SH:02/EARTH WORK file:///home/website/convert/temp/convert_html/55cf9ab8550346d033a3128a/documen /Schedule SH:02-Page:2 SUB HEAD : 2.0 EARTH WORK PREPARATORY WORK Description Unit 2.1 sqm 2.2 sqm 2.3 2.3.1 Beyond 30 cm girth upto and including 60 cm girth Each 2.3.2 Beyond 60 cm girth upto and including 120 cm girth Each 2.3.3 Beyond 120 cm girth upto and including 240 cm girth Each 2.3.4 Above 240 cm girth Each 2.4 -All kinds of soil sqm 2.5 -All kinds of soil sqm 2.6 -All kinds of soil Each EXCAVATION 2.7 -All kinds of soil 2.7.1 By manual means 100 sqm Code No. Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery of the area cleared. Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches removing the roots and stacking of serviceable material and disposal of unserviceable material. Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. Ploughing the existing ground to a depth of 15 cm to 25 cm and watering the same. Excavating holes upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil; as directed within a lead of 50 m and lift upto 1.5 m. Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth upto 50 m and lift upto 1.5 m, disposed soil to be levelled and neatly dressed:

Upload: arup-debnath

Post on 29-Nov-2015

17 views

Category:

Documents


2 download

DESCRIPTION

SOR 2011 PWD R&B Tripura

TRANSCRIPT

Page 1: 2. Building Works_earth Work

SH:02/EARTH WORK

file:///tt/file_convert/55cf9ab8550346d033a3128a/document.xls/Schedule SH:02-Page:2

SUB HEAD : 2.0EARTH WORK

PREPARATORY WORK

Description Unit Rate

2.1

sqm R 2.90

2.2sqm R 1.70

2.3

2.3.1 Beyond 30 cm girth upto and including 60 cm girth Each R 159.30

2.3.2 Beyond 60 cm girth upto and including 120 cm girth Each R 433.80

2.3.3 Beyond 120 cm girth upto and including 240 cm girth Each R 1859.70

2.3.4 Above 240 cm girth Each R 3769.70

2.4

-All kinds of soil sqm R 5.70

2.5

-All kinds of soil sqm R 10.00

2.6

-All kinds of soil Each R 73.50

EXCAVATION

2.7

-All kinds of soil

2.7.1 By manual meansR 2102.60

Code No.

Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.

Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery of the area cleared.Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches removing the roots and stacking of serviceable material and disposal of unserviceable material.

Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m.

Ploughing the existing ground to a depth of 15 cm to 25 cm and watering the same.

Excavating holes upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil; as directed within a lead of 50 m and lift upto 1.5 m.

Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth upto 50 m and lift upto 1.5 m, disposed soil to be levelled and neatly dressed:

100 sqm

Page 2: 2. Building Works_earth Work

SH:02/EARTH WORK

file:///tt/file_convert/55cf9ab8550346d033a3128a/document.xls/Schedule SH:02-Page:3

Description Unit RateCode No.

2.7.2 By mechanical meansR 1280.70

2.8

-All kinds of soil cum R 185.80

2.9

-All kinds of soil cum R 114.70

2.10cum R 3.50

100 sqm

Earth work in rough excavation [by manual means], banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m :

Note: In case the measurement of actual filling is taken to calculate the quantity involved under this item, the entire quantity of filling thus calculated, should not be considered straightway for payment under this item, but the net quantity after deduction 10% quantity for not consolidating the filling under optimum moisture content only should be considered for payment, under this rate, i.e., if the calculated quantity of filling is 10 cum the payment should be made only for 9 cum under this item. (Refer CPWD specification clause 2.10.5)

Banking excavated earth in layers not exceeding 20 cm. in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m.

Note:(Refer CPWD specification clause 2.10.5)If the banking or filling is not consolidated to optimim moisture content the quantity of filling work out after actual measurement should be deducted by 10% to arrive at the net payable quantity. The measurement of excavation as prescribed in this item especially for consolidation, is not for consolidation with optimum moisture content.Hence the deduction of 10% quantity from the actual measured and calculated quantity to arrive a correct quantity for payment is mandatory.

Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated earth in layers not exceeding 20 cm in depth.

Page 3: 2. Building Works_earth Work

SH:02/EARTH WORK

file:///tt/file_convert/55cf9ab8550346d033a3128a/document.xls/Schedule SH:02-Page:4

Description Unit RateCode No.

