Page 1: 1a - Rate Study PowerPoint Presentation
Page 2: 1a - Rate Study PowerPoint Presentation

Study Workshops are designed to be both educational and to seek broad direction from the Board

Workshop #1 Financial Forecast & Cost of Service•Water, recycled water, & sewer services

• Revenue requirement• Cost of service

Workshop #1 Financial Forecast & Cost of Service•Water, recycled water, & sewer services

• Revenue requirement• Cost of service

Workshop #2 & 3 Customer Data Analysis & Rate Design Alternatives• Customer data analysis & forecasted trends

• Rate design alternatives

Workshop #2 & 3 Customer Data Analysis & Rate Design Alternatives• Customer data analysis & forecasted trends

• Rate design alternatives

Workshop #4, 5, & 6 Resulting Rates & Customer Impacts• Rate design and calculation

• Review of customer impacts

Workshop #4, 5, & 6 Resulting Rates & Customer Impacts• Rate design and calculation

• Review of customer impacts

Workshop #7Cost of Service Refinement• Address received feedback

• Overview of previous presentations

Page 3: 1a - Rate Study PowerPoint Presentation

The Board provided general direction on the following items:

• Rates to be increased gradually rather than “just in time”• Greater recovery of fixed expenditures• General Rate Structure Revisions

– Simplify existing structure– Stabilize revenues & cost recovery– Updates based on Cost of Service

Page 4: 1a - Rate Study PowerPoint Presentation

Board provided specific direction throughout Workshops 3, 4, and 5.

• Sewer Rate Considerations– SFR: Fixed structure with 3 volumetric blocks– SFR: Sewer usage proxy based on Winter Quarter Average– Commercial: Simplify 20 classes to 3 categories 

• Water Rate Structure Alternatives– SFR: Revise structure to 3 tiers (from 5) – Unique uniform rates for MFR, commercial, potable irrigation– Affirmed outlined Fixed & Demand Charge methodology

• Recycled Water– Fixed + Variable structure, with no demand charge

• Preliminary Revenue Requirement Analysis– Desire to move forward assuming funding of O&M, R&R CIP, and both 

the Tunnel and Desal Projects– Requested funding alternative if Desal was not moved forward

Page 5: 1a - Rate Study PowerPoint Presentation

Workshop #5 outlined three high level revenue scenarios for discussion

• Revenue Requirement Scenarios1. Operation & Maintenance (O&M) and 

Repair & Replacement (R&R)2. O&M, R&R, and Tunnel Project Only3. O&M, R&R, Tunnel, and Desal Projects

• Received general consensus for Scenario #3– Although the decision to move forward with Desal is not final, 

Scenario #3 provides greater flexibility• Additionally, Board requested Staff review the following:

– Forecasted Draft 5‐year CIP– Reserve Policy– District Debt Policy

Page 6: 1a - Rate Study PowerPoint Presentation

Revenue RequirementsAnalysis

Based on refined financial forecast, requesting Board to 

approve presentation of final rates at next workshop

Page 7: 1a - Rate Study PowerPoint Presentation

Planned Capital Improvement Plan $8M/yr in rate funded capital (FYE 2017 – 2021)Remainder to be paid from Cash position

$5.6$8.0 $8.0 $8.0

$3.8 $3.8 $3.8 $4.0 $4.1 $4.2

$8.9

$8.2$4.8

$8.9

$7.7$9.6

$4.5 $4.6 $4.8 $4.9

$0

$2

$4

$6

$8

$10

$12

$14

$16

$18

FYE2016

FYE2017

FYE2018

FYE2019

FYE2020

FYE2021

FYE2022

FYE2023

FYE2024

FYE2025

Millions

Proposed Capital Improvement PlanTotals Exclude Debt Funded Projects (Tunnel & Desal)

Funded by Cash

Funded by RatesDrop in Blue Bars offset by 

increase in assumed debt service

Due to rate smoothing, reviewed differences between Rate or Cash funded has no impact to proposed increases

