    MONTHLY REPORT

    Consultancy Services for Third Party

    1.0

    2.0

    3.0 Revi

    4.0

    5.0

    6.0 Dis

    7.0 Detail

    8.0

    9.0 Details of So

    10.0 Non Compl

    uality Audit (TPQA) for National Cyclone Risk Mitigatio

    INDEX

    Project Background

    Third Party Quality Audit Consultant

    iew meetings and Major Events of this Month

    Status of TPQA Visits

    Progress of NCRMP works

    rict wise status of tests conducted by TPQA

    of Audit Reports Submitted during this Month

    Observations of Submitted Reports

    cial & Environmental Reports Submitted in this Mon

    liance Reports(NCRs) Submitted During this month

    Project (NCRMP)

    2

    3

    3

    4

    5

    26

    27

    28

    h 36

    36

  • 7/31/2019 3.November MPR 2011

    3/47

    MONTHLY REPORT

    Consultancy Services for Third Party

    1.0 Project Background

    Andhra Pradesh (AP) state has one of t

    nine coastal districts cover 26,000 km o

    cyclonic situations set in to the Bay of

    increasing resulting in very devastating

    from 1892 to 1989, there were as many

    It is essential to provide safe residential

    to natural calamities such as cyclones

    experiences of Government of Andhra

    existing facilities available in the project

    The Government of India has applied

    Association (IDA) toward the cost of

    proceeds to payments for goods, works,

    National Cyclone Risk Mitigation Projec

    Hyderabad has invited the consultants

    Audit for 9 coastal districts namely Srik

    Guntur, Prakasam and Nellore. The

    Shelters, Roads to habitations an

    Association and received through Gove

    implemented by various line departm

    agreements are concluded in each distri

    District

    No. of works(Un

    RHB RCS MP

    Srikakulam 6 8 -

    Vizianagaram - - -

    Visakhapatnam 8 6 7

    East Godavari 2 8 3

    West Godavari 10 - -

    uality Audit (TPQA) for National Cyclone Risk Mitigatio

    he longest coastal belts in India. Out of 67,362 Km of roa

    f road length. Every year during the period of April-May a

    engal. With the recent changes in climatic conditions, th

    cyclones like Laila, Jal etc where the loss is enormous

    as 67 cyclones within the State.

    accommodation to the vulnerable population during any e

    nd associated tidal waves and storm surges. The proje

    Pradesh in mitigating such disasters during the past and

    area in Andhra Pradesh.

    for a credit of US$ 255 Million equivalent from the I

    National Cyclone Risk Mitigation Project (NCRMP), an

    , related services and consulting services under this Proje

    (NCRMP) Project Implementation Unit (PIU), Andhra P

    to submit proposals for providing the consultancy servic

    akulam, Vijayanagaram, Visakhapatnam, East Godavari,

    roject Construction of Multipurpose Cyclone Shelt

    Roads & Bridges under NCRMP is funded by In

    rnment of India. This consultancy is envisaged to audit t

    ents working under PIU. The number of works und

    ict is shown in the table below.

    er Concluded Agreements) No. of works und

    S BridgesRoads(R&B)

    Total RHB RCS MPCS

    4 1 19 6 4 -

    2 1 3 - - -

    - - 21 8 5 5

    - - 13 2 6 -

    - - 10 2 - -

    Pro

    ject (NCRMP)

    network in the state, the

    d September-December,

    e catastrophic events are

    . In the 97 years ranging

    ventuality or disaster due

    ct is formulated based on

    also keeping in view the

    ternational Development

    it intends to apply the

    ct.

    radesh, headquartered at

    s for Third Party Quality

    West Godavari, Krishna,

    ers, Roads to Cyclone

    ternational Development

    he quality of works being

    er progress / for which

    r ProgressNo. ofworks

    notstarted

    BridgesRoads(R&B)

    3 1 5

    2 1 0

    - - 3

    - - 5

    - - 8

  • 7/31/2019 3.November MPR 2011

    4/47

    MONTHLY REPORT

    Consultancy Services for Third Party

    2.0 Third Party Quality Audit C

    To provide Consulting Services of Third

    Cyclone Shelters, Roads to habitations,

    Disaster Management & Project Directo

    with Egis India Consulting Engineers (

    between The Commissioner for Disaste

    the Egis International in JV with Egis In

    3.0 Review Meetings and Major

    The Major activities of this month are as

    The modified Quality AssuranceNecessary modifications are also c

    1. Volume 1 Contains Intro

    2. Volume 2 Contains Qual

    0

    5

    10

    15

    20

    25

    30

    uality Audit (TPQA) for National Cyclone Risk Mitigatio

    onsultant.

    Party Quality Auditor for Construction of Multipurpose C

    and Roads and Bridges under NCRMP in 9 coastal distri

    r, Project Implementation Unit (PIU) NCRMP has selecte

    I) Pvt. Ltd. On 31st

    May2011, the Contract for Consult

    r Management & Project Director, Project Implementatio

    ia Consulting Engineers (I) Pvt. Ltd.

    ctivities of this month

    follows.

    lan in 3 volumes duly attending the remarks pointedrried out based on discussions during TPQA review mee

    duction, Quality Assurance Plans, Check Lists and Q.C F

    lity Control Test Procedures.

