Sustain.Ability.
2012 Honeywell Users’ Group EMEA
Erwig De Hertogh
Operational Excellence and Personal Safety
on Constructions Sites
2
OEX - WHO are we ?
• PM/PCO Excellence Global Manager - Larry Christie (Houston)
• Erwig De Hertogh (Belgium)
• Karthik Sitaraman (Brisbane)
• Dirck Hornung (Houston)
• Engineering Excellence Global Manager - Rene Van Falier (NL)
• C. Tonder (Houston)
• B.K. Raghavan (Abu Dhabi)
• C. Chiang (Taiwan)
• G. Vogelzang/S. Pawar (India)
• Indra Banerjee (USA)
• And a team of Engineering Discipline Leaders
around the World (Hardware , Control , Systems ,
HMI , Safety , Etc)
3
OEX – WHAT do we do ?
Operational Excellence is responsible for GLOBAL :
• Processes and procedures
• Standards
• Tools
• People skills & competencies,
training and certification
For :
Project Management (PM)
Project Controls & Admin (PCO & PA)
Engineering (Disciplines)
Efficient and effective project execution
4
OEX - WHY ? (what is your benefit ?)
• Global Consistent Processes & Procedures (= GPM)
– Contract with any Honeywell office, anywhere in the world, and get the same results
• Reliable & Reproducible Results (= Standard Deliverables)
– Know what you get
– Right from the first time
– No surprises due to “Undisciplined Customization”
• Focus on cost & productivity (= Tools)
– Efficient implementation
– In budget and on schedule
– Drive Quality and minimize Risk
• Maintainable Installations (= Lowered Life Cycle Costs)
– Warranty and Site Service know what to expect
– No surprises in the field
– Easier to service and migration ready
– Reduce TCO
Reduce Total Cost of Ownership (TCO)
5
What You’ll Learn in the Next 40-Minutes
Goal of this session
Understand OEX and what it can mean for you
What you will have learnt
OEX is your guarantee for efficient and effective project delivery
to customer expectations
Why you should care
OEX : Why-What-How (processes-standards-tools-training)
6
OEX – AGENDA
Operational excellence has these key programs
(for ourselves and our customers) :
1. Safety and Quality First
Safe, repeatable, and responsible
2. Global Project Methodology (GPM)
The same process everywhere in the world
3. Standard Deliverables (standard builds)
Fully tested fuctions, migration ready
4. Engineering and Productivity Tools
Simpler engineering, reduce implementation risks
5. Certification and Skills - competence & training
Professional, disciplined, qualified workforce
7
1. Focus on Quality and Safety
QUALITY : HPS is ISO 9001:2008 certified
• Our QMS, garantees our ability to consistantly meet customer requirements and regulatory requirements
• Continous Improvement based on customer satisfaction
• Project Quality Plan is part of planning phase for every large project
SAFETY
• World class safety results
• HSE Planning for every project : HSE plans, risk assessment, safe work instructions, toolbox , contractor safety training)
• HSE cardinal rules
Honeywell is Committed to Quality and Safety
8
2. (GPM) Global Project Methodology : WHY
• Execute & Implement Projects consistently across the globe
• Control and monitor project execution cost
• Control impacts on schedule
• Manage project risks & opportunities
• Changes are better notified and can save your budget
• A flexible and global work force (even on the same project ! )
• Integrate best practices and lessons learnt
• This is only possible when your approach to Project Management,
Engineering and Project Controls are standardized and are the same in
all locations
GPM drives Quality and minimizes Risk
9
(GPM) Global Project Methodology - WHAT
• GPM is the set of processes, procedures and standards
used by ALL projects.
• GPM is used by the full Project Execution team (PM/PCO & Eng)
• GPM is part of our quality management system (QMS)
GPM sets the same global standards for all our deliverables
11
1. Execution Planning
2. Design & Procure
3. Implementation,
Assembly ,
Integration & Test
4. Site Installation &
Customer Acceptance
(GPM) - HOW ?
12
Required Customer Approvals
prior to moving to the next step
Required internal Gate’s
prior to moving to the next step
(GPM) - HOW ?
Customer Governance &
Controls
13
Standard Operating Procedures
Project Management (customer and contract focus) - Review booking package - Project execution plan
- Review Risk & Opportunity - Customer Kick off meeting
- Monthly customer progress meeting - Customer close out
Project Controls (separate schedules and finance from PM focus) - Book order & set up workspace - Create Estimate At Completion
- Update monthly proj. summary report - Build/monitor schedule
Engineering (separate technical-excellence from PM focus)
- Allocate resources - Functional Design
- FAT Test protocols - Build applications
- Power up and SAT - Plant start-up support
(GPM) – Global Project Methodology : HOW
Project Controls will ensure full compliance
14
3. Standard Builds - WHY
• Consistent project execution and deliverables
for our customers
• Improve and assure Quality at the source
• Solution packs provide tested solutions,
that are Migration proof.
