2017-2018 service delivery and budget … for...2018-02-192017-2018 service delivery and budget...

47
2017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Upload: lamxuyen

Post on 24-Mar-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

2017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN

Amended February 2018

Page 2: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

CONTENTS

1 Introduction 1 2 Legal Reference 1 3 Five year capital budget per department 2 4 Five year capital budget per strategic goal 3 5 Ten largest capital projects - 2017/18 3 Annexure 1: Monthly projections of revenue to be collected for each source Annexure 2: Monthly projections of expenditure (operating and capital) and revenue for each vote 5 Annexure 3: Quarterly projections of service delivery targets and performance indicators for each vote 7

Annexure 3A: Performance indicators and benchmarks (operating budget) 8 Annexure 3B: KPIs and targets from the 2017-2022 IDP 10 Annexure 3C: Generic KPIs and targets for Municipal Manager and Directors 16 General indicators in terms of the Municipal Planning and Performance Management Regulations, 2001 19 Annexure 3D: Targets and projected expenditure for each capital budget item 21

Annexure 4: Ward information for expenditure and service delivery 42

4

Page 3: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

1. INTRODUCTION

The SDBIP provides the vital link between the executive mayor, council and the administration and facilitates the process for holding management accountable for its performance. The SDBIP is a management, implementation and monitoring tool that ensures that appropriate information is circulated internally and externally for purposes of monitoring the execution of the budget, performance of senior management and achievement of the strategic objectives set by council.

The SDBIP is essentially the management and implementation tool which sets in-year information, such as quarterly service delivery and monthly budget targets, and links each service delivery output to the budget of the municipality, thus providing credible management information and a detailed plan for how the municipality will provide such services and the inputs and financial resources to be used. The SDBIP indicates the responsibilities and outputs for each of the managers in the top management team, the inputs to be used, and the time deadlines for each output. The SDBIP therefore determines the performance agreements of the municipal manager and directors, including the outputs and deadlines for which they will be held responsible. The SDBIP further provides all expenditure information (for capital projects and services) per municipal ward, so that each output can be broken down per ward, where this is possible, to support ward councillors in service delivery information.

The SDBIP is also a vital monitoring tool for the executive mayor and council to monitor the in-year performance of the municipal manager and for the municipal manager to monitor the performance of directors and division heads in the municipality within the financial year. This enables the executive mayor and municipal manager to be pro-active and take remedial steps in the event of poor performance.

2. LEGAL REFERENCE

Section 1 of the Municipal Finance Management Act (Act 56 of 2003) (MFMA) defines service delivery and budget implementation plan (SDBIP) as a detailed plan for implementing the municipality's delivery of municipal services and its annual budget, and which must indicate - (a) projections for each month of -

(i) revenue to be collected, by source; and(ii) operational and capital expenditure, by vote;

(b) service delivery targets and performance indicators for each quarter.

The purpose of the SDBIP is to support the Municipality’s management to achieve service delivery targets as well as the spending of the capital budget within given timeframes.

Section 53 of the Municipal Finance Management Act (Act 56 of 2003) MFMA determines that the municipality's SDBIP plan must be approved by the Executive Mayor within 28 days after the approval of the annual budget.

Section 53 determines further that the annual performance agreements of the Municipal Manager and directors as required in section 57 of the Municipal Systems Act (Act 32 of 2000) must be linked to the SDBIP.

Section 69 of the MFMA determines that the draft SDBIP and performance agreements must be submitted to the Executive Mayor within 14 days after the approval of an annual budget.

1

Page 4: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

3. FIVE YEAR CAPITAL BUDGET PER DEPARTMENT

Department Division / Service 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Office of the Municipal Manager Equipment MM 5 500 6 000 10 000 10 000 10 000

Equipment Council 5 500 6 000 10 000 10 000 10 000 Vehicles 652 190

Subtotal 11 000 12 000 672 190 20 000 20 000 Civil Engineering Services Equipment 42 000 44 000 46 000 48 000 50 000

Cemeteries Parks and Amenities 3 197 075 2 813 100 1 041 640 2 068 510 1 748 408 Sewerage 11 031 146 9 887 004 852 600 1 668 510 6 254 000 Waste water treatment works 475 000 10 844 201 29 963 893 28 771 349 3 853 705 Sports Fields 5 547 655 1 303 265 5 897 195 4 294 803 4 970 000 Roads 13 402 838 14 032 000 13 864 100 16 379 345 24 067 545 Storm water 51 450 54 000 3 276 000 4 825 000 12 060 000 Swimming Pools 4 700 000 Water 9 727 416 8 715 364 7 732 345 5 155 510 4 611 943 Buildings and Maintenance 2 779 326 772 050 276 000 355 000 Cleaning Services 909 360 2 498 200 7 368 000 2 256 000 3 742 000

Subtotal 47 163 266 55 263 184 70 317 773 65 822 027 62 435 601 Corporate Services General, Secretariat and Records as well as Ward

Committees 15 750 16 500 18 000 20 000 22 000

Administration: Properties and Contracts 7 091 500 33 000 35 000 35 000 35 000 Communication and Public Relations 204 466 200 000

Subtotal 7 311 716 249 500 53 000 55 000 57 000 Development Services Equipment 32 000 34 000 36 000 38 000 40 000

Community Development 4 110 887 2 215 380 1 232 925 Built Environment 150 000 1 150 000 150 000 150 000 Human Settlements 25 806 154 3 500 000 Caravan Park Yzerfontein 530 000 1 030 000 30 000 30 000 30 000

Subtotal 30 629 041 7 929 380 1 448 925 218 000 70 000 Electrical Engineering Services Equipment 384 719 340 000 350 000 350 000 350 000

ICT Services 1 454 649 546 000 1 050 000 1 190 000 1 065 000 Operations, Maintenance and Construction 10 845 281 8 630 000 8 500 000 9 650 000 9 300 000

Subtotal 12 684 649 9 516 000 9 900 000 11 190 000 10 715 000 Financial Services Financial Services General 706 400 440 000 254 925 1 171 989 26 000 Subtotal 706 400 440 000 254 925 1 171 989 26 000 Protection Services General 570 000

Traffic and Law Enforcement 475 000 342 000 844 000 1 816 000 628 000 Fire and Emergency Services 822 050 5 843 000 785 000 1 007 000 1 108 000 Subtotal 1 867 050 6 185 000 1 629 000 2 823 000 1 736 000 TOTAL 100 373 122 79 995 064 84 275 813 81 300 016 73 981 601

2

Page 5: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

4. FIVE YEAR CAPITAL BUDGET PER IDP STRATEGIC GOAL

Strategic Goal 2017/2018 % 2018/2019 % 2019/2020 % 2020/2021 % 2021/2022 % 1: Improved quality of life for citizens 5 977 937 2.6 8 400 380 10.5 2 861 925 3.4 2 823 000 3.5 1 736 000 2.3 2: Inclusive economic growth 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 3: Quality and sustainable living environment 26 518 154 16.5 5 714 000 7.1 216 000 0.3 218 000 0.3 70 000 0.1 4: Caring, competent and responsive institutions, organisations and business 9 483 765 9.5 1 247 500 1.6 2 030 115 2.4 2 436 989 3.0 1 168 000 1.6

5: Sufficient, affordable and well-run services 58 393 266 71.5 64 633 184 80.8 79 167 773 93.9 75 822 027 93.3 71 007 601 96.0 TOTAL 100 373 122 100.0 79 995 064 100.0 84 275 813 100.0 81 300 016 100.0 73 981 601 100.0

5. TEN LARGEST CAPITAL PROJECTS - 2017/18

PROJECT BUDGET SOURCE(S) OF FINANCE Bulk Sewer: De Hoop Housing Project 10 833 184 Municipal Infrastructure Grant (MIG) Swartland: Resealing of Roads 10 000 000 Capital Replacement Reserve Fund (CRRF) Rehabilitation of Riebeek West dumping site 10 000 000 R5 500 000 - Dept. Human Settlements (DHS)

R4 500 000 - Capital Replacement Reserve Fund (CRRF) Riebeek West (Streets and Stormwater) 9 542 269 R7 479 223 - Dept. Human Settlements (DHS)

R2 063 046 - Capital Replacement Reserve Fund (CRRF) Purchase of Erven: Green Lilly 7 060 000 Capital Replacement Reserve Fund (CRRF) Renewal of old/aging electrical networks/new networks. 6 200 000 Capital Replacement Reserve Fund (CRRF) Upgrading of Sports Grounds: Chatsworth 5 547 655 Municipal Infrastructure Grant (MIG) Replacement water reticulation network 3 989 630 Municipal Infrastructure Grant (MIG) Phola Park/ Ilinge Lethu UISP Electrical Services 3 000 000 Dept. Human Settlements (DHS) Riebeek West (water) 2 510 546 Capital Replacement Reserve Fund (DHS)

The ten largest capital projects represent a total budget of R68.6 million which is 68.4% of the total capital budget.

3

Page 6: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

ANNEXURE 1 Monthly projections of revenue to be collected for each source

WC015 Swartland - Supporting Table SB14 Adjustments Budget - monthly revenue and expenditure - 31 January 2018Medium Term Revenue and

Expenditure Framework

July August Sept. October November December January February March April May JuneBudget Year

2017/18Budget Year

+1 2018/19Budget Year +2 2019/20

R thousandsOutcome Outcome Outcome Outcome Outcome Outcome Adjusted

BudgetAdjusted Budget

Adjusted Budget

Adjusted Budget

Adjusted Budget

Adjusted Budget

Adjusted Budget

Adjusted Budget

Adjusted Budget

Revenue By SourceProperty rates (190) 15 368 8 595 7 908 7 725 7 620 7 568 6 641 6 641 6 499 6 427 16 158 96 960 104 222 112 026 Serv ice charges - electricity rev enue 20 755 21 923 21 279 19 594 19 577 20 057 20 068 21 609 21 693 21 975 22 336 19 531 250 396 267 249 285 018 Serv ice charges - w ater rev enue 3 731 4 195 4 384 5 507 4 856 5 559 5 950 4 875 4 871 4 084 3 839 1 688 53 538 59 828 66 865 Serv ice charges - sanitation rev enue 2 554 2 883 3 780 3 517 3 578 3 394 3 362 3 304 3 284 3 367 3 260 2 449 38 732 39 107 40 506 Serv ice charges - refuse 1 676 2 116 2 010 1 997 1 958 1 948 1 895 1 895 1 895 1 895 1 895 2 251 23 430 23 314 24 188 Rental of facilities and equipment 173 95 94 98 105 97 106 106 99 93 86 149 1 302 1 346 1 400 Interest earned - ex ternal inv estments 129 616 579 1 018 524 351 380 380 380 380 380 25 165 30 281 23 127 24 384 Interest earned - outstanding debtors 123 140 150 144 160 195 145 132 127 146 122 (19) 1 564 1 689 1 824 Fines, penalties and forfeits 11 11 14 13 18 10 40 36 36 44 70 24 663 24 965 26 923 29 037 Licences and permits 332 320 306 307 302 253 298 298 298 298 298 268 3 579 3 753 3 936 Agency serv ices 293 334 317 413 353 257 339 339 339 339 339 339 4 000 3 700 3 800 Transfers and subsidies 29 400 – 110 – 46 23 520 17 513 17 757 17 52 52 081 123 514 96 930 102 805 Other rev enue 663 1 128 1 152 1 430 1 266 878 870 845 810 819 747 1 609 12 217 12 618 13 033 Gains on disposal of PPE – 2 840 33 – 755 257 – – – – – 0 3 885 200 200

Total Revenue 59 649 51 968 42 804 41 947 41 222 64 396 41 038 40 972 58 230 39 956 39 851 146 331 668 364 664 006 709 020

