2008 reservor &-gate_operation_schedule

30
Guided by- 1 RESERVOIR OPERATION SCHEDULE AND GATE OPERATION SCHEDULE OF JAYAKWADI PROJECT. Er. Pravin Kolhe (AEE) Er. Sandeep Nalawade (AEE) Er. Bapusabeb Gade (AEE) Er. Santosh Sangale (AEE) PROF. D.G. HOLSAMBRE (PROF & HOD: ENGG) PROF. K.R. SHIRSAT (ASSOCIATE PROF) 15th Induction Training: WALMI A’bad. Wednesday, May 21, 2008 Presented by- PPT Downloaded from http://www.pravinkolhe.com/

Upload: pravin-kolhe

Post on 16-Apr-2017

352 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: 2008 reservor &-gate_operation_schedule

Guided by-

1

RESERVOIR OPERATION SCHEDULE ANDGATE OPERATION SCHEDULE OF

JAYAKWADI PROJECT.Er. Pravin Kolhe (AEE) Er. Sandeep Nalawade (AEE) Er. Bapusabeb Gade (AEE) Er. Santosh Sangale (AEE)

PROF. D.G. HOLSAMBRE (PROF & HOD: ENGG)PROF. K.R. SHIRSAT (ASSOCIATE PROF)

15th Induction Training: WALMI A’bad.Wednesday, May 21, 2008

Presented by-

PPT Downloaded from http://www.pravinkolhe.com/

Page 2: 2008 reservor &-gate_operation_schedule

Salient Features of Jayakwadi Project Introduction to ROS, GOS & EAP Gate Operation Schedule (GOS) Catchment Map of Paithan Dam & River Gauging

Stations Reservoir Operation Schedule (ROS) Concluding Remarks

2

PPT Downloaded from http://www.pravinkolhe.com/

CONTENT

Page 3: 2008 reservor &-gate_operation_schedule

3

1. SALIENT FEATURES OF JAYAKWADI PROJECT

1. Name of project: Jayakwadi Project2. Location: Paithan; Dist: Aurangabad.3 Catchment Area 21750 Sq. Km4 Gross Storage 2909 Mm3

5 Maximum height of dam from river bed 37.73 m6 Length of dam 10280 m7 Length of Spillway 417 m8 Type of Dam Earthen

PPT Downloaded from http://www.pravinkolhe.com/

Page 4: 2008 reservor &-gate_operation_schedule

4

1. SALIENT FEATURES OF JAYAKWADI PROJECT CONTINUE…

9 Submergence Area 35,000 Ha10 Earth Work 13 Mm3

11 Masonry 0.33 Mm3

12 Concrete 0.80 Mm3

13 Gates of Dama. Number 27a. Size 12 x 7.9 ma. Type Radiala. Designed Spillway Capacity 6,41,000 cusecs

14 Power Generation 12 MWPPT Downloaded from http://www.pravinkolhe.com/

Page 5: 2008 reservor &-gate_operation_schedule

5

1. SALIENT FEATURES OF JAYAKWADI PROJECT CONTINUE…

15 Lowest River Bed Level 432.206 m16 Maximum Draw Down Level 455.524 m17 Spillway Crest Level 455.981 m18 Full Reservoir Level 463.900 m19 Maximum Water Level 465.583 m20 Foundation Level of Masonry Dam 427.640 m21 Top of Dam 468.980 m22 Cut-Off Trench Level 419.917 m23 Sill Level of Canal 452.171 m

PPT Downloaded from http://www.pravinkolhe.com/

Page 6: 2008 reservor &-gate_operation_schedule

6

2. CLASSIFICATION OF RESERVOIR

•Single Purpose Reservoirs

•Multi- Purpose Reservoirs

•System of Reservoirs

PPT Downloaded from http://www.pravinkolhe.com/

Page 7: 2008 reservor &-gate_operation_schedule

Reservoir Operation Schedule (ROS) is a scientific tool which helps to maintain the storage in reservoir and at the same time, avoids the risk of flood at down stream.

7

3. INTRODUCTION TO ROS, GOS

Gate Operation Schedule (GOS) is the sequence in which gates are operated so that required discharge is released safely.PPT Downloaded from http://www.pravinkolhe.com/

Page 8: 2008 reservor &-gate_operation_schedule

Emergency Action Plan (EAP) is a pre-decided procedure in which preventive measures are undertaken in case of emergency.

8

4. INTRODUCTION TO EAP

In short, ROS, GOS and EAP helps in safely release of flood without damage to structure, life and property on down stream of dam.

PPT Downloaded from http://www.pravinkolhe.com/

Page 9: 2008 reservor &-gate_operation_schedule

9

5. SPILLWAY OPERATION SCHEDULE

PPT Downloaded from http://www.pravinkolhe.com/

Page 10: 2008 reservor &-gate_operation_schedule

10

6. COMPETENT AUTHORITY FOR APPROVAL OF ROS AND GOS

• ROS & EAP : CE (WRD)• GOS : SE (MD) CDO, NashikMajor Project

• ROS : CE (WRD)• GOS : SE (MD) CDO, Nashik• EAP : SE of Project

Medium Project

• ROS & GOS : Not Applicable for Ungated Waste Weir

• EAP : EE of ProjectMinor Project

PPT Downloaded from http://www.pravinkolhe.com/

Page 11: 2008 reservor &-gate_operation_schedule

GATE OPERATION SCHEDULE (GOS)

