04.06 - structure 03190f index of drawings_bridge_plan___0151-0326.pdf · date revision description...

16
WATERBURY CONNECTICUT STRUCTURE LAYOUT FOR DESIGN LIST 22-25 REHABILITATION OF BRIDGE 03190F 0151-0326 INTERSTATE 84 TR 808 DESIGNER/DRAFTER: CHECKED BY: PROJECT TITLE: TOWN: DRAWING TITLE: PROJECT NO. DRAWING NO. SHEET NO. Filename: SHEET NO. REVISION DESCRIPTION DATE REV. DEPARTMENT OF TRANSPORTATION STATE OF CONNECTICUT OF WORK WHICH WILL BE REQUIRED. THE CONDITIONS OF ACTUAL QUANTITIES IN NO WAY WARRANTED TO INDICATE INVESTIGATIONS BY THE STATE AND IS SHEETS IS BASED ON LIMITED QUANTITIES OF WORK, SHOWN ON THESE THE INFORMATION, INCLUDING ESTIMATED 7/29/2016 BLOCK: SIGNATURE/ ...\Br_03190F Index Plan Sheet.dgn Plotted Date: C O N N E C T I C U T D E P A R T M E N T O F T R A N S P O R T A T I O N NUMBER DRAWING DRAWING TITLE NUMBER DRAWING NUMBER DRAWING INDEX OF DRAWINGS DRAWING TITLE DRAWING TITLE BEEN PERSONALLY CHECKED BY THE UNDERSIGNED. NOT TO BE CONSTRUED TO MEAN THAT ALL ASPECTS OF THE DESIGN HAVE THE DESIGN APPEARS TO CONFORM TO APPLICABLE CRITERIA. APPROVAL IS TRANSPORTATION PRINCIPAL ENGINEER - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - HNTB Corporation Fax (860) 257-7394 Tel (860) 257-7377 Rocky Hill, CT 06067 Engineers Architects Planners 1344 Silas Deane Highway, Suite 501 SIN-01 INDEX SHEET 01 - - - - - - - - - - - - - - - - - - JOINT DETAILS M. KUCHAS B. BENNETT S-11 S-10 S-09 S-08 S-07 S-06 S-05 S-04 S-03 S-02 S-01 GEN-02 GEN-01 SAB-01 SIN-01 - - - - - - - - - - - - - - - - - - S-12 PARAPET MODIFICATIONS TYPICAL SECTION DECK PLAN FRAMING PLAN PIER 9 REPAIRS PIERS 7 AND 8 REPAIRS PIERS 5 AND 6 REPAIRS PIERS 3 AND 4 REPAIRS PIERS 1 AND 2 REPAIRS WINGWALL MODIFICATIONS ABUTMENT AND WINGWALL REPAIRS BRIDGE 03190F GENERAL NOTES GENERAL PLAN AND ELEVATION ABBREVIATIONS INDEX SHEET 1 04.06 - STRUCTURE 03190F

Upload: nguyenkien

Post on 08-Apr-2018

226 views

Category:

Documents


1 download

TRANSCRIPT

  • WATERBURYCONNECTICUT

    STRUCTURE LAYOUT FOR DESIGN

    LIST 22-25 REHABILITATION OF BRIDGE 03190F

    0151-0326

    INTERSTATE 84 TR 808

    DESIGNER/DRAFTER:

    CHECKED BY:

    PROJECT TITLE: TOWN:

    DRAWING TITLE:

    PROJECT NO.

    DRAWING NO.

    SHEET NO.

    Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

    DEPARTMENT OF TRANSPORTATION

    STATE OF CONNECTICUT

    OF WORK WHICH WILL BE REQUIRED.

    THE CONDITIONS OF ACTUAL QUANTITIES

    IN NO WAY WARRANTED TO INDICATE

    INVESTIGATIONS BY THE STATE AND IS

    SHEETS IS BASED ON LIMITED

    QUANTITIES OF WORK, SHOWN ON THESE

    THE INFORMATION, INCLUDING ESTIMATED

    7/29/2016

    BLOCK:

    SIGNATURE/

    ...\Br_03190F Index Plan Sheet.dgnPlotted Date:

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ON

    NUMBER

    DRAWINGDRAWING TITLE

    NUMBER

    DRAWING

    NUMBER

    DRAWING

    INDEX OF DRAWINGS

    DRAWING TITLE DRAWING TITLE

    BEEN PERSONALLY CHECKED BY THE UNDERSIGNED.

    NOT TO BE CONSTRUED TO MEAN THAT ALL ASPECTS OF THE DESIGN HAVE

    THE DESIGN APPEARS TO CONFORM TO APPLICABLE CRITERIA. APPROVAL IS

    TRANSPORTATION PRINCIPAL ENGINEER

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    HNTB Corporation

    Fax (860) 257-7394

    Tel (860) 257-7377

    Rocky Hill, CT 06067

    Engineers Architects Planners

    1344 Silas Deane Highway, Suite 501

    SIN-01INDEX SHEET 01

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    JOINT DETAILS

    M. KUCHAS

    B. BENNETT

    S-11

    S-10

    S-09

    S-08

    S-07

    S-06

    S-05

    S-04

    S-03

    S-02

    S-01

    GEN-02

    GEN-01

    SAB-01

    SIN-01

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    S-12

    PARAPET MODIFICATIONS

    TYPICAL SECTION

    DECK PLAN

    FRAMING PLAN

    PIER 9 REPAIRS

    PIERS 7 AND 8 REPAIRS

    PIERS 5 AND 6 REPAIRS

    PIERS 3 AND 4 REPAIRS

    PIERS 1 AND 2 REPAIRS

    WINGWALL MODIFICATIONS

    ABUTMENT AND WINGWALL REPAIRS

    BRIDGE 03190F GENERAL NOTES

    GENERAL PLAN AND ELEVATION

    ABBREVIATIONS

    INDEX SHEET 1

    04.06 - STRUCTURE 03190F

  • ABBREVIATIONSAND LEGEND

    M. KUCHAS

    DESIGNER/DRAFTER:

    CHECKED BY:

    PROJECT TITLE: TOWN:

    DRAWING TITLE:

    PROJECT NO.

    DRAWING NO.

    SHEET NO.

    Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

    DEPARTMENT OF TRANSPORTATION

    STATE OF CONNECTICUT

    OF WORK WHICH WILL BE REQUIRED.

