  • Voluntary Scheme for Biodiversity and Ecosystem Services in Territories of European

    Overseas

    2nd SC meeting 26 November 2014 - EU Commission

  • AGENDA

    • Welcome and Introduction • Presentation of BEST III progress - discussion - Communication strategy - Fundraising strategy - Ecosystem Profile methodology - Regional progress by the knowledge hubs • BESTIII internship • Selection criteria for projects funded in the first calls (EC) • AOB • Wrap up and next meeting date

  • BEST III activities in a nutshell

    Lot 1: Setting up a BEST working team (central team + 7 regional hubs) BEST III Steering Committee and organise regular meetings BEST platform for regular exchange between stakeholders Organising fundraising activities to leverage long-term funding Developing BEST investment strategies based on regional strategies

    Lot 2: Developing regional and sub-regional ecosystem profiles

  • BEST III Consortium Dashboard (Year 1-2014) Lot 1: Setting up and facilitating the interactive platform : OK

    Activity Person/

    Organisation in charge

    LocationDuration (dates)

    Intermediate deadlines/ milestones (if

    applicable)Final deadline

    Activity status Comments on progress

    Design proposal for website

    De Visu

    Jan uary 2014

    - March 2014

    Approval of the proposed initial layout received by the Commission + layouts of the different pages to be developed

    March 2014

    OK

    Done

    Prototype of the website

    AUSY Jan 2014 -

    May 2014May 2014

    OKDone

    Detailed contact l ist

    Regional hubs coordinators, BEST project manager

    Feb 2014 -

    June 2014June 2014

    Template sent to Regional Hubs in February, to be updated by hubs throughout consultation phase

    Operational website

    AUSY May 2014 -

    December 2014

    Layout and prototype proposals approved Dec 2014

    OK

    Website operational in English since June, translation into French in progress (under review by EC for approval - ready in Dec 2014)

    YEAR 1

    Lot 1 - Setting up and facil itating the interactive platform

    Progress

  • BEST III Consortium Dashboard (Year 1-2014) Lot 1: Setting up and facilitating the interactive platform : OK

    Activity Person/

    Organisation in charge

    LocationDuration (dates)

    Intermediate deadlines/ milestones (if

    applicable)Final deadline

    Activity status Comments on progress

    Information on funding possibil ities and other info on BEST website

    CEPF Fund-raising expert, CI EU Overseas expert, BEST team coordinator, BEST project manager, Communication officer

    May 2014 -

    December 2014

    Throughout the period

    May 2014 -December

    2017

    OK

    Small grants program for ornithological research in Latin America and the Caribbean;Darwin Initiative (Darwin+ for projects in UK Overseas);LIFE 2014

    Minimum of 8 Bi-Lateral/Multi-Lateral donor meetings

    CEPF Fund-raising expert, CI EU Overseas expert, BEST team coordinator

    March 2014 -

    December 2014

    Throughout the period

    March -December

    2014 OK

    Meetings with AFD, GIZ, LIFEWEB in 2014, on-going

    Minum attendance of 4 external events related to BEST per year (incl. 2 speaking opportunities)

    BEST team coordinator, Best project manager March 2014

    -December

    2014

    Throughout the period

    March 2014 -December

    2017OK

    BEST Seminar EP - 27 January 2014Hope conference, EC, 4 March 2014NetBiome Conf - 22 May 2014CBD COP - October 2014Guadeloupe Int. Conf. On Biodiversity and Climate Change - October 2014

    YEAR 1

    Lot 1 - Setting up and facil itating the interactive platform

    Progress

  • BEST III Consortium Dashboard (Year 1-2014) Lot 2: developing Ecosystem profiles : OK – on track

    Activity Person/

    Organisation in charge

    LocationDuration (dates)

    Intermediate deadlines/ milestones (if

    applicable)Final deadline

    Activity status Comments on progress

    Overview (desk study) on existing ecosystem profiles + (inventory factsheets per subregion)