Expenditure By TypeEmploy ee related costs 13 395 12 036 13 802 13 811 21 118 13 556 14 214 14 214 14 214 14 214 14 214 32 948 191 735 207 092 224 407 Remuneration of councillors 745 749 744 830 750 750 750 1 065 895 875 885 870 9 908 10 015 10 616 Debt impairment – – – – – – – – – – – 16 373 16 373 17 058 18 419 Depreciation & asset impairment 6 579 7 252 6 915 6 915 6 915 6 915 83 83 83 83 83 42 075 83 983 85 948 88 837 Finance charges 3 41 34 7 38 6 730 14 14 14 14 14 6 583 13 507 13 065 12 524 Bulk purchases – 23 036 23 442 15 586 14 495 14 377 13 067 14 648 16 830 20 285 19 044 30 581 205 391 225 669 244 416 Other materials 410 942 1 090 1 208 1 398 512 705 1 060 1 067 912 829 153 10 287 10 639 11 170 Contracted serv ices 896 4 200 2 478 5 052 4 636 4 788 4 378 5 521 5 609 5 077 4 648 44 319 91 602 60 370 49 963 Grants and subsidies 281 161 327 440 80 105 163 283 243 283 163 275 2 805 2 757 2 893 Other ex penditure 614 3 464 1 462 1 875 2 295 2 292 1 879 2 340 2 379 3 021 2 035 5 336 28 991 29 896 31 919 Loss on disposal of PPE – – – – – – – – – – – 2 364 2 364 2 482 2 606

Total Expenditure 22 922 51 880 50 294 45 725 51 724 50 024 35 254 39 230 41 335 44 764 41 916 181 876 656 945 664 991 697 769

Surplus/(Deficit) 36 727 89 (7 490) (3 778) (10 502) 14 372 5 783 1 742 16 894 (4 808) (2 065) (35 545) 11 419 (985) 11 251 Transfers and subsidies - capital (monetary ll ti ) (N ti l / P i i l d Di t i t)

– – – – – – – – – – – 50 691 50 691 29 437 23 724 Surplus/(Deficit) after capital transfers & contributions 36 727 89 (7 490) (3 778) (10 502) 14 372 5 783 1 742 16 894 (4 808) (2 065) 15 146 62 110 28 452 34 975

Description Ref

Budget Year 2017/18

4

Page 7: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

ANNEXURE 2 Monthly projections of expenditure (operating and capital) and revenue for each vote

WC015 Swartland - Supporting Table SB12 Adjustments Budget - monthly revenue and expenditure (municipal vote) - 31 January 2018Medium Term Revenue and

Expenditure Framework

July August Sept. October November December January February March April May JuneBudget Year

2017/18Budget Year

+1 2018/19Budget Year +2 2019/20

R thousandsOutcome Outcome Outcome Outcome Outcome Outcome Adjusted

BudgetAdjusted Budget

Adjusted Budget

Adjusted Budget

Adjusted Budget

Adjusted Budget

Adjusted Budget

Adjusted Budget

Adjusted Budget

Revenue by VoteVote 1 - Corporate Serv ices 85 55 169 45 111 39 65 64 162 59 58 7 837 8 749 9 236 9 644 Vote 2 - Civ il Serv ices 24 391 9 616 10 701 11 362 10 785 24 201 11 487 11 528 20 027 9 618 11 757 53 179 208 653 199 471 208 145 Vote 3 - Council 37 5 4 11 4 3 20 20 20 20 20 74 237 239 242 Vote 4 - Electricity Serv ices 21 898 21 960 21 305 19 598 19 588 20 976 20 071 21 612 22 381 21 978 22 339 22 847 256 553 270 300 288 370 Vote 5 - Financial Serv ices 12 204 19 058 9 446 9 164 9 260 18 108 8 167 7 226 14 465 7 099 7 002 42 897 164 095 168 119 182 491 Vote 6 - Dev elopment Serv ices 360 572 524 999 793 540 520 530 470 470 411 40 260 46 448 10 904 6 658 Vote 7 - Municipal Manager – – – – – – – – – – – 230 230 – – Vote 8 - Protection Serv ices 674 701 655 769 681 529 709 825 704 712 737 26 392 34 089 35 173 37 194 Vote 9 - [NAME OF VOTE 9] – – – –

Total Revenue by Vote 59 649 51 968 42 804 41 947 41 222 64 396 41 038 41 805 58 230 39 956 42 323 193 716 719 054 693 443 732 744

Expenditure by VoteVote 1 - Corporate Serv ices 1 083 1 766 1 796 2 104 2 619 1 965 2 008 2 221 2 189 2 182 2 038 5 351 27 323 29 651 31 640 Vote 2 - Civ il Serv ices 11 058 15 016 15 958 15 428 20 121 21 500 11 097 11 696 11 685 11 673 11 511 89 948 246 693 240 833 245 172 Vote 3 - Council 1 152 1 499 991 1 180 918 923 1 111 1 458 1 458 2 333 1 458 237 14 719 14 922 15 790 Vote 4 - Electricity Serv ices 3 019 25 319 24 645 17 442 17 556 16 641 12 853 14 525 16 745 19 935 18 520 39 353 226 556 243 732 261 837 Vote 5 - Financial Serv ices 2 585 2 633 2 592 2 859 3 923 3 281 2 912 3 143 3 162 3 046 2 988 13 238 46 361 48 581 52 350 Vote 6 - Dev elopment Serv ices 1 228 3 223 1 417 3 758 2 460 2 566 2 252 3 197 3 277 2 796 2 590 9 997 38 762 26 203 25 350 Vote 7 - Municipal Manager 492 396 472 459 530 491 523 523 523 523 523 1 359 6 815 6 858 7 350 Vote 8 - Protection Serv ices 2 304 2 026 2 422 2 495 3 597 2 658 2 646 2 646 2 646 2 646 2 646 20 984 49 715 54 212 58 280 Vote 9 - [NAME OF VOTE 9] – – – –

Total Expenditure by Vote 22 922 51 880 50 294 45 725 51 724 50 024 35 402 39 410 41 685 45 134 42 276 180 468 656 945 664 991 697 769

Surplus/ (Deficit) 36 727 89 (7 490) (3 778) (10 502) 14 372 5 635 2 395 16 544 (5 178) 47 13 248 62 110 28 452 34 975

Description

Budget Year 2017/18

Ref

5

Page 8: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

WC015 Swartland - Supporting Table SB16 Adjustments Budget - monthly capital expenditure (municipal vote) - 31 January 2018

Budget Year 2017/18Medium Term Revenue and Expenditure

Framework

July August Sept. October November December January February March April May JuneBudget Year

2017/18Budget Year +1 2018/19

Budget Year +2 2019/20

R thousandsOutcome Outcome Outcome Outcome Outcome Outcome Adjusted

BudgetAdjusted Budget

Adjusted Budget

Adjusted Budget

Adjusted Budget

Adjusted Budget

Adjusted Budget

Adjusted Budget

Adjusted Budget

Multi-year expenditure appropriation 1Vote 1 - Corporate Serv ices – – – – – – – – – – – – – – – Vote 2 - Civ il Serv ices 487 – 644 2 078 4 235 3 688 500 2 225 963 2 100 987 72 17 979 24 611 34 627 Vote 3 - Council – – – – – – – – – – – – – – – Vote 4 - Electricity Serv ices – – – – – – – – – – – – – – – Vote 5 - Financial Serv ices – – – – – – – – – – – – – – – Vote 6 - Dev elopment Serv ices – – – 146 – 738 – 2 506 2 906 2 906 3 006 2 967 15 174 6 500 1 000 Vote 7 - Municipal Manager – – – – – – – – – – – – – – – Vote 8 - Protection Serv ices – – – – – – – – – – – – – – – Vote 9 - [NAME OF VOTE 9] – – – –

Capital Multi-year expenditure sub-total 3 487 – 644 2 224 4 235 4 425 500 4 731 3 869 5 006 3 993 3 039 33 153 31 111 35 627

Single-year expenditure appropriationVote 1 - Corporate Serv ices 7 060 – 6 2 14 32 96 10 10 10 10 62 7 312 250 53 Vote 2 - Civ il Serv ices – 46 896 2 281 40 1 598 1 898 7 083 6 349 5 562 2 984 449 29 185 30 652 35 691 Vote 3 - Council – – – – 3 – – 3 – – – (0) 6 6 662 Vote 4 - Electricity Serv ices 42 282 1 918 914 4 490 851 533 951 1 138 412 630 523 12 685 9 516 9 900 Vote 5 - Financial Serv ices – – 327 183 4 2 5 4 – 185 – (4) 706 440 255 Vote 6 - Dev elopment Serv ices – – 1 1 – 18 219 3 336 3 186 3 324 2 686 2 686 15 455 1 829 449 Vote 7 - Municipal Manager – – – – – – – 1 1 1 1 1 6 6 10 Vote 8 - Protection Serv ices – 1 1 45 2 9 – 589 978 114 114 14 1 867 6 185 1 629 Vote 9 - [NAME OF VOTE 9] – – – –

Capital single-year expenditure sub-total 3 7 102 330 3 148 3 426 4 553 2 510 2 752 11 977 11 662 9 608 6 425 3 730 67 220 48 884 48 649 Total Capital Expenditure 2 7 589 330 3 792 5 650 8 788 6 935 3 252 16 707 15 531 14 613 10 418 6 768 100 373 79 995 84 276

Description - Municipal Vote Ref

6

Page 9: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

ANNEXURE 3 Quarterly projections of service delivery targets and performance indicators for each vote

The pages that follow contain the following reports:

Annexure 3A: Performance indicators and benchmarks (operating budget)

Annexure 3B: 2016/2017 KPIs and targets from the IDP

Annexure 3C: Generic KPIs and targets for Municipal Manager and Directors

Annexure 3D: Targets and projected expenditure for each capital budget item

7

Page 10: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

ANNEXURE 3A Performance indicators and benchmarks (operating budget)

WC015 Swartland - Supporting Table SB4 Adjustments to budgeted performance indicators and benchmarks - 31 January 2018Budget Year +1 2018/19

Budget Year +2 2019/20

Original Budget

Adjusted Budget

Adjusted Budget

Adjusted Budget

Borrowing Management

Credit Rating Short term/long term rating

Capital Charges to Operating Ex penditure Interest & Principal Paid /Operating Ex penditure

2.8% 2.8% 2.8% 2.6%

Capital Charges to Ow n Rev enue Finance charges & Repay ment of borrow ing /Ow n Rev enue

32.6% 32.0% 34.8% 35.9%

Borrow ed funding of 'ow n' capital ex penditure Borrow ing/Capital ex penditure ex cl. transfers and grants

0.0% 0.0% 8.7% 22.9%

Safety of CapitalGearing Long Term Borrow ing/ Funds & Reserv es 82.8% 81.6% 78.9% 83.6%

LiquidityCurrent Ratio Current assets/current liabilities 4:1 5:1 5:1 6:1

Liquidity Ratio Monetary Assets/Current Liabilities 2.8 3.7 3.7 3.9

Revenue ManagementAnnual Debtors Collection Rate (Pay ment Lev el %)

Last 12 Mths Receipts/ Last 12 Mths Billing 95% 95% 95% 95%

Outstanding Debtors to Rev enue Total Outstanding Debtors to Annual Rev enue 17.3% 15.2% 19.5% 22.4%

Creditors ManagementCreditors Sy stem Efficiency % of Creditors Paid Within Terms (w ithin

MFMA 65( ))100.0% 100.0% 100.0% 100.0%

Creditors to Cash and Inv estments 28.6% 21.1% 20.6% 19.6%

Description of financial indicator Basis of calculationBudget Year 2017/18

8

Page 11: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

WC015 Swartland - Supporting Table SB4 Adjustments to budgeted performance indicators and benchmarks - 31 January 2018Budget Year +1 2018/19

Budget Year +2 2019/20

Original Budget

Adjusted Budget

Adjusted Budget

Adjusted Budget

Other IndicatorsTotal Volume Losses (kW) 11 636 750 10 422 503 10 422 503 10 422 503 Total Cost of Losses (Rand '000)

10 314 815R 9 412 562R 10 136 926R 10 917 572R % Volume (units purchased and generated less units sold)/units purchased and generated 6.12% 6.00% 6.00% 6.00%

Total Volume Losses (kℓ) 1 058 029 653 265 653 265 653 265

Total Cost of Losses (Rand '000)13 310 005R 8 218 074R 9 204 504R 10 308 522R

% Volume (units purchased and generated less units sold)/units purchased and generated 18.75% 15.00% 15.00% 15.00%

