Page 1: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

1 CTF3 collaboration meeting 2007 G.Geschonke Status

Status of CTF3

G.GeschonkeCERN

Page 2: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

2 CTF3 collaboration meeting 2007 G.Geschonke Status

DL

CLEX 2007-2009building in 2006

2004 2005

CTF3 Programme

2006

Thermionic gun

CR

TL2 2007

30 GHz production(PETS line)and test stand

Photo injector / lasertests from 2006

D FFD

D F D

D F D D F D

D F D

DF DF DF DF DF DF DF DF DF

D F D

F DF D

D FFFDD

D F DD F D

D F DD F D D F DD F D

D F DD F D

DF DF DF DF DF DF DF DF DF DFDF DF DF DF DF DF DF DF DF DF DF DF DF DF DF DF

D F DD F D

F DF DF DF D

Linac

Page 3: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

3 CTF3 collaboration meeting 2007 G.Geschonke Status

Next steps: 2006 (shown at last collaboration meeting)

• Fully commission Delay Loop - done

• Separate Linac from rest of machine -done

• 30 GHz power testing -done

• Construction of CLEX building - started

• Install and commission Combiner Ring - ongoing

Combiner Ring and TL1:Optics: INFN Magnets: BINP/CERN/Lure/CIEMAT/

INFN Power supplies: CERN RF deflectors: INFN Septa: CIEMAT MoU not signed yetKicker: CIEMAT/CERN pulser: CIEMAT/CERN 3 GHz source: CERN Controls: CERN BPM electronics: LAPP / CERN Vacuum chamber + BPM: INFN

MoU not signed yet

If the expected contributions will be provided, the Combiner Ring will be built to schedule

Page 4: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

4 CTF3 collaboration meeting 2007 G.Geschonke Status

DL

CLEX 2007-2009building in 2006

2004 2005

CTF3 status

2006

Thermionic gun

CR

TL2 200730 GHz production(PETS line)and test stand

Photo injector / lasertests from 2006

On schedule so far

D FFD

D F D

D F D D F D

D F D

DF DF DF DF DF DF DF DF DF

D F D

F DF D

D FFFDD

D F DD F D

D F DD F D D F DD F D

D F DD F D

DF DF DF DF DF DF DF DF DF DFDF DF DF DF DF DF DF DF DF DF DF DF DF DF DF DF

D F DD F D

F DF DF DF D

Linac

Combiner Ring installation ongoing, commissioning start in April 2007

Beam up to here

Laser at CERNRF gun under construction

TL1 commissioned

Page 5: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

5 CTF3 collaboration meeting 2007 G.Geschonke Status

CTF3 in 2006

D FFD

DF

F

D F D

D F D D F D

D F D

DF DF DF DF DF DF DF DF DF

D F D

F DF D

D FFFDD

DF

FDD

FF

FF

D F DD F D

D F DD F D D F DD F D

D F DD F D

DF DF DF DF DF DF DF DF DF DFDF DF DF DF DF DF DF DF DF DF DF DF DF DF DF DF

D F DD F D

F DF DF DF D

Linac

Delay Loop

Transfer Line TL2and Combiner Ring

30 GHz RF power testing

Beamup to here

Page 6: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

6 CTF3 collaboration meeting 2007 G.Geschonke Status

RF power plant

10 s-band klystrons 3 GHz35 – 45 MW, 5.5 s

9 with pulse compressors:factor 1.9 – 2 (1.6 s)

3 L-band travelling wave tubes40 kW, 3 s1.5 GHz BW >200 MHz

1 L-band klystron22 MW, 5.5s

RF Pulse compression

LIPS BOC

first 5 klystrons: ~ 5000 hours operation in 20062 klystrons replaced3 thyratrons replacedphase and amplitude stability under investigation