    Regional hubs coordinators, CEPF Expert

    February 2014

    - September

    2014

    Organization of a kick off meeting for the regional ecosystem profiles; Preparation of a contact l ist and other data management tools (bibliography, data source tracker, synergies tracker)

    September 2014

    OK

    Almost completed: missing only factsheet for Polar/Sub-polar

    Regional information and out-reach events

    Regional hubs coordinators

    ORs, OCTs, Regions, EU Member States

    February 2014

    - December

    2014

    Organization of a kick off meeting for the regional ecosystem profiles

    Throughout the period February - December

    2014 OK

    In progress:

    Launch of BEST planned for Polar

    Regional Workshops for consultation and validation of the regional ecosystem profiles outcomes

    Regional hubs coordinators, CEPF Expert

    Regions, EU MS

    July 2014 -

    Decmber 2014

    Initial message sent by the regional hubs coordinators; Organization of a kick off meeting for the regional ecosystem profiles

    Throughout the period

    July - December

    2014

    OK

    In progress2 Workshop sessions organized in early July and late August 2014 for the hubs with ongoing support from CEPF expert;All materials available on web platform (teamworks);Regional workshops organized by hubs (Amazonia in Dec)

    YEAR 1 Progress

    Lot 2 - Developing regional ecosystem profiles

  • BEST III Consortium Dashboard (Year 1-2014) Lot 1 & 2: Setting up and facilitating the interactive platform and

    Developing Ecosystem profiles : OK – on track

    Activity Person/

    Organisation in charge

    LocationDuration (dates)

    Intermediate deadlines/ milestones (if

    applicable)Final deadline

    Activity status Comments on progress

    Organisation of Kick-off meeting

    BEST team coordinator

    Brussels

    1 day January 2014

    OKDone Held on the 31st of January in Brussels

    Regional hubs established

    Regional hubs coordinators, BEST team coordinator

    RegionsFeb-14

    OKDone

    Regional Hubs coordinators messages of introduction and communication

    Regional hubs coordinators

    Regions

    February 2014

    OK

    Done Flyers and letter provided to all regional hubs in Feb 2014 by the BEST central team

    Inception report for the two lots including Quality Plan

    BEST team coordinator, BESTt project manager Regional hubs coordinators+ all the partners

    Brussels

    February 2014

    OK

    Done Completed in April 2014

    Inception meeting and I Steering Committee meeting

    BEST team coordinator, BEST project manager

    Brussels1 or 2 days March 2014

    OK

    Done1st SC meeting held on the 8th of April in Brussels

    YEAR 1 Progress

    Lot 1 and 2 - Setting up and facil itating the interactive platform and developing regional ecosystem profiles

  • BEST III Consortium Dashboard (Year 1-2014) Lot 1 & 2: Setting up and facilitating the interactive platform and

    Developing Ecosystem profiles : OK – on track

    Activity Person/

    Organisation in charge

    LocationDuration (dates)

    Intermediate deadlines/ milestones (if

    applicable)Final deadline

    Activity status Comments on progress

    Expressions of interest for 1st round of internships

    Regional hubs coordinators

    RegionsFebruary

    2014OK

    DoneTORs finalized

    First round of internships begins

    Regional hubs coordinators,

    Regions

    June 2014

    OK

    Almost completed intern recruitment for all hubsJune: Macaronesia, Caribbean, October: Amazonia, South Atlantic (due July), West Pacific Recruitment in progress: Indian Ocean, Polar (delay due to admin problems)

    Expressions of interest for 2nd round of internships

    Regional hubs coordinators, EP coordinator

    Regions

    June 2014 Discussion at 1st and 2nd SC meeting

    Meeting with Commission and II Steering Committee meeting

    BEST team coordinator, BEST project manager

    Brussels

    1 or 2 days September 2014

    OK

    Done 2nd SC meeting organized on the 26th of November in Brussels with an additional day for discussion between DG DEVCO and the hubs as well as an exhibition by the hubs on the biodiversity in the BEST regions

