PRJUNE2016.pdf · show at Doordarshan kendra Kolkata on ... competency assessment training

- 9 -

11.2 वनरी्षणण (INSPECTION) : NIL

12. स्िचावलत मौसम स्टेशन (A.W.S.(

MC Bhubaneswar Maintenance of ARG stations started with effect from 25.04.2016 by Jinyang Ind.Co.Ltd, Republic of Korea. NOC & sketch diagram in connection with shifting of AWS at G.Udaygiri has been forwarded to DDGM(SI),Pune.

13. विवकरण (RADIATION)

Radiation data (Global, Diffuse, and Direct & Terrestrial) has been downloaded for the month of April 2016 at M.C.Patna (ii) Radiation data (Global, Diffuse, Direct & Terrestrial) has been calculated for the month April 2016 at

M.C.Patna and dispatched to ADGM ® Pune

(iii) Radiation observations were taken in all 30 days of the month at M.C. Bhubaneswar

14. भूकम्प – विज्ञान (SEISMOLOGY)

Name of the Station No of shocks received

Alipore Observatory, Kolkata 00

Seismo Tadong -- MC Bhubaneswar 05

MO Port Blair (Magnitude ≥5 is1):Nil

15. पे्र्षणन संगठन (OBSERVATIONAL ORGANIZATION)

Details of Highest Ascent (Upper Air)

Station Item Maximum Height Date and Time (UTC)

AMO Kolkata

RS 3.9 hpa / 37.762 km 191200

RW 3.9 hpa / 37.762 km 191200

MC Bhubaneswar

RS 4.7 hpa / 36.45 Km

040000

RW 4.7 hpa / 36.45 Km 040000

RSRW Jalpaiguri RS 4.9 hpa / 36.4 km 180000

RW 4.9 hpa / 36.4 km 180000

MC Gangtok PBO 4.8 hpa/36.3 gpm 260000

M.O. Port Blair RS RW

4.8 hpa / 36.4 gpm ---

M.C. Patna RS RW

4.1 hPa/37.9 gpm 4.1 hpa/37.9 gpm

230000

Alipore Observatory

No. of surface, dew, evaporation and sunshine observations recorded during the month : 403

No. of Upper Air P.B. observations taken during the month

Page 10: मौसम विज्ञान के ...metnet.imd.gov.in/progressreports/1999112016-06PRJUNE2016.pdf · show at Doordarshan kendra Kolkata on ... competency assessment training

- 10 -

AMO Kolkata : 60; Highest Ascent : 2.80 km at 250600 UTC M.C.Bhubaneswar : 29; M.C.Gangtok : 30; Highest Ascent : 4.8 hpa/36.259gpm at 260000 UTC M.C.Patna : 60;

16. बंदरगाह मौसम विज्ञान (PORT METEOROLOGY)

Ships visited during the month:

Station Foreign Indian Index correction card supplied

Barometer adjusted

Comparison / Calibration of Barometer

MO Port Blair Nil Nil --

17. प्रशासन (ADMINISTRATION)

A. स्थापन (ESTABLISHMENT) :

RMC Office Alipore: 01. Monthly staff statement i.r.o all officials under RMC Kolkata as on 01.07.2016 has been

prepared. 02. Prepared audit reply and forwarded to CS, Alipore. 03. Issued tour orders to S/Shri S.S.Yadav, SA, Malay Pal, SA & Sanjay Kumar-III, SA. 04. Maintenance of 3 nos. staff registers. 05. Quarterly Grievance report sent to HQ. 06. 16 nos. Part time contingent sanction order issued. 07. 10 nos. of Form-3 and other nominations have been recorded in the Service Book. 08. 20 nos. of Service Book entries have been made. 09. 02 nos. LTC verification done. 10. 05 nos. Service Books sent to other region & 01 no Service Book received from other

