1Prelim Findings version 2
Final Findings Presentation
2011-11-11
SM SCAMPI is a service mark of Carnegie Mellon University
Standard CMMI Appraisal Method for Process Improvement (SCAMPI v1.2)
SCAMPISM Lead Appraiser IDNeil Potter (0300286-01)
2Prelim Findings version 2
Agenda
• Objectives of Appraisal• Overview of Appraisal• Appraisal Activities• Capability Maturity Model Integration®
• Scope of Appraisal• Findings• Ratings• Comments & questions
3Prelim Findings version 2
Objectives of Appraisal
• Understand the organization's current management and engineering practices
• Provide an accurate picture relative to CMMI:– Collect process data to understand the current
implemented process– Identify process strengths and weaknesses– Determine the degree of satisfaction of the Process
Areas investigated– Assign ratings / characterizations
4Prelim Findings version 2
Overview of Appraisal
• Organization Undergoing Appraisal
• Sponsor of the Appraisal
5Prelim Findings version 2
Overview of Appraisal
• Appraisal Team Members– Neil Potter, team lead, The Process Group
6Prelim Findings version 2
1.Optional:
Conduct Opening Meeting
9.Deliver Appraisal
Results/ Present Final
Findings
10. Conduct Executive
Session
6.Prepare Prelim
Findings + Validate OE
8. Consolidate, Rate and Generate
Appraisal Results
11.Assessment Wrap-up
Day 1 Day 5
Parallel Activities:Perform Document Review
Perform Follow-up Interviews
2.Interview Project
Leaders +Verify OE
3.Interview
Snr./Middle Managers +Verify OE
Appraisal Activities
5.Consolidate +Examine OE
4.Interview
Functional Area Representatives +
Verify OE
7.Present Prelim
Findings + Validate OE
5.Consolidate +Examine OE
5.Consolidate +Examine OE
OE = Objective Evidence
7Prelim Findings version 2
CMMI 1.2 - Staged Representation
Organizational Innovation and Deployment (OID)Causal Analysis and Resolution (CAR)
5 Optimizing
4 Quantitatively Managed
3 Defined
2 Managed
ContinuousProcess Improvement
QuantitativeManagement
ProcessStandardization
BasicProjectManagement
Organizational Process Performance (OPP)Quantitative Project Management (QPM)
Requirements Development (RD)Technical Solution (TS)Product Integration (PI)Verification (VER)Validation (VAL)Organizational Process Focus (OPF)Organizational Process Definition +IPPD (OPD)Organizational Training (OT)Integrated Project Management +IPPD (IPM)Risk Management (RSKM)Decision Analysis and Resolution (DAR)
Requirements Management (REQM)Project Planning (PP)Project Monitoring and Control (PMC)Supplier Agreement Management (SAM)Measurement and Analysis (MA)Process and Product Quality Assurance (PPQA)Configuration Management (CM) Risk
Rework1 Initial
Process AreasLevel Focus QualityProductivity
8Prelim Findings version 2
Scope of Appraisal (Organization)
• Participated in discussions during appraisal– n project leaders– n management representatives– n software practitioners– n validation– n EPG– n QA– n CM– n HR
9Prelim Findings version 2
Scope of Appraisal (Model)
• Maturity Levels Investigated:– Level 3 investigated
• Process Areas Not Applicable:– SAM
Prelim Findings version 2 11
Requirements Management
Description:– The purpose of Requirements Management (REQM) is to manage the
requirements of the project's products and product components and to identify inconsistencies between those requirements and the project's plans and work products.
Strengths:– 公司用 CCB 制度管理需求,并使用需求跟踪矩阵跟踪需求变更的影响与范围。– Requirements are managed using the CCB. RTM tracks the relationship and
impact of requirements changes.
Prelim Findings version 2 13
Project Planning
Description:– The purpose of Project Planning (PP) is to establish and maintain plans that
define project activities.
Strengths:– 公司有制定详细的项目计划,内容包括规模(功能点)、工作量、风险、进度
和干系人。– Project plans are developed, including size (), effort, risks, schedule and stake
holders.
Prelim Findings version 2 15
Project Monitoring and Control
Description:– The purpose of Project Monitoring and Control (PMC) is to provide an
understanding of the project’s progress so that appropriate corrective actions can be taken when the project’s performance deviates significantly from the plan.