    No. o

    Work

    Project (NCRMP)

    clone Shelters, Roads to

    cts The Commissioner for

    d Egis International in JV

    ncy Service was signed

    n Unit (PIU) NCRMP and

    out by the World Bank.ing held on 05-11-2011.

    rmats.

    f works not started

    s Under Progress

  • 7/31/2019 3.November MPR 2011

    5/47

    MONTHLY REPORT

    Consultancy Services for Third Party

    4.0 Status of TPQA Visits:

    The following table shows the details of

    District

    Srikakulam

    Vizianagaram

    Vishakhapatnam

    East Godavari

    West Godavari

    Krishna

    Guntur

    Prakasam

    Nellore

    No. of

    uality Audit (TPQA) for National Cyclone Risk Mitigatio

    TPQA visits to sites in respective districts.

    Total Number of Visits

    Up to Oct.'2011 In Nov.'2011

    82 19

    45 4

    61 19

    64 39

    75 35

    45 31

    68 24

    94 29

    98 11

    isits by TPQA

    Project (NCRMP)

    Up to Nov.'2011

    101

    49

    80

    103

    110

    76

    92

    123

    109

  • 7/31/2019 3.November MPR 2011

    6/47

    MONTHLY REPORT

    Consultancy Services for Third Party

    5.0 Progress of NCRMP works:

    The district wise progress of works is

    Krishna District has just started. At m

    departments are to analyze the reason

    agreement conditions should be impose

    Third Party

    S.No. District

    1 Srikakulam

    2 Vizianagaram

    3 Visakhapatnam

    4 East Godavari

    5 West Godavari

    6 Krishna

    7 Guntur

    8 Prakasham

    9 Nellore

    Total

    Total Packages for which Agreement

    Total Number of works in the above

    uality Audit (TPQA) for National Cyclone Risk Mitigatio

    shown below. The works in the West Godavari are not

    any places the first milestone is completed but works

    s for the slow progress and if necessary penalty for the

    d.

    uality Audit by Egis India consulting services

    Summary of Activities

    Agreements for PackagesCommunicated

    St

    PR R&B Progre

    5 5 14

    0 3 3

    13 0 18

    4 0 8

    3 0 2

    4 0 5

    6 2 4

    11 1 18

    16 0 22

    62 11 94

    s are received

    ackages

    Project (NCRMP)

    started and the works in

    are not started. The line

    slow progress as per the

    atus of works

    s Not Started

    5

    0

    3

    5

    8

    3

    13

    6

    2

    45

    73

    139

  • 7/31/2019 3.November MPR 2011

    7/47

    MONTHLY REPORT

    Consultanc

    Status

    Category Packages allotted under Phase - 1Ne

    RHB

    NCRMP/B-W/AP/RHB/PRED/01/Santhabommali/003

    Rr

    RJR

    R

    S

    NCRMP/B-W/AP/RHB/PRED/01/Polaki/006

    R

    D

    RTR

    NCRMP/B-W/AP/RHB/PRED/01/Polaki/005

    REJT

    Bridges

    NCRMP/B-W/ AP/Br/R&B/01/Patnavanipeta/001

    CKPC

    S

    NCRMP/B-W/AP/Br/R&B/01/ Surampeta/003

    CBNR

    y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk

    f works in Srikakulam District up to 30.11.2011

    ames of works underach package

    Agreement No. / Date DHS DFC

    oad from DPN R&Bad to Uddandapalem

    /2010-11, Dt.30.04.2011

    30.04.11 30.04.

    oad from K. Umiladaunction to Koduru (Linkoad)

    /2010-11, Dt.30.04.2011

    30.04.11 30.04.

    oad from Borubhadra,alagam to Kollipadu viaeepuram, Gantapeta

    /2010-11, Dt.30.04.2011

    30.04.11 30.04.

    oad from R&B roadobagam to

    uubakavanipeta viaajapathinagaram

    /2010-11, Dt.

    30.04.201130.04.11 30.04.

    oad fromalasamudram to Dolaegulator

    /2010-11, Dt.30.04.2011

    30.04.11 30.04.

    oad from R&B roaddulavalasa - Killam tonnam via

    alasamudram

    /2011-12, Dt.30.04.2011

    30.04.11 31.01.

    onstruction of bridge atm 11/6-8 of NH-5 toatnavanipetaonnecting

    undarapalem

    46/2011, Dt.17.12.2010

    17.12.10 17.06.

    onstruction of Minorridge at Km 12/2-4 ofH-5 to Surampetaoad via Naruva,entada

    45/2010-2011,Dt17.12.2010

    17.12.10 17.03.

    6 | P a g e

    Mitigation Project (NCRMP)

    Progress up to30.11.2011

    .12

    First Milestone i.e.Earthwork & Cd works&GSB

    .12

    First Milestone i.e.Earthwork & Cd works&GSB

    .12

    First Milestone i.e.Earthwork & Cd works&GSB

    .12First Milestone i.e.Earthwork & Cd works&GSB

    .12

    First Milestone i.e.Earthwork & Cd works&GSB

    .12First Milestone i.e.Earthwork & Cd works&GSB

    .12

    First Milestone i.e.Foundation up to wellcapping

    .12

    Second Milestone i.e.Completion up to belowthe deck slab.