    THE CONDITIONS OF ACTUAL QUANTITIES

    IN NO WAY WARRANTED TO INDICATE

    INVESTIGATIONS BY THE STATE AND IS

    SHEETS IS BASED ON LIMITED

    QUANTITIES OF WORK, SHOWN ON THESE

    THE INFORMATION, INCLUDING ESTIMATED

    7/29/2016

    BLOCK:

    SIGNATURE/

    ...\Br_03190F Abbreviations & Legends Sheet.dgnPlotted Date:

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ON

    SAB-01HNTB Corporation

    Fax (860) 257-7394

    Tel (860) 257-7377

    Rocky Hill, CT 06067

    Engineers Architects Planners

    1344 Silas Deane Highway, Suite 501

    ABBREVIATIONS

    FH

    MAS

    QUANTITY

    FULL HEIGHT

    BRG

    RAND

    TYP

    SP SPAN

    WB

    SL

    VERT

    WESTBOUND

    SECTION LOSS

    SB

    L

    PO

    MPCR

    JT

    FW

    DIAG DIAGONAL

    FS

    NS

    OFFSET

    H

    EB EASTBOUND

    SOUTHBOUND

    NB NORTHBOUND

    CL CENTERLINE

    CR CRACK

    PED PEDESTAL

    w WITH

    HA HOLLOW AREA

    DP DEEP

    EXP EXPOSED

    POP OUT

    HAIRLINE CRACK(S)HLC/HLCR/HLCRS

    LONG

    W WIDE

    HIGH

    TYPICAL

    MAP CRACK

    EFFLO./EFF EFFLORESCENCE

    MASONRY

    VERTICAL

    QTY

    RANDOM

    UMINE UNDERMINE

    BEARING

    HORIZ HORIZONTAL

    LT LIGHT

    MOD MODERATE

    HVY HEAVY

    FULL WIDTH

    FAR SIDE

    NEAR SIDE

    JOINT

    OFF

    EVID EVIDENCE

    DIA DIAMETER

    FLANGE

    BTWN

    BOT BOTTOM

    FLG

    BETWEEN

    PL PLATE

    P PIER

    G GIRDER

    S

    FLOOR BEAM

    STRINGER

    F/FB

    C/CB CAP BEAM

    ADJ ADJACENT

    APPROX. APPROXIMATELY

    B BEAM

    BASELINEBL

    B. BENNETT WATERBURYCONNECTICUT

    STRUCTURE LAYOUT FOR DESIGN

    LIST 22-25 REHABILITATION OF BRIDGE 03190F

    0151-0326

    INTERSTATE 84 TR 808

  • SCALE: 1"=30'

    ELEVATION

    SCALE: 1"=30'

    GENERAL PLAN

    RTE. 8 S.B.

    { BRG. ABUT. { PIER 3{ PIER 2{ PIER 1

    EXISTING GROUND

    { PIER 4 { PIER 5 { PIER 6 { PIER 7 { PIER 8 { PIER 9

    S.W. ROADWAY

    ROUTE 8 N.B.

    166+00 167+00

    168+00

    169+00

    170+00

    171+00

    172+00

    173+00

    165+00

    164+00

    { PIER 1 { PIER 2{ PIER 3

    { PIER 4

    { PIER 5

    { PIER 6

    { PIER 7

    { PIER 8

    { PIER 9

    { BRG. ABUT.

    62.73' 64.23'71.37'

    70.62'

    70.63'

    61.63'

    61.63'

    61.64'

    61.63'

    61.64'

    RET. 8 S.B.

    ON RAMP

    03190B

    BRIDGE

    FOR CLARITY.

    NOTE: I-84 NOT SHOWN

    CLEARANCE

    VERTICAL

    16'-9" MIN.

    VERT. CL.

    16'-9" MIN.

    8'-11"

    12'

    2'-11"

    12'

    12'

    10'

    4'

    SLAB

    APPROACH

    SEE HIGHWAY SHEETS

    TRANSITION SECTION

    20' CONCRETE BARRIER CURB

    SEE HIGHWAY SHEETS

    TRANSITION SECTION

    20' CONCRETE BARRIER CURB

    14'

    8'

    4'

    { PIER 31

    BRG. 03190B

    { PIER 31

    ''DG'' C

    B

    MTR

    ELEC

    SIG

    N

    "C" C.B.

    H.H.

    "C" C.B.

    "C" C.B.

    "C" C.B.

    Elec MH

    "C" C.B.

    15" Mpl.

    Chain Link Fence

    12" Oak

    8" Pine

    12" Oak

    Twin 12" Oak

    18" Oak

    18" Oak

    Chain Link Fence

    H.H.

    Metal Beam Rail

    BCLCConc. Curb

    Conc. Curb

    Conc. Curb

    Conc. Curb

    Chain Link Fence

    Gran. Curb

    12" Quad Locust

    "C-L" C.B.

    Metal Beam

    RailLedge

    Ledge

    "C" C.B.

    "C" C.B.

    DBL. "C" C.B.

    DBL. "C" C.B.

    H.H.

    H.H.

    Gran. Curb

    Metal Beam Rail

    BCLC

    BCLC

    BCLC

    BCLC

    "C" C.B.

    Ledge

    Ledge

    Ledge

    Metal Beam Rail

    Metal Beam Rail

    Ledge

    BCLC

    BCLC

    Metal Beam Rail

    Metal Beam Rail

    BCLCBCLC

    Metal Beam Rail

    Metal Beam Rail

    Conc. CurbConc. Curb

    Metal Beam Rail

    Metal Beam Rail

    Conc. CurbRip Rap

    Metal Beam Rail

    Conc. Curb

    Chain Link Fence

    DBL. "C" C.B.

    "C" C.B.

    "C" C.B.

    I-84 E.B OFF RAMP

    RTE I-84

    W.B

    Gran. Curb

    Gran. Curb

    Gran. Curb

    Gran. Curb

    BCLC

    Metal Beam Rail

    Bit.Metal Beam Rail

    Twin 10" Oak

    BCLC

    "C" C.B.

    "C" C.B.

    "C-G" C.B.

    18" Oak

    PAVED DITCH

    PAVED DITCH

    Conc. Walk

    RTE. 8 S.B. ON RAMP RTE. 8 S.B.

    H.H.

    OFF R

    AMP R

    TE. 8 N.B.

    Solid Yellow

    Line

    Solid White Line

    Rip Rap

    "C" C.B.

    "C-G" C.B.

    "C" C.B.

    PIE

    R

    PIE

    R

    WATERBURYCONNECTICUT

    STRUCTURE LAYOUT FOR DESIGN

    LIST 22-25 REHABILITATION OF BRIDGE 03190F

    0151-0326

    INTERSTATE 84 TR 808

    DESIGNER/DRAFTER:

    CHECKED BY:

    PROJECT TITLE: TOWN:

    DRAWING TITLE:

    PROJECT NO.

    DRAWING NO.

    SHEET NO.

    Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

    DEPARTMENT OF TRANSPORTATION

    STATE OF CONNECTICUT

    OF WORK WHICH WILL BE REQUIRED.

    THE CONDITIONS OF ACTUAL QUANTITIES

    IN NO WAY WARRANTED TO INDICATE

    INVESTIGATIONS BY THE STATE AND IS

    SHEETS IS BASED ON LIMITED

    QUANTITIES OF WORK, SHOWN ON THESE

    THE INFORMATION, INCLUDING ESTIMATED

    SCALE AS NOTED

    7/29/2016

    BLOCK:

    SIGNATURE/

    ...\Br_03190F Plan & Elevation Sheet.dgnPlotted Date:

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ON

    ELEVATION

    CO

    NN

    EC

    TIC

    UT

    CO

    OR

    DIN

    AT

    E

    GRID

    GENERAL PLAN &

    K. DODSON

    B. BENNETT

    GEN-01

  • GEN-02BRIDGE 03190FGENERAL NOTES

    M. KUCHAS

    DESIGNER/DRAFTER:

    CHECKED BY:

    PROJECT TITLE: TOWN:

    DRAWING TITLE:

    PROJECT NO.