Employ ee costs Employ ee costs/(Total Rev enue - capital rev enue) 29.6% 28.7% 31.2% 31.7%

Remuneration Total remuneration/(Total Rev enue - capital rev enue)

31.1% 30.2% 32.7% 33.1%

Repairs & Maintenance R&M/(Total Rev enue ex cluding capital rev enue) 10.4% 10.1% 7.3% 5.8%

Finance charges & Depreciation FC&D/(Total Rev enue - capital rev enue) 15.0% 14.6% 14.9% 14.3%

IDP regulation financial viability indicatorsi. Debt cov erage (Total Operating Rev enue - Operating Grants)/Debt

serv ice pay ments due w ithin financial y ear)28.2% 29.0% 30.8% 32.9%

ii. O/S Serv ice Debtors to Rev enue Total outstanding serv ice debtors/annual rev enue receiv ed for serv ices

13.1% 9.8% 12.3% 14.0%

iii. Cost cov erage (Av ailable cash + Inv estments)/monthly fix ed operational ex penditure

7.4 8.3 8.5 8.8

Description of financial indicator Basis of calculationBudget Year 2017/18

Water Distribution Losses (2)

Electricity Distribution Losses (2)

9

Page 12: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

ANNEXURE 3B KPIs and targets from the 2017-2022 IDP

Strategic Goal 1: Improved quality of life for citizens

Strategic Objectives Strategic Initiatives Key Performance Indicators Targets 1.1 Facilitate access to the economy Make information about economic

opportunities and options more easily accessible (including referrals)

Number of people supported 3200 by June 2018 with a 10% increase annually

Entrepreneurship development Number of people benefited from entrepreneurial initiatives

60 per annum

1.2 Promote childcare facilities and early child development (0-6 years)

Develop ECD information guidelines in respect of childcare facilities

ECD information guidelines approved Yes (by June 2019)

1.3 Increase the number of legal childcare facilities

Assistance with the legalisation of facilities Number of facilities registered 2 per annum

1.4 Promote child development (7-14 years) Implementing educational programmes Number of educational programmes implemented

2 per annum

1.5 Facilitate youth development Provide access to career guidance for young adults

Number of people assisted with career guidance

3200 per annum

1.6 Coordinate social development internally and externally with partners.

Promote the coordination of social development through partnerships:

Internally: Internal Social Development Committee to identify additional action plans in each department that contributes to social development

Agreement reached on additional action plans in each department

Yes (by June annually)

Externally: Local Drug Action Committee to compile a Local Drug Action Plan that must be reviewed every two years

Local Drug Action Plan compiled Yes (by June 2019)

1.7 Lobby for the basic needs and rights of vulnerable groups

Develop guidelines for assistance to persons with disabilities

Guidelines approved Yes (by June 2020)

1.8 Establish a Municipal Court to increase the effectiveness of municipal law enforcement

If financially viable and sustainable, complete all administrative procedures for the application to establish a Municipal Court

Funds for the establishment of a Municipal Court obtained

Yes (by March 2018)

Application to establish a Municipal Court submitted to the Department of Justice

Yes (by June 2018)

Municipal Court operational Yes (by January 2019)

1.9 Integrated Crime Prevention / Safety stakeholder collaboration

Effective safety partnerships in terms of the Integrated Safety Strategy established and operational

Report on progress submitted to the Mayoral Committee

Yes (by June 2018 and annually by June thereafter

1.10 Prevent and manage land invasion. Monitor informal settlements.

Effective operation of a Land Management Unit Report on progress submitted to the Mayoral Committee

Yes (by June 2018 and annually by June thereafter

10

Page 13: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Strategic Goal 2: Inclusive economic growth

Strategic Objectives Strategic Initiatives Key Performance Indicators Targets 2.1 Relevant stakeholders systematically

improve local competitive advantages Gain commitment from key stakeholders to collaborate systematically to strengthen local competitive advantages.

Number of key stakeholder groups actively contributing to improved competitive advantage NOTE: Other public investors & their contractors Spatial Dev. Framework & approval system/s Developers, landowners, real-estate agents Investment promotion & facilitation systems Business chambers Organised Agriculture Tourism agencies

5 by end of 2018 10 by end of 2020 15 by end of 2022

2.2 Well located, serviced sites and premises available for commercial and industrial investors

Ensure adequate supply of land and services for commercial and industrial premises.

Number of well located, serviced industrial sites available.

10 by end of 2018 15 by end of 2020 20 by end of 2022

2.3 The specific opportunities and benefits for investors are actively promoted

Establish an investment promotion and facilitation system.

Number of qualified investor enquiries. 12 by end of 2018 24 by end of 2020 36 by end of 2022

2.4 Local markets work better to increase opportunity for local small businesses

Establish a local business opportunity network incl. a local business directory

Number of opportunities advertised / shared with Swartland businesses.

20 by end of 2018 50 by end of 2020 100 by end of 2022

2.5 Easier for farmers to add and grow new / promising business models

New (more enabling) Spatial Development Framework

Number of key constraints to growth removed.

1 by end of 2018 2 by end of 2020 3 by end of 2022

2.6 Easier for local citizens to access economic opportunity

Establish an information portal pointing to best information sources including local support services

Number of unique visitors (local, with more than 1 page view)

100 by end of 2018 300 by end of 2020 400 by end of 2022

2.7 Increase tourism visitors and brand as a good place to live

Develop a more effective tourism destination marketing and development business model

Study done and revised tourism business model finalised.

Yes (by end of 2018)

Strategic Goal 3: Quality and sustainable living environment

Strategic Objectives Strategic Initiatives Key Performance Indicators Targets 3.1 Maximise economic opportunities and

comparative advantage Facilitate economic sector growth (including mining, agriculture and tourism) of Swartland wards in accordance with their potential.

Develop economic growth models (EGM) for Swartland growth towns (subject to availability of funds)

By June 2018

Spatially strengthen mobility and economic links. An economic mobility spatial plan developed and integrated into LED and EGM (subject to availability of funds).

By June 2018

11

Page 14: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Strategic Objectives Strategic Initiatives Key Performance Indicators Targets 3.2 Enable sustainable rural and agricultural

development Grow and diversify the agricultural sector through support of alternative and intensive uses like agri-processing, agri-tourism, smallholdings and product development.

Formalisation of the Integrated Agriculture, Rural and Culture Development Corridor (Intensive Rural Development Corridor) and develop a precinct plan.

By June 2019

3.3 Enhance conservation and biodiversity Partnership with stakeholder Cape Nature, Heritage Western Cape (HWC), Department of Environmental Affairs and Development Planning (DEADP) and the SA National Biodiversity Institute (SANBI) on areas of conservation and biodiversity

Identify municipal land for conservation and biodiversity

By June 2018

Survey the identified areas By June 2018 Obtain Council decision By June 2018

Finalise stewardship programme Registration of stewardship programme with Cape Nature on municipal land

By June 2018

Develop management plan for conservation and biodiversity areas

By June 2020

Contribute towards establishment of a Greater West Coast National Park

Align Spatial Development Framework (SDF) with this initiative

By December 2017

3.4 Protect cultural and built heritage landscape

Partnership with stakeholder HWC to reach agreement on areas with cultural potential and heritage value

Combine urban and rural heritage surveys

By June 2019

Obtain approval from HWC By June 2020 3.5 Spatially enable sustainable settlements Provide sustainable infrastructure and services Develop overlay precinct plans for

Yzerfontein, Malmesbury, Riebeek Valley and Darling

By June 2019

Review SDF residential space and infrastructure based on growth models

By June 2019

3.6 Enhance safe, healthy, liveable and sustainable communities and neighbourhoods

Provide for adequate social infrastructure to support communities

Identification of land for the establishment of a new hospital

By June 2018

Enable transfer of properties providing subsidised housing or land reform.

By June 2018

3.7 Provide the whole spectrum of government subsidised housing (Integrated Residential Development Programme (IRDP), Upgrading of Informal Settlements Programme (UISP) and Community Residential Unit Programme (CRU))

Facilitate land availability, bulk infrastructure provision and the implementation of the Housing Pipeline

Targets achieved as per Housing Pipeline

Annually

3.8 Increase access for citizens in new settlements to urban amenities, work, schools, clinics, parks, etc.

Do new housing developments in terms of the Social economic Facility Policy and the Spatial Development Framework (SDF)

Council approval of budget and implementation for social facilities in terms of the Housing Pipeline

Annually

Secure funding for the social facilities

12

Page 15: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Strategic Objectives Strategic Initiatives Key Performance Indicators Targets 3.9 Maintain a balance between non-paying

and paying households through the increased provision of affordable housing, Finance Linked Individual Subsidy Programme (FLISP) housing, Gap housing and social housing.

Identify suitable pockets of land for (FLISP) housing, Gap housing and social housing

Land identified By November 2018

Obtain land use rights and secure funding for (FLISP) housing, Gap housing and social housing

Rights obtained By June 2018 Funding secured By June 2019

Appoint credible housing institution to build and manage social housing

Appointment finalised By December 2018

Strategic Goal 4: Caring, competent and responsive institutions, organisations and business

Strategic Objectives Strategic Initiatives Key Performance Indicators Targets 4.1 A redesigned organisation structure that

effectively facilitate the strategic objectives and purpose of the organisation

Review the organisation design in light of the IDP Strategy and recommend a new organisation design

Review completed By June 2019

Implement the redesigned organisation structure

Redesigned organisation structure implemented

During the 2019/2020 financial year

4.2 Proactive succession and talent management that ensures consistent high levels of employee performance

Implement a succession and talent management programme that links and develops high potential employees with key future roles in the organisation

Talent pool and succession plan compiled and implemented

By December 2018

4.3 Employment relations that create a climate of trust, cooperation and stability and accomplish a harmonious and productive workforce

Develop a programme of innovative interventions, e.g. diversity management and awareness, climate creation to ensure sound employee relations and practices

Programme developed and implemented

By June 2019

4.4 More informed and effective ward councillors and ward committees

Compile, implement and monitor communication plans for individual ward councillors to enhance public participation

Annual communication activity plans for ward councillors compiled, implemented and shared

Annually by June

Councillors' performance monitored by the Executive Mayor as part of the PMS for councillors.

Annually

4.5 An IT connectivity strategy for the Swartland

Develop an IT connectivity strategy and status quo report

Report finalised By Jun 2018

4.6 Identify risks and implement preventative and corrective controls

Assign Risk Management responsibilities to Internal Audit as RM Shared Services contract ended

Updated Internal Audit Charter which include risk management facilitation role

By Jan 2017 and thereafter every second year

Compile a Handover procedure to newly appointed Manager, Internal Audit

Complete handover procedure By March 2019

Assign Disciplinary Committee responsibilities to four newly appointed members

Appointment of new members for the Disciplinary Committee over a period of six months for continuity

2 members by 1 July 2017. Thereafter every three years

13

Page 16: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Strategic Objectives Strategic Initiatives Key Performance Indicators Targets Maintain an effective independent Performance, Risk and Financial Audit Committee as per legislation (Appoint for three years, but can extend for six years)

Appointment of new members for the PRF Committee over a period of three years for continuity

Annually by June

4.7 Sound long-term financial planning including making the right investment decisions

Review the Long Term Financial Plan Review completed By Feb 2018 Review budget related policies in line with the LTFP

Review completed By Feb 2018

4.8 Sound financial management, budgeting and expenditure control

Critical review of the free basic services model

Review and implementation of an improved basic services model

By Mar 2018

Each director to do a critical review of the cost drivers and implement a savings plan

Review completed By Sep 2017

4.9 Broaden the tax/ revenue base Create institutional capacity to facilitate this Budget approved for critical interventions to give effect to increased revenue

By Mar 2018

Strategic Goal 5: Sufficient, affordable and well-run services

Strategic Objectives Strategic Initiatives Key Performance Indicators Targets 5.1 Secure sufficient long term bulk water

provision Conduct a section 78 investigation Section 78 investigation completed Yes (by end of June

2019) Work with relevant role-players to commit to an agreed service delivery model.

An agreed service delivery model Yes (by end of June 2020)

5.2 Maintenance and upgrading that sustain and improve the current condition of surfaced roads

Report annually on the status quo condition of surfaced roads

Report submitted to the Portfolio Committee

Yes (by September annually)

Inform budgetary processes of funding requirement for maintenance and upgrading of surfaced roads.