  • 7/31/2019 3.November MPR 2011

    8/47

    MONTHLY REPORT

    Consultanc

    NCRMP/B-W/AP/Br/R&B/01/Bendigadda/004

    CleBoin

    Roads NCRMP/B-W/AP/RD/R&B/01/Nowpada/006)IV0

    RCS

    NCRMP/B-W/AP/RCS/PRED/01/V.Kotturui/002

    RU

    RBOS

    R

    to

    RKC

    NCRMP/B-W/AP/RCS/PRED/01/Etcherla/005

    RB

    RD

    Rr

    &RrP

    y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk

    onstruction of Highvel bridge acrossendigadda at KM 4/10Pundi-Parlakimidi roadSrikakulam Dt, A.P.

    1/2010,Dt.11.11.2010 11.11.10 11.05.

    provements Naupada-enkatapuram road from0to15/0km

    43/2010-11,17.12.2010 17.12.10 17.03.

    oad from NP road toRK Puram

    G.O.Rt.No.451, Dt.06.04.2011

    06.04.11 29.09.

    oad from Deppuru,ahadapalli road tonkuluru to Cyclonehelter

    G.O.Rt.No.451, Dt.06.04.2011

    06.04.11 29.09.

    oad from R & B Road

    Devunthalada

    G.O.Rt.No.451, Dt.

    06.04.201106.04.11 29.09.

    oad from Pollada toomarthalada toyclone Shelter

    G.O.Rt.No.451, Dt.06.04.2011

    06.04.11 29.09.

    oad from Koyyam R &Road tooosavanipeta

    G.O.Rt.No.451, Dt.06.04.2011

    30.04.11 07.05.

    oad from Mentada toovupeta

    G.O.Rt.No.451, Dt.06.04.2011

    30.04.11 07.05.

    oad from Kotcherelaad to Kollibhemavaram

    Cyclone Shelter

    G.O.Rt.No.451, Dt.06.04.2011

    30.04.11 07.05.

    oad from Kotcherlaad toathesundrapalem

    G.O.Rt.No.451, Dt.06.04.2011

    30.04.11 07.05.

    7 | P a g e

    Mitigation Project (NCRMP)

    .12

    First Milestone i.eFoundation upto wellcaping

    .12Second mile stonei.e.WMM,Shoulders

    .12

    E/W,pipeculverts,GSB,R/W

    .12E/W,pipeculverts,GSB,R/W

    .12

    E/W,pipeculverts,GSB,R/W

    .12

    E/W,pipeculverts,GSB,R/W

    .12

    E/W,pipe culverts,GSB.

    .12

    E/W,pipe culverts,GSB.

    .12

    E/W,pipe culverts,GSB.

    .12

    E/W,pipe culverts,GSB.

  • 7/31/2019 3.November MPR 2011

    9/47

    MONTHLY REPORT

    Consultanc

    Status of

    CategoryPackages allotted

    under Phase - 1

    Names of works

    packag

    Bridges

    NCRMP/ B-W/ AP/Br/ R&B/ 02/

    Puligadda/ 007

    Construction of MiKm. 7/2 near Puliga RamatheerthamKonathalapalem viPasupam, Kollaya

    Road)

    NCRMP/ B-W/ AP/Br/ R&B/ 02/

    Chakaligadda / 008

    Construction of MiKm 15/2 near Cha

    Konada Ramatheertto Konatalapalem (vi

    Pasupam, KollayRoad)

    Road (R&B)NCRMP/B-

    W/AP/RD/R&B/ 02/Konada/009

    Improvements toKonada RamatheeRoad to Konathal

    Pasupam, YeKollayavalasa fro

    16/5 (Km 0/0 to 4/0 icrossin

    y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk

    works in Vizianagaram District up to 30.11.2011

    under each

    e

    Agreement No./ Date DHS

    nor Bridge atda of Konada

    R&B Road toYerukonda,

    valasa (Z.P.

    31/2010-201 Dt.1.12.2010

    01.12.10 3

    nor Bridge atkaligedda ofham R&B roadia) Yerukonda,valasa (ZP

    34/2010-2011 Dt.8.12.2010

    08.12.10 0

    Road fromrtham (R&B)palem (Via)ukonda,

    Km 12/0 toi.e. up to NH-5)

    33/2010-201 Dt.8.12.2010

    08.12.10 0

    8 | P a g e

    Mitigation Project (NCRMP)