    DRAWING NO.

    SHEET NO.

    Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

    DEPARTMENT OF TRANSPORTATION

    STATE OF CONNECTICUT

    OF WORK WHICH WILL BE REQUIRED.

    THE CONDITIONS OF ACTUAL QUANTITIES

    IN NO WAY WARRANTED TO INDICATE

    INVESTIGATIONS BY THE STATE AND IS

    SHEETS IS BASED ON LIMITED

    QUANTITIES OF WORK, SHOWN ON THESE

    THE INFORMATION, INCLUDING ESTIMATED

    7/29/2016

    BLOCK:

    SIGNATURE/

    ...\Br_03190F General Notes Sheet.dgnPlotted Date:

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ON

    GENERAL NOTES:

    T. ADINOLFI

    WATERBURYCONNECTICUT

    QTY.UNIT

    TABLE OF BRIDGE QUANTITIES

    CONCRETE HAUNCH REMOVAL

    MEMBRANE WATERPROOFING (WOVEN GLASS FABRIC)

    ABRASIVE BLAST CLEANING AND FIELD PAINTING OF BEAM ENDS

    STRUCTURAL STEEL REPAIRS

    ASPHALTIC PLUG EXPANSION JOINT SYSTEM

    VARIABLE DEPTH PATCH

    FULL DEPTH PATCH

    PARTIAL DEPTH PATCH

    SURFACE PATCH

    CLASS "S" CONCRETE

    BRIDGE PARAPET CAP

    MODIFY BRIDGE PARAPET

    8'' PIPE FOR BRIDGE DRAINAGE (FIBERGLASS)

    RECONSTRUCT CONCRETE DECK ENDS

    MILLING OF BITUMINOUS CONCRETE (0" TO 6")

    CLEANING AND SEALING JOINTS AND CRACKS

    HMA S0.25

    HMA S0.5

    LF

    SY

    LS

    CWT

    LF

    CF

    CY

    CY

    SF

    CF

    LF

    LF

    LF

    CY

    SY

    LF

    TON

    TON

    580

    1780

    1

    120

    310

    4

    30

    25

    100

    40

    1360

    1360

    80

    20

    1650

    90

    110

    160

    THE CONTRACTOR IS ADVISED THAT EXISTING STRUCTURE INFORMATION IS AVAILABLE IN THOSE PLANS.

    EXISTING PLANS: THE REHABILITATION PLANS FOR THESE PROJECTS ARE AVAILABLE AT THE CONNECTICUT DEPARTMENT OF TRANSPORTATION MAP ROOM.

    FIELD MEASUREMENTS NECESSARY TO ASSURE PROPER FIT.

    THEY HAVE BEEN TAKEN FROM THE ORIGINAL DESIGN DRAWINGS, AND ARE NOT GUARANTEED. THE CONTRACTOR SHALL TAKE ALL

    EXISTING DIMENSIONS: DIMENSIONS OF THE EXISTING STRUCTURE SHOWN ON THESE PLANS ARE FOR GENERAL REFERENCE ONLY.

    WHEN DIMENSIONS ARE GIVEN TO LESS THAN THREE DECIMAL PLACES, THE OMITTED DIGITS SHALL BE ASSUMED TO BE ZEROS.

    DIMENSIONS: ALL DIMENSIONS SHOWN ON THE PLANS ARE IN FEET EXCEPT IF NOTED OTHERWISE. ALL ELEVATIONS ARE GIVEN IN FEET.

    BE HMA S0.5 (1 IN. THICK).

    BITUMINOUS CONCRETE OVERLAY: THIS SHALL CONSIST OF TWO LIFTS. THE FIRST SHALL BE HMA S0.25 (1 IN. THICK) AND THE SECOND SHALL

    PAINT: PAINTING OF THE STRUCTURAL STEEL IS ONLY REQUIRED AT THE ENDS OF THE GIRDERS.

    PRIOR APPROVAL OF THE ENGINEER.

    CONSTRUCTION JOINTS: CONSTRUCTION JOINTS, OTHER THAN THOSE SHOWN ON THE PLANS, WILL NOT BE PERMITTED WITHOUT THE

    THESE BARS SHALL BE INCLUDED IN THE PAY ITEM FOR "DEFORMED STEEL BARS (EPOXY COATED)".

    EPOXY COATED REINFORCING BARS: ALL REINFORCEMENT IN THE PARAPETS SHALL BE EPOXY COATED UNLESS OTHERWISE NOTED.

    REINFORCEMENT: ALL REINFORCEMENT SHALL BE ASTM A615 GRADE 60, UNLESS NOTED OTHERWISE.

    CONCRETE COVER: ALL REINFORCEMENT SHALL HAVE 2 IN. COVER UNLESS DIMENSIONED OTHERWISE.

    EXPOSED EDGES: EXPOSED EDGES OF CONCRETE SHALL BE BEVELED 1 IN. X 1 IN. UNLESS DIMENSIONED OTHERWISE.

    PARAFFIN: THE COST OF FURNISHING AND APPLYING PARAFFIN IS INCLUDED IN THE ITEM "CLASS "F" CONCRETE".

    CONCRETE ". SEE SPECIFICATIONS.

    JOINT SEAL: THE COST OF FURNISHING AND INSTALLING JOINT SEAL SHALL BE INCLUDED UNDER THE ITEM "CLASS "F"

    CLASS "F" CONCRETE: CLASS "F" CONCRETE SHALL BE USED FOR PARAPETS AND WHERE NOTED ON THE PLANS.

    STRUCTURAL STEEL: SEE STRUCTURAL STEEL NOTES FOR DESIGNATIONS AND REQUIREMENTS.

    FUTURE PAVING ALLOWANCE: NONE

    LIVE LOAD: AASHTO HL-93 AND CTDOT P204 AND P380 OPERATING VEHICLES (STRENGTH II LIMIT STATE ONLY)

    STRUCTURAL STEEL (AASHTO M270, GRADE 50) ..... FY = 50,000 PSI

    REINFORCEMENT (ASTM A615, GRADE 60) ........... FY = 60,000 PSI

    CLASS "S"...............BASED ON F'C = 4,000 PSI

    PRECAST.................BASED ON F'C = 5,000 PSI

    CLASS "F" ..............BASED ON F'C = 4,000 PSI

    ALLOWABLE DESIGN STRESSES:

    AS SUPPLEMENTED BY THE CONNECTICUT DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN MANUAL (2003 WITH REVISIONS THROUGH 2012)

    DESIGN SPECIFICATIONS: 2012 AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, CUSTOMARY U.S. UNITS, 1ST EDITION,

    JANUARY 2016 AND SPECIAL PROVISIONS.

    SPECIFICATIONS: CONNECTICUT DEPARTMENT OF TRANSPORTATION FORM 817 (2016), SUPPLEMENTAL SPECIFICATIONS DATED

    WATERBURYCONNECTICUT

    STRUCTURE LAYOUT FOR DESIGN

    LIST 22-25 REHABILITATION OF BRIDGE 03190F

    0151-0326

    INTERSTATE 84 TR 808

  • SCALE: " = 1'-0"

    ELEVATION

    SCALE: " = 1'-0"

    SOUTH WINGWALL ELEVATIONSCALE: " = 1'-0"

    NORTH WINGWALL ELEVATION

    EL. 337.00

    EL. 340.00

    WATERBURYCONNECTICUT

    STRUCTURE LAYOUT FOR DESIGN

    LIST 22-25 REHABILITATION OF BRIDGE 03190F

    0151-0326

    INTERSTATE 84 TR 808

    DESIGNER/DRAFTER:

    CHECKED BY:

    PROJECT TITLE: TOWN:

    DRAWING TITLE:

    PROJECT NO.

