7/28/2019 1 9 Format
1/16
S.No Month
Energy Input
Billed and losses Hawal Rainawari K.K.Moulla Khanyar Zakura
Total
ED-IV
Input (LU's) 191.5 121.43 28.92 68.4 56.11 466.36
Billed (LU's) 47.00 38.28 6.28 22.60 13.40 127.56
Losses % 75.46 68.48 78.28 66.96 76.12 72.65
Input (LU's) 172.66 110.79 27.8 58.48 50.28 420.01
Billed (LU's) 45.16 35.70 6.16 21.55 13.69 122.26
Losses % 73.84 67.78 77.84 63.15 72.77 70.89
Input (LU's) 158.9 94.28 23.7 52.77 45.07 374.72
Billed (LU's) 48.36 36.02 6.37 21.60 13.29 125.64
Losses % 69.57 61.79 73.12 59.07 70.51 66.47Input (LU's) 134.34 81.35 21.06 43.04 37.03 316.82
Billed (LU's) 85.88 29.51 6.70 22.00 13.20 157.29
Losses % 36.07 63.72 68.19 48.88 64.35 50.35
Input (LU's) 145.46 81.35 22.2 49.4 37.20 335.61
Billed (LU's) 87.58 29.51 7.22 22.12 13.29 159.72
Losses % 39.79 63.72 67.48 55.22 64.27 52.41
Input (LU's) 152.09 80.68 23.29 53.55 41.37 350.98
Billed (LU's) 60.70 30.76 7.02 23.46 13.03 134.97
Losses % 60.09 61.87 69.86 56.19 68.50 61.54
Input (LU's) 199.7 119.25 30.75 62.39 58.16 470.25Billed (LU's) 47.02 36.21 7.02 38.70 14.52 143.47
Losses % 76.45 69.64 77.17 37.97 75.03 j
Input (LU's) 232.88 139.24 32.01 71.30 61.62 537.05
Billed (LU's) 57.29 41.86 9.172 33.4 14.34 156.06
Losses % 75.40 69.94 71.35 53.16 76.73 70.94
Input (LU's) 245.62 161.01 32.44 83.67 70.54 593.28
Billed (LU's) 61.53 54.22 9.22 20.67 16.49 162.13
Losses % 74.95 66.33 71.58 75.30 76.62 72.67
Input (LU's)
Billed (LU's)
Losses %
9 December
10 January
2
7 October
6 September
May
June
8 November
3
5 August
4 July
(For Achievement under Triparitite MoU and for progress to SERC)
Form # 1 : Monthly Energy-Kashmir
Circle-Ist, Srinagar Division:- Electric Division-IV, Khanyar
MONTHLY ENERGY INPUT, ENERGY BILLED & LOSSES FOR THE YEAR 2012-13.
1 April
-
7/28/2019 1 9 Format
2/16
Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)Losses %
Input (LU's)
Billed (LU's)
Losses %
Electric Division -IV Khanyar
Grand Total:
Executive Engineer
March12
Febuary11
-
7/28/2019 1 9 Format
3/16
Form # 3 : Monthly Revenue-Kashmir
S.No Month
Monthly Revenue
Realised, Pure & ED (Rs.
