    Jadwal Laporan-1

    Aircraft Structure Development

    REPORT-1

    Aircraft Load Definition

    REPORT-2

    Structure Layout (Concepts Generation

    and Selection)

    REPORT-3

    Initial Sizing and Stress

    Analysis

    24 September 2010 27 Nov 09 18 Dec 09

    Submission date Item Description Reference24/09/10 10:00 Report-1: Flight Loads: Niu, Ch.3; Tooren Ch.5;

    Kamil; Howe, Ch.3.2,

    Ch.8, Ch.9

    - Flight envelope n-V diagrams

    - Wing loads Schrenk Method

    - Fuselage Loads Inertia

    - Tail Loads Schrenk

    - SF, BM, T Diagrams Limit and ManeuversLoads

  • 8/3/2019 1 Design Project Dan Jadwal APS I 2010

    4/13

    Jadwal Laporan-2

    Aircraft Structure Development

    REPORT-1

    Aircraft Load Definition

    REPORT-2

    Structure Layout (Concepts Generation

    and Selection)

    REPORT-3

    Initial Sizing and Stress

    Analysis

    16 Oct 095 Nov 2010

    18 Dec 09Submission date Item Description Reference

    5/11/10 10:00 Report-2: Structural concepts and

    Selection

    Niu: Ch.8 (Wing), Ch.10 (Tail),

    Ch. 11 (Fuselage); Howe, Ch.14- Skin-stringer Configuration Skin-Stringer Types

    - Spar Configuration Spars Number, Position and Types

    - Frame Configurations Frame number, Position and types

    - Ribs Configuration Ribs number, Position and types

    - Wing-Fuselage Joints Joints Types

    - Tail-Fuselage Joints Joint Types

    - Material Selection Material types and Manufacturing

  • 8/3/2019 1 Design Project Dan Jadwal APS I 2010

    5/13

    Jadwal Laporan-3

    Aircraft Structure Development

    REPORT-1

    Aircraft Load Definition

    REPORT-2

    Structure Layout (Concepts Generation

    and Selection)

    REPORT-3

    Initial Sizing and Stress

    Analysis

    16 Oct 09 27 Nov 09 17 Dec 2010

    Submission

    date

    Item Description Reference

    17/12/09

    10:00

    Report-3: Initial Sizing

    and Stress Analysis

    Howe, Ch.15;

    C.T. Sun

    - Wing Sizing and

    Analysis

    Skin and Stringer,

    Spars, and Ribs

    Sizing and Analysis

    - Fuselage Sizing

    and Analysis

    Skin and Stringer

    Sizing and Analysis

    - Tail Sizing and

    Analysis

    Skin and Stringer,

    Spars, and Ribs

    Sizing and Analysis

  • 8/3/2019 1 Design Project Dan Jadwal APS I 2010

    6/13

    Catatan Kerja Mingguan - LOG BOOK(WAJIB di isi dan diserahkan saat design review)

    Periode Kegiatan Nama / NIM Kel. / Tugas Dosen Pembimbing

    ( s.d. ) / / (wing/fuselage/Tail) HS / DW / MK

    Kategori Kegiatan Target Capaian Tindakan Evaluasi

    1. 1. 1. 1.

    2. 2. 2. 2.

    3. 3. 3. 3.

    4. 4. 4. 4.

  • 8/3/2019 1 Design Project Dan Jadwal APS I 2010

    7/13

    Disksusi dengan Dosen Pembimbing

    Design Meeting tiap Jumat jam 15.0016.40 (mulai

    13 Agustus 2010)

    Kelompok 1-4 : R.4.14 (Lt.4)

    Kelompok 5-8 : R.4104 (Lt.4) Kelompok 9-12 : R.4106 (Lt.4)

    Jika dosen berhalangan, mahasiswa menemui dosenpembimbing lain dalam minggu yang sama

    Membawa log book pada tiap pertemuan, ditanda

    tangani oleh dosen pembimbing / dosen pengganti

  • 8/3/2019 1 Design Project Dan Jadwal APS I 2010

    8/13

    Process, Team Work, Communication

  • 8/3/2019 1 Design Project Dan Jadwal APS I 2010

    9/13

    Process, Team Work, Communication

  • 8/3/2019 1 Design Project Dan Jadwal APS I 2010

    10/13

    Design Process

  • 8/3/2019 1 Design Project Dan Jadwal APS I 2010

    11/13

    Design Process

  • 8/3/2019 1 Design Project Dan Jadwal APS I 2010

    12/13

    Team Work

  • 8/3/2019 1 Design Project Dan Jadwal APS I 2010

    13/13

    Communication