Page 7: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

7 CTF3 collaboration meeting 2007 G.Geschonke Status

CTF3 main activities in 2006

a) Commission Delay Loop + 1.5 GHz bunching system, beam dynamics studies

Three 40 kW travelling wave tubesat 1.5 GHz installed

travelling wave wide-band buncherfor fast phase coding at 1.5 GHz

fast phase switch,5-pulse recombination

1.4 us train length, 3.5 A peak current 1.4 us train length, 3.5 A peak current

Page 8: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

8 CTF3 collaboration meeting 2007 G.Geschonke Status

CTF3 main activities in 2006

b) Operation for 30 GHz CLIC component testing

100 MW produced at 30 GHz, operation for 30 GHz now routine,largely automatic, supervision from CCC

D FFD

DF

F

D F D

D F D D F D

D F D

DF DF DF DF DF DF DF DF DF

D F D

F DF D

D FFFDD

DF

FDD

FF

FF

D F DD F D

D F DD F D D F DD F D

D F DD F D

DF DF DF DF DF DF DF DF DF DFDF DF DF DF DF DF DF DF DF DF DF DF DF DF DF DF

D F DD F D

F DF DF DF D

CTF3 linac

PETs branch

High-gradient test stand, CTF2

High-power transf er line

Two-beam 30 GHz power production in CTF3

CTF3 linac

PETs branch

High-gradient test stand, CTF2

High-power transf er line

Two-beam 30 GHz power production in CTF3

Separation walldecouples operation of linac for 30 GHz testing from installation

Page 9: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

9 CTF3 collaboration meeting 2007 G.Geschonke Status

CTF3 main activities in 2006

c) Installation of : Combiner Ring and Transfer Line TL1

TL1 installed, commissioned with beam,Combiner Ring injection region commissioned,

Combiner Ring installation:all magnets, septa, kicker installed,vacuum chambers and beam diagnostics will be installed before March 2007

Page 10: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

10 CTF3 collaboration meeting 2007 G.Geschonke Status

Improvements

Big effort to improve operational reliability

water temperature stability for RF pulse compression:new system gives stability within ± 0.02 degrees !

automatic system for 3 GHz conditioning, as well as 30 GHz operation for CLIC structure copnditioning/testing

supervision from CCC now possible

Beam dynamics studies:Emittance measurements,better understanding of the machine: model fits machine

Page 11: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

11 CTF3 collaboration meeting 2007 G.Geschonke Status

Jan Feb Mar

Wk 1 2 3 4 5 6 7 8 9 10 11 12 13

Mo 2 9 16 23 30 6 13 20 27 6 13 20 27

Tu

We

Th

Fr

Sa

Su

Apr May Jun

Wk 14 15 16 17 18 19 20 21 22 23 24 25 26

Mo 3 10 17 24 1 8 15 22 29 5 12 19 26

Tu

We

Th

Fr

Sa

Su

Jul Aug Sep

Wk 27 28 29 30 31 32 33 34 35 36 37 38 39

Mo 3 10 17 24 31 7 14 21 28 4 11 18 25

Tu

We

Th

Fr

Sa

Su

Oct Nov Dec

Wk 40 41 42 43 44 45 46 47 48 49 50 51 52

Mo 2 9 16 23 30 6 13 20 27 4 11 18 25

Tu

We

Th

Fr

Sa

Su

CTF3 SHUTDOWNSee planning EDMS

2006 - CTF 3 - Schedule

CTF3 under access control for HV and

RFconditionning

Shut downCTF3

with beamCTF3 closed with keys for Hardware tests

CTF3

SHUTDOWN

CTF3 CR installationBeam in PETS

9 November 2006

Tests BDI

CCC ready

G. Frid

East May

Ascen

Whit.

Jeune G.

CTF3 stop with beam

Beam in TL1

Start conditioning and setting-upTests CO + PO

D.L.(+ PETS)

Installation C.R.

Beam in PETS only

Beam in PETS only

Tests POTests BDI during the night

D.L.

Installation CTS + TL1 + CR + CRM

Linac Conf.

EPAC

Start MKS in diode

POSIPOL

Start CLEXCivil Engineering

Machine open

CTF2 openwater stations tests in Linac

Installation CTS/TL1/CR

CTF3 under access control

Beam in PETS

Tests BI Tests PO

and polarities

1. period:DL commissioning, Beam dynamics studies

operation for 30 GHz at nights and weekends

2. period:operation for 30 GHz power production only,installation of TL1 and CR

3. period:Commissioning TL1 and CR injection,

operation for 30 GHz at nights and weekends

Operation nearly all year !