    Second round of internships begins

    Regional hubs coordinators,

    Regions December 2014

    Recruitment in progress for East Pacific, Indian Ocean and Polar hubs

    YEAR 1 Progress

    Lot 1 and 2 - Setting up and facil itating the interactive platform and developing regional ecosystem profiles

  • Intern’s dates of recruitment June 2014 October 2014 December 2014

  • BEST III Communication Strategy

  • BEST III Communication Strategy: OK

    Communication strategy document Printed material: brochure, banner, etc. Website

  • BEST Brochure: • explains BEST • pdf factsheets of each project

    BEST Banner:

  • BEST III Website

    Homepage

    • Hosted on EC website

    Launched in

    June 2014

    http://ec.europa.eu/best/

  • Current projects page

    • with pdf factsheet of each project

    BEST III Website

  • Regions page

    • Leads to page of each region/hub

    • Regional pages with info on − Main characteristics − Socioeconomic,

    Policy and Civil Society Context

    − Facts & Figures − Main challenges

    • Ecosystem profiles will be uploaded here once completed

  • BEST III Communication Strategy Communication strategy document Printed material: brochure, banner, etc. Website Social media Supporting communications channels

    + o develop e-newsletter o increase links and synergy with hubs’ communication channels o increase audience: please help us spread the word

  • BEST III Fundraising Strategy

  • BEST III Fundraising Strategy: in progress Assessment of funding needs Analysis of fundraising environment Existing funding sources in the EU Trends in environmental funds New and ongoing funding for conservation

    In progress: Elaboration of fundraising action plan Defining targets, responsibilities, work plan

  • BEST III Ecosystem Profiles

    Methodology and training

  • Ecosystem Profile methodology: Marine areas integrated All hubs trained during 2 online work-

    shops session held in June and August 2014 • Guidelines and additional documentation

    provided by CEPF expert available online on BEST sharing platform • Q & A sessions planned • Exchanges on Ecosystem Services

  • Ecosystem Profile – desk study: Hubs developed first regional factsheets Establishment of data bases, bibliographies,

    and reviewing of key documents in progress

    Regions with an existing CEPF Ecosystem Profile

    Polynesia –Micronesia (May 2007) Caribbean (Jan 2010)

    Mediterranean Basin (2010) Madagascar and Indian Ocean

    islands (May 2014)

    Regions out existing CEPF Ecosystem Profile

    Polar and Sub-polar regions South Atlantic region Amazonian region

  • BEST III Regional updates by the

    Knowledge hubs

  • Romain Renoux Hub Coordinator

    Réserve Naturelle de Saint-Martin

    CARIBBEAN Hub

    Caribbean Hub Team

    Amandine Vaslet Ecosystem Profile Expert

    (Hub Intern) SPAW-RAC

  • 15 OVERSEAS ENTITIES

    CARIBBEAN Hub

  • Where are we now? BEST Caribbean hub in place

    Information spread to the 15 territories in the Caribbean – 2 pages brief note

    Caribbean contact list (170 contacts/15 territories)

    Information on BEST spread trough SPAW-RAC newsletters (1000 contacts in the Caribbean region)

    Regional ID card provided for BEST website

    CARIBBEAN Hub

  • Where are we now? Launch BEST initiative at different regional events : ICRI meeting

    in Bonaire/French MPA workshop in Martinique/DCNA board members meeting in Aruba/Guadeloupe Conference on Biodiversity and climate change in Europe overseas /GCFI in Barbados

    List of references and key documents, scientific studies, management plans for each territory

    A first version of a Caribbean factsheet has been established

    CARIBBEAN Hub

  • Caribbean Factsheet

  • Desk review List of references and key documents, scientific studies, management plans /

    Draft maps of protected areas and biodiversity areas of interest

    Working document - BEST Project - List of references - Saba - version Oct 2014

    Thematics References Strategic documents

    Anon. 2014. Convention on Biological Diversity. Fifth National Report of the Kingdom of the Netherlands. Report of the Ministry of Economic Affairs, The Hague, Netherlands. 96p. Meesters E., Slijkerman D., de Graaf M. & Debrot D. 2010. Management plan for the natural resources of the EEZ of the Dutch Caribbean. IMARES Wageningen Report N. C100/10, 93p. Nature Policy Plan The Caribbean Netherlands 2013-2017. 56p.