region.. 11. 12 nos. of NOC / Permission for extra departmental post have been done. 12. 01 nos. transfer request letter i.r.o Gaz officers forwarded to HQ. 13. 02 nos transfer O/o i.r.o Gaz officers issued. 14. 02 Nos. tentative tour programme approved. 15. 08 nos. charge assumption & relinquished report sent to HQ. 16. 58 nos. Earned leave cases done. 17. 12 nos. commuted leave cases done. 18. 41 nos. leave memo has been issued in bilingual. 19. 15 Nos. leave cases have been updated in Service Book. 20. 05 nos. final leave encashment O/o issued. 21. 01 no leave encashment O/o issued. 22. 23 nos.Various type of letter issued for meet up the pending leave cases. 23. Withheld Gratuity i.r.o Late Barun Shaw, Ex LDC sent to CS, Alipore for payment. 24. 20 nos, Special C/L cases doen. 25. Leave encashment i.r.o S/Shri Dilip Kr Haldar, Ex AM-I & Bimal Ch. Das, Ex MTS sent to

CS, Alipore for payment. 26. Difference of leave encashment (Revised) i.r.o S/Shri R.M.Seal, Ex AM-I, T.K.Nandi, Ex

AM-II &M Pranab Chakraborty, Ex AM-II sent to CS, Alipore for payment. 27. Pension papers i.r.o S/Sri Sushil Kr. Barua, SA, Asis Dasgupta, AM-I & Asish Roy

Chowdhury, AM-I sent to PAO, Alipore. 28. Revised Pension paper i.r.o Sri L.C.Paul, Ex AM-I sent to PAO, Alipore. 29. Revised Gratuity i.r.o Sri Murli Dhar sahoo, Ex SA sent to PAO, Alipore. 30. 17 nos. other correspondence related to pension and family pension case done. 31. S/Sri Asoke Kr. Naik, AM-II & Brindaban Nath, MTS have been retired from Govt. service

on attaining the age of superannuation on 30.06.2016. 32. Authority of Gratuity and CVP i.r.o S/Sri Swapan Kr Biswas, AM-I (Retd.) & Iswar Jena

Page 11: मौसम विज्ञान के ...metnet.imd.gov.in/progressreports/1999112016-06PRJUNE2016.pdf · show at Doordarshan kendra Kolkata on ... competency assessment training

- 11 -

MTS (Retd.) sent to CS, Alipore for payment. 33. Monthly recruitment returns for May’ 2016 sent to CS, Alipore. 34. Pending case report for May’ 2016 has been sent to HQ. 35. Technical resignation of Shri Sumit Kumar, New recruited SA accepted by HQ. 36. 05 nos. E-Service books updated and verified. 37. Progress report of RMC Kolkata for May’ 2016 and other circulars uploaded on Metnet. 38. 16 nos of scanning done and e-mail sent. MC M.C.Bhubaneswar: 1. S/Sh Kandan Murmu,AM-I joined at MC Bhubaneswar on transfer from RMC Mumbai and Shri G.C Behera,AM-I joined at MC Bhubaneswar on 27.06.2016 on transfer from DGM NEW DELHI.

B. सूचना का अवधकार (RIGHT TO INFORMATION) : NIL

1 Number of RTI applications received during the month

2

No of cases in which replies sent

Interim Reply ---

Final Reply 01(Previous

months case)

3 Transfer of applications u/s 6(3) of RTI Act --

4 Applications found not in order --

5

a. Number of RTI First Appeals received during the month Nil

b. Number of cases in which FAA has issued decision during the month Nil

6 CIC hearing(if any) took place in the month. Nil

7 Amount of charges collected during the month. -

8 Number of cases in which any disciplinary action taken against officials

under the provisions of the Act.