Page 12: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

12 CTF3 collaboration meeting 2007 G.Geschonke Status

CLEX building

Construction on scheduleEquipment installation from May 2007,Beam foreseen from March 2008

June 2006

31.8.2006

25.10.2006

existing building

D FFD

DF

F

D F D

D F D D F D

D F D

DF DF DF DF DF DF DF DF DF

D F D

F DF D

D FFFDD

DF

FDD

FF

FF

D F DD F D

D F DD F D D F DD F D

D F DD F D

DF DF DF DF DF DF DF DF DF DFDF DF DF DF DF DF DF DF DF DF DF DF DF DF DF DF

D F DD F D

F DF DF DF D

42.5 m

8 m

2m

D FFD

DF

F

D F DDUMPD F D

F

FD

ITB

1.85m

CALIFES Probe beam injector

LIL-ACSLIL-ACSLIL-ACSD F D

D F D

DFDUMP

0.75

1.4m

1

DUMP

22.4 mTBL

2.5m

Transport path

DUMP

DUMP 22 m

2.0m

DF DF DF DF DF DF DF DF

3.0m3.0m6 m

D F D

F DF D

16.5 mTBTS

16 m

TL2’

42.5 m42.5 m

8 m8 m

2m2m

D FFFDD

DF

FDD

FF

FF

D F DD F DDUMPD F DD F D

F

FD

F

FD

F

FD

ITB

1.85m1.85m

CALIFES Probe beam injector

LIL-ACSLIL-ACSLIL-ACSLIL-ACSLIL-ACSLIL-ACSD F DD F D

D F DD F D

DF DFDUMP

0.75

1.4m1.4m

11

DUMP

22.4 m22.4 mTBL

2.5m2.5m

Transport path

DUMP

DUMP 22 m22 m

2.0m2.0m

DF DF DF DF DF DF DF DFDF DF DF DF DF DF DF DF DF DF DF DF DF DF DF DF

3.0m3.0m3.0m3.0m6 m6 m

D F DD F D

F DF DF DF D

16.5 m16.5 mTBTS

16 m16 m

TL2’

Test Beam Line TBL

Jan 2007

Page 13: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

13 CTF3 collaboration meeting 2007 G.Geschonke Status

Collaborating institutes

Countries Funding Agencies LaboratoryCERN CERN

FINLAND Helsinki Inst of Phys (HIP)CEA DAPNIA Saclay

LALLAPPLURE

INDIA* Indian DAE RRCAT, IndoreITALY INFN LNF

Budker Inst (BINP)IAP

Dubna JINRCIEMAT

UPCIFIC

Uppsala UniversityTSL

SWITZERLAND Paul Scherrer Inst (PSI)TURKEY Ankara Univ Group (2)

Northwestern Univ Illinois (NWU)SLAC

CNRS/IN2P3FRANCE

RUSSIA

SPAINMinistry of Education &

Science (MEC)

SWEDENSwedish Research Council

Wallenberg Foundation

USA DOE

* India has not signed the CTF3 MoU, but has an agreement with CERN for the development of novel accelerator technologies

new member

Discussions with : Pakistan, Iran, UK (Cockcroft Institute, J.Adams Institute), JLAB, EPFL, INFN Milan

16 membersinvolving 21 Institutes

Collaboration with RAL within PHIN

Page 14: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

14 CTF3 collaboration meeting 2007 G.Geschonke Status

Ongoing work (2006 and later)

D FFD

DF

F

D F D

D F D D F D

D F D

DF DF DF DF DF DF DF DF DF

D F D

F DF D

D FFFDD

DF

FDD

FF

FF

D F DD F D

D F DD F D D F DD F D

D F DD F D

DF DF DF DF DF DF DF DF DF DFDF DF DF DF DF DF DF DF DF DF DF DF DF DF DF DF

D F DD F D

F DF DF DF D

INFN vac chambers, BPI, installation, optics, operationCIEMAT correctors,BINP quadrupolesLURE quadrupolesCERN magnets, BPM, infrastructure, installationNWU RF bunch length monitorLAPP BPI/BPM electronics