    DCNA Dutch Caribbean Nature Alliance 2013. DCNA Multi Year Plan 2013-2017 ver.2013/003. 18p. Dutch Caribbean Nature Alliance 2013. DCNA Fundraising Strategy 2013-2017 ver.2013/001. 18p. Dutch Caribbean Nature Alliance 2013. DCNA Communication Strategy 2013-2017 ver.2013/001. 20p. Dutch Caribbean Nature Alliance 2012. DCNA Annual Report 2012, 82p.

    Key Conservation Species Special Species List - Dutch Caribbean Key Conservation Species (December 2012)

    DCNA Database Dutch Caribbean Biodiversity Database. http://www.dcbd.nl/

    Management plans Lundvall S. 2008. Saba Bank: Special Marine Area Management Plan 2008. 75p + app. Schults E.G. and Kooistra D. 1999. Management Plan Saba Marine Park. Saba Conservation Foundation. 44p.

    SPAW label Report concerning the inclusion of Saba Bank National Park in the SPAW list. UNEP-SPAWRAC Report.

    TEEB report The Economics of Ecosystems and Biodiversity in the Caribbean Netherlands. Benefi ts of valuing nature for the Caribbean Netherlands. Report, Caribbean Netherlands. The Economics of Ecosystems and Biodiversity in the Caribbean Netherlands. The value of nature in the Caribbean Netherlands. Report, Caribbean Netherlands. Tieskens et al. 2014. Mapping the Economic Value of Ecosystems on Saba. IVM Institute for Environmental Studies. Cado van der Lely et al. 2014. The Total Economic Value of Nature on Saba. IVM Institute for Environmental Studies. van Beukering et al. The non-use value of nature in the Netherlands and the Caribbean Netherlands. IVM Institute for Environmental Studies

    Economic-social study Buchan K., Framhein R., Fernandes L. An Economic and Social Study of the Saba Marine Park, Saba, Netherlands Antilles. 37p

    Management capacity (CAMPAM)

    Gombos, M., A. Arrivillaga, D. Wusinich-Mendez, B. Glazer, S. Frew, G. Bustamante, E. Doyle, A. Vanzella-Khouri, A. Acosta, B. Causey, C. Rolli and J. Brown. 2011. A Management Capacity Assessment of Selected Coral Reef Marine Protected Areas in the Caribbean. Commissioned by the National Oceanic and Atmospheric Administration (NOAA) Coral Reef Conservation Program (CRCP), the Gulf and Caribbean Fisheries Institute (GCFI) and by the UNEP-CEP Caribbean Marine Protected Area Management Network and Forum (CaMPAM). 269 pp.

  • Next steps Online access on BEST activities through SPAW-RAC website

    Based on the list of references and key documents a synthetic note for each territory will be established as a guide for the consultation process

    Consultation process on the ground with civil society, local government and stakeholders will take place in 2015 in UK, NL and FR territories in order to share and validate key information for each territory and to better identify Key Biodiversity Areas

    CARIBBEAN Hub

    Fish ball, Saba © Hans Leijnse, SHAPE Photography

    Blue Iguana at Cayman Island © Jonathan Hall

    Mangroves in Bonaire © Christian Konig, SHAPE Photography

  • MACARONESIAN Hub

    José Azevedo

    Hub Coordinator

    Luísa Madruga

    Exossystem Profile Expert (Hub Intern)

    Francisco Wallenstein Macedo

    Hub Expert / Scientific Officer

    Fundo Regional para a Ciência e Tecnologia (FRCT) Regional Fund for Science and Technology