    DRAWING NO.

    SHEET NO.

    Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

    DEPARTMENT OF TRANSPORTATION

    STATE OF CONNECTICUT

    OF WORK WHICH WILL BE REQUIRED.

    THE CONDITIONS OF ACTUAL QUANTITIES

    IN NO WAY WARRANTED TO INDICATE

    INVESTIGATIONS BY THE STATE AND IS

    SHEETS IS BASED ON LIMITED

    QUANTITIES OF WORK, SHOWN ON THESE

    THE INFORMATION, INCLUDING ESTIMATED

    SCALE AS NOTED

    7/29/2016

    BLOCK:

    SIGNATURE/

    ...\Br_03190F Abutment & Wingwall Repair Sheet.dgnPlotted Date:

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ON

    -

    WINGWALL REPAIRSABUTMENT AND

    M. KUCHAS

    1' x 4" x 1" SPALL AREA

    6" x 8" x 1" SPALL AREA

    W/ EXPOSED REBAR

    2' x 1' x 1" SPALL AREA6' x 1' HC

    1.5' HA

    8" x 4" x " HC

    2' HLC W/ EFF

    3' HLC W/ EFF

    6" x 4" x 1" SPALL AREA

    W/RUST

    1.5' x 1' HA

    SPALL AREA

    16" x 3" x 3"

    REPAIR NOTES:

    3. SEE REPAIR DETAILS SHEET FOR TYPES AND METHODS OF REPAIRS.

    ENGINEER.

    2. THE CONTRACTOR SHALL NOT PERFORM ANY WORK WITHOUT APPROVAL BEING GRANTED BY THE

    SHALL THEN DETERMINE THE TYPE OF REPAIR REQUIRED FOR EACH AREA.

    DETERMINE THE LOCATIONS AND EXACT LIMITS OF ALL AREAS TO BE REPAIRED. THE ENGINEER

    STRUCTURE. THE ENGINEER SHALL PERFORM AN INSPECTION OF THE EXISTING SUBSTRUCTURE TO

    BE USED AS A GUIDE, AND DOES NOT NECESSARILY REFLECT THE CURRENT CONDITION OF THE

    1. THE DETERIORATION SHOWN AND THE RECOMMENDED METHODS OF REPAIR ARE INTENDED TO

    - CRACK OR HAIRLINE CRACK

    AND/OR SPALL- REPAIR AREA W/ MAPCRACK, HOLLOW AREA

    LEGEND

    1' x 3" x 1" PED

    1' EXPOSED REBAR

    2" x 1' x 1.5" SPALL

    S-01

  • WATERBURYCONNECTICUT

    STRUCTURE LAYOUT FOR DESIGN

    LIST 22-25 REHABILITATION OF BRIDGE 03190F

    0151-0326

    INTERSTATE 84 TR 808

    DESIGNER/DRAFTER:

    CHECKED BY:

    PROJECT TITLE: TOWN:

    DRAWING TITLE:

    PROJECT NO.

    DRAWING NO.

    SHEET NO.

    Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

    DEPARTMENT OF TRANSPORTATION

    STATE OF CONNECTICUT

    OF WORK WHICH WILL BE REQUIRED.

    THE CONDITIONS OF ACTUAL QUANTITIES

    IN NO WAY WARRANTED TO INDICATE

    INVESTIGATIONS BY THE STATE AND IS

    SHEETS IS BASED ON LIMITED

    QUANTITIES OF WORK, SHOWN ON THESE

    THE INFORMATION, INCLUDING ESTIMATED

    SCALE AS NOTED

    7/29/2016

    BLOCK:

    SIGNATURE/

    ...\Br_03190F Wingwall Modification Sheet.dgnPlotted Date:

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ON

    SAFETY WALK

    REMOVE EXISTING

    BRIDGE RAIL

    REMOVE EXISTING STEEL

    TOP OF ROAD

    MODIFIED BRIDGE PARAPET (TYP.)

    DRILL & GROUT

    PARAPET CAP ADDED (TYP.)

    SCALE: 1"=1'-0"SCALE: 1"=1'-0"

    TOP OF ROAD

    WINGWALLMODIFICATION

    M. KUCHAS

    MODIFIED NORTH WINGWALL MODIFIED SOUTH WINGWALLSCALE: 1"=1'-0"

    EXISTING WINGWALL

    TOP OF ROAD

    MODIFIED BRIDGE PARAPET (TYP.)

    PARAPET CAP ADDED (TYP.)

    DRILL & GROUT

    SOUTH WALL

    LIMITS OF REMOVAL

    NORTH WALL

    LIMITS OF REMOVAL

    1

    1

    BOTTOM OF SUBBASE

    T. ADINOLFI

    S-02

  • 2' x 2' MAP CRACK

    1' HLC

    W/RUST

    2' HLC

    3' HLC

    MAP CRACKS

    3' x 7' PATCH W/

    1 CLAMP BROKEN

    4' x 6" PATCH W/MAP CRACKS 2' HLC W/EFF

    3' x 2' HA

    3.5' x 6" PATCH

    1' HLC

    15" HLC

    12" HLC

    6" HLC

    8" HLC

    2" HLC

    4" HLC

    W/RUST

    1' ~ HA

    2' x 3' x 2" SPALL

    24" x 28" x 2" SPALL AREA

    WATERBURYCONNECTICUT

    STRUCTURE LAYOUT FOR DESIGN

    LIST 22-25 REHABILITATION OF BRIDGE 03190F

    0151-0326

    INTERSTATE 84 TR 808

    DESIGNER/DRAFTER:

    CHECKED BY:

    PROJECT TITLE: TOWN:

    DRAWING TITLE:

    PROJECT NO.

    DRAWING NO.

    SHEET NO.

    Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

    DEPARTMENT OF TRANSPORTATION

    STATE OF CONNECTICUT

    OF WORK WHICH WILL BE REQUIRED.