INFN vac chambers, BPI, wiggler, installation, optics, RF deflectorsCIEMAT correctors, septa, kicker + pulserBINP quadrupoles, sextupolesLURE quadrupolesCERN Infrastructure, RF power, installation, magnets, Beam diagnostics, vacuumUppsala Bunch phase monitorLAPP BPI/BPM electronics

RRCAT optics, 5 bending magnets, Al vacuum chambersTSL magnetsCERN Infrastructure, vacuum , magnets, installation

WP 7WP 7 WP 9WP 9

Structures 30 GHz power sourceCTF3 Operation

WP 8

HIP HelsinkiCERNCIEMATSLAC structure testing

Ankara Universities,INFN,JINR Dubna automatic conditioningRRCAT softwareCERN

IAP

Project is covered including TL2.

PSI additional modulator

NWU: Beam loss monitoring

Page 15: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

15 CTF3 collaboration meeting 2007 G.Geschonke Status

Ongoing work in CLEX (2006 and later)

42.5 m

8 m

2m

D FFD

DF

F

D F DDUMPD F D

F

FD

ITB

1.85m

CALIFES Probe beam injector

LIL-ACSLIL-ACSLIL-ACSD F D

D F D

DFDUMP

0.75

1.4m

1

DUMP

22.4 mTBL

2.5m

Transport path

DUMP

DUMP 22 m

2.0m

DF DF DF DF DF DF DF DF

3.0m3.0m6 m

D F D

F DF D

16.5 mTBTS

16 m

TL2’

42.5 m42.5 m

8 m8 m

2m2m

D FFFDD

DF

FDD

FF

FF

D F DD F DDUMPD F DD F D

F

FD

F

FD

F

FD

ITB

1.85m1.85m

CALIFES Probe beam injector

LIL-ACSLIL-ACSLIL-ACSLIL-ACSLIL-ACSLIL-ACSD F DD F D

D F DD F D

DF DFDUMP

0.75

1.4m1.4m

11

DUMP

22.4 m22.4 mTBL

2.5m2.5m

Transport path

DUMP

DUMP 22 m22 m

2.0m2.0m

DF DF DF DF DF DF DF DFDF DF DF DF DF DF DF DF DF DF DF DF DF DF DF DF

3.0m3.0m3.0m3.0m6 m6 m

D F DD F D

F DF DF DF D

16.5 m16.5 mTBTS

16 m16 m

TL2’

Instrumentation Test Beam Linenot presently funded(FP7 GADGET proposal)

CEA Dapnia Saclay overall responsibilityCERNCEA laser beam line, laser beam conditioningLAL RF gun for photo injector

Uppsala University Two Beam Test StandCERN PETS and Accelerating structure

CIEMAT magnet movers, PETS prototype,(+ series ????), PETS tank (series ???)UPC & IFIC : BPM development + electronics (series ???)CERN overall responsibility, optics, RF equipment, diagnostics, infrastructure, quadrupoles ???

Pakistan: stainless steel vacuum components + ???Iran: RF + Beam dynamics simulations

Page 16: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

16 CTF3 collaboration meeting 2007 G.Geschonke Status

Photo Injector

Solenoid

RF inputPhotocathode

Phase 1:off-line testing from 2007

Phase 2:Gun in CTF3: earliest spring 2008 ?????

smaller emittance, faster phase coding, no “satellite bunches”

Cs2Te photo cathode3% QE40 hours life timepulse train: 1.5 s,charge per bunch: 2.33 nCbunch spacing 0.67 nsnumber of bunches: 2332

diode pumped Nd:YLF laser10 J IR / bunch 0.37 J UV on cathode /bunch

LAL CERN RAL

Present status: RF gun being built, Laser at CERN, needs to be finished with strong involvement from CERN, INFN Frascati and Milan

Laser is needed also for CALIFES injector !