    Internship – Luisa Madruga Duration: 18 months (Jun. 2014 - Nov. 2015)

    Meetings Kick Off Meeting – Jan. 2014 (José Azevedo) Steering Committee – Apr. 2014 (Francisco Wallenstein Macedo) CEPF Training Session (Skype) – Jun. 2014 (Macaronesian, Caribbean) Local workshops – Oct.2014 Consortium Meeting – Oct. 2014 (Francisco Wallenstein Macedo)

    TEA

    M

  • D

    ELIV

    ERA

    BLE

    S

    Contact List (ongoing) Azores – 82 contacts Madeira – 41 contacts Canary Islands – 247 contacts Factsheets both for each islands and one regional Azores Madeira Canary Islands Macaronesia

    Regional ID card provided for BEST website Ecosystem Profile – 1st version Social-Economic context Conservation status Database on globally threatned species (Jul. 2014) Database on protected areas /sites (Sep. 2014) KBAs (mid Nov. 2014)

    MACARONESIAN Hub

  • C

    OM

    MU

    NIC

    ATIO

    N

    Flyer – BEST III Macaronesian Hub Sent out to contact list by e-mail – April 2014 Site launched – July 2014 http://www.azores.gov.pt/Gra/BEST_III_Macaronesia/ Partnership establishement with strategic organisms in Madeira and the Canary Is. Poster – BEST III Macaronesian Hub NetBiome-CSA International Conference (Gran Canaria, Jul. 2014) Media – August 2014 Azores – 3 locally distributed newspapers and 1 online local newspaper Canary Is. – 1 online newspaper with distribution throughout the archipelago Madeira – 1 locally distributed newspaper In situ Public Presentation – November 2014 Azores – Terceira (Nov. 10) | São Miguel (Nov. 11) Canary Is. – Gran Canaria (Nov. 19) | Tenerife (Nov. 20) Madeira – Funchal (Nov. 24)

    MACARONESIAN Hub

    http://www.azores.gov.pt/Gra/BEST_III_Macaronesia/

  • C

    ON

    SULT

    ATIO

    N

    Database sharing with stakeholders Threatned species (Jul. 2014) Protected areas (Sep. 2014) Feedback on important missing species KBA discussion workshops Azores – Terceira (Nov. 10) | São Miguel (Nov. 11) Canary Is. – Gran Canaria (Nov. 19) | Tenerife (Nov. 20) Madeira – Funchal (Nov. 24)

    MACARONESIAN Hub

  • NEX

    T ST

    EPS

    Reception from experts of updated distribution and abundance data of endemic species that fall outside criterion A, but within criterion B (until the end of 2014);

    List of potential KBAs (January 2015) KBA prioritization (February 2015) Internship Brussels – 1st part (March 2015 - in case there are other hubs present

    in Brussels at this time) Social-Economical chapter of Ecosystem Profile (April - June 2015) Second round of information dissemination and workshops (June/July 2015)

    MACARONESIAN Hub

    Canary Islands © Ricardo Haroun Pico Island, Azores © Pedro Raposeiro Madeira with Zino's petrel © Manuel Biscoitol

  • Dr Paul Brickle Hub Coordinator

    Dr Megan Tierney Hub Expert

    Maria Taylor Hub Ecologist (Hub Intern)

    South Atlantic Hub Team

    South Atlantic Hub

    South Atlantic Environmental Research Institute (SAERI) www.south-atlantic-research.org The South Atlantic Environmental Research Institute (SAERI) is an academic organisation conducting research in the South Atlantic from the tropics down to the ice in Antarctica. SAERI's remit includes the natural and physical sciences. It aims to conduct world class research, teach students, and build capacity within and between the South Atlantic Overseas Territories.

    http://www.south-atlantic-research.org/http://www.south-atlantic-research.org/http://www.south-atlantic-research.org/http://www.south-atlantic-research.org/http://www.south-atlantic-research.org/http://www.south-atlantic-research.org/http://www.south-atlantic-research.org/http://www.south-atlantic-research.org/http://www.south-atlantic-research.org/

