20131029 cs ind brief launch - udicloud.chambermaster.com/userfiles/userfiles/chambers/...design...
TRANSCRIPT
750+ businesses from all sectors
TRAINED
training, tools and cer>fica>on for businesses to manage greenhouse gas emissions and associated expenses
who industries, size, revenue
GHGs sub-‐sector carbon profiles benchmarking among peers
reduc>on strategies & cost savings
why drivers for GHG mgmt
case study
industry brief
Why are you choosing to manage carbon?
“The City of Surrey is our customer and they are moving towards being greener.” ligh%ng contractor Surrey, BC
11% Supply chain / other requirements
28% An%cipa%ng future requirements
42% Marke%ng / reputa%on / brand image
38% Building on exis%ng green ini%a%ves
38% Cost-‐cuBng / efficiency 36% Interest / personal mo%va%on
25% Industry / community engagement
23% CSR mandate
17% Customer / investor / partner demand
9% Networking / B2B opportuni%es
4% Employee reten%on
51%of emissions come from
transport and equipment
Building construction emissions profile
10%Heat
51%Transport and equipment38%Waste
1%Electricity
carbon profiles
92%of emissions come from
transport and equipment
Specialty tradesemissions profile
2%Heat
92%Transport and equipment5%Waste
1%Electricity
benchmarking
likely upper range
likely lower range
reduc>on opportuni>es may exist
you may have a story to tell
} }
50% of businesses
50% of businesses
} }
NO YES
do you know your emissions per FTE? per
0.1
0.08
0.06
0.04
0.02
0
Electricity
1
0.8
0.6
0.4
0.2
0
Heat
10
8
6
4
2
0
Company Transportand Equipment
2
1.6
1.2
0.8
0.4
0
Waste
2.5
2.0
1.5
1.0
0.5
0
Flights Paper
0.5
0.4
0.3
0.2
0.1
0
0.1
0.08
0.06
0.04
0.02
0
Electricity
1
0.8
0.6
0.4
0.2
0
Heat
10
8
6
4
2
0
Company Transportand Equipment
2
1.6
1.2
0.8
0.4
0
Waste
2.5
2.0
1.5
1.0
0.5
0
Flights Paper
0.5
0.4
0.3
0.2
0.1
0
benchmarking
cu=ng carbon
Construc%on firms
61%
56%
56%
44%
$140
$100waste costnot given
$120
$80
$60
$40
$20
$0Shopping
mallOffice
buildingRetirement
homeShopping
mallOffice
buildingRetirement
home
350
250
300
200
150
100
50
0Electricity
Heating
Waste
Annual emissionstonnes CO2e $ CAD (000s)
Annual costs
real estate rental and management
cu=ng carbon
electricity – behaviour change
heat – behaviour change
80%
50%
30% heat – capital upgrades
Real estate lessors and managers
the cost of carbon
breaks down into
$54,200 $28,500 $5,500 air travel$4,000 $1,400 waste $300 paper
$7,800projected cost of carbon-‐ emiJng acKviKes to a construcKon firm, per FTE
of Metro Vancouver’s emissions come from 40% commercial and residen>al buildings
source: Metro Vancouver Regional District
Emissions in Construction Jonathan Meads, Sustainability Manager October 29, 2013
Who is Concert?
• Exclusively owned by union & management pension plans representing over 200,000 Canadians
• Developed some 10,000
condominium and rental apartments since 1989
• Over 10 million square feet of
income producing properties
• Assets in excess of $1.6 billion
Mileage & Cost
$ $
$ $
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
Flight Data
2010 2011
2013 Projected 2012
Mileage & Emissions
0
50
100
150
200
250
300
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000 Flight Data
2010 2011 2012 2013 t CO2e
Flights as Percent of Corporate Travel
8%
55% 0%
37%
2010 -‐ Travel
Road
Air
Water
Staff Commute
Flights as Percent of Corporate Travel
5%
55% 0%
40%
2011 -‐ Travel
Road
Air
Water
Staff Commute
Flights as Percent of Corporate Travel
8%
49% 1%
42%
2012 -‐ Travel
Road
Air
Water
Staff Commute
Energy Audit
Energy Audit
Energy Audit
ANGELA LAI, SENIOR COST CONSULTANT
ADVISORS & PRACTITIONERS
Cutting Carbon + Costs: Taking Stock of Your Business
BTY GROUP’S JOURNEY TO BECOME A
SUSTAINABILITY
BUSINESS
October 29, 2013
A D V I S O R S & P R A C T I T I O N E R S S U S T A I N A B I L I T Y
October 29, 2013 25
PRESENTATION OVERVIEW
ABOUT BTY GROUP
WHY CLIMATE SMART?
MAIN GHG EMISSION SOURCES
KEY REDUCTION STRATEGY
GOING CARBON NEUTRAL
A D V I S O R S & P R A C T I T I O N E R S S U S T A I N A B I L I T Y
October 29, 2013
ABOUT BTY GROUP
26
WE CONDUCT TIMELY AND THOROUGH DUE DILIGENCE BASED ON KNOWLEDGE OF LOCAL MARKETS, FOR THOSE WHO DESIGN, BUILD, FINANCE, AND OPERATE BUILDING AND INFRASTRUCTURE PROJECTS.
CORE SERVICES:
• Cost Management • Cost Planning/ Estimating • Risk Management
• P3 Advisory • Lenders’ Technical Advisor • Independent Certifier
• Management Consulting • Value Engineering • Sustainability Consulting • Asset & Facilities Management Consulting • Scheduling
8 OFFICES: Vancouver, Toronto, Calgary, Edmonton, Saskatoon, St. Catharines, Ottawa, and Montréal.
A D V I S O R S & P R A C T I T I O N E R S S U S T A I N A B I L I T Y
October 29, 2013
WHY CLIMATE SMART?