    DFCProgress up to

    30.11.2011

    1.05.12

    40.72% of workcompleted

    7.06.12

    74.57% of workcompleted

    7.03.1295% of workcompleted

  • 7/31/2019 3.November MPR 2011

    10/47

    MONTHLY REPORT

    Consultanc

    Status of

    Category Packages allotted under Phase - 1

    RHB

    NCRMP/B-W/AP/RHB/PRED/03/Nakkapalli/001

    NCRMP/B-W/AP/RHB/PRED/03/Anandapuram/003

    NCRMP/B-W/AP/RHB/PRED/03/Paravada/004

    NCRMP/B-W/AP/RHB/PRED/03/Rambilli/006

    NCRMP/B-W/AP/RHB/PRED/03/Atchutapuram/007

    y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk

    orks in Visakhapatnam District up to 30.11.2011

    Names of works

    under eachpackage

    AgreementNo. / Date

    DHS DFC

    Road from Vempadu toPatimeeda

    /2010-11, Dt.11.01.2011

    11.01.11 11.01.12

    Road from R&B road toMulaparra up to Beach

    end

    /2010-11, Dt.11.01.2011

    11.01.11 27.10.11

    Road from R&B B.PKallalu to

    Matchvanipalem

    /2010-11, Dt.10.03.2011

    10.03.11 09.12.11

    Road from R & B roadto Pothu Rajannapalem

    /2010-11, Dt.28.03.2011

    28.03.11 27.12.11

    Road from R & B roadto Jalaripeta

    /2010-11, Dt.28.03.2011

    28.03.22 28.12.11

    Road from R & B roadto Venkayyapalem

    /2010-11, Dt.11.01.2011

    11.01.11 11.10.11

    Road from R&B road toAva- Somavaram

    /2011-12, Dt.27.04.2011

    27.04.11 26.01.12

    9 | P a g e

    Mitigation Project (NCRMP)

    Progress up to 30.11.2011

    Third Milestone i.e Road furniture& Shoulders work are in progress

    Third Milestone i.eShoulders work are in progress

    For Second Milestone i.e WBM

    Gr-III is in progressFor Second Milestone i.e WBM

    Gr-III is in progress

    Collection of B.T material isstarted for Third Milestone i.e B.T

    & Shoulders ..etc work

    Third Milestone i.e Road furniture

    & Shoulders work are inprogrress

    Third Milestone i.e Road furniture

    & Shoulders work are inprogrress

    Third Milestone i.e Road furniture& Shoulders work are in progress

    Third Milestone i.eShoulders work are in progress

    For Second Milestone i.e WBM

    Gr-III is in progressFor Second Milestone i.e WBM

    Gr-III is in progress

  • 7/31/2019 3.November MPR 2011

    11/47

    MONTHLY REPORT

    Consultanc

    Status of

    CategoryPackages allotted under

    Phase - 1Nam

    RCS

    NCRMP/B-W/AP/RCS/PRED/03/Anandapuram/001

    NCRMP/B-W/AP/RCS/PRED/03/Rambilli/002

    RK

    R

    NCRMP/B-W/AP/RCS/PRED/03/Nakkapalli/003

    RPed

    RoadR &

    y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk

    Road from R&B Roadto Avarajam

    /2011-12, Dt.27.04.2011

    27.04.11 26.01.12

    orks in Visakhapatnam District up to 30.11.2011

    s of works under eachpackage

    Agreement No. /Date

    DHS

    Road from NH-5 toRamarayadupalem

    /2010-11, Dt. 15.09.2011 15.09.11

    oad from R&B road to

    Krishnampalem/2010-11, Dt. 15.09.2011 15.09.11

    oad from R & B road toattubolu to Marripalem

    /2010-11, Dt. 15.09.2011 15.09.11

    oad from R & B road toRajakoduru

    /2010-11, Dt. 15.09.2011 15.09.11

    oad from R & B road toteenarla to Chinateenarla

    /2010-11, Dt. 15.09.2011 15.09.11

    rom Upamaka RajayyapetaB road to Janakayyapeta

    /2010-11, Dt. 15.09.2011 15.09.11

    10 | P a g e

    Mitigation Project (NCRMP)

    Collection of B.T material is

    started for Third Milestone i.e B.T& Shoulders ..etc work

    DFCProgress up

    to30.11.2011

    14.06.12

    1st Milestonei.e WBM

    Grade- II is inprogress.

    14.09.12

    1st Milestonei.e CD works

    are completed

    & WBM Grade-II is in

    progress.

    14.09.12

    Ready tostarted

    14.09.12

    1st Milestonei.e CD works

    and WBMGrade- II is in

    progress.

    14.06.12Earth work

    widening is inprogress.

    14.06.12

    Earth workwidening is in

    progress.

  • 7/31/2019 3.November MPR 2011

    12/47

    MONTHLY REPORT

    Consultanc

    Status of

    Category Packages allotted under Phase - 1

    MPCS

    NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/

    NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/00

    NCRMP/B-W/AP/MPCS/PRED/03/Rambillii/00

    NCRMP/B-W/AP/MPCS/PRED/03/Parawada/00

    y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk

    orks in Visakhapatnam District up to 30.11.2011

    Names of works undereach package

    Agreement No./ Date

    Milestone Comple

    First Second

    003

    Construction of cycloneshelter at Gajapathi

    Nagaram

    /2011-12, Dt.03.10.2011

    02.02.12 02.06.12

    Construction of cycloneshelter at Ratnayampeta

    /2011-12, Dt.03.10.2011

    02.02.12 02.06.12

    2

    Construction of cycloneshelter at Patimeeda

    /2011-12, Dt.03.10.2011

    02.03.12 02.08.12

    Construction of cycloneshelter at Moolaparra

    /2011-12, Dt.03.10.2011

    02.03.12 02.08.12

    Construction of cycloneshelter at Bangarampeta

    /2011-12, Dt.03.10.2011

    02.03.12 02.08.12

    Construction of cyclone

    shelter atVenkayyapalem

    /2011-12, Dt.03.10.2011 02.01.12 02.04.12

    1Construction of cyclone

    shelter atTikkavanipalem

    /2011-12, Dt.07.10.2011

    06.01.12 06.04.12

    11 | P a g e

    Mitigation Project (NCRMP)