In lacs) Hawal Rainawari K.K.Moulla Khanyar Zakura ED-IV
Revenue Pure 123.39 26.82 7.62 26.69 6.60 191.12
ED 26.80 5.81 1.69 5.84 1.13 41.27
Total (Rs. In lacs) 150.19 32.63 9.31 32.53 7.73 232.39
Revenue Pure 118.62 92.23 9.23 20.29 23.05 263.42
ED 25.73 13.23 2.04 4.44 4.70 50.14
Total (Rs. In lacs) 144.35 105.46 11.27 24.73 27.75 313.56
Revenue Pure 58.77 13.84 5.07 9.13 12.66 99.47
ED 12.78 3.03 1.12 1.99 2.45 21.37
Total (Rs. In lacs) 71.55 16.87 6.19 11.12 15.11 120.84
Revenue Pure 169.02 155.28 21.73 31.00 30.87 407.90
ED 36.49 30.57 4.78 6.79 6.47 85.10
Total (Rs. In lacs) 205.51 185.85 26.51 37.79 37.34 493.00
Revenue Pure 118.39 85.21 10.22 18.16 27.28 259.26
ED 25.69 13.93 2.25 3.97 5.68 51.52
Total (Rs. In lacs) 144.08 99.14 12.47 22.13 32.96 310.78
Revenue Pure 128.63 61.62 16.45 31.28 31.75 269.73
ED 27.87 11.42 3.67 6.86 6.64 56.46
Total (Rs. In lacs) 156.50 73.04 20.12 38.14 38.39 326.19
Revenue Pure 138.81 112.71 8.48 23.80 39.57 323.37
ED 30.26 23.85 1.87 5.22 8.36 69.56
Total (Rs. In lacs) 169.07 136.56 10.35 29.02 47.93 392.93
Revenue Pure 113.33 76.26 9.30 21.52 26.71 247.12
ED 24.34 16.65 2.07 4.72 5.47 53.25
Total (Rs. In lacs) 137.67 92.91 11.37 26.24 32.18 300.37
Revenue Pure 155.25 186.19 14.30 25.08 29.52 410.34
ED 33.89 29.81 4.06 5.52 5.99 79.27
Total (Rs. In lacs) 189.14 216.00 18.36 30.60 35.51 489.61
Revenue Pure 90.39 103.27 15.35 23.77 32.56 265.34
ED 19.60 17.56 3.36 5.22 6.67 52.41
Total (Rs. In lacs) 109.99 120.83 18.71 28.99 39.23 317.75
8
November
9
December
10
January
5
August
6
September
7
October
2
May
3June
4
July
Circle-Ist, Srinagar Division:- Electric Division-IV, Khanyar
MONTHLY REVENUE REALISED (PURE AND ED) FOR THE YEAR 2012-13
(For Achievement under Triparitite MoU and for progress reporting to SERC)
1
April
-
7/28/2019 1 9 Format
4/16
Revenue Pure 89.31 174 9.28 21.86 30.64 325.09
ED 19.39 35.59 2.03 4.79 6.72 68.52
Total (Rs. In lacs) 108.70 209.59 11.31 26.65 37.36 393.61
Revenue Pure
EDTotal (Rs. In lacs)
Revenue Pure
ED
Total (Rs. In lacs)
11
February
Executive Engineer
Electric Division-IV, Khanyar
12March
13
Total
-
7/28/2019 1 9 Format
5/16
April May June July Aug Sept. Oct Nov. Dec Jan Feb Mar
Domestic 38827 38907 39034 39165 39256 40074 39249 39316 39424
N.Dom/Commercial 8519 8483 8471 8477 8479 8492 8861 8889 8904
Iri/Aggri. 48 48 47 48 48 48 34 34 34
State / Central 187 187 187 187 187 187 187 187 187
Publ;ic Lighting 0 0 0 0 0 0 0 0 0
LT Industries 474 475 475 475 475 475 995 995 996
HT Industries 0 0 0 0 0 0 0 0 0
HT P. Inten. 0 0 0 0 0 0 0 0 0LT Pub. WW 32 32 32 32 32 32 32 32 32
HT Pub. WW 15 15 15 15 15 15 15 15 15
Gen. Bulk 38 38 38 38 38 38 38 38 38
Temporary 0 0 0 0 0 0 0 0 0
Total 48140 48185 48299 48437 48530 49361 49411 49506 49630Domestic 67.64 64.88 66.69 83.98 84.75 71.55 76.26 82.93 86.17
N.Dom/Commercial 15.24 14.69 15.25 18.87 19.17 16.16 17.22 18.73 19.46
Iri/Aggri. 5.40 4.89 5.03 6.29 6.39 5.39 5.74 6.25 6.49
State / Central 7.65 7.46 7.54 9.69 9.78 8.08 8.61 9.37 9.73
Publ;ic Lighting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LT Industries 11.68 11.50 11.72 14.19 14.47 12.52 13.34 14.51 15.08
