1 | program name or ancillary texteere.energy.gov water power peer review sensor fish redesign...

4
1 | Program Name or Ancillary Text eere.energy.gov Water Power Peer Review Sensor Fish Redesign Collaboration Z. (Daniel) Deng Thomas J. Carlson Pacific Northwest National Laboratory [email protected] (509) 372- 6120 Thomas. C arlso [email protected] (503) 417-7562 DOE Water Power Program Tim e-seconds Pressure-atm Penstock Turbine Inlet Draft Tube Tailwater Turbine Blades 0 5 10 20 35 40 45 50 30 25 15 0 1 2 3 4 Intake

Upload: cordelia-conley

Post on 24-Dec-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sensor Fish Redesign Collaboration Z. (Daniel) Deng Thomas J. Carlson Pacific

1 | Program Name or Ancillary Text eere.energy.gov

Water Power Peer Review

Sensor Fish Redesign CollaborationZ. (Daniel) Deng

Thomas J. Carlson

Pacific Northwest National [email protected] (509) 372-6120Thomas. [email protected] (503) 417-7562November, 2011

DOE Water Power Program

Time - seconds

P res

sure

-at m

Penstock

TurbineInlet

Draft Tube

TailwaterTurbineBlades

0 5 10 20 35 40 45 50302515

0

1

2

3

4

Intake

Page 2: 1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sensor Fish Redesign Collaboration Z. (Daniel) Deng Thomas J. Carlson Pacific

2 | Wind and Water Power Program eere.energy.gov

• Project Purpose– Redesign a proven device to address current needs to observe

conditions in the water passageways of hydroturbines that affect power production performance and fish passage safety

• Objectives– Identify measurement applications identified by turbine designers, power

production entities, research institutes, and regulators– Develop design specifications that address application needs– Build and test prototypes in the laboratory and at operating power

production facilities

• Integration– Place the sensor fish a commercial vendor that can build the sensor and

support its use by others

Purpose, Objectives, & Integration

Page 3: 1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sensor Fish Redesign Collaboration Z. (Daniel) Deng Thomas J. Carlson Pacific

3 | Wind and Water Power Program eere.energy.gov

Technical Approach

• Work with potential users to identify requirements for application

• Design to meet application requirements• Perform both laboratory and full scale field tests of

prototypes• Implement an innovative design to reduce deployment

and recovery complexities and costs• Place the new Sensor Fish with a commercial vendor

capable of building the sensor at a competitive cost and supporting its users

Page 4: 1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sensor Fish Redesign Collaboration Z. (Daniel) Deng Thomas J. Carlson Pacific

4 | Wind and Water Power Program eere.energy.gov

Plan, Schedule, & Budget

Schedule• Initiation: January 2012• Completion: September 2013• FY12 Milestones

– Q2: Application Space Definition– Q3: Design Specification Finalization, Prototype Build Initiation– Q4: Complete Prototype Build, Initiate Laboratory Testing

Budget– DOE Funding $300K– Partner Funding $50K– Partner In-Kind Contributions of Labor and Support for Field

Testing