Page 8: 1a - Rate Study PowerPoint Presentation

Without increases, existing Rates and Cash are insufficient to support proposed O&M & CIP

$0

$10

$20

$30

$40

$50

$60

FYE2016

FYE2017

FYE2018

FYE2019

FYE2020

FYE2021

FYE2022

FYE2023

FYE2024

FYE2025

Millions

Status Quo: Forecast at Existing RatesOperating Expenditures Non‐Operating ExpendituresCapital (Annual Debt Service) Capital (Rate Funded)Capital (Cash Funded) Total Revenue Without Increases

Tunnel and Desal Project Costs (Debt) are shown in Dark Blue Bars (above)

Page 9: 1a - Rate Study PowerPoint Presentation

Proposed Increases support O&M + CIP + Desal & TunnelUse of Cash supports Board objective of rate smoothing 

9% 8% 7% 3% 3% 3% 3% 3% 3%$0

$10

$20

$30

$40

$50

$60

FYE2016

FYE2017

FYE2018

FYE2019

FYE2020

FYE2021

FYE2022

FYE2023

FYE2024

FYE2025

Millions

Financial Forecast with Proposed Revenue AdjustmentsOperating Expenditures Non‐Operating ExpendituresCapital (Annual Debt Service) Capital (Rate Funded)Capital (Cash Funded) Total Revenues

Cash Reserves used to fund capital in excess of revenuesDebt Coverage Ratio of 1.62x (FYE 2022)

Proposed Revenue Increases

Page 10: 1a - Rate Study PowerPoint Presentation

Following proposed increase, Cash funded capital projects are forecasted reduce cash balance

$24 $18  $17  $14  $13  $11  $10  $9  $8  $7 

 $‐

 $5

 $10

 $15

 $20

 $25

 $30

FYE2016

FYE2017

FYE2018

FYE2019

FYE2020

FYE2021

FYE2022

FYE2023

FYE2024

FYE2025

Millions

Available Cash

 Cash Position

Page 11: 1a - Rate Study PowerPoint Presentation

Water Rate Design

Page 12: 1a - Rate Study PowerPoint Presentation

Water: Rate design updated to reflect changes in water demands and system utilization 

Existing Rate Design• Two Components

– Fixed + Variable Charge

• SFR – 5 Tiers

• MFR – Uniform

• Commercial – Uniform

• Potable Irrigation – Tiered Allocation

• Recycled Water – 90% of Commercial Rate

Modeled Rate Design• Three Components (Potable)

– Fixed + Demand + Variable

• Class specific variable design– SFR – 3 Tiers – MFR – Uniform– Commercial – Uniform– Potable Irrigation – Uniform

• Recycled Water– Fixed + Variable

Shown at Workshop #4

Page 13: 1a - Rate Study PowerPoint Presentation

Water: Rate design philosophy is founded on cost of service principles and SCWD’s system & utilization

Three rate components designed to reflect Cost of Service (pertains to all potable water classes):1. Fixed Charge

– Recovers fixed costs based on provided capacity– Collected on the tax roll

2. Demand Charge– Recovers fixed costs based on utilized capacity– Collected on the tax roll

3. Variable Charge– Volumetric based charge, per CCF, based on variable costs– Billed monthly

Shown at Workshop #4

Page 14: 1a - Rate Study PowerPoint Presentation

Water: Proposed Fixed Service Charges are set to recover half of fixed costs

FY ‘17 Fixed Charge CalculationWater Revenue Requirement $16.3 Million

Fixed Allocation $9.7 Million 

Allocated to Fixed Charge $4.85 Million 

¾” Meter Equivalents 18,968 

Annual Rate per ME(Collected on the Tax Roll)

$255.90 

FY ‘17 Modeled ChargeMeter Size

CurrentRate

Proposed Ratios**

July 2016(Rate * Ratio)