  • Ascension Island • 81 endemic species • 21 threatened species • Population: 880 • Pop. density: 10/km2

    • 20% of land protected • No MPA or MMA

    St Helena • 501 endemic species • 38 threatened species • Population: 4,225 • Pop. density: 35/km2

    • 27% of land protected • No MPA or MMA

    Tristan da Cunha • 152 endemic species • 4 threatened species • Population: 297 • Pop. density: 1.4/km2

    • 64% of land protected • No MPA or MMA

    South Atlantic Hub

    Rockhopper penguins at Tristan da Cunha © Trevor Glass

    Spiky Yellow Woodlouse at St Helena © Ed Thorpe

  • Progress to date Hub establishment: Appointment of the BEST Ecologist (Intern) – Maria Taylor –

    for South Atlantic and Sub-Antarctic

    Local meetings on St Helena and Ascension Island Presentations to stakeholders and Government officials in the Falkland Islands

    Creation of contact lists for the South Atlantic Hub and the Falkland Islands (FI)

    and South Georgia and South Sandwich Islands (SGSSI)

    Completion of Factsheet (pending stakeholder review)

    Continued update of the Regional ID cards for the website

    Initial draft planning for BEST activities for South Atlantic hub

    South Atlantic Hub

  • Future Planning / Next steps

    • Priority – Internal training of BEST Ecologist on Ecosystem Planning

    Workshops: • Organising visits to Ascension Island and St Helena for 2015 • Organising workshops within Ascension Island and St Helena with an interactive

    presentation sent to Tristan da Cunha • Organise local stakeholder meetings (South Atlantic Hub and FI and SGSSI) • Contact regional and local media; including newspapers, MercoPress

    • Create a BEST webpage on SAERI’s main website

    South Atlantic Hub

  • AMAZONIAN Hub

    Hub Coordinator [email protected]

    Ecosystem Profile Expert (Hub Intern)

    [email protected]

    Anne-Gaëlle Verdier

    Laurent Kelle Ruben Lopez

    Amazonian Hub Team

    Hub Expert [email protected]

  • Updates

    Deliverables Contact list Communication tools and promotion of the hub: ID card, inventory factsheet

    Consultations and BEST meetings Several stakeholders consultation 2 Amazonian BEST meetings: promotion and information on BEST process

    (25/07) + Amazonian quick off meeting (08/10) → establishment of a local SC Presentation of BEST project to private sector (several meetings) and in each

    territory of French Guyana (5 territories before 31/12)

    Ecosystem profile Training on EP: 28/08 + early December for Amazonian hub team Validation of EP process by regional scientific committee (CSRPN): 26/11

    AMAZONIAN Hub

  • Ecosystem profile on the Amazonian hub Focus on ecosystem services Application of KBA+ methodology

    Working groups 4 WG: Marine issues and ecosystem services, Terrestrial issues (KBA

    identification), Terrestrial ecosystem services, Threats Next meetings: Marine issues and ES (16/12), Terrestrial ES (18/12)

    Participatory process Integration of Amazonian territories vision into the works of WG, mainly into the

    WG3 (terrestrial ES) Involvement of regional cooperation (Guiana Shield Facility)

    AMAZONIAN Hub

  • Expression of needs

    Methodological support for the application of KBA+ methodology, mainly on ES

    Stakeholders mobilization is quite long to be sure of the appropriation of the process → need to extend the time spent by the EP expert (assistant) in the hub

    Be careful on communication about BEST with OR's (regarding BEST 2.0)

    AMAZONIAN Hub

  • Coordinator Sub-region East Pacific

    Hub Expert East Pacific

    Hub Coordinator

    IUCN French committee www.uicn.fr [email protected] / [email protected] / [email protected]

