03.03.2009 cologne´s tunnel tube disaster annual imia ... · hdi-gerling industrie versicherung...

31
03.03.2009 Cologne´s tunnel tube disaster Annual IMIA Conference - Berlin, 14.09.2010 Jens Manderfeld E-TVS Essen

Upload: others

Post on 25-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

03.03.2009Cologne´s tunnel tube disaster

Annual IMIA Conference - Berlin, 14.09.2010

Jens ManderfeldE-TVS Essen

Page 2: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 2 -HDI-Gerling Industrie Versicherung AG

Cologne´s tunnel tube disaster

Jens Manderfeld

Degree in Civil Engineering and Business Administration and Engineering

1993 - 2001 Structural Engineer / Site Manager

2002 - 2003 Gerling Risk Management Department

2003 - today HDI-Gerling Claims Management Engineering (CAR / EAR)

Responsible claims manager for the project “Nord-Süd-Stadtbahn Köln”

Page 3: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 3 -HDI-Gerling Industrie Versicherung AG

Cologne´s tunnel tube disaster

Lead Insurer Claims-dep.

Broker

Insured

Lead InsurerCo-Insurer

BrokerLoss Adjuster

Insured

Co-Insurer

International Engineering market German speaking Eng. market

Experts,LawyerExperts

Lawyer

Page 4: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 4 -HDI-Gerling Industrie Versicherung AG

Cologne´s tunnel tube disaster

General information about the project

Track crossover structure (Gleiswechselbauwerk)

Collapse of the archive on March 3rd 2009

Possible cause of loss

Further site activities

Characteristic of the German CAR Wordings

Page 5: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 5 -HDI-Gerling Industrie Versicherung AG

General information about the projectLocation of the project

Page 6: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 6 -HDI-Gerling Industrie Versicherung AG

General information about the project

Length ca. 4 km

8 underground stations

Max depth: 30 meter

Construction period (scheduled) 2004 – 2010

Completion expected 2016

Estimated constr. value / insured sum 630 Mio €

Final constr. costs ? Mio €

Page 7: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 7 -HDI-Gerling Industrie Versicherung AG

Track crossover structure (Gleiswechselbauwerk)Topview

Page 8: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 8 -HDI-Gerling Industrie Versicherung AG

Track crossover structure Construction sequence 1

Water table

1.) Diaphragm wallsdown to –45m

Water resistant layer (tertiary)

+47,80m

+12,80m

+2,80m

11

Page 9: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 9 -HDI-Gerling Industrie Versicherung AG

Track crossover structure Construction sequence 2

Water table

2.) Tunnelling worksdiameter 7.30m

+47,80m

+12,80m

+2,80m

2

Page 10: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 10 -HDI-Gerling Industrie Versicherung AG

Track crossover structure Construction sequence 3

3.) Dewateringsystem

+47,80m

+12,80m

+2,80m

3

3

Page 11: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 11 -HDI-Gerling Industrie Versicherung AG

Track crossover structure Construction sequences 4 - 7

4.) Excavation of 12 m

5.) Grouted anchor

6.) Temporary steel ceiling

7.) Concrete slab I as final concr. ceiling I

+47,80m

+36,00m

+12,80m

+2,80m

7

54

6

5

Page 12: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 12 -HDI-Gerling Industrie Versicherung AG

Track crossover structure Construction sequences 8 - 9

8.) Excavation of next 6 m

9.) Concrete slab II as final concrete ceiling II

+47,80m

+36,00m

+29,95m

+12,80m

+2,80m

9

8

Page 13: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 13 -HDI-Gerling Industrie Versicherung AG

Track crossover structure Construction sequences 10 - 12

10.) Excavation of next 8 m

11.) Dismantling of tunnel tube in the crossover structure

12.) Bottom slab

+47,80m

+36,00m

+29,95m

+21,80m

+12,80m

+2,80m

10

12

11

Page 14: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 14 -HDI-Gerling Industrie Versicherung AG

Track crossover structure Construction sequences 13 - 14

13.) Backfilling and asphalt works

14.) Final works

+47,80m

+36,00m

+29,95m

+21,80m

+12,80m

+2,80m

14

13

14

Water resistant layer (tertiary)