3/4" $294.20  30/30 = 1 $255.90 

1" 529.56  50/30 = 1.67  426.50 

1.5" 1,182.69  100/30 = 3.33  852.95 

2" 2,100.60  160/30 = 5.33  1,364.70 

3" 4,727.83  350/30 = 11.67  2,985.25 

4" 8,399.48  630/30 = 21.00 5,373.45 

6" 18,896.62  1300/30 = 43.33  11,088.00 

Based on Full Funding O&M + CIP + Desal & Tunnel

** Ratios based on gallon per minute (gpm) flows relative to a ¾” meter. For example, a 1” meter with a flow of 50 gpm is divided by the ¾” flow of 30 gpm to achieve a 1.67 ratio

Page 15: 1a - Rate Study PowerPoint Presentation

Water: Remaining fixed costs to be recovered through the new Demand Charge

FY ‘17 Demand Charge Calculation FY ‘17 Methodology

• Blue area represents underutilized fixed costs (capital and distribution)

• Based on 2nd highest month– Minimizes adjustments

• Individualized per account

• Encourages Conservation

Water Revenue Requirement $16.3 Million

Fixed Expenditures $9.7 Million 

Allocated to Demand Charge1 $4.58 Million 

Account’s Peak Month Demand (CCF) 252,000

Rate per CCF(2nd Max Month * Rate)Collected on the Tax Roll

$18.20

1 Adjusted for Recycled Water Customers

Based on Full Funding O&M + CIP + Desal & Tunnel

Page 16: 1a - Rate Study PowerPoint Presentation

Water: Tiered rates are sized and designed to reflect SCWD’s SFR demand patterns and system

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

 ‐

 100

 200

 300

 400

 500

 600

 700

 800

 900

 1,000

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29

Cumulative % of A

ccou

nts

Accoun

ts

Cumulative Demand (CCF)

SFR Monthly Demand Patterns

Sep‐15 Jan‐15

% of Accounts ‐ Sept % of Accounts ‐ Jan

RefinedAllocation % Share

FYE 2017Rate

Tier 1 1 – 5 CCF 50% $2.58Tier 2 6 – 18 43% 2.73Tier 3 19+ 7% 2.88

* Variable Rate billed monthly

Based on Full Funding O&M + CIP + Desal & Tunnel

Page 17: 1a - Rate Study PowerPoint Presentation

Water: Based on the outlined rate design changes, impact will be varied between customers

¾” Customer Existing Rates ¾” Customer FY ‘17 Modeled Rates

Changes to the Fixed Charge (AWWA Ratios) and creation of a Demand Charge provide greater financial stability – Existing is 44% | Modeled Fixed to 61% Fixed

FY ‘17 Rates include revenue increase 

$44 

$57 

$65 $61 

$75 

$57 

$65 

$57 

$48 $48 $44 $44 

 $‐

 $10

 $20

 $30

 $40

 $50

 $60

 $70

 $80

Jan7ccf

Feb10ccf

Mar12ccf

Apr11ccf

May14ccf

Jun10ccf

Jul12ccf

Aug10ccf

Sep8ccf

Oct8ccf

Nov7ccf

Dec7ccf

Fixed Variable Total

$58 

$66 $72 $69 

$77 

$66 $72 

$66 $61 $61 $58 $58 

 $‐

 $10

 $20

 $30

 $40

 $50

 $60

 $70

 $80

Jan7ccf

Feb10ccf

Mar12ccf

Apr11ccf

May14ccf

Jun10ccf

Jul12ccf

Aug10ccf

Sep8ccf

Oct8ccf

Nov7ccf

Dec7ccf

Fixed Demand Variable Total

Page 18: 1a - Rate Study PowerPoint Presentation

Water: Based on the outlined rate design changes, impact will be varied between customers

1” Customer Existing Rates 1” Customer FY ‘17 Modeled Rates

Proposed rate structure stabilizes revenue volatilityExisting is 59% | Modeled Fixed to 68% Fixed 