HT Industries 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
HT P. Inten. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LT Pub. WW 4.97 4.77 4.90 6.18 6.23 5.45 5.81 6.32 6.56
HT Pub. WW 5.10 4.89 5.03 6.29 6.95 5.38 5.73 6.24 6.48
Gen. Bulk 9.88 9.18 9.48 11.80 11.98 10.10 10.76 11.71 12.16
Temporary 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 127.56 122.26 125.64 157.29 159.72 134.63 49554.47 156.06 162.13
Metered 89.29 85.58 87.95 110.10 111.80 94.24 100.43 109.24 113.49
Flat Rate 38.27 36.68 37.69 47.19 47.92 40.39 43.04 46.82 48.64
Total 127.56 122.26 125.64 157.29 159.72 134.63 143.47 156.06 162.13
Connections
EnergyBilled
Form # 5: Category Detail-Kashmir
Circle-Ist, Srinagar Division:- Electric Division-IV, Khanyar
CATEGORIES CONNECTIONS ENERGY SALES AND REVENUE FOR THE YEAR 2012-13
(For Achievement under Triparitite MoU and for progress reporting to SERC)
criptiCategory
Month
-
7/28/2019 1 9 Format
6/16
Desc Category
Domestic 103.38 129.63 79.32 169.93 124.26 139.28 123.07 147.47 172.21
N.Dom/Commercial 56.24 47.10 31.01 55.37 59.14 53.39 84.51 35.73 79.61
Iri/Aggri. 0.00 0.36 0.03 0.00 0.12 14.73 13.44 1.29 3.74
State / Central 68.91 130.00 6.29 250.62 89.38 87.29 150.60 107.24 202.42Publ;ic Lighting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LT Industries 3.66 6.47 4.19 8.64 8.03 5.55 5.34 7.46 8.28
HT Industries 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.44
HT P. Inten. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LT Pub. WW 0.20 0.00 0.00 0.00 21.89 25.95 8.28 1.18 5.37
HT Pub. WW 0.00 0.00 0.00 8.44 7.96 0.00 7.69 0.00 17.54
Gen. Bulk 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Temporary 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 232.39 313.56 120.84 493.00 310.78 326.19 392.93 300.37 489.61
Metered 131.35 177.22 68.30 278.64 175.65 184.36 222.08 169.77 276.73
Flat Rate 101.04 136.34 52.54 214.36 135.13 141.83 170.85 130.60 212.88Total 232.39 313.56 120.84 493.00 310.78 326.19 392.93 300.37 489.61
Electric Division-IV, Khanyar
Executive Engineer
Revenue
-
7/28/2019 1 9 Format
7/16
Form # 2 : Monthly Meters-Kashmir.
S.No Month
Total consumers electronic
metering level and %
metering at end of month Hawal Rainawari K.K.Moulla Khanyar Zakura ED-IV
Total Consumers 21310 11000 3226 7203 5401 48140
Meters Installed 9858 10039 249 3057 3209 26412
% Metering 46.26 91.26 7.72 42.44 59.41 54.86Total Consumers 21360 11064 3233 7076 5452 48185
Meters Installed 10097 10120 263 3416 3362 27258
% Metering 47.27 91.47 8.13 48.28 61.67 56.57
Total Consumers 21396 11137 3221 7076 5469 48299
Meters Installed 10542 10521 336 3517 3959 28875
% Metering 49.27 94.47 10.43 49.70 72.39 59.78
Total Consumers 21443 11199 3225 7076 5494 48437
Meters Installed 10829 10582 425 3625 4072 29533
% Metering 50.50 94.49 13.18 51.23 74.12 60.97
Total Consumers 21497 11192 3225 7097 5519 48530
Meters Installed 11203 10515 563 3928 4102 30311
% Metering 52.11 93.95 17.46 55.35 74.33 62.46
Total Consumers 21855 11510 3225 7225 5546 49361
Meters Installed 11703 10224 711 4162 4284 31084
% Metering 53.55 88.83 22.05 57.61 77.24 62.97
Total Consumers 21889 11511 3224 7238 5549 49411