    Jean Kapé

    Eleonora Avagliano

    Aurélie Bocquet

    Coordinator Sub-region

    West Pacific

    Ecosystem Profile Expert (Intern) West

    Pacific

    Conservation International www.conservation.org

    Jean-Christophe Lefeuvre

    Selma Haouet

    West Pacific New Caledonia and Wallis & Futuna

    East Pacific French Polynesia and Pitcairn

    PACIFIC Hub

    mailto:[email protected]:[email protected]:[email protected]

  • [Regional] Hub

    West Pacific East Pacific

    French Polynesia Pitcairn

    New Caledonia Wallis & Futuna

  • Status quo / Updates Deliverables Contact lists (to be updated throughout): West Pacific: 37 contacts (New Caledonia – 29, Wallis & Futuna – 6) East Pacific: 17 contacts (French Polynesia – 15 contacts, Pitcairn – 2)

    Regional ID card for website Factsheets: East Pacific: French Polynesia & Pitcairn New Caledonia (NC) Wallis & Futuna (WF) Pacific to be completed

    International and regional meetings 3rd SIDS (Small Island Developing States) Conference in Samoa (Sept 2014) Guadeloupe Conference on Biodiversity and Climate Change (Oct 2014) IUCN World Park Congress in Sydney (Oct 2014)

    Pacific Hub PACIFIC Hub

  • Updates West Pacific New Caledonia and Wallis & Futuna

    Hub organization completed Communication Launch meeting in Wallis & Futuna (Oct 2014) and New Caledonia

    (Nov 2014) Consultations literature review and data collection for Ecosystem Profile in progress Experts meeting in New Caledonia under the CEN BEST meetings Meeting with scientific research institutes

    Pacific Hub PACIFIC Hub

  • Updates East Pacific French Polynesia and Pitcairn

    Organization Recruitment of the Ecosystem profile expert done

    BEST meetings Presentation of BESTIII project to local authorities (Maina Sage

    member of the Parliament, Heremoana Maamaatuaiahutapu French Polynesian minister)

    [Regional] Hub PACIFIC Hub

  • Next steps for West Pacific

    NC & WF Hub PACIFIC Hub

    Organization of the working group NC – Dec 2014 Organization of the working group WF – mission in Dec 2014 Elaboration and update of KBA – 1st quarter of 2015 Workshops in NC and WF – March 2015

    New Caledonia © Dan Laffoley New Caledonia © Jean-Christophe Lefeuvre

    Northern Province in New Caledonia © F Tron

  • Next steps for East Pacific Information about BESTIII organization at the contact list Bibliography for French Polynesia and Pitcairn data (Dec 2014) Intern recruitment (Jan 2015) Launch meeting in French Polynesia and organization of the

    thematic working group for French Polynesia and Pitcairn (Jan 2015)

    Thematic workshops (Jan 2015 - July 2015) Ecosystem profile (Sept 2015)

    [Regional] Hub PACIFIC Hub

    Meetia, Tahiti, French Polynesia © Fred Jacq Baie Rikitea, Gambier © Fred Jacq Motu Oatara © Fred Jacq

  • Hub Coordinator

    Ecosystem Profile Expert (Hub Intern) Hub Expert

    IUCN French comittee www.uicn.fr , contacts: [email protected] , [email protected]

    Tanguy NICOLAS

    Aurélie BOCQUET

    [Recruitment in progress] Portrait/

    Photo

    INDIAN OCEAN Hub Team

    INDIAN OCEAN Hub

    http://www.uicn.fr/http://www.uicn.fr/http://www.uicn.fr/http://www.uicn.fr/http://www.uicn.fr/mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]

  • Updates Deliverables Contact list: updated following meetings with partners in Reunion,

    Mayotte, and added some related to BIOT and Scattered islands Factsheet: First version completed (Nov. 2014), to be consolidated soon

    with references, protected areas maps and update some figures Ecosystem Profile: Gathering strategic docs from various territories

    (biodiversity assessments, management plans, etc.), scientific literature review to fill gaps, identified regional CEPF ecosystem profiles

    BEST meetings Nov. 2014: met partners from Reunion & Mayotte and updated them

    about BEST III’s work plan (Local authorities, decentralized national institutions, Reunion National Park, Coastal protection agency, scientific key experts).