Strengths:– 公司对工作量、成本和进度进行了跟踪。并在偏差达到一定的阀值时( 10% )
进行计划调整。– Actual effort, cost and schedule tasks are tracked. Replans occur at defined de
viation percentages (e.g., 10%)
Prelim Findings version 2 16
Project Monitoring and Control
Improvement Opportunities: – 加班工作量要认真收集,以供项目经理、项目组成员和高管了解加班的状况,
掌握项目员工实际生产率,减少项目风险,意识到加班所带来的潜在风险。– 建议加班时间可以累计、可以进行调休。
– Team members need to be more involved in looking at actual effort expended to help management understand the risk of relying on overtime, and improve estimates for future work
Prelim Findings version 2 17
Measurement and Analysis
Description:– The purpose of Measurement and Analysis (MA) is to develop and sustain a
measurement capability that is used to support management information needs.
Strengths:– 公司定义了测量目标并对其进行跟踪(节约成本、合理利用项目资源、控制进
度、提高生产率)。并把数据记录在测量报告和阶段报告。– Measurement objectives are defined and tracked ().
Prelim Findings version 2 19
Process and Product Quality Assurance
Description:– The purpose of Process and Product Quality Assurance (PPQA) is to provide
staff and management with objective insight into processes and associated work products.
Strengths:– QA 使用已定义的检查单在各阶段进行过程检查。 – QA performs process checks for each phase using defined checklists.
Prelim Findings version 2 21
Configuration Management
Description:– The purpose of Configuration Management (CM) is to establish and maintain
the integrity of work products using configuration identification, configuration control, configuration status accounting, and configuration audits.
Strengths:– CM 公司对配置管理进行了策划,并使用 SVN 作为管理工具。– Artifacts to be managed are defined in a CM plan, and managed using SVN.
Prelim Findings version 2 24
Requirements Development
Description:– The purpose of Requirements Development (RD) is to produce and analyze
customer, product, and product-component requirements.
Strengths:– 公司与客户访谈获取需求,并对需求进行优先级排序和评审。– Requirements are elicited from the customer, prioritized and reviewed.
Prelim Findings version 2 26
Technical Solution
Description:– The purpose of Technical Solution (TS) is to design, develop, and implement
solutions to requirements. Solutions, designs, and implementations encompass products, product components, and product-related lifecycle processes either singly or in combinations as appropriate.
Strengths:– 项目组编写了概要设计与详细设计,并在设计文档中对接口进行了定义。项目组还
对编码和设计进行了评审。– High-level, low-level designs are created. Interfaces are defined in design
documents. Code and design are reviewed for defects.
Prelim Findings version 2 28
Product Integration
Description:– The purpose of Product Integration (PI) is to assemble the product from the
product components, ensure that the product, as integrated, functions properly, and deliver the product.
Strengths:– 建立专门的集成环境、配备专职集成人员进行系统集成。也有对集成进行策
划。
Prelim Findings version 2 29
Product Integration
Improvement Opportunities: – 建议对接口的变更有更加全面的跟踪(例如 : 把接口放到需求跟踪矩阵里进行跟
踪)
Prelim Findings version 2 30
Verification
Description:– The purpose of Verification (VER) is to ensure that selected work products
meet their specified requirements.
Strengths:– 项目组按照 WBS 中的安排进行了同行评审和单元测试。– Peer reviews and component testing are performed and planned in the WBS.
Prelim Findings version 2 31
Verification
Improvement Opportunities: – 同行评审的效率不高。加强代码走查,走查时,不但关注规范性,还要注重具
体实现。– 项目组成员必须定期查看同行评审和验证的数据。– 建议对代码走查的数据进行分析,加强同行评审的效果。– 项目组成员应该更加熟悉公司对此过程域的期望。
– Need to find more interface issues before system test. For example, review interface definitions in RTM, peer review interface definitions in requirements, design and code reviews, and test interfaces during component test.
Prelim Findings version 2 32
Validation
Description:– The purpose of Validation (VAL) is to demonstrate that a product or product
component fulfills its intended use when placed in its intended environment.
Strengths:– 制定并根据测试计划进行相关的测试。并且搭建了专门的测试环境。
Prelim Findings version 2 34
Organizational Process Focus
Description:– The purpose of Organizational Process Focus (OPF) is to plan, implement,
and deploy organizational process improvements based on a thorough understanding of the current strengths and weaknesses of the organization’s processes and process assets.
Strengths:– 公司按照商业目标进行过程改进(提高软件和项目的质量,降低缺陷率,降低
产品和项目的开发成本)。– Business objectives are used to drive process improvement ().