Meters Installed 11703 10334 711 4284 4370 31402
% Metering 53.47 89.77 22.05 59.19 78.75 63.55
Total Consumers 21914 11543 3225 7239 5585 49506
Meters Installed 12611 10658 711 4216 4527 32723
% Metering 57.55 92.33 22.05 58.24 81.06 66.10
Division:- Electric Division-IV, Khanyar
MONTHLY TOTAL CONSUMERS, ELECTRONIC METERS INSTALLED AND %age ELECTRONIC
FOR THE YEAR 2012-13
(For Achievement under Triparitite MoU and for progress reporting to SERC)
1
April
Circle-Ist, Srinagar
May
August
4
2
November
7
October
8
September
June
July
5
3
6
-
7/28/2019 1 9 Format
8/16
Total Consumers 21933 11556 3221 7236 5628 49574
Meters Installed 12954 10985 821 4312 4806 33878
% Metering 59.06 95.06 25.49 59.59 85.39 68.34
Total Consumers 21943 11582 3225 7231 5649 49630
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
February
Executive Engineer
March
12
9
Electric Division-IV, Khanyar
Total
December
10
11
January
-
7/28/2019 1 9 Format
9/16
S.No Month
Monthly Connections
added
metered and flat rate
(No's) Hawal Rainawari Khanyar K.K.Moulla Zakura ED-IVMetered 64 15 4 5 10 98
Flat Rate 0 0 0 0 0 0
Total 64 15 4 5 10 98
Metered 50 64 -127 7 51 45
Flat Rate 0 0 0 0 0 0
Total 50 64 -127 7 51 45
Metered 36 73 0 -12 17 114Flat Rate 0 0 0 0 0 0
Total 36 73 0 -12 17 114
Metered 47 62 4 0 25 138
Flat Rate 0 0 0 0 0 0
Total 47 62 4 0 25 138
Metered 54 -7 21 0 25 93
Flat Rate 0 0 0 0 0 0
Total 54 -7 21 0 25 93
Metered 358 318 0 128 27 831
Flat Rate 0 0 0 0 0 0
Total 358 318 0 128 27 831
Metered 34 1 -1 13 3 50
Flat Rate 0 0 0 0 0 0
Total 34 1 -1 13 3 50
Metered 25 32 1 1 36 95
Flat Rate 0 0 0 0 0 0
Total 25 32 1 1 36 95
Metered 19 13 -4 -3 43 68
Flat Rate 0 0 0 0 0 0
Total 19 13 -4 -3 43 68
Metered
8 November
9 December
5 August
6 September
7 October
2 May
3 June
4 July
Form # 4: Monthly Connctions-Kashmir
Circle-Ist, Srinagar Division:- Electric Division-IV, Khanyar
MONTHLY CONNECTIONS ADDED (METERED AND FLAT RATE) FROM FOR THE YEAR 2012-13
(For Achievement under Triparitite MoU and for progress reporting to SERC)
1 April
-
7/28/2019 1 9 Format
10/16
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Executive Engineer
Electric Division-IV, Khanyar
11 February
12 March
13 Total
10 January
-
7/28/2019 1 9 Format
11/16
S.No Month Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses
Whether KVAH
Based tariff
implemented
Feeder-1 BAMK 2.00 1.74 0.26 13.00
Feeder-1 Zakura 2.19 1.86 0.33 15.07
Feeder-1 BAMK 1.98 1.75 0.23 11.62
Feeder-1 Zakura 2.03 1.29 0.74 36.45
Feeder-1 BAMK 1.90 1.79 0.11 5.79
Feeder-1 Zakura 1.75 1.42 0.33 18.86
Feeder-1 BAMK 1.98 1.75 0.23 11.62
Feeder-1 Zakura 1.66 1.46 0.20 12.05
Feeder-1 BAMK 2.57 1.70 0.87 33.85
Feeder-1 Zakura 1.58 1.56 0.02 1.27
Feeder-1 BAMK 2.49 2.36 0.13 5.22
Feeder-1 Zakura 1.24 1.18 0.06 4.84
Feeder-1 BAMK 2.32 1.81 0.51 21.98
Feeder-1 Zakura 1.80 1.46 0.34 18.89
Feeder-1 BAMK 2.30 1.55 0.75 32.61
Feeder-1 Zakura 1.71 1.68 0.03 1.75
Feeder-1 BAMK 2.84 1.74 1.10 38.73
Feeder-1 Zakura 2.45 2.04 0.41 16.73Feeder-1 BAMK
Feeder-1 Zakura
Feeder-1 BAMK
Feeder-1 Zakura
Feeder-1 BAMK
Feeder-1 Zakura
Feeder-1 BAMK
Feeder-1 Zakura
Form # 6: En. Aud. Ind.