Page 15: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 15 -HDI-Gerling Industrie Versicherung AG

Collapse of the archive on March 3rd 2010 Historical town archive Cologne

Built in 1971

Largest town archive north of the alps

30 km storage space

Oldest document dates back to the year 922

Contents sum insured 60 Mio. €

Page 16: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 16 -HDI-Gerling Industrie Versicherung AG

Collapse of the town archive on March 3rd 2009Location of archive and track crossover structure

Page 17: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 17 -HDI-Gerling Industrie Versicherung AG

Collapse of the town archive on March 3rd 2009

Page 18: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 18 -HDI-Gerling Industrie Versicherung AG

Collapse of the town archive on March 3rd 20093.000m³ of soil (gravel)

Page 19: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 19 -HDI-Gerling Industrie Versicherung AG

Collapse of the town archive on March 3rd 20093.000m³ of soil (gravel)

Page 20: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 20 -HDI-Gerling Industrie Versicherung AG

Collapse of the town archive on March 3rd 20093.000m³ of soil (gravel)

Page 21: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 21 -HDI-Gerling Industrie Versicherung AG

Collapse of the town archive on March 3rd 2009Demolition rubble in the structure

Page 22: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 22 -HDI-Gerling Industrie Versicherung AG

Collapse of the town archive on March 3rd 2009Protection measures for the archive contents

Page 23: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 23 -HDI-Gerling Industrie Versicherung AG

Collapse of the town archive on March 3rd 2009Damaged property

3.000m³

+47,80m

+36,00m

+29,95m

+21,80m

+12,80m

+2,80m

Water resistant layer (tertiary)

- Temporary steel ceiling

- Debris and soil in the structure

- Cracks in concrete construction

- Movement of the structure

- Loosening and loss of the surrounding soil

- Dewatering system

Page 24: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 24 -HDI-Gerling Industrie Versicherung AG

Cologne´s tunnel tube disasterPossible cause of loss

Cause is still under investigation by

The public attorney's office

The independent experts nominated by the court

Page 25: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 25 -HDI-Gerling Industrie Versicherung AG

Cologne´s tunnel tube disasterPossible cause of loss - Scenario I

Scenario IRemoval of soil by the dewatering system has caused a local separation

Page 26: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 26 -HDI-Gerling Industrie Versicherung AG

Cologne´s tunnel tube disasterPossible cause of loss - Scenario II

Scenario II

Imperfection in the diaphragm wall

Page 27: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 27 -HDI-Gerling Industrie Versicherung AG

Cologne´s tunnel tube disasterPossible cause of loss

Soil investigation18.11.2009

Page 28: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 28 -HDI-Gerling Industrie Versicherung AG

Cologne´s tunnel tube disasterFurther site activities

Next steps:

1.) Temporary structure for the recovery of remaining archives contents

2.) Temporary structure for the inspection of the diaphragm wall

3.) Reinstatement works

Page 29: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 29 -HDI-Gerling Industrie Versicherung AG

Cologne´s tunnel tube disasterCharacteristic of the German CAR Wordings

Insured property in standard German wordings

Construction work

Building materials, prefabricated parts

Temporary structures

Page 30: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 30 -HDI-Gerling Industrie Versicherung AG

Cologne´s tunnel tube disasterCharacteristic of the German CAR Wordings

On application: the surrounding building ground / subsoil up to a first risk sum.

Examples for clauses:

Surrounding Building ground / subsoil is insured against all kind of perils

Surrounding Building ground / subsoil is insured only as a result of covered loss

Surrounding Building ground / subsoil is insured only as a result of a loss

Page 31: 03.03.2009 Cologne´s tunnel tube disaster Annual IMIA ... · HDI-Gerling Industrie Versicherung AG-23-Collapse of the town archive on March 3rd 2009 Damaged property . 3.000m³ +47,80m

Jens Manderfeld, E-TVS EssenBerlin, 14.09.2010

- 31 -HDI-Gerling Industrie Versicherung AG

Cologne´s tunnel tube disaster

The collapse of the archive is not the result of a typical tunnel risk

The collapse of the archive is the result of an excavation pit risk