FY ‘17 Rates include revenue increase 

$64 

$76 $85 

$80 

$95 

$76 $85 

$76 $68 $68 

$64 $64 

 $‐

 $10

 $20

 $30

 $40

 $50

 $60

 $70

 $80

 $90

 $100

Jan7ccf

Feb10ccf

Mar12ccf

Apr11ccf

May14ccf

Jun10ccf

Jul12ccf

Aug10ccf

Sep8ccf

Oct8ccf

Nov7ccf

Dec7ccf

Fixed Variable Total

$72 $80 

$86 $83 $91 

$80 $86 

$80 $75 $75 $72 $72 

 $‐

 $10

 $20

 $30

 $40

 $50

 $60

 $70

 $80

 $90

 $100

Jan7ccf

Feb10ccf

Mar12ccf

Apr11ccf

May14ccf

Jun10ccf

Jul12ccf

Aug10ccf

Sep8ccf

Oct8ccf

Nov7ccf

Dec7ccf

Fixed Demand Variable Total

Page 19: 1a - Rate Study PowerPoint Presentation

Water: Based on the outlined rate design changes, impact will be varied between customers

 $(6.00)

 $(4.00)

 $(2.00)

 $‐

 $2.00

 $4.00

 $6.00

 $8.00

 $10.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 200

100

200

300

400

500

600

700

800

900

Mon

thly Bill Im

pact

Usage (CCF)

# of Accou

nts

Average Monthly Impact (FY ‘17 Rates)

SFR Accounts Monthly Impact ($)

Page 20: 1a - Rate Study PowerPoint Presentation

Water: Multi Family class and rate created to reflect distinct uses and updated Cost of Service results

MFR Variable Rate• Separate rate better reflects MFR user characteristics

• Uniform rate provides simplicity, ease of understanding, and ease of application

• Existing Rate per CCF: $4.13

FY ‘17 Modeled Rate

MFR Variable Allocation $1.07 MillionMFR Water Usage

(Annual CCF) 412,000 

Rate per CCF $2.60 

Based on Full Funding O&M + CIP + Desal & Tunnel

MFR to also pay the proposed Fixed Charge (Slide 15) and 

Demand Charge (Slide 16) on the Tax Roll

Page 21: 1a - Rate Study PowerPoint Presentation

Water: Commercial class and rate created to reflect distinct uses and updated Cost of Service results

Commercial Variable Rate• Best reflects class’ heterogeneous needs

• Uniform rate provides simplicity, ease of understanding, and ease of application

• Existing Rate per CCF: $4.13

FY ‘17 Modeled Rate

Higher Commercial uniform rate (relative to MFR) reflects commercial’s higher peaking 

Comm. Variable Allocation $1.18 MillionCommercial Usage

(Annual CCF) 421,600 

Rate per CCF $2.79 

Based on Full Funding O&M + CIP + Desal & Tunnel

Commercial to also pay the proposed Fixed Charge (Slide 15) and 

Demand Charge (Slide 16) on the Tax Roll

Page 22: 1a - Rate Study PowerPoint Presentation

Water: Impact to the 5 largest Commercial users based on May 2015

Existing Rates – 6% Fixed (Annual Cost)

Modeled FY ‘17 Rates – 42% Fixed (Annual Cost)

Proposed rate structure stabilizes revenue volatility

FY ‘17 Rates include revenue increase

$365,870 $357,213 $322,205 

$233,610 

$131,545 

 $‐ $50,000

 $100,000 $150,000 $200,000 $250,000 $300,000 $350,000 $400,000

Existing Fixed Existing Variable Existing Total

$395,574 $392,474 $351,495 

$248,441 

$145,381 

 $‐ $50,000

 $100,000 $150,000 $200,000 $250,000 $300,000 $350,000 $400,000 $450,000

Modeled Fixed Modeled Demand

Modeled Variable Modeled Total

Page 23: 1a - Rate Study PowerPoint Presentation

Water: Potable Irrigation class and rate created to reflect distinct uses and updated Cost of Service results