Prelim Findings version 2 36
Organizational Process Definition
Description:– The purpose of Organizational Process Definition (OPD) is to establish and
maintain a usable set of organizational process assets and work environment standards.
Strengths:– 公司定义了完整的标准过程,并在 PDP 中体现,包括了瀑布、迭代、增量等模
型的裁剪指南。– There is a defined set of processes to use, summarized in the PDP.
Includes waterfall, Spiral and some tailoring guidelines.
Prelim Findings version 2 37
Organizational Process Definition
Improvement Opportunities: – 建议大家使用更多的生命周期模型或者修改文档,把模型删减。按照实际要求来选择。
– It is suggested to use and experience other lifecycles in addition to waterfall.
Prelim Findings version 2 38
Organizational Training
Description:– The purpose of Organizational Training (OT) is to develop the skills and
knowledge of people so they can perform their roles effectively and efficiently.
Strengths:– 公司融合了员工技能与部门需求,进行了培训的策划。– Training is planned for the department based on staff skill needs and business
objectives.
Prelim Findings version 2 40
Integrated Project Management
Description: – The purpose of Integrated Project Management (IPM) is to establish and
manage the project and the involvement of the relevant stakeholders according to an integrated and defined process that is tailored from the organization's set of standard processes.
Strengths:– 项目组使用了财富库的数据、历史数据和裁剪进行项目策划。– Projects use the PAL assets and historical data to plan their projects, with
some use of tailoring .
Prelim Findings version 2 41
Integrated Project Management
Improvement Opportunities: – When projects get bigger and there are more external dependencies and
groups to coordinate, expand the use of IPM to include having a master schedule to track and manage these dependencies. » An integrated plan is not just a merge of sub plan documents
Prelim Findings version 2 42
Risk Management
Description:– The purpose of Risk Management (RSKM) is to identify potential problems
before they occur, so that risk-handling activities may be planned and invoked as needed across the life of the product or project to mitigate adverse impacts on achieving objectives.
Strengths:– 项目组对风险进行了评估,管理和评审,并在关键里程碑中进行更新。– Risks are assessed, managed and reviewed, and updated at major milestones.
Prelim Findings version 2 44
Decision Analysis and Resolution
Description:– The purpose of Decision Analysis and Resolution (DAR) is to analyze possible
decisions using a formal evaluation process that evaluates identified alternatives against established criteria.
Strengths:– 每个项目都对技术方案进行了决策分析。– DAR has been used at least once per project for technical solution or tool selec
tion.
Prelim Findings version 2 45
Decision Analysis and Resolution
Improvement Opportunities: – 体系文件应进一步细化决策分析的应用准则 , 并考虑在项目中使用更多的决策分
析。– It is suggested to further define the DAR application criteria and consider
performing more DARs.– 评价的方法只使用了讨论法。进行方案评价的时候使用除 Delphi 以外的方法
(模拟法进行方案的调研研究)。
Prelim Findings version 2 47
Global Strengths
Strengths: • 技术能力较强• 领导亲和力强• 好的项目管理及汇报机制• 公司工作氛围好• 提供了很多的锻炼机会• 午餐不错
Prelim Findings version 2 48
Global Areas to Improve
Improvement Opportunities: • 希望多组织一些团队活动,以便加强沟通。• 加班可以调休。• 更新电脑设备,提高配置。• 改善网络环境。• 提供多元化培训,提供多媒体影像培训,提供更多技术方面?、管理方面的培训,增加平均培训时间。
• 为长期外派的同事提供轮换机制。
50Prelim Findings version 2
Rating of CMMI Goals
• The goal is rated Satisfied if– there are no findings that document the weaknesses
associated with a goal,• OR
– (a) all associated practices are characterized at the organizational unit level as either Largely Implemented or Fully Implemented, and (b) the aggregate of weaknesses associated with the goal does not have a significant negative impact on goal achievement.
• Otherwise the goal is rated Unsatisfied.
© 2003 by Carnegie Mellon University
51Prelim Findings version 2
Rating of Process Areas(Staged)
Satisfied If and only if all of the process area’s relevant specific and generic goals are rated as satisfied.
Unsatisfied One or more relevant goals of the process area are rated unsatisfied.
Not applicable Process area is determined to be outside the organization unit’s scope of work during planning by
the Team Leader and Sponsor.
Not rated One or more of the goals in a PA is rated Not Rated and none of the other goals are rated Unsatisfied.
Out of Scope Process area is outside reference model scope.