Page 17: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

17 CTF3 collaboration meeting 2007 G.Geschonke Status

Plan for 2007

Jan Feb Mar

Wk 1 2 3 4 5 6 7 8 9 10 11 12 13

Mo 1 8 15 22 29 5 12 19 26 5 12 19 26

Tu

We

Th

Fr

Sa

Su

Apr May Jun

Wk 14 15 16 17 18 19 20 21 22 23 24 25 26

Mo 2 9 16 23 30 7 14 21 28 4 11 18 25

Tu

We

Th

Fr

Sa

Su

Jul Aug Sep

Wk 27 28 29 30 31 32 33 34 35 36 37 38 39

Mo 2 9 16 23 30 6 13 20 27 3 10 17 24

Tu

We

Th

Fr

Sa

Su

Oct Nov Dec

Wk 40 41 42 43 44 45 46 47 48 49 50 51 52

Mo 1 8 15 22 29 5 12 19 26 3 10 17 24

Tu

We

Th

Fr

Sa

Su

2007 - CTF 3 - Schedule

CTF3 under access control for HV and

RFconditionning

Shut downCTF3

with beamCTF3 closed with keys for Hardware tests

CTF3

SHUTDOW

N

CTF3 CR installationBeam in PETS

16 October 2006

Tests BI

G. Frid

East

May

Ascen

Whit.

Jeune G.

CTF3 stop with beam

Start conditioning

Tests CO + PO

Start MKS in diode

Machine open

Start with beam

WaterInstallation

CR

PAC 07

Work possible in Linac

Work possible in C.R.

Install BPI

Align BPI

start with beam 2. half March,Commission Combiner Ring operation

Install vacuum system for Combiner Ring

operate for 30 GHz productionlike in 2006:nights and weekends, supervised by CCCfull-time during installation of TL2

Install equipment in CLEX from May 2007

Install TL2: Finish optics, detailed layout produce all vacuum elements produce magnets, power convertersVery ambitious, spill over into 2008 ?

Page 18: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

18 CTF3 collaboration meeting 2007 G.Geschonke Status

12 GHz

Decision to change CLIC structure development from 30 GHz to 12 GHz

For 30 GHz: bunch repetition frequency in Linac: 1.5 GHz increase by x2 in DL x5 in CR 15 GHzFor 12 GHz: bunch repetition frequency in Linac: 1.5 GHz increase by x2 in DL x4 in CR 12 GHz

small circumference change in CR can be accomplished with wiggler

no effect on hardware

30 GHz structure programme continues for the moment 12 GHz PETS in TBL 12 GHz PETS and accelerating structures in Two Beam Test Stand

smaller nominal beam current: can be increased by higher current in linac and higher RF power (shorter pulse)

Effect on CTF3:

Page 19: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

19 CTF3 collaboration meeting 2007 G.Geschonke Status

DL

CLEX 2007-2009building in 2006

2004 2005

Conclusion

2006

Thermionic gun

CR

TL2 200730 GHz production(PETS line)and test stand

Photo injector / lasertests from 2006 2007

D FFD

D F D

D F D D F D

D F D

DF DF DF DF DF DF DF DF DF

D F D

F DF D

D FFFDD

D F DD F D

D F DD F D D F DD F D

D F DD F D

DF DF DF DF DF DF DF DF DF DFDF DF DF DF DF DF DF DF DF DF DF DF DF DF DF DF

D F DD F D

F DF DF DF D

Linac

Beam up to here

2007

Page 20: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

20 CTF3 collaboration meeting 2007 G.Geschonke Status

Conclusion

Highly motivated team, excellent collaboration between all partners

Programme almost on schedule

• Commissioned up to including TL1 and CR injection• Combiner Ring to be completed in 2007, • TL2 in 2007 (?)• CLEX : many components covered by collaboration some still missing

Already demonstrated:

• full Beam Loading operation of linac• Phase coding of bunches• Bunch Interleaving in Delay Loop

Page 21: 1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

21 CTF3 collaboration meeting 2007 G.Geschonke Status

Meeting Objectives

Define some open questions:

BPM / BPI: electronics TBL diagnostics – monitor + read-out

PETS TBL: Advance on tank design

Open topics not covered: TBL RF + other diagnostics - discussions with EPFL started, analog front-end ?TBL series components: quadrupoles, PETS, diagnosticsMachine protectionRadiation monitoring