27
SUSTAINABILITY CONSULTING
BUSINESS SAVINGS
EMPLOYER OF CHOICE
CORPORATE RESPONSIBILITY
A D V I S O R S & P R A C T I T I O N E R S S U S T A I N A B I L I T Y
October 29, 2013
MAIN GHG EMISSION SOURCES
28
Air Travel 64.79
Road 3.14
CommuKng 57.34
Gross 2012 GHG Emissions 132.09 metric tonnes
A D V I S O R S & P R A C T I T I O N E R S S U S T A I N A B I L I T Y
October 29, 2013
KEY REDUCTION STRATEGY - SHIFT IN FUNDING
29
SHIFT IN FUNDING FROM PARKING TO SUPPORTING ALTERNATIVE TRANSPORT
A D V I S O R S & P R A C T I T I O N E R S S U S T A I N A B I L I T Y
October 29, 2013
PROMOTING A REDUCTION CULTURE
30
A D V I S O R S & P R A C T I T I O N E R S S U S T A I N A B I L I T Y
October 29, 2013
GOING CARBON NEUTRAL
31
WE BELIEVE BUYING CARBON CREDITS SHOULD BE PART OF OUR EMISSION REDUCTION STRATEGY
A D V I S O R S & P R A C T I T I O N E R S S U S T A I N A B I L I T Y
October 29, 2013
BTY GROUP RETIRED OFFSETS
32
TIMBERWEST (IMPROVED FOREST MANAGEMENT) STRATHCONA PARK, VANCOUVER ISLAND ESTIMATED VOLUME: 600,000 tCO2 BENEFITS: Habitat for protected species, marbled murrelet, Vancouver Island marmot, Northern goshawk.
COLUMBIA SHUSWAP REGIONAL DISTRICT (COMMUNITY ENERGY SYSTEM)
ESTIMATED VOLUME: 20,000 tonnes of GHG reduced
BENEFITS: employed over 30 companies for construction.
A D V I S O R S & P R A C T I T I O N E R S S U S T A I N A B I L I T Y
October 29, 2013
CONTACT US
ANGELA LAI, SENIOR COST CONSULTANT [email protected]
VANCOUVER OFFICE
2288 Manitoba Street, Vancouver, BC V5Y 4B5 T: 604-734-3126
BTY.COM
33
@BTYGroup
WALKING THE WALK SUSTAINABILITY AT PERKINS+WILL
Vancouver, BC, October 29 2013
Design
Sustainability
Social Responsibility
Core Strengths.
perkinswill.com 36
image
image
image
image
image
image
image
image
image
ALTERNATE LAYOUT SUGGESTIONS
SUSTAINABLE LEADERSHIP • Founders and Current Board Members of the Canada
Green Building Council
• CaGBC LEED Faculty and LEED certification team
• Two completed projects targeting Living Building Status
• 163 LEED Certified projects and 236 LEED Registered projects
• The first LEED-NC Gold certified new construction project in Canada – the City of White Rock Operations Centre in White Rock, BC
• The first LEED-NC Platinum certified multi-family residential project in North America – The Vento Residences in Calgary, AB
• 3 Projects amongst the highest scoring LEED-NC Platinum projects in the world - Dockside Phase 1 + 2 in Victoria, BC and Perkins+Will Offices, Atlanta, GA
perkinswill.com 37
image
image
image
image
image
image
image
ALTERNATE LAYOUT SUGGESTIONS
image
image
GREEN OPERATIONS PLAN 2005
perkinswill.com 38
image
image
image
image
image
image
image
ALTERNATE LAYOUT SUGGESTIONS
image
image
% Change From 2011: • Electricity: 7% • Heat: -10% • Transporting
people: 31% • Overall
reduction from 2011: 21%
perkinswill.com 39
image
image
image
image
image
image
image
ALTERNATE LAYOUT SUGGESTIONS
image
image • Vancouver office – targeting LEED EBOM Platinum
• Building re-commissioned • Recent upgrades:
– Window Control – Blinds for daylight – CO2 monitoring and control – Schedule for fans – Schedule for lights
VANCOUVER INTERNAL OPERATIONS
perkinswill.com 40
image image
image Image
image
ALTERNATE LAYOUT SUGGESTIONS
BUILDING ENERGY USE INTENSITY
perkinswill.com 41
Inter Office Energy Competitions
perkinswill.com 42
image
image
image
image
image
image
image
ALTERNATE LAYOUT SUGGESTIONS
image
image
CENTRE FOR INTERACTIVE RESEARCH ON SUSTAINABILITY UBC, Vancouver, BC, Canada
• Project Vision: to be the most innovative and high performance building in North America that will assist in accelerating sustainability.
• Building Area: 5,675 sm (61,085 sf) • Budget: $23 million CAD • Project Duration: 2008-2011
• Designed to be net zero energy • Saving 185 tCO2e/yr
perkinswill.com 43
image
image
image
image
image
image
image
image
image
ALTERNATE LAYOUT SUGGESTIONS
• Compact: Home to 30,000
• Complete: Live-work-play-learn
• Carbon neutral: 100% renewable energy
• Significantly reduced ecological footprint
• Many sustainable lifestyle choices
Westwood
Prince Rupert
Spruce Avenue
Kingsway Mall
YHT
NAIT
Agrihood
Town Centre
Technology & Research
Blatchford Redevelopment, Edmonton Global model for sustainable city-building
perkinswill.com 44
THANK YOU