2.11 Deduct for not watering the excavated earth for banking cum R 34.60

2.12

-All kinds of soil

2.12.1 By manual means cum R 95.60

2.12.2 By mechanical means cum R 90.30

2.13

-All kinds of soil

2.13.1 By manual means cum R 113.40

2.13.2 By mechanical means cum R 106.30

2.14 Extra rates for quantities of works, executed:

2.14.120%

2.14.225%

2.15 Deduct for disposed soil not levelled and neatly dressed. cum R 16.50

2.16

-All kinds of soil cum R 48.80

Earth work in excavation over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.

Earth work in excavation in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.

In or under water and/ or liquid mud, including pumping out water as required.

Metre-depth

In or under foul position, including pumping out water as required.

Metre-depth

Note for item no. 2.14:- The extra percentage rate is applicable in respect of each item but limited to quantities of work executed in these difficult conditions. The unit, namely, metre depth, to be considered for payment, shall be the depth measured from the sub soil water level up to the centre of gravity of the quantity executed in difficult condition. The depth shall be reckoned correct to 0.10m, 0.05m or more shall be taken as 0.10m and less than 0.05m ignore.

Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.

Page 4: 2. Building Works_earth Work

SH:02/EARTH WORK

file:///tt/file_convert/55cf9ab8550346d033a3128a/document.xls/Schedule SH:02-Page:5

Description Unit RateCode No.

2.17 Extra for additional lift of 1.5m or part thereof

-All kinds of soil cum R 13.60

2.18

cum R 424.40

ANTI TERMITE TREATMENT

2.19

2.19.1 Chlorpyriphos/Lindane emulsifiable concentrate of 20% Litre R 228.70

2.20

2.20.1 With Chlorpyriphos/Lindane E.C. 20% with 1% concentration. sqm R 80.10

2.21

2.21.1

With Chlorpyriphos/Lindane E.C. 20% with 1% concentration. m R 17.80

2.21.2

With Chlorpyriphos/Lindane E.C. 20% with 1% concentration. m R 13.60

Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete.

Supplying chemical emulsion in sealed containers including delivery as specified.

Diluting and injecting chemical emulsion for PRE-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) and continuous chemical barrier under and alround the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth of which apron is to be laid, surroundings of pipes and conduits etc. complete as per specification. The work should be carried out as per IS: 6313 (Part II)- Latest revision [Plinth area of the building at ground floor only shall be measured for payment] :

Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment as per IS: 6313 (Part III)- Latest revision (excluding the cost of chemical emulsion):

Along external wall where the apron is not provided using chemical emulsion @ 7.5 litres/sqm of the vertical surface of the substructure to a depth of 300 mm including excavation channel along the wall & rodding etc. complete:

2.21.1.1

Along the external wall below concrete or masonry apron using chemical emulsion @ 2.25 litres per linear metre including drilling and plugging holes etc.

2.21.2.1

Page 5: 2. Building Works_earth Work

SH:02/EARTH WORK

file:///tt/file_convert/55cf9ab8550346d033a3128a/document.xls/Schedule SH:02-Page:6

Description Unit RateCode No.

2.21.3

sqm R 45.90

With Chlorpyriphos/Lindane E.C. 20% with 1% concentration.

2.21.4

With Chlorpyriphos/Lindane E.C. 20% with 1% concentration. m R 14.00

2.22.5

m R 86.80

Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 fine sand) to match the existing floor:

2.21.3.1

Treatment of existing masonry using chemical emulsion @ one litre per hole at 300 mm interval including drilling holes at 45° and plugging them with cement mortar 1:2 (1 cement: 2 fine sand) to the full depth of the hole:

2.21.4.1

Treatment at points of contact of wood work by chemical emulsion Chlorpyriphos/ Lindane (in oil or kerosene based solution) @ 0.5 litres per hole by drilling 6 mm dia holes at downward angle of 45° at 150 mm centre to centre and sealing the same.

Note: For Item No. 2.20 & 2.21.The work will be carried out as per IS: 6313 [Latest Revision].Under the Insecticides Rule 1971: 10(3A) any person who desires to undertake pest control operations will be a Licence holder.The agency must complying with all safety health and welfare regulations, appertaining to staff and work people employed on the site.Keeping the site free from debris arising from the works during the work and leave the site free from debris on completion of work to the satisfaction of the Owner.The agency shall give a 10-year service guarntee in writing supplemented by a seperate and unilateral guarantee from the specialised agency for the job to keep the building free of termites for the specified period at no extra cost of the Owner.