Budget and motivation submitted to budget office (norm = 7.5% of the asset value)

Yes (by end of November annually)

5.3 Ensure sufficient civil services capacity for planned developments

Review and maintain master plans Master plans reviewed and maintained where necessary

Within one year after approval of the SDF and every second year thereafter subject to budget provision

5.4 Maintenance and upgrading that sustain and improve the current condition of civil infrastructure

Inform budgetary processes of funding requirement for maintenance, renewal, upgrading and refurbishment of civil infrastructure

Budget and motivation submitted to budget office (norm = 7.5% of the asset value)

Yes (by end of November annually)

14

Page 17: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Strategic Objectives Strategic Initiatives Key Performance Indicators Targets 5.5 Ensure sufficient electricity capacity for

planned developments (built environment) that are feasible

Review and maintain master plans Master plans reviewed and maintained where necessary

Within one year after approval of the SDF and every second year thereafter subject to budget provision

Secure capacity for the De Hoop, Malmesbury, Development (2000 plots) subject to availability of budget

Capacity secured By June 2023

Secure available capacity for Yzerfontein Capacity secured By June 2018 5.6 Maintenance and upgrading that sustain

and improve the current condition of electrical infrastructure

Inform budgetary processes of funding requirement for maintenance, renewal, upgrading and refurbishment of electrical infrastructure

Budget and motivation submitted to budget office (minimum 6% of annual electricity revenue allocation is a Nersa license condition)

Yes (by end of November annually)

5.7 Provide electricity cost effectively Provide competitive tariffs for industrial consumers in support of economic growth

Approval of tariffs by Nersa Annually before end of June

Maintain energy losses at an acceptable level

% total energy losses (technical + non-technical)

Maintain the annual average below 8%

15

Page 18: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

ANNEXURE 3C Generic KPIs and targets for Municipal Manager and Directors

MUNICIPAL MANAGER

The performance objectives, KPI’s, annual targets and risks in the following table are applicable to the Municipal Manager:

Perf Objectives Key Performance Indicators Targets 09-0001: Liaison with business role-players Annual event with local business held Yes (before end of June) 09-0003: Sound management Number of monthly management meetings held At least 10 p.a. 09-0004: Legally compliant procurement Number of appeals against the municipality regarding the

awarding of tenders that were upheld 0 maximum

09-0005: Performance and financial monitoring Number of monthly performance and financial assessments done

At least 10 p.a.

09-0006: Annual report compilation and approval Annual Report as required by MFMA (121) tabled Yes (annually by end of January) Annual Report as required by MFMA (121) approved Yes (annually by end of March)

09-0007: Council decision implementation % of due council decisions initiated 100% 09-0008: Monitoring the IDP / Budget process Number of months that the IDP / Budget process schedule were

checked At least 10 p.a.

09-0009: Functional macro-structure maintained Annual review of the macro-structure completed Yes (before end of June) 09-0012: LED fund management % of the LED funds actually spent 90% for the year 10-0040: MFMA Section 131(1): Ensure that any issues raised by the Auditor-General in an audit report are addressed

% of issues raised by the Auditor-General in an audit report addressed

100%

DIRECTORS

The performance objectives, KPI’s and targets in the following table are on a management level and are applicable to all the directors:

Perf Objective KPI Target Capital expenditure in line with budget and time frames

% of capital budget spent Between 90%and 105%

Capital project implementation Average % completion of capital projects 90%for the year Operating expenditure in line with budget and time frames

% of operating budget spent Between 90% and 100%

Workforce training roll-out % of planned training sessions according to the Workplace Skills Plan realised

100%

Council decision implementation % of due council decisions initiated 100% Performance and financial monitoring Number of monthly performance assessments and

reconciliation of departmental records of expenditure with finance records done

Qtr 1: 3 per qtr Qtr 2: 2 per qtr Qtr 3 and 4: 3 per qtr

Annual report inputs provided by departments Departmental input to the annual report submitted by due date

Yes

16

Page 19: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Perf Objective KPI Target Budget inputs provided by departments Budget requests provided to financial department in

accordance with the budget time schedule Yes

Assignments from the municipal manager completed Number of written warnings received from municipal manager 0 maximum Correspondence addressed in a timely manner % of all correspondence recorded by Collaborator less than 60

days old 90%

Equal employment opportunity management % of employment opportunities applied for appropriate equity appointments

100%

Procurement in line with legal process % compliance with SCM policy with the exception of approved deviations

100%

Audit issues resolved % internal audit queries for which an action plan was submitted within 10 working days

100%

% internal actions implemented within agreed time frame 100% % of Auditor General's queries (comafs) for which an action plan was submitted within 5 working days

100%

% of Auditor General's findings implemented within agreed time frame

100%

Risk identification and control implementation Confirmations of risk assessment done Yes (bi-annually by November and May)

% of Risk Action Plans implemented in accordance with the agreed time frame

100% (bi-annually by November and May)

Chief Risk Officer / Internal Audit informed of any newly identified risks

Yes (monthly)

Chief Risk Officer / Internal Audit informed of any changes in work procedures

Yes (monthly)

Chief Risk Officer / Internal Audit informed of any incidents where controls have failed (loss control register update)

Yes (monthly)

Invocoms held Number of invocoms held Qtr 1: 3 per qtr Qtr 2: 2 per qtr Qtr 3 and 4: 3 per qtr

Average duration of vacancies reduced Average duration of vacancies after decision was taken by management to fill the post

3 months maximum

Productive workforce % of person days lost per month due to sick leave 4% pm maximum EPWP monitoring (not applicable to Financial Services)

Number of Full Time Equivalents (FTE's)* for the financial year FTE: (Full Time Equivalent): Total people (workers) x person days of work (total days worked) divided by 240 gives you total FTE

103 for the whole organisation (DORA target for 2017/18 = 53)

Number of work opportunities created during the financial year 296 for the whole organisation

17

Page 20: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Perf Objective KPI Target Assets safeguarding A condition assessment and a review of the remaining useful

life of all assets in the department done and a certification in this regard provided to the Head Asset Management.

Yes (by June annually)

All moveable assets that became unusable or that were lost or stolen reported immediately in the prescribed manner to the Head: Asset Management

Yes

Communication Strategy implementation All planned communication activities for the next financial year in terms of the Communication Strategy submitted to the Director Corporate Services

Yes (annually by end of June)

Number of reports on all communication activities undertaken by the department submitted to the Director Corporate Services

1 per quarter

Issuing of safety clothing All safety clothing issued Yes (by end of March) Spending of grants % spending of grants 100% (by end of June) Ensure that accurate revenue estimates are prepared in relation to operating requirements

Projected tariff increases determined for the budget of the new financial year

Yes (annually by November)

Over and above the performance objectives, KPI’s and targets in the preceding table, the under mentioned are only applicable to the specific directors as indicated:

Perf Objective KPI Target Director Civil Engineering Services 15-0007: Availability of bulk services (civil) for all projects on the housing pipeline

If bulk services (civil) are not available for any one of the projects on the housing pipeline, has the planning and budget process for the provision of bulk services commenced?

Yes (annually by October)

12-0086: Maintain water losses at an acceptable level

% total water losses Maintain the annual average below 17%

Director Electrical Engineering Services 15-0009 Availability of bulk services (electrical) for all projects on the housing pipeline

If bulk services (electrical) are not available for any one of the projects on the housing pipeline, has the planning and budget process for the provision of bulk services commenced?

Yes (annually by October)

Director Development Services 10-0024: Availability of bulk services for all projects on the housing pipeline

If bulk services are not available for any one of the projects on the housing pipeline, has the planning and budget process for the provision of bulk services commenced?

Yes (annually by October)

Director Financial Services 17-0001: Issuing of safety clothing Annual tender for safety clothing awarded By end of October

18

Page 21: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Perf Objective KPI Target Director Protection Services 16-0004: Effective monitoring of informal settlements Report to Management on the number of new informal

dwellings / structures (including backyard dwellings / structures erected

Yes - monthly

16-0006: Establishment of a Municipal Court If found financially viable and sustainable, complete all administrative procedures for the establishment of the Municipal Court

By November 2017

New: Attainment of minimum competencies Minimum competencies attained to avoid non-compliance Yes (by 31 July 2018)

General Indicators in terms of the Municipal Planning and Performance Management Regulations, 2001

In terms of section 43 of the Municipal Systems Act 32 of 2000 the Minister may by regulation prescribe general key performance indicators (KPI’s) that are appropriate and that can be applied to local government generally. The KPI’s set by a municipality must include any such general KPI’s. Regulation 10 of the Municipal Planning and Performance Management Regulations, 2001 prescribes the following general KPI’s that will be included with the top level KPI’s of the Municipality in the Service Delivery and Budget Implementation Plan (SDBIP) and also reported on in the Bi-annual Report and the Annual Report:

(a) The percentage of households with access to basic level of water, sanitation, electricity and solid waste removal

Perf Objective KPI Target 14-0023: Households with access to basic level of water,sanitation and solid waste removal

% of urban households with access to at least piped (tap) water within 200 meters from dwelling

100.0%

% of urban households with access to at least a flush toilet, chemical toilet or pit toilet with ventilation (VIP)

100.0%

% households registered for refuse removal service which receive a service once a week

100.0%

14-0024: Households with access to basic level of electricity % of urban households with access to electricity 100.0%

(b) The percentage of households earning less than R4 515 per month with access to free basic services

Perf Objective KPI Target 14-0025: Households earning less than R4 515 per month withaccess to free basic services

% of indigent households* with access to free basic services

*Households owning properties with municipal valuations ofR115 000 or less OR households earning less than R4 515 permonth

100.0%

(c) The percentage of a municipality’s capital budget actually spent on capital projects identified for a particular financial year in terms of themunicipality’s integrated development plan

Perf Objective KPI Target 14-0029: % of capital budget spent on IDP projects % of capital budget actually spent on capital projects

identified for a particular financial year in terms of the Between 90% and 105%

19

Page 22: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

municipality's IDP (% of capital budget spent)

(d) The number of jobs created through municipality’s local economic development initiatives including capital projects

Perf Objective KPI Target 14-0026: Jobs created through municipality’s LED initiatives 100 for the year including capital projects

Number of jobs created through Municipality’s capital projects (contracts > R200 000)

150 for the year

(e) The number of people from employment equity target groups employed in the three highest levels of management in compliance with a municipality’s approved employment equity plan

Perf Objective KPI Target 14-0027: People from employment equity target groups employed

% of PDI's appointed for the month in terms of the Municipality’s approved Employment Equity plan

70.0%

16-0009: Promote employment equity through continuous planning

Compilation/review of Employment Equity plan completed Yes (by end of Nov)

(f) The percentage of a municipality’s budget actually spent on implementing its workplace skills plan

Perf Objective KPI Target 14-0028: % of the budget spent on implementing the workplace skills plan

% of the municipality’s salary budget actually spent on implementing its workplace skills plan (cumulative)

1.0%

(g) Financial viability as expressed by ratios

Perf Objective KPI Target 09-0096: Ensure general financial viability % Outstanding service debtors to revenue = B÷C

B represents total outstanding service debtors C represents annual revenue actually received for services

Norm = 20%

Cost coverage =(B+C)÷D B represents all available cash at a particular time C represents investments D represents monthly fixed operating expenditure

Norm = 1–3 Months

% Debt coverage =(B-C)÷D B represents total operating revenue received C represents operating grants D represents debt service payments (i.e. interest +

redemption) due within the financial year

Norm = 45%

20

Page 23: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

ANNEXURE 3D Targets and projected expenditure for each capital budget item

21

Page 24: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Office of the Municipal Manager Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD916 1832 2748 3664 4580 5496 6412 7328 8244 9160 10076 11000 11000Projected Cash Flow CUMULATIVE 11000 2877

11000> Capital 916 916 916 916 916 916 916 916 916 916 916 924Per month 11000 2877Expenditure to date 2877TOTAL

> Capital 2877Cumulative

Office of the Municipal Manager General Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD916 1832 2748 3664 4580 5496 6412 7328 8244 9160 10076 11000 11000Projected Cash Flow CUMULATIVE 11000 2877