    tion Dates

    Progress w.r.t.milestone up to30.11.2011Third

    02.10.12 Not to be started

    02.10.12

    E/W for foundationwork is in progress

    02.01.13 Not to be started

    02.01.13

    E/W for foundationwork is in progress

    02.01.13

    Foundation PCCwork is in progress

    02.07.12

    Earth work

    excavation is inprogress

    06.07.12

    Earth workexcavation is inprogress

  • 7/31/2019 3.November MPR 2011

    13/47

    MONTHLY REPORT

    Consultanc

    Status of wo

    Category Packages allotted under Phase - I

    N

    RHB (2 )RCS (8)MPCS (3)

    NCRMP/B-W/AP/RHB/PRED/04/Katrenikona/003

    Roto

    to

    NCRMP/B-W /RCS/PRED/04/Karapa/001Ac

    NCRMP/B-W/AP/RHB/PRED/04/Karapa/001/

    B

    NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004

    Roto P

    NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004

    Roto K

    NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004

    Roto

    y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk

    rks in East Godavari District up to 30.11.2011

    mes of works

    under eachpackage

    AgreementNo. / Date

    Mile stones

    First Second

    ad from PR roadsasarivanipeta andCyclone Shelter

    /2011-12Dt:27.04.2011

    30-11-2011 30-11-2011 2

    pproach Road toclone Shelter at

    Adavipudi

    2011-12Dt:20.05.2011

    30-11-2011 31-10-2011 3

    Road fromurajanapalli tondulavaripalem

    2011-12Dt:27.04.2011

    30-09-2011 31-10-2011 3

    d from R&B Road.Chodipallipeta CS

    2011-12Dt:07.09.2011

    3 months 3 months

    d from R&B Road.Chodipallipeta CS

    /2011-12Dt:07.09.2011

    3 months 3 months

    d from R&B RoadHukumpeta CS

    /2011-12Dt:07.09.2011

    3 months 3 months

    12 | P a g e

    Mitigation Project (NCRMP)

    Remarks

    Third

    -01-2012

    Work stopped due toland acquisition problem

    In between chainageKm.1.400 to Km.2.280

    1-01-2012

    Work stopped due toland acquisition problemPipe Culverts completed

    in Km :0/2 & 1/6Culverts completed in

    Km:0/2 & WBM Gr. iiiLayer work is in progress

    in between chainageKm.1.100 to Km. 1.775

    1-01-2012

    Jungle clearance & Np3600 mm dia pipe Culvert

    Completed in Km. 0/2

    3 months

    Jungle clearance & Np3600 mm dia pipe Culvert

    Completed in Km. 0/2

    3 months

    Work stopped due toland acquisition problem

    In between chainageKm.1.400 to Km.2.280

    3 months

    Work stopped due toland acquisition problemPipe Culverts completed

    in Km :0/2 & 1/6

  • 7/31/2019 3.November MPR 2011

    14/47

    MONTHLY REPORT

    Consultanc

    NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004

    Rot

    NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004

    Roto

    NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004/

    Roto

    NCRMP/B-W/AP/RCS/PRED/04/Uppalaguptam/003

    Roto C

    NCRMP/B-W/AP/MPCS/PRED/04/Uppalaguptam/002

    C

    PedUpp

    NCRMP/B-W

    /AP/MPCS/PRED/04/Thondangi/004

    C

    L

    NCRMP/B-W/AP/MPCS/PRED/04/Thondangi/004

    C

    y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk

    d from R&B RoadGaddipeta CS

    /2011-12Dt:07.09.2011

    3 months 3 months

    d from R&B RoadDanavaipeta CS

    /2011-12Dt:07.09.2011

    3 months 3 months

    d from R&B RoadG.Musalayyapeta

    CS

    2011-12Dt:07.09.2011

    3 months 3 months

    d from R&B Roadhinaraghavulapetayclone Shelter

    /2011-12 Dt:23.09.2011

    3 months/22.11.2011

    3 months22.06.2011

    onstruction ofclone Shelter ataraghavulapeta ofalaguptam Mandal

    E.G.Dt.

    /2011-12Dt:17.10.2011

    3 months16.01.2012

    3 months16.04.2012

    1

    onstruction ofclone Shelter at

    xamanudupaduinThondangi

    /2011-12

    Dt:07.09.2011

    onstruction ofclone Shelter atAvulamanda

    /2011-12Dt:07.09.2011

    13 | P a g e

    Mitigation Project (NCRMP)

    3 months

    Jungle clearance is inprogress

    3 months

    Jungle clearance is inprogress

    3 months To be started

    ----------- Not yet Started

    3 months6.07.2012

    Not yet Started

    Not yet Started

    Not yet Started

  • 7/31/2019 3.November MPR 2011

    15/47

    MONTHLY REPORT

    Consultanc

    Status of

    CategoryPackages allotted under

    Phase - 1Names of

    RHB

    NCRMP/B-W/AP/RHB/PRED/05/Mogalthuru/001

    Road from NHarijanawada o

    R&B road at PanBadava

    Mogalthuru Vemto Gogulamm

    From Narsapur Mvia Venkateswa

    Road from NH(Mo

    NCRMP/B-W/AP/RHB/PRED/05/Narsapur/002

    R&B Road to I(Na

    Road from R&B

    Road from LB Ch(Na

    NCRMP/B-W/AP/RHB/PRED/05/Kalla/003

    From A-U R&B

    From A-U R&B Ro

    y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk

    works in West Godavari District up to 30.11.2011

    works under each package

    Agreement No./ Date

    DHS

    H 214 A at Ranga Statue center tof Kalipatnam (E) (Mogalthuru Mandal

    W.G.Dist.)

