Page 1: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

1

1717 Maintenance and Reliability

Maintenance and Reliability

PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management, 8e

PowerPoint slides by Jeff HeylAdditional content from Gerry Cook

Page 2: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

2

Outline

The Strategic Importance of Maintenance and Reliability

Reliability Improving Individual Components Providing Redundancy

Maintenance Implementing Preventive Maintenance

Total Productive Maintenance Techniques for Enhancing Maintenance

Page 3: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

3

Learning Objectives1. Describe how to improve system reliability

2. Determine system reliability

3. Determine mean time between failure (MTBF)

4. Distinguish between preventive and breakdown maintenance

5. Describe how to improve maintenance

6. Compare preventive and breakdown maintenance costs

Page 4: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

4

Orlando Utilities Commission

Maintenance of power generating plants Every year each plant is taken off-line for 1-3

weeks maintenance Every three years each plant is taken off-line

for 6-8 weeks for complete overhaul and turbine inspection

Each overhaul has 1,800 tasks and requires 72,000 labor hours

OUC performs over 12,000 maintenance tasks each year

Every day a plant is down costs OUC $110,000 Unexpected outages cost between $350,000

and $600,000 per day

Page 5: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

5

Strategic Importance of Maintenance and Reliability

Failure has far reaching effects on a firm’s Operation Reputation Profitability Dissatisfied customers Idle employees Profits becoming losses Reduced value of investment in plant and

equipment

Page 6: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

6

Maintenance and Reliability

Reliability is the probability that a machine will function properly for a specified time

Tactics to improve Reliability Improving individual components Providing redundancy

Maintenance: activities involved in keeping a system’s equipment in working order

Maintenance Tactics Implementing or improving preventive maintenance Increasing repair capability or speed

Page 7: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

7

Reliability

Improving individual components

Rs = R1 x R2 x R3 x … x Rn

where R1 = reliability of component 1R2 = reliability of component 2

and so on

Page 8: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

8

Overall System ReliabilityR

elia

bil

ity

of

the

syst

em (

per

cen

t)

Average reliability of each component (percent)

| | | | | | | | |

100 99 98 97 96

100 –

80 –

60 –

40 –

20 –

0 –

n = 10

n = 1

n = 50n = 100n = 200n = 300

n = 400Figure 17.2

Page 9: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

9

Rs

R3

.99

R2

.80

Reliability Example

R1

.90

Reliability of the process is

Rs = R1 x R2 x R3 = .90 x .80 x .99 = .713 or 71.3%

Page 10: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

10

Product Failure Rate (FR)

Basic unit of measure for reliability

FR(%) = x 100%Number of failures

Number of units tested

FR(N) =Number of failures

Number of unit-hours of operating time

Mean time between failures

MTBF =1

FR(N)

Page 11: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

11

Failure Rate Example

20 air conditioning units designed for use in NASA space shuttles operated for 1,000 hoursOne failed after 200 hours and one after 600 hours

FR(%) = (100%) = 10%2

20

FR(N) = = .000106 failure/unit hr2

20,000 - 1,200

MTBF = = 9,434 hrs1.000106

Page 12: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

12

Failure Rate Example

20 air conditioning units designed for use in NASA space shuttles operated for 1,000 hoursOne failed after 200 hours and one after 600 hours

FR(%) = (100%) = 10%2

20

FR(N) = = .000106 failure/unit hr2

20,000 - 1,200

MTBF = = 9,434 hrs1.000106

Page 13: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

13

Providing Redundancy

Provide backup components to increase reliability

+ x

Probability of first

component working

Probability of needing

second component

Probability of second

component working

(.8) + (.8) x (1 - .8)

= .8 + .16 = .96

Page 14: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

14

Redundancy ExampleA redundant process is installed to support the earlier example where Rs = .713

R1

0.90

0.90

R2

0.80

0.80

R3

0.99

= [.9 + .9(1 - .9)] x [.8 + .8(1 - .8)] x .99

= [.9 + (.9)(.1)] x [.8 + (.8)(.2)] x .99

= .99 x .96 x .99 = .94

Reliability has increased

from .713 to .94

Page 15: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

15

Maintenance

Two types of maintenance Preventive maintenance –

routine inspection and servicing to keep facilities in good repair

Breakdown maintenance – emergency or priority repairs on failed equipment

Page 16: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

16

Maintenance Costs The traditional view attempted to

balance preventive and breakdown maintenance costs

Typically this approach failed to consider the true total cost of breakdowns Inventory Employee morale Schedule unreliability

Page 17: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

17

Maintenance Costs

Total costs

Breakdown maintenance costs

Co

sts

Maintenance commitment

Traditional View

Preventive maintenance costs

Optimal point (lowestcost maintenance policy)

Co

sts

Maintenance commitment

Full Cost View

Optimal point (lowestcost maintenance policy)

Total costs

Full cost of breakdowns

Preventive maintenance costs

Page 18: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

18

Maintenance Cost ExampleShould the firm contract for maintenance on their printers?