Potable Irrigation Variable Rate• Existing Tiered Allocation structure is complex and creates greater revenue volatility

• Uniform rate provides simplicity, ease of understanding, and ease of application

Modeled FY ‘17 Rate

Higher uniform rate (relative to MFR) reflects higher peaking 

Potable IrrigationVariable Allocation $0.61 Million

Potable Irrigation Usage (Annual CCF) 207,000 

Rate per CCF $2.90 

Based on Full Funding O&M + CIP + Desal & Tunnel

Potable Irrigation to also pay the proposed Fixed Charge (Slide 15) and 

Demand Charge (Slide 16) on the Tax Roll

Page 24: 1a - Rate Study PowerPoint Presentation

Recycled Water: Under the One Water approach, costs are blended throughout the water system

One Water Concept One Water: Fixed + Variable• Same Fixed Charge as potable customers

• No Demand Charge– Demand Charge allocation 

built into Variable rate

• Recycled water costs are treated similar to Groundwater Recovery Facility

• Recycled Water is simply another customer class

Recycled Water Allocation $1.06 Million

RW Demand Charge Allocation $0.3 Million

Recycled Water Usage (CCF) 323,000 

Annual Cost per CCF $4.13

Potable Irrigation Equivalent $4.73

Recycled Water unit cost roughly equal to commercial rate, Discount 

from Potable Irrigation Rate

Page 25: 1a - Rate Study PowerPoint Presentation

Water: Five year rate schedule defines the maximum allowable rate for each year

Fixed Service Charge All Customers

FYE 2017 FYE 2018 FYE 2019 FYE 2020 FYE 2021

3/4" $255.75  $276.05  $295.25  $304.05  $313.10 

1" 426.25  460.10  492.05  506.70  521.80 

1.5" 852.50  920.15  984.05  1,013.35  1,043.55 

2" 1,364.00  1,472.20  1,574.45  1,621.35  1,669.70 

3" 2,983.75  3,220.40  3,444.05  3,546.70  3,652.45 

4" 5,370.70  5,796.70  6,199.30  6,384.05  6,574.35 

6" 11,082.35  11,961.45  12,792.15  13,173.40  13,566.10 

Demand ChargePer ccf of 2nd highest monthPotable Customers Only

$18.20  $19.65  $21.00  $21.65  $23.60 

Based on Full Funding O&M + CIP + Desal & Tunnel

Page 26: 1a - Rate Study PowerPoint Presentation

Water: Five year rate schedule defines the maximum allowable rate for each year

Variable Rate ($/CCF) FYE 2017 FYE 2018 FYE 2019 FYE 2020 FYE 2021

SFR – Tier 1 $2.58  $2.78  $2.98  $3.06  $3.16 

SFR – Tier 2 $2.73  $2.94  $3.15  $3.24  $3.34 

SFR – Tier 3 $2.88  $3.11  $3.32  $3.42  $3.52 

MFR $2.60  $2.81  $3.00  $3.09  $3.18 

Commercial $2.79  $3.01  $3.22  $3.32  $3.42 

Potable Irrigation $2.90  $3.13  $3.35  $3.45  $3.55 

Recycled Water $4.13  $4.45  $4.76  $4.91  $5.05 

Based on Full Funding O&M + CIP + Desal & Tunnel

Page 27: 1a - Rate Study PowerPoint Presentation

Sewer Rate Design

Page 28: 1a - Rate Study PowerPoint Presentation

Sewer: Existing sewer rates are comprised of two components and vary by customer class

Fixed ChargeCustomer Type

Existing Equivalents

Existing Annual Cost

SFR 1.00 $446.46 Duplex 0.66 296.53 Triplex 0.69 309.89 Fourplex 0.70 314.19 MFR 0.52 231.91

Variable Charge• Residential (SFR & MFR)