11000> Capital 916 916 916 916 916 916 916 916 916 916 916 924Per month 11000 2877Expenditure to date 2877TOTAL

> Capital 2877Cumulative

Equipment Councilpj-09-0021aa

Project:

458 916 1374 1832 2290 2748 3206 3664 4122 4580 5038 5500 5500Projected Cash Flow CUMULATIVE 5500 28775500458 458 458 458 458 458 458 458 458 458 458 462Per month> Capital

Expenditure to date 2877TOTAL2877Cumulative> Capital

Equipment Municipal Managerpj-09-0021ab

Project:

458 916 1374 1832 2290 2748 3206 3664 4122 4580 5038 5500 5500Projected Cash Flow CUMULATIVE 55005500458 458 458 458 458 458 458 458 458 458 458 462Per month> Capital

22

Page 25: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Civil Engineering Services Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD225504 1032522 3004540 6801255 10042291 13202209 18685648 29749009 40404984 49542819 56179152 60505855 60505855Projected Cash Flow CUMULATIVE 60505855 16338980

60505855> Capital 225504 807018 1972018 3796715 3241036 3159918 5483439 11063361 10655975 9137835 6636333 4326703Per month 60505855 16338980Expenditure to date 486879 46246 1539754 4358173 4274816 5627795 5317TOTAL

> Capital 486879 46246 1539754 4358173 4274816 5627795 5317Cumulative

Civil Engineering Services General Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 2500 6000 9500 13000 16500 20000 23500 27000 29803 29803 29803 29803Projected Cash Flow CUMULATIVE 29803 3597

29803> Capital 0 2500 3500 3500 3500 3500 3500 3500 3500 2803 0 0Per month 29803 3597Expenditure to date 844 2753TOTAL

> Capital 844 2753Cumulative

Equipment Civil Servicespj-09-0021ac

Project:

0 2500 6000 9500 13000 16500 20000 23500 27000 29803 29803 29803 29803Projected Cash Flow CUMULATIVE 29803 3597298032500 3500 3500 3500 3500 3500 3500 3500 2803Per month> Capital

Expenditure to date 844 2753TOTAL844 2753Cumulative> Capital

Buildings and Structures Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD225504 328022 431540 1035076 1239612 1343130 1446648 1511004 1514504 1817701 2790523 2790523 2790523Projected Cash Flow CUMULATIVE 2790523 636089

2790523> Capital 225504 102518 103518 603536 204536 103518 103518 64356 3500 303197 972822 0Per month 2790523 636089Expenditure to date 574 622240 12199 1077TOTAL

> Capital 574 622240 12199 1077Cumulative

Community Hall/New Clubhouse - Riebeek Kasteelpj-16-0005Project:0 0 0 400000 400000 400000 400000 400000 400000 400000 400000 400000 400000Projected Cash Flow CUMULATIVE 400000 604096

400000400000Per month> CapitalExpenditure to date 600747 3349TOTAL

600747 3349Cumulative> Capital

Equipment Buildings & Maintenancepj-16-0006Project:0 2500 6000 9500 14000 17500 21000 25500 29000 32197 32197 32197 32197Projected Cash Flow CUMULATIVE 32197 31993

321972500 3500 3500 4500 3500 3500 4500 3500 3197Per month> CapitalExpenditure to date 574 21493 8850 1077TOTAL

574 21493 8850 1077Cumulative> Capital

23

Page 26: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Monitoring office - Upgrading / Constructionpj-16-0048Project:225504 325522 425540 625576 825612 925630 1025648 1085504 1085504 1085504 1085504 1085504 1085504Projected Cash Flow CUMULATIVE 1085504

1085504225504 100018 100018 200036 200036 100018 100018 59856Per month> Capital

Village square: Erf 12 Riebeek Kasteel - developmentpj-17-0005Project:0 0 0 0 0 0 0 0 0 0 535000 535000 535000Projected Cash Flow CUMULATIVE 535000

535000535000Per month> Capital

Community Hall/New Clubhouse - Riebeek Westpj-17-0081Project:0 0 0 0 0 0 0 0 0 300000 737822 737822 737822Projected Cash Flow CUMULATIVE 737822

737822300000 437822Per month> Capital

Parks and Amenities Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 2000 7000 55000 113000 510400 555400 2274045 4049690 4925785 5786430 6607962 6607962Projected Cash Flow CUMULATIVE 6607962 1173475

6607962> Capital 0 2000 5000 48000 58000 397400 45000 1718645 1775645 876095 860645 821532Per month 6607962 1173475Expenditure to date 7737 40986 768411 13941 342400TOTAL

> Capital 7737 40986 768411 13941 342400Cumulative

Equipment Parkspj-11-0058Project:0 2000 7000 15000 23000 28000 33000 41000 46000 51450 51450 51450 51450Projected Cash Flow CUMULATIVE 51450 47973

514502000 5000 8000 8000 5000 5000 8000 5000 5450Per month> CapitalExpenditure to date 7737 40236TOTAL

7737 40236Cumulative> Capital

RSEP - Parks and Amenities: Activity recreation nodes (playgrounds, trees & benches)pj-15-0021 bProject:

0 0 0 0 0 0 0 460645 921290 1381935 1842580 2303225 2303225Projected Cash Flow CUMULATIVE 2303225 7831022303225460645 460645 460645 460645 460645Per month> Capital

Expenditure to date 750 768411 13941TOTAL750 768411 13941Cumulative> Capital

RSEP - Parks and Amenities: Public toilets / landscapingpj-15-0025Project:0 0 0 0 0 0 0 0 0 50000 100000 100000 100000Projected Cash Flow CUMULATIVE 100000

10000050000 50000Per month> Capital

RSEP - Container for police/neighbourhood watch contact pointpj-15-0029Project:0 0 0 0 0 0 0 900000 1850000 1850000 1850000 1850000 1850000Projected Cash Flow CUMULATIVE 1850000

1850000900000 950000Per month> Capital

Vehicles Parks: CK32577 Case Tractorpj-16-0011Project:0 0 0 0 0 342400 342400 342400 342400 342400 342400 342400 342400Projected Cash Flow CUMULATIVE 342400 342400

342400342400Per month> CapitalExpenditure to date 342400TOTAL

342400Cumulative> Capital

24

Page 27: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Parks: Ward Committee projectspj-17-0079Project:0 0 0 40000 90000 140000 180000 230000 290000 350000 400000 400000 400000Projected Cash Flow CUMULATIVE 400000

40000040000 50000 50000 40000 50000 60000 60000 50000Per month> Capital

RSEP - Indoor outdoor sport centrepj-17-0088Project:0 0 0 0 0 0 0 300000 600000 900000 1200000 1560887 1560887Projected Cash Flow CUMULATIVE 1560887

1560887300000 300000 300000 300000 360887Per month> Capital

Roads Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 0 0 574417 624417 654417 3872838 7172838 10472838 12772838 13062838 13334540 13334540Projected Cash Flow CUMULATIVE 13334540 540744

13334540> Capital 0 0 0 574417 50000 30000 3218421 3300000 3300000 2300000 290000 271702Per month 13334540 540744Expenditure to date 538634 2110TOTAL

> Capital 538634 2110Cumulative

Roads: Resealing/upgrading of roads and sidewalks (Swartland)pj-09-0004Project:0 0 0 0 0 0 2000000 5000000 8000000 10000000 10000000 10000000 10000000Projected Cash Flow CUMULATIVE 10000000 2109

100000002000000 3000000 3000000 2000000Per month> CapitalExpenditure to date 2109TOTAL

2109Cumulative> Capital

Vehicles Roads: CK18292 (Case Digger)pj-12-0020Project:0 0 0 0 0 0 1168421 1168421 1168421 1168421 1168421 1168421 1168421Projected Cash Flow CUMULATIVE 1168421

11684211168421Per month> Capital

RSEP - Roads: Safe taxi stops and shelterspj-15-0027Project:0 0 0 0 0 0 0 240000 480000 720000 960000 1231702 1231702Projected Cash Flow CUMULATIVE 1231702 2109

1231702240000 240000 240000 240000 271702Per month> CapitalExpenditure to date 2109TOTAL

2109Cumulative> Capital

Vehicles Roads: CK34112 Cabster UD40pj-17-0017Project:0 0 0 534417 534417 534417 534417 534417 534417 534417 534417 534417 534417Projected Cash Flow CUMULATIVE 534417 534417

534417534417Per month> CapitalExpenditure to date 534417TOTAL

534417Cumulative> Capital

Roads: Ward Committee projectspj-17-0080Project:0 0 0 40000 90000 120000 170000 230000 290000 350000 400000 400000 400000Projected Cash Flow CUMULATIVE 400000 2110

40000040000 50000 30000 50000 60000 60000 60000 50000Per month> CapitalExpenditure to date 2110TOTAL

2110Cumulative> Capital

25

Page 28: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Sewerage Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 500000 1500000 2657262 4162262 5172262 6172262 7672262 9197962 10197962 11031146 11031146 11031146Projected Cash Flow CUMULATIVE 11031146 8429659

11031146> Capital 0 500000 1000000 1157262 1505000 1010000 1000000 1500000 1525700 1000000 833184 0Per month 11031146 8429659Expenditure to date 486879 3925 516982 1991140 3325466 2105267TOTAL

> Capital 486879 3925 516982 1991140 3325466 2105267Cumulative

Sewerage: Telemetry - new installationspj-09-0003Project:0 0 0 0 0 0 0 0 25700 25700 25700 25700 25700Projected Cash Flow CUMULATIVE 25700

2570025700Per month> Capital

Equipment Seweragepj-10-0114Project:0 0 0 5000 10000 20000 20000 20000 20000 20000 20000 20000 20000Projected Cash Flow CUMULATIVE 20000 19208

200005000 5000 10000Per month> CapitalExpenditure to date 3925 625 13845 813TOTAL

3925 625 13845 813Cumulative> Capital

Sewerage: Bulk sewer De Hoop Housing Project (MIG)pj-16-0001Project:0 500000 1500000 2500000 4000000 5000000 6000000 7500000 9000000 10000000 10833184 10833184 10833184Projected Cash Flow CUMULATIVE 10833184 8258190

10833184500000 1000000 1000000 1500000 1000000 1000000 1500000 1500000 1000000 833184Per month> CapitalExpenditure to date 486879 516357 1825034 3325466 2104454TOTAL

486879 516357 1825034 3325466 2104454Cumulative> Capital

Vehicles Sewerage: CK24931 High pressure trailerpj-16-0004Project:0 0 0 152262 152262 152262 152262 152262 152262 152262 152262 152262 152262Projected Cash Flow CUMULATIVE 152262 152261

152262152262Per month> CapitalExpenditure to date 152261TOTAL

152261Cumulative> Capital

Sports Fields Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 200000 800000 1400000 2000000 2600000 3200000 3800000 4400000 5000000 5547655 5547655 5547655Projected Cash Flow CUMULATIVE 5547655 2335392

5547655> Capital 0 200000 600000 600000 600000 600000 600000 600000 600000 600000 547655 0Per month 5547655 2335392Expenditure to date 127705 252521 479411 1475755TOTAL

> Capital 127705 252521 479411 1475755Cumulative

Sport: Upgrading of Sports Grounds: Chatsworthpj-17-0074Project:0 200000 800000 1400000 2000000 2600000 3200000 3800000 4400000 5000000 5547655 5547655 5547655Projected Cash Flow CUMULATIVE 5547655 2335392

5547655200000 600000 600000 600000 600000 600000 600000 600000 600000 547655Per month> CapitalExpenditure to date 127705 252521 479411 1475755TOTAL

127705 252521 479411 1475755Cumulative> Capital

26

Page 29: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Storm Water Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 0 5000 10000 15000 20000 28000 36000 44000 52450 52450 52450 52450Projected Cash Flow CUMULATIVE 52450 52258

52450> Capital 0 0 5000 5000 5000 5000 8000 8000 8000 8450 0 0Per month 52450 52258Expenditure to date 33167 2156 7700 1475 7761TOTAL