Number of Breakdowns

Number of Months That Breakdowns Occurred

0 2

1 8

2 6

3 4

Total : 20Average cost of breakdown = $300

Page 19: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

19

Maintenance Cost Example

1. Compute the expected number of breakdowns

Number of Breakdowns

Frequency Number of Breakdowns

Frequency

0 2/20 = .1 2 6/20 = .3

1 8/20 = .4 3 4/20 = .2

∑ Number of breakdowns

Expected number of breakdowns

Corresponding frequency= x

= (0)(.1) + (1)(.4) + (2)(.3) + (3)(.2)

= 1.6 breakdowns per month

Page 20: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

20

Maintenance Cost Example

2. Compute the expected breakdown cost per month with no preventive maintenance

Expected breakdown cost

Expected number of breakdowns

Cost per breakdown= x

= (1.6)($300)

= $480 per month

Page 21: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

21

Maintenance Cost Example

3. Compute the cost of preventive maintenance

Preventive maintenance cost

Cost of expected breakdowns if service contract signed

Cost of service contract

=+

= (1 breakdown/month)($300) + $150/month= $450 per month

Hire the service firm; it is less expensive

Page 22: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

22

Total Productive Maintenance (TPM)

Designing machines that are reliable, easy to operate, and easy to maintain

Emphasizing total cost of ownership when purchasing machines, so that service and maintenance are included in the cost

Developing preventive maintenance plans that utilize the best practices of operators, maintenance departments, and depot service

Training for autonomous maintenance so operators maintain their own machines and partner with maintenance personnel

Page 23: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

23

Problems With Breakdown Maintenance

“Run it till it breaks” Might be ok for low criticality

equipment or redundant systems Could be disastrous for mission-

critical plant machinery or equipment

Not permissible for systems that could imperil life or limb (like aircraft)

Page 24: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

24

Problems With Preventive Maintenance

“Fix it whether or not it is broken” Scheduled replacement or

adjustment of parts/equipment with a well-established service life

Typical example – plant relamping Sometimes misapplied

Replacing old but still good bearings Over-tightening electrical lugs in

switchgear

Page 25: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

25

Another Maintenance Strategy Predictive maintenance – Using advanced

technology to monitor equipment and predict failures Using technology to detect and predict

imminent equipment failure Visual inspection and/or scheduled

measurements of vibration, temperature, oil and water quality

Measurements are compared to a “healthy” baseline

Equipment that is trending towards failure can be scheduled for repair

Page 26: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

26

Maintenance Strategy Comparison

Maintenance Strategy Advantages Disadvantages

Resources/ Technology Required

Application Example

Breakdown No prior work required

Disruption of production, injury or death

May need labor/parts at odd hours

Office copier

Preventive Work can be scheduled

Labor cost, may replace healthy components

Need to obtain labor/parts for repairs

Plant relamping, Machine lubrication

Predictive Impending failures can be detected & work scheduled

Labor costs, costs for detection equipment and services

Vibration, IR analysis equipment or purchased services

Vibration and oil analysis of a large gearbox

Page 27: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

27

In-Class Problems from the Lecture Guide Practice Problems

Problem 1:California Instruments, Inc., produces 3,000 computer chips per day. Three hundred are tested for a period of 500 operating hours each. During the test, six failed: two after 50 hours, two at 100 hours, one at 300 hours, and one at 400 hours. Find FR(%) and FR(N).

Page 28: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

28

In-Class Problems from the Lecture Guide Practice Problems

Problem 2:If 300 of these chips are used in building a mainframe computer, how many failures of the computer can be expected per month?

Page 29: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

29

In-Class Problems from the Lecture Guide Practice Problems

Problem 3: Find the reliability of this system:

Page 30: 1 17 Maintenance and Reliability PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management,

30

In-Class Problems from the Lecture Guide Practice Problems

Problem 4:Given the probabilities below, calculate the expected breakdown cost.Assume a cost of $10 per breakdown.

Number of Breakdowns

Daily Frequency

0 31 22 23 3