    INDIAN OCEAN Hub

  • Next steps 1. Complete the important docs list and sort out literature review

    2. Move forward to shaping the definitive contact group that will review and validate the ecosystems profiles (EP) during its collaborative elaboration process

    3. Periodic stakeholders meetings throughout EP elaboration and thematic workshops (marine, terrestrial environments, ecosystem services)

    4. Thematic workshops preparing EP’s writing

    5. EP writing process and collective validation with the various regional partners

    Reunion peak on sunset © Benoît de Suzanne

    Chagos’ endemic brain coral © John Slayer

    Mayotte’s endemic chameleon © Johannes Chambon

    INDIAN OCEAN Hub

  • Hub Coordinator

    Ecosystem Profile Expert (Hub Intern) Hub Expert /

    Scientific Officer

    Terres Australes et Antarctiques Françaises www.taaf.fr The French Southern and Antarctic Lands (TAAF) are spread out along an exceptional latitudinarian gradient, which runs from the tropics to the south pole. Thanks to its geographic isolation and limited occupancy the territory’s scientific and environmental issues are of significant value. Over several decades the TAAF have hosted many research projects on all five districts. Research ranges from life sciences to universe sciences. On average, 225 French and foreign researchers are present every year on the stations to work on about sixty different programs.

    Paul TIXIER

    Cedric MARTEAU

    [Recruitment in progress]

    Polar / Sub-polar Hub Team

    POLAR SUB-POLAR Hub

    http://www.taaf.fr/http://www.taaf.fr/http://www.taaf.fr/http://www.taaf.fr/http://www.taaf.fr/

  • Updates Deliverables Contact list: going on Regional ID card for the website Factsheet: To be completed Ecosystem Profile: Participated in methodology training Meetings Guadeloupe conference

    POLAR SUB-POLAR Hub

    Antarctic Peninsula © John B. Welle Leonie Island, Ryder Bay, Adelaide Island (BAT) © RebeccaUpson Albatross at Falklands © Dave Higgins

  • Timeline for main deliverables/ milestones

    2015: Year 2

    January Meeting with Commission and SG meeting March/April?

    December

    --------------------------------------Meetings with Donors --------------------------------------------------

    --------Regional Workshops for consultation-------

    and validation of the regional ecosystem profiles outcomes

    August Meeting with Commission and SG meeting November

    ----------------Regional Ecosystem profiles and BEST strategies -------------------------

    February

    --------------------Regional information and out-reach events --------------------

    --------------------------------------- Info on the BEST website -------------------------------------------------

    -------------------------------------Potential new BEST Partnerships ----------------------------------

  • Work plan - Year 2, 2015

  • We thank you for your attention

    ��BEST III Consortium�AGENDA BEST III activities in a nutshell Slide Number 4Slide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11BEST Brochure:Slide Number 13Slide Number 14Slide Number 15Slide Number 16Slide Number 17Slide Number 18Slide Number 19Slide Number 20Slide Number 21Slide Number 22Slide Number 2315 OVERSEAS ENTITIES�Where are we now?Where are we now?Caribbean Factsheet�Desk review�List of references and key documents, scientific studies, management plans /� Draft maps of protected areas and biodiversity areas of interest � �Next stepsSlide Number 30Slide Number 31Slide Number 32Slide Number 33Slide Number 34Slide Number 35Slide Number 36Slide Number 37Slide Number 38Slide Number 39UpdatesEcosystem profile on the Amazonian hubExpression of needsSlide Number 43Slide Number 44Status quo / UpdatesUpdates West Pacific�New Caledonia and Wallis & FutunaUpdates East Pacific�French Polynesia and PitcairnNext steps for West PacificNext steps for East PacificSlide Number 50Slide Number 51UpdatesNext stepsSlide Number 54UpdatesSlide Number 56Slide Number 57We thank you for your attention