> Capital 33167 2156 7700 1475 7761Cumulative

Equipment Streets and Storm Water: Global amountpj-11-0060Project:0 0 5000 10000 15000 20000 28000 36000 44000 52450 52450 52450 52450Projected Cash Flow CUMULATIVE 52450 52258

524505000 5000 5000 5000 8000 8000 8000 8450Per month> CapitalExpenditure to date 33167 2156 7700 1475 7761TOTAL

33167 2156 7700 1475 7761Cumulative> Capital

Water Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 0 255000 1060000 1865000 2670000 3175000 4550000 5514630 7561920 8493947 9727416 9727416Projected Cash Flow CUMULATIVE 9727416 3158445

9727416> Capital 0 0 255000 805000 805000 805000 505000 1375000 964630 2047290 932027 1233469Per month 9727416 3158445Expenditure to date 229685 787568 440651 1700542TOTAL

> Capital 229685 787568 440651 1700542Cumulative

Equipment Waterpj-11-0062Project:0 0 5000 10000 15000 20000 25000 30000 35000 39400 39400 39400 39400Projected Cash Flow CUMULATIVE 39400 21607

394005000 5000 5000 5000 5000 5000 5000 4400Per month> CapitalExpenditure to date 1351 7003 10500 2753TOTAL

1351 7003 10500 2753Cumulative> Capital

Water: Upgrading/Replacement water reticulation networkpj-12-0013Project:0 0 250000 1050000 1850000 2650000 3150000 3650000 3989630 3989630 3989630 3989630 3989630Projected Cash Flow CUMULATIVE 3989630 2599308

3989630250000 800000 800000 800000 500000 500000 339630Per month> CapitalExpenditure to date 228334 780565 1590409TOTAL

228334 780565 1590409Cumulative> Capital

Water: New Reservior: MBY (Wesbank) De Hoop Developmentpj-16-0018Project:0 0 0 0 0 0 0 250000 250000 250000 537531 651000 651000Projected Cash Flow CUMULATIVE 651000 537531

651000250000 287531 113469Per month> CapitalExpenditure to date 430151 107381TOTAL

430151 107381Cumulative> Capital

Water: Upgrading of water reticulation network: PRV's, flow control, zone meteringpj-17-0082Project:0 0 0 0 0 0 0 250000 500000 750000 1024496 1274496 1274496Projected Cash Flow CUMULATIVE 1274496

1274496250000 250000 250000 274496 250000Per month> Capital

27

Page 30: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Water: New water tankerpj-17-0083Project:0 0 0 0 0 0 0 0 0 1422890 1422890 1422890 1422890Projected Cash Flow CUMULATIVE 1422890

14228901422890Per month> Capital

Water: Network expansion and new boreholespj-17-0084Project:0 0 0 0 0 0 0 370000 740000 1110000 1480000 1850000 1850000Projected Cash Flow CUMULATIVE 1850000

1850000370000 370000 370000 370000 370000Per month> Capital

Water: Supply scheme mitigationpj-17-0085Project:0 0 0 0 0 0 0 0 0 0 0 500000 500000Projected Cash Flow CUMULATIVE 500000

500000500000Per month> Capital

Cleansing Services Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 0 0 0 10000 15500 15500 2509360 4709360 6709360 8909360 10909360 10909360Projected Cash Flow CUMULATIVE 10909360 9320

10909360> Capital 0 0 0 0 10000 5500 0 2493860 2200000 2000000 2200000 2000000Per month 10909360 9320Expenditure to date 11764 -2444TOTAL

> Capital 11764 -2444Cumulative

Equipment Refuse Removalpj-11-0059Project:0 0 0 0 10000 15500 15500 15500 15500 15500 15500 15500 15500Projected Cash Flow CUMULATIVE 15500 9320

1550010000 5500Per month> CapitalExpenditure to date 11764 -2444TOTAL

11764 -2444Cumulative> Capital

Vehicles Refuse: CK36311 Nissan UD40pj-16-0022Project:0 0 0 0 0 0 0 493860 493860 493860 493860 493860 493860Projected Cash Flow CUMULATIVE 493860

493860493860Per month> Capital

Refuse skipspj-17-0086Project:0 0 0 0 0 0 0 0 0 0 200000 200000 200000Projected Cash Flow CUMULATIVE 200000

200000200000Per month> Capital

Refuse: Upgrading of Riebeek West transfer stationpj-17-0087Project:0 0 0 0 0 0 0 0 200000 200000 200000 200000 200000Projected Cash Flow CUMULATIVE 200000

200000200000Per month> Capital

Housing Riebeek Wes: Rehabilitation of dumping sitepj-17-0090Project:0 0 0 0 0 0 0 2000000 4000000 6000000 8000000 10000000 10000000Projected Cash Flow CUMULATIVE 10000000

100000002000000 2000000 2000000 2000000 2000000Per month> Capital

28

Page 31: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Sewerage: Waste Water Treatment Plant Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 0 0 0 0 200000 200000 200000 475000 475000 475000 475000 475000Projected Cash Flow CUMULATIVE 475000

475000> Capital 0 0 0 0 0 200000 0 0 275000 0 0 0Per month 475000

Sewerage: WWTW Moorreesburgpj-13-0008Project:0 0 0 0 0 200000 200000 200000 475000 475000 475000 475000 475000Projected Cash Flow CUMULATIVE 475000

475000200000 275000Per month> Capital

29

Page 32: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Corporate Services Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD7060000 7060000 7060000 7060000 7060000 7254466 7254466 7264466 7264466 7290966 7296716 7311716 7311716Projected Cash Flow CUMULATIVE 7311716 7121566

7311716> Capital 7060000 0 0 0 0 194466 0 10000 0 26500 5750 15000Per month 7311716 7121566Expenditure to date 7059567 5605 7960 16496 31938TOTAL

> Capital 7059567 5605 7960 16496 31938Cumulative

Corporate Services General Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 0 0 0 0 10000 10000 10000 10000 10000 15750 15750 15750Projected Cash Flow CUMULATIVE 15750 7847

15750> Capital 0 0 0 0 0 10000 0 0 0 0 5750 0Per month 15750 7847Expenditure to date 5621 2226TOTAL

> Capital 5621 2226Cumulative

Equipment Corporatepj-09-0021ad

Project:

0 0 0 0 0 10000 10000 10000 10000 10000 15750 15750 15750Projected Cash Flow CUMULATIVE 15750 78471575010000 5750Per month> Capital

Expenditure to date 5621 2226TOTAL5621 2226Cumulative> Capital

Properties, Contracts and Legal Administration Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD7060000 7060000 7060000 7060000 7060000 7080000 7080000 7080000 7080000 7091500 7091500 7091500 7091500Projected Cash Flow CUMULATIVE 7091500 7062987

7091500> Capital 7060000 0 0 0 0 20000 0 0 0 11500 0 0Per month 7091500 7062987Expenditure to date 7059567 3420TOTAL

> Capital 7059567 3420Cumulative

Equipment Corporate: Halls and buildingspj-09-0024Project:0 0 0 0 0 20000 20000 20000 20000 31500 31500 31500 31500Projected Cash Flow CUMULATIVE 31500 3420

3150020000 11500Per month> CapitalExpenditure to date 3420TOTAL

3420Cumulative> Capital

Purchase of Erven: Glen Lillypj-17-0071Project:7060000 7060000 7060000 7060000 7060000 7060000 7060000 7060000 7060000 7060000 7060000 7060000 7060000Projected Cash Flow CUMULATIVE 7060000 7059567

70600007060000Per month> CapitalExpenditure to date 7059567TOTAL

7059567Cumulative> Capital

30

Page 33: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Public Relations, Library and Tourism Services Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 0 0 0 0 164466 164466 174466 174466 189466 189466 204466 204466Projected Cash Flow CUMULATIVE 204466 50732

204466> Capital 0 0 0 0 0 164466 0 10000 0 15000 0 15000Per month 204466 50732Expenditure to date 5605 2339 14270 28518TOTAL

> Capital 5605 2339 14270 28518Cumulative

Equipment Librariespj-17-0069Project:0 0 0 0 0 10000 10000 20000 20000 35000 35000 50000 50000Projected Cash Flow CUMULATIVE 50000 33714

5000010000 10000 15000 15000Per month> CapitalExpenditure to date 5605 2339 14270 11500TOTAL

5605 2339 14270 11500Cumulative> Capital

Libraries: New air conditionerspj-17-0070Project:0 0 0 0 0 154466 154466 154466 154466 154466 154466 154466 154466Projected Cash Flow CUMULATIVE 154466 17018

154466154466Per month> CapitalExpenditure to date 17018TOTAL

17018Cumulative> Capital

31

Page 34: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Development Services Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD31666 67332 98998 264664 296330 1435996 3067662 5709328 8426994 11168660 13810326 17568154 17568154Projected Cash Flow CUMULATIVE 17568154 1040987

17218154> Capital 2500 6500 2500 136500 2500 1110500 1602500 2612500 2688500 2712500 2612500 3728654Per month 17218154 903981350000> Operating 29166 29166 29166 29166 29166 29166 29166 29166 29166 29166 29166 29174Per month 350000 137007

Expenditure to date 1053 150177 107175 782582TOTAL> Capital 1053 146665 756263Cumulative> Operating 3512 107175 26320Cumulative

Development Services General Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 4000 4000 8000 8000 16000 16000 16000 32000 32000 32000 32000 32000Projected Cash Flow CUMULATIVE 32000 20181

32000> Capital 0 4000 0 4000 0 8000 0 0 16000 0 0 0Per month 32000 20181Expenditure to date 1053 693 18435TOTAL

> Capital 1053 693 18435Cumulative

Equipment Development Servicespj-11-0097Project:0 4000 4000 8000 8000 16000 16000 16000 32000 32000 32000 32000 32000Projected Cash Flow CUMULATIVE 32000 20181

320004000 4000 8000 16000Per month> CapitalExpenditure to date 1053 693 18435TOTAL

1053 693 18435Cumulative> Capital

Community Development Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 0 0 0 0 0 0 0 0 0 0 700000 700000Projected Cash Flow CUMULATIVE 700000

700000> Capital 0 0 0 0 0 0 0 0 0 0 0 700000Per month 700000

Thusong centre Malmesbury (Wesbank)pj-17-0089Project:0 0 0 0 0 0 0 0 0 0 0 700000 700000Projected Cash Flow CUMULATIVE 700000

700000700000Per month> Capital

Housing Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 0 0 0 0 1100000 2600000 5210000 7820000 10430000 13040000 15806154 15806154Projected Cash Flow CUMULATIVE 15806154 883800

15806154> Capital 0 0 0 0 0 1100000 1500000 2610000 2610000 2610000 2610000 2766154Per month 15806154 883800Expenditure to date 145972 737828TOTAL

> Capital 145972 737828Cumulative

Housing Riebeek Wes: Sewerage + Professional Feespj-13-0072Project:0 0 0 0 0 0 0 580000 1160000 1740000 2320000 2903339 2903339Projected Cash Flow CUMULATIVE 2903339

2903339580000 580000 580000 580000 583339Per month> Capital

32

Page 35: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Housing Riebeek Wes: Streets and Stormwaterpj-13-0080Project:0 0 0 0 0 1100000 2600000 4100000 5600000 7100000 8600000 10242269 10242269Projected Cash Flow CUMULATIVE 10242269 883800

102422691100000 1500000 1500000 1500000 1500000 1500000 1642269Per month> CapitalExpenditure to date 145972 737828TOTAL

145972 737828Cumulative> Capital

Housing Riebeek Wes: Waterpj-17-0073Project:0 0 0 0 0 0 0 530000 1060000 1590000 2120000 2660546 2660546Projected Cash Flow CUMULATIVE 2660546

2660546530000 530000 530000 530000 540546Per month> Capital

Caravan Parks Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD2500 5000 7500 110000 112500 115000 217500 220000 222500 325000 327500 530000 530000Projected Cash Flow CUMULATIVE 530000

530000> Capital 2500 2500 2500 102500 2500 2500 102500 2500 2500 102500 2500 202500Per month 530000

Equipment: YZF Caravan Parkpj-16-0044Project:2500 5000 7500 10000 12500 15000 17500 20000 22500 25000 27500 30000 30000Projected Cash Flow CUMULATIVE 30000

300002500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500Per month> Capital