Nil

18. रोकड अनुभाग (CASH SECTION) :

Sl. No

Name Of Seat Nature Of Jobs Cleared Number Of Bills /Cash Cleared During The Month

1 All Pay Seats (a) Regular Pay Bills (b) Arrear bills.

98

Page 12: मौसम विज्ञान के ...metnet.imd.gov.in/progressreports/1999112016-06PRJUNE2016.pdf · show at Doordarshan kendra Kolkata on ... competency assessment training

- 12 -

(c) Other bills (Children Education Allowance, ADA, Festival Advance, and C.P.C.) Bills prepared and submitted to PAO

162

2 G.P.F. Seat (a) Cleared G.P.F. Part final withdrawal, Advance & G.P.F. Final Payment to retired employee.

20

(b) Correspondences done, if any --

3 Contingent Seat Prepared Contingent Advance & Adjustment Bills.

10

Recoupment from Station Imprest / Newspaper

35

Wages 61

Telephone Bills 168

Electricity Bills 131

Rent & taxes 13

Payments made to different parties against Pre-receipted Bills

48

Correspondences done 07

Met. allowances --

4 Medical Bills processed & submitted to P.A.O. 131

Issued “Permission Letter” for C.G.H.S./AMA Pathological Test & Emergency Indoor Treatment

08

Different correspondences made 04

5 LTC Seat (a) Processed & submitted LTC Advance cases & Adjustment cases to P.A.O. to P.A.O.

10

(b) Cleared E.L. encashment cases for availing LTC

05

6 T.A. Seat (a) Processed TA/DA Advance and Adjustment cases and submitted to P.A.O. for Payment.

34

7 HBA Seat And D.C.R.G. Seat

Cases Processed --

Interest Calculated --

D.C.R.G. cases cleared 15

Different correspondences made 05

8 O.T.A. Seat (a) Bills processed & submitted to P.A.O. 218

Page 13: मौसम विज्ञान के ...metnet.imd.gov.in/progressreports/1999112016-06PRJUNE2016.pdf · show at Doordarshan kendra Kolkata on ... competency assessment training

- 13 -

9 Cashier Seat Receipts Cash Transaction through R.T.G.S.(E-Payment) Salary has been disbursed. Others has been disbursed

80/-

20/-

Payments Cash Transaction through E.C.S.(Electronics clearing system)/BD

--

Other work: - Maintenance of Cash Book, Challan Register, Undisbursed Register as routine work.

--

10 Budget Seat Head-wise Booking of passed bills (both Plan & Non-Plan)

480

Booking of Challan deposited into Bank --

Preparation of Monthly Progressive Expenditure Statement according to the sanctioned Budget Head of A/C (Plan & Non Plan)

--

Reconciliation of Monthly Progress Expenditure Statement with the P.A.O.’s Figures (Plan & Non Plan) and all Budget related work as and when required in exigencies.

--

11 Dak-Receipt Seat

Total Dak receipt and its distribution to the concerned seat and entering in the respective register.

250

19. सामान्द्र् अनुभाग (GENERAL SECTION) :

1. 21 nos. of persons stayed at Alipore VOR during the month.

2. The bills related to store statinery purchases, electricity/telephone/municipal taxes, house rent, office equipments, furniture & fixture, photographic charges etc. were passed for payment.

20. प्रदशानी / मेला (EXHIBITION / FAIR) :

NIL

21. पुस््कालर् अनुभाग (LIBRARY SECTION) :

No. of visitors in RMC Kolkata Library during the month:24 No. of books/publications included in library: 1

Page 14: मौसम विज्ञान के ...metnet.imd.gov.in/progressreports/1999112016-06PRJUNE2016.pdf · show at Doordarshan kendra Kolkata on ... competency assessment training

- 14 -

No. of Journal/ Magazines included in Library: 2 Total No of library users: 32

22. अवतवथ (VISITORS) :

Alipore Obsy. = 4, FMO Asansol = 12, M.C.Patna = 109, M.C. Bhubaneswar = 30

(डॉ. जी.सी.दबेनाथ)

(DR. S BANDYOPADHYAY)

मौसम विज्ञान के उप महावनदशेक Deputy Director General of Meteorology

प्रादेवशक मौसम केन्द्र Regional Meteorological Centre अलीपुर, कोलकाता 700027 Alipore, Kolkata 700027

RMC KOLKATA UO. NO.LS & RU/S-0036 /II/ Dated 15.07.2016