2016 02-16 asebstos insulation board removal

8
Case Study: Asbestos Insulation Board Removal Notting Hill, West London

Upload: jan-alvino

Post on 14-Apr-2017

25 views

Category:

Business


1 download

TRANSCRIPT

Page 1: 2016 02-16 asebstos insulation board removal

Case Study:

Asbestos Insulation Board RemovalNotting Hill, West London

Page 2: 2016 02-16 asebstos insulation board removal

Amiante STR Limited

Our Services

Our company provides the highest standard of professionalism and workmanship.  We understand customers are often wary and concerned at the potential hazards of asbestos and asbestos containing materials or ACM’s.

We provide the full range of asbestos services, from asbestos surveying, asbestos encapsulation or if necessary asbestos removal and disposal. Our aim is to provide quality workmanship at a price that ensures the health, safety and welfare of our clients and our staff. We also provide asbestos consultancy services as well as asbestos training.

Our philosophy is to ensure that all of our customers are able to make informed decisions about asbestos management issues.

Page 3: 2016 02-16 asebstos insulation board removal

Asbestos Insulation Board RemovalSite: Notting Hill, West London

Page 4: 2016 02-16 asebstos insulation board removal

Asbestos Insulation Board RemovalSite: Notting Hill, West London

PROJECT

Amiante STR Ltd were instructed by the client to remove the asbestos

insulation board wall panelling to the clients side of a partition wall. The

A.I.B was present on both sides of the partition, however removal of the

other side was outside of the client’s scope of works therefore the internal

face was encapsulated with ET-150 Co-polymer emulsion paint, labelled &

left in situ.

Page 5: 2016 02-16 asebstos insulation board removal

Asbestos Insulation Board RemovalSite: Notting Hill, West London

All works were undertaken

under full controlled conditions

and had to be notified to the

Health & Safety Executive 14

days prior to day of works.

Health & Safety

Page 6: 2016 02-16 asebstos insulation board removal

P E T EPeople, Environment, Tools and Exposure

PETE represents a process encompassing Health & Safety, risk assessment and project management. PETE assists in ensuring that all aspects of a project are managed safely.Below are a few of the PETE considerations taken into account on this project.

[This PETE is where those planning a project ask about the impact of People, Environment, Tools and Exposure to the project. Includes Client discussions, site surveying, estimating or consultancy]. -The removal of the AIB falls under licensed asbestos works, this means it could only be carried out by a licensed asbestos contractor. The removal required a 14-day notification to be submitted to the Health & Safety executive prior to works taking place. Careful planning was required and Risk and method statements prepared prior to works commencing. Waste transit routes have to be taken into consideration in addition to parking for our decontamination unit. We were required to use a Modular Hygiene unit as appose to a Mobile D.C.U due to there being no external parking.

[This PETE is all of the people involved above who must have asbestos awareness training to ensure they are legally compliant for controlling the risks to People, Environment, Tools and Exposure]. -Once the remaining material (which the client was not instructed to get removed) was encapsulated the material was marked with asbestos warning labels, this allows the property owner to keep in line with the duty to manage the asbestos present on site. It also allows any workers or staff in the building to be aware of the risk which is present and to avoid disturbing the material.-Asbestos Surveys is a legal requirement for any Non-domestic building built before 2000 to hold an asbestos management survey. These surveys identify any asbestos within the building, and ascertain, monitor and record the potential risk of the material. Any asbestos present must have its condition checked annually (at very least).

[This PETE represents the safe removal of asbestos materials in compliance with current legislation and is also our reminder to assess all of the risks to our own staff of People, Environment, Tools and Exposure and not just the asbestos risk]. -Due to the fibrous nature of insulation board it must be removed in heavy-duty polythene enclosures with the use of airlocks & negative pressure to ensure control limits are not exceeded.-Four stage air monitoring is carried out on completion to confirm that no airborne fibres are present within the premises, the analytical certificate is then given to our client on completion.

Page 7: 2016 02-16 asebstos insulation board removal

Our Vision

Working together to create a safer environment by building an international consultancy providing asbestos solutions worldwide.

Our Values

To act openly and respect everyone

To work safely to prevent, accidents, incidents or near misses

To be honest and trustworthy in all of our actions

To remember the customer pays for the service they receive

Our Mission

To reduce the spread and exposure of asbestos at all times

To create a safer environment for everyone

To provide a reliable solution for anyone with an asbestos problem

To provide an income for our staff and shareholders

Amiante STR Limited

Page 8: 2016 02-16 asebstos insulation board removal

Providing asbestos solutions to create a safer environment

[email protected]

Hampshire: 023 9223 0700London: 020 8531 4969

Head Office: Unit 5, Falcon Court, Parklands Business Park, Forest Road, Denmead, Hampshire, PO7 6BZ

People, Environment, Tools and Exposure

P E T E