    /2011-12 , Dt.27.04.2011

    27.04.11

    chayat Office to Pulaparthivarithota via(Mogalthuru Mandal W.G.Dist.)

    a R&B Road at Uchintha Kalava Bridgea Harijanapeta (Mogalthuru Mandal

    W.G.Dist.)

    ogalthuru R&B road to Dayadaldaspetara Swamy temple (Mogalthuru Mandal

    W.G.Dist.)

    14 A road to Harijanapeta of Kothotaalthuru Mandal W.G.Dist.)

    Indira nagar (via) Pochamma templersapur Mandal W.G.Dist.)

    /2011-12 , Dt.09.05.2011

    09.05.11

    road to Pedalanka (Narsapur MandalW.G.Dist.)

    ria CC road to Chillapalem of LB Cheriarsapur Mandal W.G.Dist.)

    Road to Satyanarayanapuram, (KallaMandal W.G.Dist.)

    /2011-12 , Dt.26.05.2011

    26.05.11d to Mekaladibba

    14 | P a g e

    Mitigation Project (NCRMP)

    DFCProgress up to

    30.11.2011

    26.07.2012

    Works notstarted

    GrII and GSB595 mts

    Completed,2 culverts

    completed

    Works notstarted

    CC Roadcompleted

    08.05.2012 Works not started

    25.02.2012 Works not started

  • 7/31/2019 3.November MPR 2011

    16/47

    MONTHLY REPORT

    Consultanc

    Statu

    CategoryPackages allotted under Phase -

    1Nam

    RHB

    NCRMP/B-W/AP/RHB/PRED/06/Machipatnam/001

    Road

    NCRMP/B-W/AP/RHB/PRED/06/Machipatnam/002

    Road f

    Road

    NCRMP/B-W/AP/RHB/PRED/06/Kruthivennu/003

    Roa

    Roa

    y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk

    of works in Krishna District up to 30.11.2011

    es of works under eachpackage

    Agreement No. /Date

    DHS

    onnecting R&B road throughGantalammapalem

    /2011-12Dt.27.4.2011

    27.04.11 26

    rom R & B Road to B.V Thota

    /2011-12Dt.27.4.2011

    27.04.11 26

    from Potlapalem Z.P road toChikativanipalem

    from Intheru R&B Road toRangaraopet

    /2011-12Dt.27.4.2011

    27.04.11 26

    from R&B road to CycloneShelter at Chandala

    15 | P a g e

    Mitigation Project (NCRMP)

    DFCProgress up to

    30.11.2011

    .01.2012

    GSB work in progressand Pipe culvert

    excavation work inprogress

    .01.2012

    Jungle clearance andearth work in progress

    Jungle clearance andearth work in progress

    .01.2012

    Jungle clearance andearth work in progress

    Jungle clearance andearth work in

    progress.Material collected(sand) and Gravel.

    Pipe culvertconstruction work in

    progress

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    17/47

    MONTHLY REPORT

    Consultanc

    Status

    Category Packages allotted under Phase - 1N

    RCSNCRMP/B-W

    /AP/RCS/PRED/06/Machipatnam/001

    Bh

    Rot

    Pot

    y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk

    of works in Krishna Districts up to 30.11.2011

    mes of worksunder each

    package

    Agreement No./ Date

    Milestone Completion Dat

    First Second Th

    Road fromgireddipalli R&B

    Road toamakhandam

    /2011-12/Dt.02.09.2011

    01.12.2011 01.03.12 01.

    oad from R&Bad Chinnapuram

    Gundupalem

    /2011-12/27.04.2011

    01.12.2011 01.03.12 01.

    Road fromlapalem Z.P roadto Pothepalli.

    /2011-12/Dt.02.09.2011

    01.12.2011 01.03.12 01.

    16 | P a g e

    Mitigation Project (NCRMP)

    sProgressw.r.t.milestone

    up to30.11.2011

    Remarksird

    6.12 5%Jungle

    clearancework in

    progress

    6.12 10%

    GSB workin progress

    6.12 10%

    Jungleclearance

    work inprogress

    and leavestaken

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    18/47

    MONTHLY REPORT

    Consultanc

    Status

    CategoryPackages allotted under

    Phase - 1Names

    RHB

    NCRMP/B-W/AP/RHB/PRED/07/KARLAPAL

    EM/001

    Ro

    NCRMP/B-W/AP/PRED/07/Nagaram/002

    R/f R&

    R/f

    Bridges

    NCRMP/B-W/AP/Br/R&B/07/Bapatla/010

    ReconstrucBapatla-Su

    NCRMP/B-W/AP/Br/R&B/07/Bapatla/011

    ReconstrucBapatla-Pa

    y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk

    of works in GUNTUR District up to 30.11.2011

    f works under each package

    Agreement No./Date

    DHS

    R/f Ganapavaram R&Bad to Kesavapuri ST colony 7/2011-2012

    27.04.201127.04.11

    B Road to Mohammad Alipalem

    8/2011-201227.04.2011

    27.04.11

    R&B Road to Katuivaripalem.