    THE CONDITIONS OF ACTUAL QUANTITIES

    IN NO WAY WARRANTED TO INDICATE

    INVESTIGATIONS BY THE STATE AND IS

    SHEETS IS BASED ON LIMITED

    QUANTITIES OF WORK, SHOWN ON THESE

    THE INFORMATION, INCLUDING ESTIMATED

    SCALE AS NOTED

    7/29/2016

    BLOCK:

    SIGNATURE/

    ...\Br_03190F Pier Repairs Sheet 1.dgnPlotted Date:

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ON

    S-03M. KUCHAS

    T. ADINOLFI

    PIER 1 & 2 REPAIRS

    - CRACK OR HAIRLINE CRACK

    AND/OR SPALL- REPAIR AREA W/ MAPCRACK, HOLLOW AREA

    PIER 1 EAST ELEVATION

    PIER 1 WEST ELEVATION

    LEGEND

    PIER 2 WEST ELEVATION

    PIER 2 EAST ELEVATION

    REPAIR NOTES:

    1. SEE SHEETS S-01 FOR PIER REPAIR NOTES.

    SCALE: " = 1'-0" SCALE: " = 1'-0"

    SCALE: " = 1'-0"SCALE: " = 1'-0"

  • 6' HLC

    3' x 2' HA

    5' x 2' HA

    8' x 1' HA

    4' x 10" HA

    2' x 1' HA

    2.5' x 2' HA

    3' x 2' HA

    2' x 1' x 2" SPALL AREA

    W/CRACKS

    3' x 6" HA

    W/EXPOSED REBAR

    4' x 9" x 5" SPALL

    6' x 6" HA

    2' x 2' HA

    2' x 1' HOLLOW CORNER

    10" x 5" x 1" SPALL AREA

    W/EXPOSED REBAR

    28" x 2' x 2" SPALL AREA

    W/EXPOSED REBAR

    30" x 10" SPALL AREA

    1' x 5" HA

    18" x 4" x 1.5" SPALL AREA

    4' x 1' HA

    2' HLC

    6" HLC

    1' HLC

    3' HLC3' HLC

    9" HLC

    1' ~ HA

    MAP CRACK

    1' ~

    1' ~ HA

    W/EXPOSED REBAR

    1' ~x 1.5' SPALL AREA

    16" x 1' x 1.5"

    1' ~ HA

    6" x 1" SPALL

    8" HLC

    10" HLC

    12" HLC

    14" HLC

    1' ~ HA

    1' ~ HA

    4' HLC

    SPALLING UP TO 1"

    1.5' ~ HA W/EDGE

    2' HLC

    1' HLC

    3' HLC

    4' x 2' x 2" HLC

    2' x 6" HA

    20" x " VERTICAL CRACK

    WATERBURYCONNECTICUT

    STRUCTURE LAYOUT FOR DESIGN

    LIST 22-25 REHABILITATION OF BRIDGE 03190F

    0151-0326

    INTERSTATE 84 TR 808

    DESIGNER/DRAFTER:

    CHECKED BY:

    PROJECT TITLE: TOWN:

    DRAWING TITLE:

    PROJECT NO.

    DRAWING NO.

    SHEET NO.

    Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

    DEPARTMENT OF TRANSPORTATION

    STATE OF CONNECTICUT

    OF WORK WHICH WILL BE REQUIRED.

    THE CONDITIONS OF ACTUAL QUANTITIES

    IN NO WAY WARRANTED TO INDICATE

    INVESTIGATIONS BY THE STATE AND IS

    SHEETS IS BASED ON LIMITED

    QUANTITIES OF WORK, SHOWN ON THESE

    THE INFORMATION, INCLUDING ESTIMATED

    SCALE AS NOTED

    7/29/2016

    BLOCK:

    SIGNATURE/

    ...\Br_03190F Pier Repairs Sheet 2.dgnPlotted Date:

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ON

    S-04M. KUCHAS

    T. ADINOLFI

    PIER 3 & 4 REPAIRS

    PIER 3 WEST ELEVATION

    PIER 4 EAST ELEVATION

    - CRACK OR HAIRLINE CRACK

    AND/OR SPALL- REPAIR AREA W/ MAPCRACK, HOLLOW AREA

    REPAIR NOTES:

    1. SEE SHEETS S-01 FOR PIER REPAIR NOTES.

    PIER 4 WEST ELEVATION

    PIER 3 EAST ELEVATION

    LEGEND

    SCALE: " = 1'-0"SCALE: " = 1'-0"

    SCALE: " = 1'-0" SCALE: " = 1'-0"

  • 3' x 2.5' HA

    1.5' x 6" HA

    6' x 2' HA

    3' HLC

    1.5' ~ HA

    2' x 1.5' MAP CRACK

    1' x 6" MAP CRACK

    3.5' HLC

    4" HLC

    2' HLC

    1' x 6' MAP CRACK8" ~ SPALL AREA

    1' ~ HA

    14" x 2.5' HA

    8" x 4" x 1" SPALL AREA

    6" HLC

    6" HLC

    6" HLC

    4" ~ POPOUT

    WATERBURYCONNECTICUT

    STRUCTURE LAYOUT FOR DESIGN

    LIST 22-25 REHABILITATION OF BRIDGE 03190F

    0151-0326

    INTERSTATE 84 TR 808

    DESIGNER/DRAFTER:

    CHECKED BY:

    PROJECT TITLE: TOWN:

    DRAWING TITLE:

    PROJECT NO.

    DRAWING NO.

    SHEET NO.

    Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

    DEPARTMENT OF TRANSPORTATION

    STATE OF CONNECTICUT

    OF WORK WHICH WILL BE REQUIRED.

    THE CONDITIONS OF ACTUAL QUANTITIES

    IN NO WAY WARRANTED TO INDICATE

    INVESTIGATIONS BY THE STATE AND IS

    SHEETS IS BASED ON LIMITED

    QUANTITIES OF WORK, SHOWN ON THESE

    THE INFORMATION, INCLUDING ESTIMATED

    SCALE AS NOTED

    7/29/2016

    BLOCK:

    SIGNATURE/

    ...\Br_03190F Pier Repairs Sheet 3.dgnPlotted Date:

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ON

    S-05M. KUCHAS

    T. ADINOLFI

    PIER 5 & 6 REPAIRS

    - CRACK OR HAIRLINE CRACK

    AND/OR SPALL- REPAIR AREA W/ MAPCRACK, HOLLOW AREA

    PIER 5 EAST ELEVATION PIER 6 EAST ELEVATION

    PIER 5 WEST ELEVATION PIER 6 WEST ELEVATION

    REPAIR NOTES:

    1. SEE SHEETS S-01 FOR PIER REPAIR NOTES.

    LEGEND

    SCALE: " = 1'-0" SCALE: " = 1'-0"

    SCALE: " = 1'-0" SCALE: " = 1'-0"

  • 6' HLC

    1' HLC

    1.5' RUST 6" HLC

    8" HLC

    WATERBURYCONNECTICUT

    STRUCTURE LAYOUT FOR DESIGN

    LIST 22-25 REHABILITATION OF BRIDGE 03190F

    0151-0326

    INTERSTATE 84 TR 808

    DESIGNER/DRAFTER:

    CHECKED BY:

    PROJECT TITLE: TOWN:

    DRAWING TITLE:

    PROJECT NO.

    DRAWING NO.

    SHEET NO.

    Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

    DEPARTMENT OF TRANSPORTATION

    STATE OF CONNECTICUT

    OF WORK WHICH WILL BE REQUIRED.