– $1.20 per CCF

• Non Residential– 20 separate classes with 14 

unique rates– Rates vary by strength– Minimum charge of 1 EDU

Page 29: 1a - Rate Study PowerPoint Presentation

Sewer: Assumptions can be made to better estimate sewer flows and to improve financial stability

13 

12  13

 

12 

11 

7  7 

9  9  9  9 

AVERAGE CONSUMPTION PER SFR ¾”  ACCOUNT

Dec – Feb could be used as Winter Quarter Average (WQA) Baseline to define sewer demand

Page 30: 1a - Rate Study PowerPoint Presentation

WQA distribution analysis reveals forecasted sewer demands vary within SFR

 ‐

 100

 200

 300

 400

 500

 600

 700

 800

 900

 1,000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Accoun

ts

WQA Demand (CCF)

Accounts by WQA Demands

*20 includes all accounts greater than or equal to 20 CCF** Only includes accounts with calculable WQA

Page 31: 1a - Rate Study PowerPoint Presentation

Sewer: Proposed sewer rate methodology refine existing approach to provided increased stability and clarity

Single FamilyWQA

AllocationFY ‘17 Charge

% of Accounts

Block 1 0 – 5 CCF $574 28%Block 2 6 – 10 $607 49%Block 3 11+ $665 22%

Note: 1) Block 2 is account default. 2) No Rate per CCF. Billed completely on Tax Roll

Multi Family & Commercial• Multi Family

– $385 per dwelling unit (Tax Roll)– $0.70 per ccf (Billed Monthly)

• Commercial– Simplified structure– Low Strength: $6.76/ccf– Medium Strength: $7.71/ccf– High Strength: $9.84/ccf– Minimum Payment $607

Based on Full Funding O&M + CIP + Desal & Tunnel

Page 32: 1a - Rate Study PowerPoint Presentation

Sewer: SFR Customer impacts will be varied as rates no longer impacted by total water use

 ‐

 200

 400

 600

 800

 1,000

 1,200

<=‐$10

 $(9)

 $(8)

 $(7)

 $(6)

 $(5)

 $(4)

 $(3)

 $(2)

 $(1)

 $‐  $1

 $2

 $3

 $4

 $5

 $6

 $7

 $8

 $9

>=$10

Accoun

ts

Monthly Sewer Impact

Page 33: 1a - Rate Study PowerPoint Presentation

Sewer: Five year rate schedule defines the maximum allowable rate for each year

FYE 2017 FYE 2018 FYE 2019 FYE 2020 FYE 2021

SFR – Block 1 $574  $619  $662  $682  $702 

SFR – Block 2 607  654  699  720  741 

SFR – Block 3 665  717  767  790  814 

MFR – Fixed $384.50 $414.75  $443.75  $457.00  $470.75 

MFR ‐ Variable 0.70  0.75  0.81  0.83  0.86 

Commercial ‐ Low Strength $6.76  $7.29  $7.80  $8.03  $8.27 

Commercial – Med Strength 7.71  8.31 8.89 9.15 9.42

Commercial – High Strength 9.84  10.61 11.35 11.69 12.04

Based on Full Funding O&M + CIP + Desal & Tunnel

Page 34: 1a - Rate Study PowerPoint Presentation

Next Steps

• Board to approve Rate Design and Rates– Minor changes may be reflected in Final Workshop

• Finalize Revenue Requirements Analysis• Drafting of Administrative Record (report)• QA/QC Process

Page 35: 1a - Rate Study PowerPoint Presentation

Future workshops will continue to refine the overall cost of service process and address next steps

Workshop #8 (New)TBDReview & Public Comment• Presentation of Draft Report & final rates

Workshop #8 (New)TBDReview & Public Comment• Presentation of Draft Report & final rates

Next Steps• Review & Public Comment• Prepare Draft Cost of Service Report• Outline Schedule for Proposition 218 Process

Next Steps• Review & Public Comment• Prepare Draft Cost of Service Report• Outline Schedule for Proposition 218 Process

Page 36: 1a - Rate Study PowerPoint Presentation

End