Circle-Ist, Srinagar Division:- Electric Division-IV, Khanyar
MONTH WISE AUDIT OF INDUSTRIAL FEEDERS
3
September-126
4
August-12
(For Achievement under Triparitite MoU and for progress reporting to SERC)
May-12
July-12
April-12
June-12
5
2
January-13
7
Total
February-13
October-12
November-12
December-12
Executive Engineer
1
Grand Total
8
9
10
11
March-1312
-
7/28/2019 1 9 Format
12/16
Electric Division -IV Khanyar
-
7/28/2019 1 9 Format
13/16
Division:- Electric Division-IV, Khanyar
ED-IV
54Energy Supplied KWH) 16.11
Energy Billed (KWH) 10.07
Amount Billed (Lacs) 135.43
Revenue Collectted (Lacs) 69.06
% of Revenue Collection 50.99
Energy Supplied KWH) 16.15
Energy Billed (KWH) 10.09
Amount Billed (Lacs) 136.84
Revenue Collectted (Lacs) 36.24
% of Revenue Collection 26.48
Energy Supplied KWH) 16.74
Energy Billed (KWH) 10.46
Amount Billed (Lacs) 141.68
Revenue Collectted (Lacs) 118.96% of Revenue Collection 83.96
Energy Supplied KWH) 15.24
Energy Billed (KWH) 9.52
Amount Billed (Lacs) 131.35
Revenue Collectted (Lacs) 134.40
% of Revenue Collection 102.32
Energy Supplied KWH) 15.83
Energy Billed (KWH) 9.89
Amount Billed (Lacs) 139.07Revenue Collectted (Lacs) 107.10
% of Revenue Collection 77.01
Energy Supplied KWH) 15.49
Energy Billed (KWH) 0.00
Amount Billed (Lacs) 136.00
Revenue Collectted (Lacs) 157.48
% of Revenue Collection 115 79
Energy Account
for the Month of July, 2012
Energy Account
for the Month of August, 2012
Form # 7
Circle-Ist, Srinagar
MONTHLY ENERGY ACCOUNT & REVENUE REALISATION FOR INSTALLATIONS HAVING LOAD 25 KVA & ABOVE FOR THE YEAR 2012-13
Energy/Revenue Details
Energy Account
for the Month of September, 2012
No. of Consumers
Energy Account
for the Month of April, 2012
Energy Account
for the Month of May,2012
Energy Account
for the Month of June, 2012
-
7/28/2019 1 9 Format
14/16
Energy Supplied KWH) 17.63
Energy Billed (KWH) 11.02
Amount Billed (Lacs) 145.49
Revenue Collectted (Lacs) 61.68
% of Revenue Collection 42.40
Energy Supplied KWH) 22.69
Energy Billed (KWH) 14.18
Amount Billed (Lacs) 169.06
Revenue Collectted (Lacs) 218.92
% of Revenue Collection 129.49
Energy Supplied KWH) 24.07
Energy Billed (KWH) 15.04Amount Billed (Lacs) 178.59
Revenue Collectted (Lacs) 57.29
% of Revenue Collection 32.08
Energy Supplied KWH)
Energy Billed (KWH)
Amount Billed (Lacs)
Revenue Collectted (Lacs)
% of Revenue Collection
Energy Supplied KWH)
Energy Billed (KWH)
Amount Billed (Lacs)
Revenue Collectted (Lacs)
% of Revenue Collection
Energy Supplied KWH)
Energy Billed (KWH)
Amount Billed (Lacs)
Revenue Collectted (Lacs)
% of Revenue Collection
Energy Account
for the Month of March, 2012
Executive Engineer
Electric Division-IV Khanyar
Energy Account
for the Month of November, 2012
Energy Account
for the Month of December, 2012
Total Energy Account
ending Janauary 2012
Energy Account
for the Month of February, 2012
Energy Account
for the Month of October, 2012
-
7/28/2019 1 9 Format
15/16
Form # 8
(For achievement under Tripartite MoU and for progress reporting to SERC)
Division:- Electric Division-IV, Khanyar
No 54
KVA 13239.25
Required
(KVAR) 4516
Installed
(KVAR) 0
Deficiency(KVAR) 4516
%
Deficiency 100
Status of KVAR Compensation for Installations having Load 25 KVA & Above from April to DEC 2012
Circle-Ist, Srinagar
Executive Engineer
Electric Division -IV Khanyar
KVAR Compensation Details ED-IV
Connections with
load 25 KVA & Above
KVAR
Compensation
through ShuntCapacitor
-
7/28/2019 1 9 Format
16/16
Division:- Electric Division-IV, Khanyar
Computerized
Billing April May June July August September October November December January February March
Total Energy Biled (LU's) 127.56 122.26 125.64 157.29 159.72 134.97 143.47 156.06 162.13Energy Billed through
computer
(LU's) 121.56 117.72 122.15 152.00 153.23 130.22 140.11 152.25 158.29
%age computerised Billing 95.30 96.29 97.22 96.64 95.94 96.48 97.66 97.56 97.63
Executive EngineerElectric Division-IV, Khanyar
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Form # 9
Circle-Ist, Srinagar
Monthly detail of Computerised Billed Energy from April, 2012 TO March , 2013.