Caravan Park Yzerfontein: Expansion (Service of 8 plots + ablution block)pj-17-0041Project:0 0 0 100000 100000 100000 200000 200000 200000 300000 300000 500000 500000Projected Cash Flow CUMULATIVE 500000

500000100000 100000 100000 200000Per month> Capital

Planning Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 0 0 30000 30000 30000 30000 30000 90000 90000 90000 150000 150000Projected Cash Flow CUMULATIVE 150000

150000> Capital 0 0 0 30000 0 0 0 0 60000 0 0 60000Per month 150000

SDF Planspj-15-0011Project:0 0 0 30000 30000 30000 30000 30000 90000 90000 90000 150000 150000Projected Cash Flow CUMULATIVE 150000

15000030000 60000 60000Per month> Capital

Valuations Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD29166 58332 87498 116664 145830 174996 204162 233328 262494 291660 320826 350000 350000Projected Cash Flow CUMULATIVE 350000 137007

350000> Operating 29166 29166 29166 29166 29166 29166 29166 29166 29166 29166 29166 29174Per month 350000 137007Expenditure to date 3512 107175 26320TOTAL

> Operating 3512 107175 26320Cumulative

Valuation - Supplementarypj-09-0094Project:29166 58332 87498 116664 145830 174996 204162 233328 262494 291660 320826 350000 350000Projected Cash Flow CUMULATIVE 350000 137007

35000029166 29166 29166 29166 29166 29166 29166 29166 29166 29166 29166 29174Per month> OperatingExpenditure to date 3512 107175 26320TOTAL

33

Page 36: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

3512 107175 26320Cumulative> Operating

34

Page 37: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Electrical Engineering Services Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD85381 256143 533716 1014970 1857543 2582305 2857067 10395541 11072464 11599387 12256310 12684649 12684649Projected Cash Flow CUMULATIVE 12684649 8604642

12684649> Capital 85381 170762 277573 481254 842573 724762 274762 7538474 676923 526923 656923 428339Per month 12684649 8604642Expenditure to date 42330 282309 1918483 913819 4489787 946565 11349TOTAL

> Capital 42330 282309 1918483 913819 4489787 946565 11349Cumulative

Electrical Engineering Services General Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 0 12811 269303 282114 282114 282114 294925 320586 346247 371908 384719 384719Projected Cash Flow CUMULATIVE 384719 358022

384719> Capital 0 0 12811 256492 12811 0 0 12811 25661 25661 25661 12811Per month 384719 358022Expenditure to date 83827 192207 10659 64429 6899TOTAL

> Capital 83827 192207 10659 64429 6899Cumulative

Equipment Electricitypj-11-0096Project:0 0 12811 269303 282114 282114 282114 294925 320586 346247 371908 384719 384719Projected Cash Flow CUMULATIVE 384719 358022

38471912811 256492 12811 12811 25661 25661 25661 12811Per month> CapitalExpenditure to date 83827 192207 10659 64429 6899TOTAL

83827 192207 10659 64429 6899Cumulative> Capital

Electricity Operations, Maintenance and Construction Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD85381 256143 476905 697667 918429 1139191 1359953 8867616 9350878 9834140 10447402 10845281 10845281Projected Cash Flow CUMULATIVE 10845281 8019435

10845281> Capital 85381 170762 220762 220762 220762 220762 220762 7507663 483262 483262 613262 397879Per month 10845281 8019435Expenditure to date 42330 144034 1721987 901610 4366689 837001 5784TOTAL

> Capital 42330 144034 1721987 901610 4366689 837001 5784Cumulative

Electricity networks: New infrastructurepj-09-0044Project:85381 256143 426905 597667 768429 939191 1109953 5634516 5805278 5976040 6146802 6232181 6232181Projected Cash Flow CUMULATIVE 6232181 6219011

623218185381 170762 170762 170762 170762 170762 170762 4524563 170762 170762 170762 85379Per month> CapitalExpenditure to date 10406 26308 238545 797388 4327779 812801 5784TOTAL

10406 26308 238545 797388 4327779 812801 5784Cumulative> Capital

Vehicles Electricity: CK23693 Nissan UD80 - Crane Truckpj-16-0029Project:0 0 0 0 0 0 0 1483100 1483100 1483100 1483100 1483100 1483100Projected Cash Flow CUMULATIVE 1483100 1483100

14831001483100Per month> CapitalExpenditure to date 1483100TOTAL

1483100Cumulative> Capital

Housing Phola Park/De Hoop: Block 4: Electrical infrastructure, connections and streetlights: 130 ervenpj-17-0044Project:0 0 50000 100000 150000 200000 250000 1750000 2062500 2375000 2687500 3000000 3000000Projected Cash Flow CUMULATIVE 3000000 317323

300000050000 50000 50000 50000 50000 1500000 312500 312500 312500 312500Per month> Capital

35

Page 38: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Expenditure to date 31923 117726 342 104222 38910 24200TOTAL31923 117726 342 104222 38910 24200Cumulative> Capital

Electricity: Malmesbury - Traffic office building - solar electricity generationpj-17-0091Project:0 0 0 0 0 0 0 0 0 0 130000 130000 130000Projected Cash Flow CUMULATIVE 130000

130000130000Per month> Capital

Information, Communication and Technology Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 0 44000 48000 657000 1161000 1215000 1233000 1401000 1419000 1437000 1454649 1454649Projected Cash Flow CUMULATIVE 1454649 227185

1454649> Capital 0 0 44000 4000 609000 504000 54000 18000 168000 18000 18000 17649Per month 1454649 227185Expenditure to date 54448 4289 1550 58669 102665 5565TOTAL

> Capital 54448 4289 1550 58669 102665 5565Cumulative

IT: Terminalspj-11-0104Project:0 0 40000 40000 40000 40000 40000 40000 40000 40000 40000 40000 40000Projected Cash Flow CUMULATIVE 40000 39928

4000040000Per month> CapitalExpenditure to date 39928TOTAL

39928Cumulative> Capital

IT: Equipmentpj-11-0106Project:0 0 4000 8000 12000 16000 20000 38000 56000 74000 92000 109649 109649Projected Cash Flow CUMULATIVE 109649 18838

1096494000 4000 4000 4000 4000 18000 18000 18000 18000 17649Per month> CapitalExpenditure to date 4289 1550 7434 5565TOTAL

4289 1550 7434 5565Cumulative> Capital

IT: Backup sollution expansionpj-12-0034Project:0 0 0 0 0 0 0 0 100000 100000 100000 100000 100000Projected Cash Flow CUMULATIVE 100000 95231

100000100000Per month> CapitalExpenditure to date 95231TOTAL

95231Cumulative> Capital

IT: Server SM virtual environmentpj-13-0053Project:0 0 0 0 0 500000 500000 500000 500000 500000 500000 500000 500000Projected Cash Flow CUMULATIVE 500000

500000500000Per month> Capital

IT: Notebookspj-14-0030Project:0 0 0 0 75000 75000 75000 75000 125000 125000 125000 125000 125000Projected Cash Flow CUMULATIVE 125000 73189

12500075000 50000Per month> CapitalExpenditure to date 14520 58669TOTAL

14520 58669Cumulative> Capital

IT: Upgrade: 6 x PABX (telephone systems)pj-14-0031Project:0 0 0 0 530000 530000 530000 530000 530000 530000 530000 530000 530000Projected Cash Flow CUMULATIVE 530000

530000530000Per month> Capital

36

Page 39: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

IT: Camera Monitoring Equipmentpj-17-0049Project:0 0 0 0 0 0 50000 50000 50000 50000 50000 50000 50000Projected Cash Flow CUMULATIVE 50000

5000050000Per month> Capital

37

Page 40: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Financial Services Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD-2681 -1369 602261 603573 697210 698522 699834 701146 702458 703770 705082 706400 706400Projected Cash Flow CUMULATIVE 706400 516713

706400> Capital -2681 1312 603630 1312 93637 1312 1312 1312 1312 1312 1312 1318Per month 706400 516713Expenditure to date 326500 183492 4374 1700 647TOTAL

> Capital 326500 183492 4374 1700 647Cumulative

Financial Services General Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD-2681 -1369 602261 603573 697210 698522 699834 701146 702458 703770 705082 706400 706400Projected Cash Flow CUMULATIVE 706400 516713

706400> Capital -2681 1312 603630 1312 93637 1312 1312 1312 1312 1312 1312 1318Per month 706400 516713Expenditure to date 326500 183492 4374 1700 647TOTAL

> Capital 326500 183492 4374 1700 647Cumulative

Equipment Financialpj-09-0021afProject:

-2681 -1369 -57 1255 2567 3879 5191 6503 7815 9127 10439 11757 11757Projected Cash Flow CUMULATIVE 11757 672111757-2681 1312 1312 1312 1312 1312 1312 1312 1312 1312 1312 1318Per month> Capital

Expenditure to date 4374 1700 647TOTAL4374 1700 647Cumulative> Capital

Vehicles Financial Services: CK39500 (Isuzu 240i 4x4)pj-13-0055Project:0 0 326500 326500 326500 326500 326500 326500 326500 326500 326500 326500 326500Projected Cash Flow CUMULATIVE 326500 326500

326500326500Per month> CapitalExpenditure to date 326500TOTAL

326500Cumulative> Capital

Vehicles Financial Services: CK40697 Citi Golf 310pj-16-0032Project:0 0 183493 183493 183493 183493 183493 183493 183493 183493 183493 183493 183493Projected Cash Flow CUMULATIVE 183493 183492

183493183493Per month> CapitalExpenditure to date 183492TOTAL

183492Cumulative> Capital

Meter reading handheldspj-17-0050Project:0 0 92325 92325 184650 184650 184650 184650 184650 184650 184650 184650 184650Projected Cash Flow CUMULATIVE 184650

18465092325 92325Per month> Capital

38

Page 41: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Protection Services Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 0 114500 114500 626500 750093 750093 750093 1528727 1528727 1731184 1867050 1867050Projected Cash Flow CUMULATIVE 1867050 57561

1867050> Capital 0 0 114500 0 512000 123593 0 0 778634 0 202457 135866Per month 1867050 57561Expenditure to date 1307 646 45381 1712 8515TOTAL

> Capital 1307 646 45381 1712 8515Cumulative

Traffic and Law Enforcement Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 0 14500 14500 526500 541000 541000 541000 555500 555500 570000 570000 570000Projected Cash Flow CUMULATIVE 570000 54656

570000> Capital 0 0 14500 0 512000 14500 0 0 14500 0 14500 0Per month 570000 54656Expenditure to date 1307 646 45381 983 6340TOTAL

> Capital 1307 646 45381 983 6340Cumulative

Equipment Traffic and Law Enforcementpj-10-0138Project:0 0 14500 14500 14500 29000 29000 29000 43500 43500 58000 58000 58000Projected Cash Flow CUMULATIVE 58000 54656

5800014500 14500 14500 14500Per month> CapitalExpenditure to date 1307 646 45381 983 6340TOTAL

1307 646 45381 983 6340Cumulative> Capital

Vehicles Traffic and Law Enforcement: CK38353 Nissan bakkiepj-16-0035Project:0 0 0 0 273000 273000 273000 273000 273000 273000 273000 273000 273000Projected Cash Flow CUMULATIVE 273000

273000273000Per month> Capital

Vehicles Traffic and Law Enforcement: CK40698 Citi Golfpj-16-0036Project:0 0 0 0 239000 239000 239000 239000 239000 239000 239000 239000 239000Projected Cash Flow CUMULATIVE 239000

239000239000Per month> Capital

Fire and Emergency Services Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 0 0 0 0 9093 9093 9093 773227 773227 784184 820050 820050Projected Cash Flow CUMULATIVE 820050 2905

820050> Capital 0 0 0 0 0 9093 0 0 764134 0 10957 35866Per month 820050 2905Expenditure to date 730 2175TOTAL

> Capital 730 2175Cumulative

Equipment Fire and Emergency Servicespj-10-0139Project:0 0 0 0 0 9093 9093 9093 9093 9093 20050 55916 55916Projected Cash Flow CUMULATIVE 55916 2905