    tion of High level Bridge @Km5/2 ofryalanka Road across Perali drain inGuntur

    79/2010-20111.12.2010

    01.12.10

    tion of High level Bridge @Km2/4 ofndurangapuram Road across Perali

    drain in Guntur78/2010-2011

    1.12.201001.12.10

    17 | P a g e

    Mitigation Project (NCRMP)

    DFCProgress up to

    30.11.2011

    26.01.2012

    2nd milestonecompleted ,Work

    yet to be start

    26.4.2012

    CC Roadcompleted, Earth

    Work is inprogress.

    Earth Work is in

    Progress.

    31.5.2012

    Total cost of projectis Rs 330.00 lakhs,

    total amountof 1st, 2nd milestone is Rs

    2,05,33,000.00 , Upto 30.11.2011 Work

    done is2,10,00,000.00

    31.5.2012

    Total cost of projectis Rs 370.00 lakhs,

    total amountof 1st, 2nd mile

    stone is Rs1,91,98,882.00 Upto 30.11.2011 Work

    done is Rs2,80,00,000.00

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    19/47

    MONTHLY REPORT

    Consultanc

    Statu

    Category Packages allotted under Phase - 1Na

    RCS

    NCRMP/B-W/AP/RCS/PRED/07/P

    Palem/001

    R

    NCRMP/B-

    W/AP/RCS/PRED/07/KarlaPalem/002

    R

    r

    Pe

    NCRMP/B-

    W/AP/RCS/PRED/07/Nizampatnam/003

    Ro

    y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk

    s of works in GUNTUR District up to 30.11.2011

    mes of works under each

    package

    Agreement No. /

    DateDHS D

    Road from R&B Road to

    Mandevaripalem

    /2010-11

    Dt.01.11.201101.11.11 31.07

    ad from R&B Road Alluru to

    Yadavapalem

    /2010-11

    Dt.01.11.201101.11.11 31.07

    ad from Ganapavaram R & B

    oad to Pedamarpuvaripalem

    /2010-11

    Dt.01.11.201101.11.11 31.10

    Road from R & B Road to

    Chinapuluguvaripalem

    /2010-11

    Dt.01.11.2011

    01.11.11 31.10

    Road from R & B road to

    Yaramvaripalem

    /2010-11

    Dt.01.11.201101.11.11 31.10

    Road from R & B road to

    dagollapalem Cyclone Shelter

    /2010-11

    Dt.01.11.201101.11.11 31.1

    edagollapalem PR Road to

    Bonthagorlapalem

    /2010-11

    Dt.01.11.201101.11.11 31.1

    Road from R&B Road to

    Gurunadhanagar

    /2010-11 Dt.

    17.10.201117.10.11 16.0

    ad from R&B Road to Adavala

    H/O Bavajipalem

    /2010-11 Dt.

    17.10.201117.10.11 16.0

    18 | P a g e

    Mitigation Project (NCRMP)

    C Progress up to 31.10.2011

    .2012 Not yet started

    .2012 Not yet started

    .2012 Not yet started

    .2011 Not yet started

    .2011 Not yet started

    .201 Not yet started

    .201 Not yet started

    7.12 Work to be Grounded

    7.12 Work to be Grounded

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    20/47

    MONTHLY REPORT

    Consultanc

    NCRMP/B-

    W/AP/RCS/PRED/07/Bapatla/004

    y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk

    Road from R&B Road to

    Atlavaripalem

    /2010-11 Dt.

    17.10.201117.10.11 16.0

    Road from R&B Road to

    Hanumanthanagar2010-11

    Dt13.10.201113.10.11 12.07

    Road from R & B road to

    Adarsanagar

    19 | P a g e

    Mitigation Project (NCRMP)