11

PPT Downloaded from http://www.pravinkolhe.com/

Page 12: 2008 reservor &-gate_operation_schedule

12

PPT Downloaded from http://www.pravinkolhe.com/

APPROVED GOS FOR JAYAKWADI PROJECT

WLGate

Operation Q/gate GATE NUMBERS(Feet) Left Right cusecs LEFT SIDE RIGHT SIDE

        1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 271522   0.5 529                                                      

     1  1043                                                           1.5  1547                       2  2035                       2.5  2513                       3  2984                                                           3.5  3453                                                           4  3909                                                         0.5    529                                                         1    1043                                                         1.5    1547                                                         2    2035                                                         2.5    2513                                                      

 3    2984                                                      1524     4.5  4492                                                      

     5  4952                                                      

1 12 23 34 45 56 67 78 89 9

Page 13: 2008 reservor &-gate_operation_schedule

Opened 18 Gates by 5 feet (RIGHT SIDE) Discharge = 18 x 4952 cusecs

= 89,136 cusecs Opened 9 Gates by 3 feet (LEFT SIDE) Discharge = 9 x 2984 cusecs

= 26,856 cusecs Total Discharge = (LEFT+RIGHT) =

1,15,992 cusecs

13

DISCHARGE THROUGH GATES…

PPT Downloaded from http://www.pravinkolhe.com/

Page 14: 2008 reservor &-gate_operation_schedule

14

7. EXISTING ROS FOR JAYAKWADI PROJECT

PPT Downloaded from http://www.pravinkolhe.com/

Page 15: 2008 reservor &-gate_operation_schedule

8. INFLOW & OUTFLOW AT DAM SITE DURING 09.10 TO 14.10.1990

15

PPT Downloaded from http://www.pravinkolhe.com/

Page 16: 2008 reservor &-gate_operation_schedule

9. SUMMARY OF GOS FOR JAYAKWADI DAM

16

PPT Downloaded from http://www.pravinkolhe.com/

Page 17: 2008 reservor &-gate_operation_schedule

RESERVOIR OPERATION SCHEDULE (ROS)

17

PPT Downloaded from http://www.pravinkolhe.com/

Page 18: 2008 reservor &-gate_operation_schedule

18

10. CATCHMENT MAP OF PAITHAN DAM

PPT Downloaded from http://www.pravinkolhe.com/

Page 19: 2008 reservor &-gate_operation_schedule

19

11. EXISTING RIVER GAUGING STATIONS

Sr. No

Name of River

River Gauge station

Catchment Area (sq. km)

Distance from dam site

Travelling time form dam

1 Godavari NMC 4247 154 km 30 hours2 Pravara Devgarh 7273 54 km 6 hours3 Shivana Solegaon 2505 36 4 hours

PPT Downloaded from http://www.pravinkolhe.com/

Page 20: 2008 reservor &-gate_operation_schedule

20

12. PROPOSED RIVER GAUGING STATIONS

Sr. No

Name of River

River Gauge station

Catchment Area (sq. km)

Distance from dam site

Travelling time form dam

1 Godavari NAUR 4310 76 km 12 hours2 Shivana Lasur 2267 48 km 6 hours3 Kham Tembhapuri 613 36 km 5 hours

4 Nani Wadule 527 33 km 3 hours5 Dhor Jalgaon 456 48 km 4 hours

PPT Downloaded from http://www.pravinkolhe.com/

Page 21: 2008 reservor &-gate_operation_schedule

21

13. ROS

PPT Downloaded from http://www.pravinkolhe.com/

Page 22: 2008 reservor &-gate_operation_schedule

22

14. STATEMENT SHOWING ROS FOR 1992 1997, 1999, 2006 AND 2007.

PPT Downloaded from http://www.pravinkolhe.com/

Page 23: 2008 reservor &-gate_operation_schedule

23

15. PROPOSED GOS FOR JAYAKWADI PROJECT FOR 2007-08

PPT Downloaded from http://www.pravinkolhe.com/

Page 24: 2008 reservor &-gate_operation_schedule

24

16. FORT NIGHT INFLOW AT JAYAKWADI PROJECT 1975-2006

PPT Downloaded from http://www.pravinkolhe.com/

Page 25: 2008 reservor &-gate_operation_schedule

25

17. FORT NIGHTLY INFLOW IN DESCENDING ORDER

PPT Downloaded from http://www.pravinkolhe.com/

Page 26: 2008 reservor &-gate_operation_schedule

26

WITHDRAWALS FROM DAM

PPT Downloaded from http://www.pravinkolhe.com/

Page 27: 2008 reservor &-gate_operation_schedule

27

WITHDRAWAL FROM DAM

PPT Downloaded from http://www.pravinkolhe.com/

Page 28: 2008 reservor &-gate_operation_schedule

28

ROS

PPT Downloaded from http://www.pravinkolhe.com/

Page 29: 2008 reservor &-gate_operation_schedule

29

CONCLUDING REMARKS

The GOS for designed capacity is not yet tested. Although ROS is generally prepared in case of Flood

situations, it might be useful in case of water deficiency. It is observed that the ROS is prepared by referring the past

data which is based on the old methods of analysis. Now a days rainfall prediction is possible with help of

satellite observations and by performing rigorous analysis of meteorological data, using high speed computer, accurate prediction is of yield possible. Such techniques should be preferred for ROS and GOS.

PPT Downloaded from http://www.pravinkolhe.com/

Page 30: 2008 reservor &-gate_operation_schedule

Thank You…!

© Pravin Kolhe, 2008http://www.pravinkolhe.com/

30