559169093 10957 35866Per month> CapitalExpenditure to date 730 2175TOTAL

730 2175Cumulative> Capital

39

Page 42: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Vehicles Fire Services: New fire fighting vehiclepj-17-0092Project:0 0 0 0 0 0 0 0 764134 764134 764134 764134 764134Projected Cash Flow CUMULATIVE 764134

764134764134Per month> Capital

Protection Services General Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD0 0 100000 100000 100000 200000 200000 200000 200000 200000 377000 477000 477000Projected Cash Flow CUMULATIVE 477000

477000> Capital 0 0 100000 0 0 100000 0 0 0 0 177000 100000Per month 477000

CCTV Camera Systems - Malmesburypj-17-0056Project:0 0 0 0 0 100000 100000 100000 100000 100000 200000 200000 200000Projected Cash Flow CUMULATIVE 200000

200000100000 100000Per month> Capital

CCTV Camera Systems - Moorreesburgpj-17-0076Project:0 0 0 0 0 0 0 0 0 0 77000 77000 77000Projected Cash Flow CUMULATIVE 77000

7700077000Per month> Capital

CCTV Camera Systems - Darlingpj-17-0077Project:0 0 0 0 0 0 0 0 0 0 0 100000 100000Projected Cash Flow CUMULATIVE 100000

100000100000Per month> Capital

CCTV Camera Systems - Yzerfonteinpj-17-0078Project:0 0 100000 100000 100000 100000 100000 100000 100000 100000 100000 100000 100000Projected Cash Flow CUMULATIVE 100000

100000100000Per month> Capital

40

Page 43: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Grand Total Financial State: 2017/8 June 2018

Projected/Actual ETD Jul17 Aug17 Sep17 Oct17 Nov17 Dec17 Jan18 Feb18 Mar18 Apr18 May18 June18Type Budget Var % VarETDPTD7400786 8416460 11416763 15862626 20584454 25929087 33321182 54576911 69408337 81843489 91988846100654824 100654824Projected Cash Flow CUMULATIVE 100654824 33683327

100304824> Capital 7371620 986508 2971137 4416697 4692662 5315467 7362929 21226563 14802260 12405986 10116191 8636804Per month 100304824 33546320350000> Operating 29166 29166 29166 29166 29166 29166 29166 29166 29166 29166 29166 29174Per month 350000 137007

Expenditure to date 7588776 329862 3792040 5659003 8897238 7399095 17312TOTAL> Capital 7588776 329862 3792040 5655491 8790064 7372776 17312Cumulative> Operating 3512 107175 26320Cumulative

41

Page 44: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

ANNEXURE 4 Ward information for expenditure and service delivery

Project Ref Project Description Budget 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022

WARDS 1 & 2 14-0021 Refuse site Moorreesburg 1 500 000 13-0008 Sewerage 475 000 5 034 411 29 963 893 28 771 349 3 853 705 17-0076 CCTV Camera System 77 000 - Vehicles 1 168 421 96 800 1 448 600 550 000 1 932 612 TOTAL: 1 720 421 5 131 211 32 912 493 29 321 349 5 786 317 WARDS 3 & 12 13-0072 Housing Riebeek Wes: Sewerage 2 903 339 13-0080 Housing Riebeek Wes: Streets and Stormwater 10 242 269 2 877 940 17-0073 Housing Riebeek Wes: Water 2 660 546 622 060 17-0081 Community Hall / New clubhouse - Riebeek West 737 822 14-0022 Refuse site Riebeek West and Riebeek Kasteel 2 200 000 17-0087 Upgrading of Riebeek West transfer station 200 000 17-0090 Rehabilitation of Riebeek West dumping site 10 000 000 16-0005 Community Hall / New clubhouse - Riebeek Kasteel 400 000 17-0005 Development of village square: Erf 12 Riebeek Kasteel 535 000 750 000 - Vehicles 534 417 93 170 TOTAL: 28 213 393 4 250 000 2 293 170 WARD 4 17-0016 Roads: Upgrading and Diversion: Kalbaskraal Riverlands Pipeline

(N7 construction works) 2 664 000

11-0095 Sewerage: Chatsworth sewerage works 4 233 790 17-0074 Sport: Upgrading of Sport Grounds: Chatsworth 5 547 655 1 303 265 2 000 000 TOTAL: 5 547 655 8 201 055 2 000 000 WARDS 5 & 6 14-0005 Sewerage: Darling - Upgrading of beltpress 6 200 000 10-0044 Sewerage: Security upgrade Darling sewerage works 1 576 000 16-0044 Equipment: Yzerfontein Caravan Park 30 000 30 000 30 000 30 000 30 000 17-0041 Caravan Park Yzerfontein: Expansion 500 000 1 000 000 17-0075 Sport: Upgrading of Sports Grounds: Darling 3 897 195 17-0077 CCTV Camera System - Darling 100 000 17-0078 CCTV Camera System - Yzerfontein 100 000 - Vehicles 152 262 1 815 000 2 363 400 8 054 475 3 457 867 TOTAL: 882 262 4 421 000 6 290 595 8 084 475 9 687 867

42

Page 45: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Project Ref Project Description Budget 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022

WARD 7 17-0070 New air conditioners for library 154 466 17-0016 Roads: Upgrading and Diversion: Kalbaskraal Riverlands Pipeline

(N7 construction works) (See ward 4)

TOTAL: 154 466 WARDS 8, 9, 10 & 11 16-0048 Upgrading / Construction of Monitoring office 1 085 504 16-0024 Sport: Indoor Sport Centre 2 000 000 1 000 000 13-0035 Storm water: Replace part of channel under Voortrekker Street 2 000 000 12 000 000 13-0036 Storm water: Retention structure - inlet to channel Malmesbury 2 200 000 2 767 000 16-0001 Sewerage: Bulk sewer De Hoop Housing Project (MIG) 10 833 184 8 023 004 16-0018 Water: New Reservoir: MBY (Wesbank) De Hoop Development 651 000 8 674 064 2 662 725 17-0044 Housing Phola Park/De Hoop: Block 4: Electrical infrastructure,

connections and streetlights: 130 erven 3 000 000

17-0091 Traffic office building Malmesbury - solar electricity generation 130 000 TOTAL: 15 699 688 18 697 068 5 862 725 4 767 000 12 000 000 VARIOUS WARDS 17-0056 CCTV Camera System - Malmesbury 200 000 - Vehicles 1 825 500 2 560 300 0 3 335 380 3 393 663 TOTAL: 2 025 500 2 560 300 0 3 335 380 3 393 663 ALL WARDS Land for development 17-0071 Purchase of Erven: Glen Lilly 7 060 000 Electricity Distribution 09-0044 Electricity networks: New infrastructure 6 232 181 7 800 000 8 000 000 8 000 000 8 000 000 Finance (Credit Control, income and Expenditures) 17-0050 Meter reading handhelds 184 650 ICT Services 10-0004 IT: Storage Array Network (SAN) 700 000 11-0104 IT: Terminals 40 000 40 000 40 000 40 000 11-0105 IT: Scanner replacements 20 000 11-0106 IT: Equipment 109 649 65 000 70 000 70 000 70 000 11-0107 IT: Wireless and fibre network 75 000 12-0034 IT: Backup solution expansion 100 000 12-0036 IT: Monitor replacement 45 000 13-0053 IT: Server SM virtual environment 500 000 600 000 500 000 14-0028 IT: Printers Capital 56 000 60 000 60 000 60 000

43

Page 46: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Project Ref Project Description Budget 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022

14-0029 IT: Desktops Capital 140 000 140 000 140 000 140 000 14-0030 IT: Notebooks Capital 125 000 180 000 180 000 180 000 180 000 14-0031 IT: Upgrade: 6 x PABX (telephone systems) 530 000 17-0049 IT: Camera Monitoring Equipment 50 000 Planning 15-0011 Planning and Development: SDF Plans 150 000 150 000 150 000 150 000 Refuse Removal 09-0027 Refuse bins, traps, skips 32 000 36 000 17-0086 Refuse skips 200 000 Roads 09-0004 Resealing/upgrading of roads and sidewalks (Swartland) 10 000 000 10 000 000 12 000 000 16-0015 New Roads and Stormwater (MIG Project) 8 000 000 18 191 811 Ward Committee Projects 400 000 400 000 400 000 400 000 400 000 Sewerage 09-0003 Telemetry - new installations 25 700 27 000 30 000 32 000 34 000 Sportsgrounds 14-0037 Sport Projects: (MIG) 4 294 803 4 970 000 Parks Ward Committee Projects 400 000 400 000 400 000 400 000 400 000 Storm Water 09-0009 Upgrading of old networks (Swartland) 1 020 000 Water Distribution 12-0013 Upgrading/Replacement water reticulation network 3 989 630 5 000 000 3 500 000 2 471 280 17-0082 Upgrading of water reticulation network: PRV's, flow control, zone

metering 1 274 496

17-0083 New water tanker 1 422 890 17-0084 Network expansion and new boreholes 1 850 000 17-0085 Supply scheme mitigation 500 000 Equipment 09-0021ac Equipment Civil Services 29 803 44 000 46 000 48 000 50 000 16-0006 Equipment Buildings & Maintenance 32 197 22 050 11-0058 Equipment Parks 51 450 54 000 56 000 58 000 60 000 11-0059 Equipment Refuse Removal 15 500 16 200 18 000 20 000 22 000 10-0114 Equipment Sewerage 20 000 22 000 24 000 26 000 20 000 11-0060 Equipment Streets and Storm Water: Global amount 52 450 54 000 56 000 58 000 60 000 11-0062 Equipment Water 39 400 41 300 43 000 45 000 47 000 09-0021ad Equipment Corporate 15 750 16 500 18 000 20 000 22 000 09-0024 Equipment Corporate: Halls and buildings 31 500 33 000 35 000 35 000 35 000

44

Page 47: 2017-2018 SERVICE DELIVERY AND BUDGET … for...2018-02-192017-2018 SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN Amended February 2018

Project Ref Project Description Budget 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022

17-0069 Equipment Libraries 50 000 09-0021aa Equipment Council 5 500 6 000 10 000 10 000 10 000 09-0021ab Equipment Municipal Manager 5 500 6 000 10 000 10 000 10 000 11-0097 Equipment Development Services 32 000 34 000 36 000 38 000 40 000 11-0096 Equipment Electricity 384 719 340 000 350 000 350 000 350 000 09-0021af Equipment Financial 11 757 16 500 22 000 24 000 26 000 10-0138 Equipment Traffic and Law Enforcement 58 000 72 000 74 000 76 000 78 000 10-0139 Equipment Fire and Emergency Services 55 916 23 000 25 000 27 000 30 000 Vehicles - Vehicles Community Development 215 380 232 925 - Vehicles Parks 93 170 - Vehicles Refuse 493 860 2 450 000 3 000 000 1 500 000 3 000 000 - Vehicles Sewerage 1 610 510 - Vehicles Water 26 620 1 610 510 2 093 663 - Vehicles Financial Services: 509 993 423 500 232 925 1 147 989 - Vehicles Traffic and Law Enforcement 512 000 270 000 770 000 1 740 000 550 000 - Vehicles Fire Services 764 134 5 820 000 760 000 980 000 1 078 000 - Vehicles Municipal Property 276 000 355 000 - Vehicles Municipal Manager 652 190 TOTAL: 38 315 625 29 334 430 34 916 830 35 791 812 43 113 754 RSEP Wards 17-0089 Thusong centre Wesbank 700 000 17-0088 RSEP - Indoor outdoor sport centre 1 560 887 15-0010 Box city - business centres 1 000 000 15-0021 b RSEP - Parks and Amenities: Activity recreation nodes

(playgrounds, trees & benches) 2 303 225 500 000

15-0022 RSEP - Parks and Amenities: Splash pool / Fountain 4 700 000 15-0025 RSEP - Parks and Amenities: Public toilets / landscaping 100 000 600 000 15-0027 RSEP - Roads: Safe taxi stops and shelters 1 231 702 15-0029 RSEP - Protection Services: Container for police/neighbourhood

watch contact point 1 850 000 400 000

15-0030 RSEP - Corporate Services: Information board / signage 200 000 TOTAL: 7 745 814 7 400 000 GRAND TOTAL: 100 373 122 79 995 064 84 275 813 81 300 016 73 981 601