    THE CONDITIONS OF ACTUAL QUANTITIES

    IN NO WAY WARRANTED TO INDICATE

    INVESTIGATIONS BY THE STATE AND IS

    SHEETS IS BASED ON LIMITED

    QUANTITIES OF WORK, SHOWN ON THESE

    THE INFORMATION, INCLUDING ESTIMATED

    SCALE AS NOTED

    7/29/2016

    BLOCK:

    SIGNATURE/

    ...\Br_03190F Pier Repairs Sheet 4.dgnPlotted Date:

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ON

    S-06M. KUCHAS

    T. ADINOLFI

    PIER 7 & 8 REPAIRS

    - CRACK OR HAIRLINE CRACK

    AND/OR SPALL- REPAIR AREA W/ MAPCRACK, HOLLOW AREA

    REPAIR NOTES:

    1. SEE SHEETS S-01 FOR PIER REPAIR NOTES.

    LEGEND

    PIER 7 WEST ELEVATION PIER 8 WEST ELEVATION

    PIER 8 EAST ELEVATIONPIER 7 EAST ELEVATION

    SCALE: " = 1'-0" SCALE: " = 1'-0"

    SCALE: " = 1'-0" SCALE: " = 1'-0"

  • 1' HLC8" HLC

    6" HLC

    5" HLC

    6" HLC

    WATERBURYCONNECTICUT

    STRUCTURE LAYOUT FOR DESIGN

    LIST 22-25 REHABILITATION OF BRIDGE 03190F

    0151-0326

    INTERSTATE 84 TR 808

    DESIGNER/DRAFTER:

    CHECKED BY:

    PROJECT TITLE: TOWN:

    DRAWING TITLE:

    PROJECT NO.

    DRAWING NO.

    SHEET NO.

    Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

    DEPARTMENT OF TRANSPORTATION

    STATE OF CONNECTICUT

    OF WORK WHICH WILL BE REQUIRED.

    THE CONDITIONS OF ACTUAL QUANTITIES

    IN NO WAY WARRANTED TO INDICATE

    INVESTIGATIONS BY THE STATE AND IS

    SHEETS IS BASED ON LIMITED

    QUANTITIES OF WORK, SHOWN ON THESE

    THE INFORMATION, INCLUDING ESTIMATED

    SCALE AS NOTED

    7/29/2016

    BLOCK:

    SIGNATURE/

    ...\Br_03190F Pier Repairs Sheet 5.dgnPlotted Date:

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ON

    S-07M. KUCHAS

    PIER 9 REPAIRS

    T. ADINOLFI

    - CRACK OR HAIRLINE CRACK

    AND/OR SPALL- REPAIR AREA W/ MAPCRACK, HOLLOW AREA

    PIER 9 WEST ELEVATION

    LEGEND

    PIER 9 EAST ELEVATION

    REPAIR NOTES:

    1. SEE SHEETS S-01 FOR PIER REPAIR NOTES.

    SCALE: " = 1'-0" SCALE: " = 1'-0"

  • 168+00169+00

    166+00

    167+00

    { PIER 6

    { PIER 5

    { PIER 4{ PIER 3{ PIER 2

    { PIER 1

    { BRG. ABUT.

    61.63'

    70.63'70.62'71.37'64.23'

    62.73'EXP EXP FIXFIX FIXEXP

    FIXEXP

    EXP

    EXPFIX

    EXPSPAN 2

    SPAN 3 SPAN 4SPAN 5

    SPAN 6SPAN 1

    FIXFIX

    EXPFIX

    165+85.79

    STA

    170+00 171+00

    172+00

    { PIER 9{ PIER 8{ PIER 7

    61.64' 61.63'61.63'

    61.64'FIX FIXEXP FIXEXP

    FIXEXP

    EXP

    172+33.54

    STA

    BRG. 03190A

    { PIER 6

    SPAN 7 SPAN 8 SPAN 9SPAN 10

    WATERBURYCONNECTICUT

    STRUCTURE LAYOUT FOR DESIGN

    LIST 22-25 REHABILITATION OF BRIDGE 03190F

    0151-0326

    INTERSTATE 84 TR 808

    DESIGNER/DRAFTER:

    CHECKED BY:

    PROJECT TITLE: TOWN:

    DRAWING TITLE:

    PROJECT NO.

    DRAWING NO.

    SHEET NO.

    Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

    DEPARTMENT OF TRANSPORTATION

    STATE OF CONNECTICUT

    SCALE 1"=20'

    20 400

    SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.

    THE CONDITIONS OF ACTUAL QUANTITIES

    IN NO WAY WARRANTED TO INDICATE

    INVESTIGATIONS BY THE STATE AND IS

    SHEETS IS BASED ON LIMITED

    QUANTITIES OF WORK, SHOWN ON THESE

    THE INFORMATION, INCLUDING ESTIMATED

    7/29/2016

    BLOCK:

    SIGNATURE/

    ...\Br_03190F Framing Plan Sheet.dgnPlotted Date:

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ON

    - -

    -

    -

    -

    - - -

    - - -

    - -

    - -

    - - -

    HNTB Corporation

    Fax (860) 257-7394

    Tel (860) 257-7377

    Rocky Hill, CT 06067

    Engineers Architects Planners

    1344 Silas Deane Highway, Suite 501

    HNTB Corporation

    Fax (860) 257-7394

    Tel (860) 257-7377

    Rocky Hill, CT 06067

    Engineers Architects Planners

    1344 Silas Deane Highway, Suite 501

    -BRIDGE 03190F-

    -

    -

    -

    -

    -

    M. KUCHAS

    FRAMING PLAN

    FRAMING PLANSCALE: 1" = 20'

    CO

    NN

    EC

    TIC

    UT

    CO

    OR

    DIN

    AT

    E

    GRID

    CO

    NN

    EC

    TIC

    UT

    CO

    OR

    DIN

    AT

    E

    GRID

    LEGEND

    { PIER 6

    MA

    TC

    H

    LIN

    E

    A-A

    MA

    TC

    H

    LIN

    E

    A-A

    TOP AND BOTTOM COVER PLATE RETROFIT

    - 0

    - 0

    - 0

    - 1

    STRINGER WEB CRACK

    STIFFENER WELD CRACK

    DIAPHRAGM WELD CRACK

    FLOORBEAM/STRINGER BEARING PLATE TACK WELD CRACK

    GIRDER TO CAP BEAM CONNECTION

    FLOORBEAM WEB CRACK

    - 0

    - 0

    GIRDER TOP FLANGE REPAIR - 0

    GIRDER WEB REPAIR - 22

    STIFFNER REPAIR - 0

    SPOT PAINTING - 0

    GIRDER BOT FLANGE REPAIR - 8

    S1

    S1S1 S1

    S1

    S1

    S1 S1 S1 S1

    S2

    S3

    S4

    S2

    S3

    S4

    S2

    S3

    S4

    S2

    S3

    S4

    S2

    S3

    S4

    S2

    S3

    S4

    S2

    S3

    S4

    S2

    S3

    S4

    S2

    S3

    S4

    S2

    S3

    S4

    TR 808

    TR 808

    I. SOZENOGLU

    S-08

  • 168+00169+00

    166+00

    167+00

    { BRG. ABUT.

    { PIER 1

    { PIER 2 { PIER 3 { PIER 4{ PIER 5

    { PIER 662.73'

    64.23'70.62'71.37'

    70.63'

    61.63'

    SPAN 1

    DECK DETERIORATION

    SPAN 2

    24.1%14.8%

    SPAN 3

    21.8%

    SPAN 4

    17.1%

    SPAN 5

    11.7%SPAN 6

    24.5%

    A.P.J.

    A.P.J. A.P.J.

    A.P.J.

