  • Martin Schmidt

    Slide 1

    07/04/2010

    CDM Specialist TrainingPart 05 - Summary

  • CDM Specialist Training

    Martin Schmidt

    Slide 2

    07/04/2010

    Similar Requirements Well Known in Endress+Hauser

    Module Integration Test :

    (Software Integration Test) :

    (Software Modulation Test) :

    Project :Acceptance :

    Form :

    SAT :

    OQ Documents for Memo-Graph S :

    IQ Test plan :

    Signature List :

    : Software Architecture

    : Software Module Specification

    : User Manual

    : Hardware & System : Software Specification

    PQPerformance

    Qualification

    OQOperational

    Qualification

    DQ ModuleIntegration

    Test

    IQInstallation

    Qualification

    Implementation

    DSSW Design

    Specification

    FSFunctional

    Specification

    DSSystem

    Specification

    URSUser Requirement

    Specification

    Documents for Memo-Graph S :

    AdditionalDocumentation

    Module Integration Test :

    (Software Integration Test) :

    (Software Modulation Test) :

    Project :Acceptance :

    Form :

    SAT :

    OQ Documents for Memo-Graph S :

    IQ Test plan :

    Signature List :

    : Software Architecture

    : Software Module Specification

    : User Manual

    : Hardware & System : Software Specification

    PQPerformance

    Qualification

    OQOperational

    Qualification

    DQ ModuleIntegration

    Test

    IQInstallation

    Qualification

    Implementation

    DSSW Design

    Specification

    FSFunctional

    Specification

    DSSystem

    Specification

    URSUser Requirement

    Specification

    Documents for Memo-Graph S :

    AdditionalDocumentation

  • CDM Specialist Training

    Martin Schmidt

    Slide 3

    07/04/2010

    Position of Endress+Hauser: Fulfiller

    Owner / Investor / OperatorOwner / Investor / Operator

    CDM ConsultantCDM Consultant Biogas EPCBiogas EPC

    AuthoritiesAuthorities

    AutomationAutomation

    Ensure CDM compliant automation solutions and calculate CERs.

    Process Design and Performance with PI&D according CDM rules.

    PI and PDDPI and PDDCDMCDMTeamTeamWorkWork

  • CDM Specialist Training

    Martin Schmidt

    Slide 4

    07/04/2010

    Biogas Composition

    500 mg/m10 .. 30.000 mg/mHydrogen sulfide

    0,7 mg/m0,01 .. 2,5 mg/mAmmonia

  • CDM Specialist Training

    Martin Schmidt

    Slide 5

    07/04/2010

    Tele Alarm Functionality

    Acknowledgment of alarms

    Alarms

    4 20 mA Relays 1-12

    Set relays

    MemographMemograph M : Tele Alarm provides fast M : Tele Alarm provides fast information to plant operator and service information to plant operator and service for fastest possible reaction.for fastest possible reaction.

    CDM requires reliability, sustainability and CDM requires reliability, sustainability and availability. Malfunction need to be availability. Malfunction need to be informed and optimized as fast as possible.informed and optimized as fast as possible.

  • CDM Specialist Training

    Martin Schmidt

    Slide 6

    07/04/2010

    Memograph M Mathematic Module simplified

    Mathematic & Mathematic & Integration Integration FunctionFunction

    DIN

    /ISO 5167

    RMC621 calculation of compensated dp FlowAccording Standard DIN/ISO 5167 !

    MemographMemograph M calculate and M calculate and documented the Methane documented the Methane Flow in kg/h and integrate the Flow in kg/h and integrate the flow over time for the total flow over time for the total amount in kg or t.amount in kg or t.

    In addition (customization),In addition (customization),MemographMemograph M can deliver M can deliver signals to control the gas signals to control the gas engine, to calculate for other engine, to calculate for other biogas measuring points (e.g. biogas measuring points (e.g. flare gas flow) or the control flare gas flow) or the control system at all.system at all.