• Execute faster & Optimize Cost
• Easier execution of global projects
(touching multiple regions)
• Based on best practices and feedback
Drive down TCO
15
Standard Builds - WHAT
• Standard Builds consists of:
• Templates
• Guidelines
• Solution Libraries
• Checklists
• Tools
• Methodology
• For the different Disciplines : PM – PCO & Engineering
- Project Management - Hardware
- Project Controls - Control Applications
- Operator Interface - Network Eng
- Safety Engineering - Virtualization
16
Standard Builds - WHAT
• Templates,
- standard project deliverable documents
- e.g. : KOM – FDS - DDS, Project Execution Plan, FAT protocols, etc.)
17
Standard Builds - WHAT
• Solution Libraries
- include all possible libraries of standard solutions and functions used in the various disciplines. These could be :
- Shapes, displays (HMI solution pack)
- FLD’s, Function Blocks (Safety),
- Control Modules, CASP
(Control Application Solution Pack)
- Drawings (Hardware)
and many more.
Ensure Quality at the Source
18
Standard Builds - WHAT
• Checklists,
- these are standard checklists that are used by engineers to check completion of project documents and/or to guide them through the various process steps.
- Examples
Kick-off meeting checklists
Review Basis of Design
Application design checklists
Code review checklists
Configuration checklists
System performance checklists
Etc.
- Created to help engineers executing
and completing their project works.
19
4. Engineering Tools - WHY
Hardware and Software are no longer the primary project cost
drivers. Engineering services are the key component nowadays.
Main drivers for Tool development :
• Global Standard Implementation
• Increase efficiency & productivity
• Higher quality of deliverables (less implementation error’s)
• Consistency in engineering (when implemented with
automated tools , implement changes consistently)
• Cope with Technology development changes
Reduce Implementation Risk & meet Schedule
20
CONTINUOUS CONTROL ENG
TPS Builder
TPS Builder Data transfer
EB Factory
Unison Smart builder
AMCL to CAB migration
DOC 4000
Control Match
EB Express
Point Builder
Smart builder
HPM builder
C300 Simulator
SAFETY Consultancy
Hazop
Risk assessment
SIL validation
SIS HM
SAFETY ENG TOOLS
FS Navigator
TS 1131 / MSW 1131
FSC/SM simulator
Bulk point builder
FSC-PS DB convertor
Safety Builder
Project Logbook
Function Block Library SM
Function Block Library FSC/Triconex
Engineering tools - WHAT
HMI ENG.
GUS Tool
HMI Web Power Tool
HMI Solution pack
Graphics Match
Search and replace
HMI performance tool
Groups backup/restore
Print multiple display
LEAD ENGINEERING
Test specification/procedures
FAT change tracker
EDMT
Work packaging tool
Document register list
1
2
HARDWARE ENG
Build book
CEDT for FSC systems
Template libraries
IO connection typical
P&P field bus standard solution
Total plant configurator
FSC system designer
Wiring Ferrule Tool
E3 drawing generator
FIELD & INSTR ENG
Field architect
INTOOLS
INTERFACE ENG
FF simulation
Mod bus emulator
OPC test clients/bridges
NETWORK ENG
EBR (backup & restore)
CISCO Works
Disaster recovery
kiwi Cat tools
network health check
4
5
3
VIRTUAL OFFICES
EPKS VIRTUALIZATION
6
CENTERS of EXCELLENCE
Increase productivity
21
• Engineering is using a Qualification & Certification process for
the disciplines :
* Qualification trainings and test
* Certification
- demonstrate project – and grow experience
- certification trainining and test
* Annual qualification and certification test
5. Skills – Competence & training
• In Project Management * PMP certification is our standard * PMP knowledge community for mentoring & help
* PM Skills Assessment tools with improvement training courses customized for each individual * Frequent training opportunities * Global experience matrix used to recognize individual experiences and to allocate resources accordingly
Certified expertise on your project
22
Honeywell Global Presence
• More that 30 major project execution locations
• 11.100 HPS Employees of which 3500 in project execution
• Executing 3000 active projects (each USD 50 K to 100 M +)
Regional Engineering Center
Houston
Phoenix
Caracas
Calgary
Atlanta
Sao Paulo
Cincinnati
Singapore
Melbourne Perth
Pune
Johannesburg
Varkaus, FI
Buenos Aires
Santiago
Anchorage
Brisbane
Vancouver
York, PA
Waterford, IE
Acton, MA
Integration Center
Madrid
Local Service Center
Shanghai
Tianjin
Amsterdam Bracknell, UK
Abu Dhabi
Milan
Seoul
Trinidad
Mexico
Jubail
Luanda
Tokyo
Oslo
Kuala Lumpur
Jakarta
Factory
Bucharest Paris
Offenbach
Egypt
Algeria
Moscow
Kazakhstan
Oman America's
PRJ 107
ENG 664
AS 228
TOT 999
EMEA
PM 142
ENG 918
AS 277
TOT 1337
APAC
PM 137
ENG 739
AS 300
TOT 1176
OEX = Global Consistent Delivery
23
The Honeywell Difference
• Honeywell has a proven global projection execution & lifecycle support and service capability
• Best-in-class project execution for large integrated solutions
• We complete projects within budget and on schedule
• We approach projects with a set of procedures – standards – tools
, so that we deliver up to customer expectations
• Certified workforce and deep expertise in
the latest technology being demanded
• Reduced TCO
• Experience
• Integrated
solutions
• Project execution
• Best practices
• Reputation