    A.P.J.A.P.J.

    TYPE A (TYP.)

    DECK END RECONSTRUCTION

    SLAB

    14' APPROACH

    STA 165+85.79

    END OF SLAB

    60' |

    95" |

    23'-10"

    170+00 171+00

    172+00

    { PIER 7 { PIER 8 { PIER 9

    61.63' 61.64'61.63'

    SPAN 7

    27.8%

    SPAN 8

    15.7%

    SPAN 9

    61.64'

    37.4%

    SPAN 10

    18.4%

    BR. 03190A

    { PIER 31

    A.P.J.

    A.P.J.

    A.P.J.

    A.P.J.

    STA 172+26

    { SCUPPER

    STA 170+53

    { SCUPPER

    STA 172+33.54

    END OF SLAB

    23'-10"

    27'-1"

    WATERBURYCONNECTICUT

    STRUCTURE LAYOUT FOR DESIGN

    LIST 22-25 REHABILITATION OF BRIDGE 03190F

    0151-0326

    INTERSTATE 84 TR 808 BRIDGE 03190FDECK PLAN

    M. KUCHAS

    SCALE: 1" = 20'

    CO

    NN

    EC

    TIC

    UT

    CO

    OR

    DIN

    AT

    E

    GRID

    CO

    NN

    EC

    TIC

    UT

    CO

    OR

    DIN

    AT

    E

    GRID

    DECK PLAN

    A.P.J. = ASPHALTIC PLUG JOINT

    S-09

    DESIGNER/DRAFTER:

    CHECKED BY:

    PROJECT TITLE: TOWN:

    DRAWING TITLE:

    PROJECT NO.

    DRAWING NO.

    SHEET NO.

    Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

    DEPARTMENT OF TRANSPORTATION

    STATE OF CONNECTICUT

    SCALE 1"=20'

    20 400

    SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.

    THE CONDITIONS OF ACTUAL QUANTITIES

    IN NO WAY WARRANTED TO INDICATE

    INVESTIGATIONS BY THE STATE AND IS

    SHEETS IS BASED ON LIMITED

    QUANTITIES OF WORK, SHOWN ON THESE

    THE INFORMATION, INCLUDING ESTIMATED

    7/29/2016

    BLOCK:

    SIGNATURE/

    ...\Br_03190F Deck Plan Sheet.dgnPlotted Date:

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ON

    LEGEND

    T. ADINOLFI

    { PIER 6

    = DECK END TO BE REPLACED

    REHABILITATION (TYP.)

    LIMITS OF HAUNCH

    = LIMITS OF HAUNCH REHABILITATION

    4' (TYP.)

    STA 172+33

    END OF SLAB

    SLAB

    14' APPROACH

    A.P.J.

    A.P.J.

    REHABILITATION (TYP.)

    LIMITS OF HAUNCH

    A.P.J.

    A.P.J.

    A.P.J.

    TYPE A (TYP.)

    DECK END RECONSTRUCTION A.P.J.

    A.P.J.

    STA 170+53

    { SCUPPER

    A.P.J. A.P.J.

    STA 172+26

    { SCUPPER

    A.P.J.

    STA 165+85.79

    END OF SLAB

    PC PCC R LPT T

    CURVE DATA

    1500

    2600

    32.00

    605.17

    64.00

    1189.17

    172+95.63

    -

    172+31.63

    172+31.63

    -

    160+42.46

    TR 808

    TR 808

    LIMITS OF HAUNCH REHABILITATION (TYP.)

    95" |

    MA

    TC

    H

    LIN

    E S

    EE

    BE

    LO

    W

    MA

    TC

    H

    LIN

    E S

    EE

    AB

    OV

    E

    LIMITS OF HAUNCH

    60' |

    REHABILITATION (TYP.)

    1.8

    3'

  • WATERBURYCONNECTICUT

    STRUCTURE LAYOUT FOR DESIGN

    LIST 22-25 REHABILITATION OF BRIDGE 03190F

    0151-0326

    INTERSTATE 84 TR 808

    SCALE: " = 1'-0"

    SCALE: " = 1'-0"

    "/FT

    "/FT

    DESIGNER/DRAFTER:

    CHECKED BY:

    PROJECT TITLE: TOWN:

    DRAWING TITLE:

    PROJECT NO.

    DRAWING NO.

    SHEET NO.

    Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

    DEPARTMENT OF TRANSPORTATION

    STATE OF CONNECTICUT

    SCALE 1"=40'

    40 800

    SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.

    THE CONDITIONS OF ACTUAL QUANTITIES

    IN NO WAY WARRANTED TO INDICATE

    INVESTIGATIONS BY THE STATE AND IS

    SHEETS IS BASED ON LIMITED

    QUANTITIES OF WORK, SHOWN ON THESE

    THE INFORMATION, INCLUDING ESTIMATED

    7/29/2016

    BLOCK:

    SIGNATURE/

    ...\Br_03190F Typical Section Sheet.dgnPlotted Date:

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ON

    BRIDGE 03190FTYPICAL SECTION

    M. KUCHAS

    BRIDGE RAIL (TYP.)

    REMOVE EXISTING STEEL

    1'-3"

    1'-6"

    22'-0"

    1'-3"

    1'-6"

    7" CONCRETE DECK

    TO EXPOSE DECK

    MILL EXISTING OVERLAY

    23'-10"

    7"

    1'-3"

    1'-3"

    7"

    2" BITUMINOUS CONCRETE

    (TYP.)

    MODIFIED BRIDGE PARAPET

    7" CONCRETE DECK

    (WOVEN GLASS FABRIC)

    MEMBRANE WATERPROOFING

    "/FT

    REHABILITATED HAUNCH

    PROPOSED REHABILITATED TYPICAL SECTION

    SCALE: " = 1'-0"

    (TYP.)

    EXISTING GIRDERS

    (TYP.)

    EXISTING GIRDERS

    EXISTING TYPICAL SECTION (DECK REPAIR)

    SCALE: " = 1'-0"

    SAFETY WALK (TYP.)

    REMOVE EXISTING

    "/FT

    } TR 808

    } TR 808

    (TYP.)

    BRIDGE PARAPET CAP

    I. SOZENOGLU

    S-10

  • WATERBURYCONNECTICUT

    STRUCTURE LAYOUT FOR DESIGN

    LIST 22-25 REHABILITATION OF BRIDGE 03190F

    0151-0326

    INTERSTATE 84 TR 808

    DECK END DEMOLITION DETAILSCALE: 1" - 1'-0"

    GIRDER NOT SHOWN FOR CLARITY

    NOTE: SECTION TAKEN AT MID BAY.

    SCALE: 1" - 1'-0"

    GIRDER NOT SHOWN FOR CLARITY

    NOTE: SECTION TAKEN AT MID BAY.

    DECK END RECONSTRUCTION DETAIL

    1

    1

    DESIGNER/DRAFTER:

    CHECKED BY:

    PROJECT TITLE: TOWN:

    DRAWING TITLE:

    PROJECT NO.

    DRAWING NO.

    SHEET NO.

    Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

    DEPARTMENT OF TRANSPORTATION

    STATE OF CONNECTICUT

    OF WORK WHICH WILL BE REQUIRED.