    Norm Volume Flow

    > Norm Volume/Mass> Norm Volume/Mass> Humidity> Humidity> Gas Composition> Gas Composition

    > > dpdp> p> p> T> T

  • CDM Specialist Training

    Martin Schmidt

    Slide 7

    07/04/2010

    Gas Flow Comparison

    Vortex: Prowirl 72F dp: Deltatop Series

    15D5D (b 0.1) . . 22D (b 0.75)

    15DStraight Length

    Bad (Good for Dry Gas)

    GoodGoodWet Gas accuracy

    LowLowHigh (Need Min Flow)

    Flowrate

    2% (Mass)1% (Volume)1% (Volume)Accuracy

    Thermal MassFlow

    99 DIN/ISO !DIN/ISO !99 recalibrationrecalibration99 T, p compensationT, p compensation

    99 application engineeringapplication engineering99 Service 2Service 2ndnd devicedevice99 NO compensationNO compensation

    99 Service 2Service 2ndnd devicedevice99 complex traceabilitycomplex traceability99 T, p compensationT, p compensation

  • CDM Specialist Training

    Martin Schmidt

    Slide 8

    07/04/2010

    Tips & Traps

  • CDM Specialist Training

    Martin Schmidt

    Slide 9

    07/04/2010

    Tips & Traps

  • CDM Specialist Training

    Martin Schmidt

    Slide 10

    07/04/2010

    Tips & Traps Low Flow/Max Flow

  • CDM Specialist Training

    Martin Schmidt

    Slide 11

    07/04/2010

    Benefits and Added Value Examples

    SAFETY

    QUALITY

    PROFIT

    Competence in Validation, Qualification, Traceable (Re-)Calibration and complete automated solutions will benefit in suitable documentation as well as fast and professional customization of the CDM Solutions.

  • CDM Specialist Training

    Martin Schmidt

    Slide 12

    07/04/2010

    Benefits and Added Value Examples

    SAFETY

    QUALITY

    PROFIT

    CDM Rules and Conservative Way ofCertified Emission Reduction !

    The balance of the calculated and measured emission reduction takes any probable loss and error into account.

    In a conservative way, all possible errors are deducted from the measured and calculated value of Methane and CO2e .

    Therefore, accuracy of instrumentation, equipment and error calculation plays a major role for the profit !

    +x

    -x

    +y

    -y

    Delta CO2e !

    The selection of the Design, the Equipment and the Procedures according Good Practices and described in

    the PDD, will have a Major Impact on the CDM Result !

  • CDM Specialist Training

    Martin Schmidt

    Slide 13

    07/04/2010

    Benefits and Added Value Examples

    CDM Rules and Conservative Way ofCertified Emission Reduction !

    +x

    -x

    +y

    -y

    Delta CO2e !

    Customer Project Description:

    % each error counts

  • Martin Schmidt

    Slide 14

    07/04/2010

    CDM Automation the Key to Success

  • CDM Specialist Training

    Martin Schmidt

    Slide 15

    07/04/2010

    What are the drivers for CDM investors?

    On the example of a PDD:

    Fossil fuel replacement with Methane capture from anaerobic digestion of bio waste.

    The solution has to be:

    As efficient as possible

    Easy and fast to implement

    Lowest risk in CDM validation process

    Fastest return of investment

    Traceability

    Durable to ensure the Verification after years of operation

  • CDM Specialist Training

    Martin Schmidt

    Slide 16

    07/04/2010

    The proven way

    Of course, there are many other ways between how to build a Biogas plant, but there are not much flexibility in the way of engineer a CDM projects.

    Our competence and our solutions will help to implement the CDM Biogas projects much faster and doubtless proven.

    How a system integrationshould not look like!

  • CDM Specialist Training

    Martin Schmidt

    Slide 17

    07/04/2010

    There are different ways to build a Biogas plant

    The simple way without any technology

  • CDM Specialist Training

    Martin Schmidt

    Slide 18

    07/04/2010Patent pending

    Fast ROI

    Easy

    Safety

    Services

    Thank You

    Any Question ?

    CDM AutomationCDM AutomationSpecialist SeminarSpecialist Seminar