    THE CONDITIONS OF ACTUAL QUANTITIES

    IN NO WAY WARRANTED TO INDICATE

    INVESTIGATIONS BY THE STATE AND IS

    SHEETS IS BASED ON LIMITED

    QUANTITIES OF WORK, SHOWN ON THESE

    THE INFORMATION, INCLUDING ESTIMATED

    SCALE AS NOTED

    7/29/2016

    BLOCK:

    SIGNATURE/

    ...\Br_03190F Parapet Modification Sheet.dgnPlotted Date:

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ON

    PARAPETMODIFICATION

    M. KUCHAS

    EXISTING PARAPETSCALE 1"=1'-0"

    MODIFIED PARAPETSCALE 1"=1'-0"

    TOP OF ROAD

    SAFETY WALK

    REMOVE EXISTING

    BRIDGE RAIL

    REMOVE EXISTING STEEL

    TOP OF ROAD

    MODIFIED BRIDGE PARAPET (TYP.)

    DRILL & GROUT

    PARAPET CAP ADDED (TYP.)

    (TYP.)

    MODIFIED BRIDGE HAUNCH

    (TYP.)

    OF HAUNCH

    REMOVE LIMITS

    EXISTING DECK

    (TYP.)

    END DIAPHRAGM

    DECK END DEMOLITION DETAILSCALE: 1" - 1'-0"

    GIRDER NOT SHOWN FOR CLARITY

    NOTE: SECTION TAKEN AT MID BAY.

    LIMITS TYP.

    DECK END REMOVAL

    CUT TYP.

    1" DEEP SAW

    LIMITS OF DECK END RECONSTRUCTION

    { JOINT

    DECK END

    2'-0"2'-0"

    EXISTING DECK

    (TYP.)

    END DIAPHRAGM

    SCALE: 1" - 1'-0"

    GIRDER NOT SHOWN FOR CLARITY

    NOTE: SECTION TAKEN AT MID BAY.

    DECK END RECONSTRUCTION DETAIL

    CAST IN PLACE DECK END

    1

    1

    DECK END

    { JOINT

    1'-6"6"|

    NEW PAVEMENT

    (TYP.)

    PAVEMENT REMOVAL

    I. SOZENOGLU

    S-11

  • SCALE: " = 1'-0"

    ASPHALTIC PLUG JOINT TREATMENT AT PARAPET

    PARAPET OUTER FACE OF BARRIER

    SEALANT RECESSED" FROM

    " THICK SILICONE JOINT

    1" FROM FACE OF PARAPET

    1" CLOSED CELL BACKER ROD INSERTED

    JOINT SYSTEM

    ASPHALTIC PLUG EXPANSION

    WATERBURYCONNECTICUT

    STRUCTURE LAYOUT FOR DESIGN

    LIST 22-25 REHABILITATION OF BRIDGE 03190F

    0151-0326

    INTERSTATE 84 TR 808

    "

    MATERIAL (TYP.)

    AND REPLACE WITH PATCHING

    REMOVE ALL DETERIORATED CONCRETE

    AFTER REMOVING THE EXISTING OVERLAY

    VARIES

    VARIES

    INSTALLATION OF ASPHALTIC PLUG EXPANSION JOINT SYSTEM

    ASECTION

    -

    BRIDGE DECK

    ROADWAY SLAB, APPROACH SLAB, OR

    WHERE NECESSARY

    PROVIDE A SMOOTH, LEVEL SURFACE

    APPLY A CEMENTITIOUS MATERIAL TO

    WITH AGGREGATE

    INSTALL NEW BINDER

    { JOINT

    INSTALL NEW BINDERAND BACKER ROD

    INSTALL NEW LOCATING PIN

    BRIDGE DECK

    SILICONE EXPANSION JOINT SYSTEM

    VARIES

    BRIDGE DECK

    THAN JOINT OPENING

    BACKER ROD 25% LARGER

    APPROACH SLAB

    BRIDGE DECK OR

    SILICONE SEALANT

    "

    1/2" BEVEL (TYP.){ JOINT

    10" (TYP.)

    EXPANSION JOINT SYSTEM

    MEMBRANE REPLACE WITH SILICONE

    REMOVE BITUMINOUS OVERLAY AND

    SCALE: " = 1'-0" SCALE: " = 1'-0"

    INSTALL NEW " BRIDGING PLATE

    EXPANSION JOINT SYSTEM" (TYP.)

    BE PAID FOR UNDER THE ITEM "ASPHALTIC PLUG

    PLUG JOINT OR AS DIRECTED BY THE ENGINEER) SHALL

    LIMITS OF SAW CUTTING (1" MIN. BEYOND EXISTING 3.

    ENGINEER.

    HAVE THE LIMITS OF SAW CUTTING APPROVED BY THE

    SHALL VERIFY THE BRIDGE DECK JOINT LOCATION AND

    BENEATH BITUMINOUS CONCRETE OVERLAY THE CONTRACTOR

    WHERE EXISTING BRIDGE DECK JOINTS ARE CONCEALED 2.

    "ASPHALTIC PLUG EXPANSION JOINT SYSTEM"

    PROPOSED JOINT TO BE PAID FOR UNDER THE ITEM

    BITUMINOUS CONCRETE WITHIN THE LIMITS OF THE

    THE REMOVAL OF ALL EXISTING JOINT MATERIAL AND1.

    DESIGNER/DRAFTER:

    CHECKED BY:

    PROJECT TITLE: TOWN:

    DRAWING TITLE:

    PROJECT NO.

    DRAWING NO.

    SHEET NO.

    Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

    DEPARTMENT OF TRANSPORTATION

    STATE OF CONNECTICUT

    OF WORK WHICH WILL BE REQUIRED.

    THE CONDITIONS OF ACTUAL QUANTITIES

    IN NO WAY WARRANTED TO INDICATE

    INVESTIGATIONS BY THE STATE AND IS

    SHEETS IS BASED ON LIMITED

    QUANTITIES OF WORK, SHOWN ON THESE

    THE INFORMATION, INCLUDING ESTIMATED

    SCALE AS NOTED

    7/29/2016

    BLOCK:

    SIGNATURE/

    ...\Br_03190F Joint Details sheet .dgnPlotted Date:

    CON

    NECTICUT

    DE

    PA

    RT

    ME

    NT

    O F TRAN

    S

    PO

    RT

    ATI

    ON

    - -

    -

    -

    -

    - -

    - - -

    - - - -

    - - -

    - - -

    - - - -

    JOINT DETAILS

    S-12

    N. WILD

    M. KUCHAS

    WATERBURYCONNECTICUT

    Br_03190F Index Plan SheetBr_03190F Abbreviations & Legends SheetBr_03190F Plan & Elevation SheetBr_03190F General Notes SheetBr_03190F Abutment & Wingwall Repair SheetBr_03190F Wingwall Modification SheetBr_03190F Pier Repairs Sheet 1Br_03190F Pier Repairs Sheet 2Br_03190F Pier Repairs Sheet 3Br_03190F Pier Repairs Sheet 4Br_03190F Pier Repairs Sheet 5Br_03190F Framing Plan SheetBr_03190F Deck Plan SheetBr_03190F Typical Section SheetBr_03190F Parapet Modification SheetBr_03190F Joint Details sheet