    7.12 Work to be Grounded

    .2012

    Not yet started

    Not yet started

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    21/47

    Consultanc

    Statu

    CategoryPackages allotted under

    Phase- 1Names of w

    pa

    BRIDGESNCRMP/B-W/AP/Br/R&B/08/

    Kanaparthi/012

    Construction oat Km 16/10 of Kanaparthi

    D

    RHB

    NCRMP/B-W/AP/RHB/PRED/08/S.Konda/001

    Road from PAtlavaripale

    Road fromSom

    Road froNarra

    NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002

    Road from NH5

    Road fromChaliv

    Road from PaMosa

    Road fro

    BinginapalliCyclo

    y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk

    s of works in Prakasam District up to 31.10.2011

    rks under eachkage

    Agreement No. / Date DHS

    f High level BridgeNaguluppalapaduoad in Prakasamistrict

    76/2010-11 Dated 1/12/2010 01.12.10

    kala ZP Road toCyclone shelter

    NCRMP/B-W/AP/RHB/PRED/08/S.Konda/001

    Dated 10/02/201110.02.11

    R&B Road torajupalli

    NCRMP/B-W/AP/RHB/PRED/08/S.Konda/001

    Dated 10/02/201110.02.11

    R&B road toaripalem

    NCRMP/B-

    W/AP/RHB/PRED/08/S.Konda/001Dated 10/02/2011 10.02.11

    to MulaguntapaduNCRMP/B-

    W/AP/RHB/PRED/08/S.Konda/002dated 10/02/2011

    10.02.11

    R&B road tondradibba

    NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002

    dated -10/02/201110.02.11

    kala R&B road toaladinne

    NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002

    dated 10/02/201110.02.11

    R&B road to

    i Harijanawadae Shelter

    NCRMP/B-

    W/AP/RHB/PRED/08/S.Konda/002dated 10/02/2011

    10.02.11

    20 | P a g e

    Mitigation Project (NCRMP)

    DFCProgress up to

    31.10.2011

    31.5.12piers raised up to bedblock & Abutment filter

    media working progress

    9.2.12

    cc road completed &pipe culvert is in

    progress

    9.2.12

    CC road layingprogress,

    9.2.12 work not resumed

    10.02.12 not started

    10.02.12

    C.D work is inprogress,Gsb to bedone

    10.02.12

    earth work wideningprogress,Gsb to bedone

    10.02.12 Work not Resumed

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    22/47

    Consultanc

    Statu

    CategoryPackages allotted under Phase -

    1Names of

    each

    RHB

    NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/00

    3

    Road fromto M T

    NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/00

    4

    Road fromto San

    Road froRoad to P

    NCRMP/B-W/AP/RHB/PRED/08/Ulavapadu/07

    Road froSubbara

    NCRMP/B-W/AP/RHB/PRED/08/Ulavapadu/08

    Road fromto Ram

    NCRMP/B-W/AP/RHB/PRED/08/Tangutur/09

    Road fromto Vas

    NCRMP/B-W/AP/RHB/PRED/08/Tangutur/10

    Road froKes

    y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk

    s of works in Prakasam District up to 31.10.2011

    works underpackage

    Agreement No. / Date DHS

    &B Road Alluraju colony NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/003

    Dated 27/04/201127.04.11

    EM R&B Roaduvarigunta

    NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/004

    Dated 27/04/201127.04.11

    KEM R & Bllareddypalem

    NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/004

    Dated 27/04/201127.04.11

    MC Road toudu Satram

    NCRMP/B-W/AP/RHB/PRED/08/Ulavapadu/07

    dated 27/04/201127.04.11

    R&B road Tettuayapatnam

    NCRMP/B-W/AP/RHB/PRED/08/Ulavapadu/08dated 27/04/2011

    27.04.11

    &B road Pellurepallipadu

    NCRMP/B-W/AP/RHB/PRED/08/Tangutur/09 dated

    16/03/201116.03.11

    R&B road toupalem

    NCRMP/B-W/AP/RHB/PRED/08/Tangutur/10 dated

    16/03/201116.03.11

    21 | P a g e

    Mitigation Project (NCRMP)

    DFCProgress up to

    31.10.2011

    27.04.12

    CC road compleetd, Gsbprogress material approvalshall be taken from

    competent authority.

    27.04.12 WBM Gr-I II progress

    27.04.12 WBM Gr-I II progress

    27.04.12 Gsb progress

    27.04.12 WBM Gr-I I progress

    16.03.12

    CC road compleetd,Gsbprogress material approval

    shall be taken fromcompetent authority.C.D

    work is in progress

    16.03.12 Gsb progress

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    23/47

    Consultanc

    Status of

    CategoryPackages allotted under Phase

    - I

    Namesunde

    pac

    RCS

    NCRMP/B-W/AP/RCS/PRED/08/Vetapalem/001

    Road frroad to vi

    colonysh

    Road frot

    Challare

    Road frroad to j

    nagarcyclon

    Road frroad to

    colonysh

    Road frroad to

    shelMankena

    NCRMP/B-W/AP/RCS/PRED/08/Chirala/002

    Road frRo

    Keertivcyclon

    Road frRoad tocyclonechiralaprakasa

    y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk

    works in Prakasam District up to 30.11.2011

    of worksr eachkage

    Agreement No. / DateMile sto

    First Seconom R&Bijayanagarcyclonelter

    NCRMP/B-W/AP/RCS/PRED/08/Vetapalem/00

    1 dated 2011/12 dated30.09.2011

    29.01.2012

    29.05.22

    NH roadoddypalem

    om R&Bevarakshcolonyshelter

    om R&Bamnagarcyclonelter

    om R&Bcycloneter atvaripalem

    m R&Bd toripalemshelter

    NCRMP/B-W/AP/RCS/PRED/08/Chirala/002

    dated 27.08.2011

    om R&Bevinutala

    shelter ofandal in

    m district.

    22 | P a g e

    Mitigation Project (NCRMP)

    nesRemarks

    d Third

    0129.09.2012

    cc roadcompleted &

    Grade-II work isin progress

    Grade-IIIprogress

    cc road work is

    in progress

    not started

    not started

    not started

    cc road laid 260m out of 800 m

    work is notresumed.

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    24/47

    Consultanc

    Status

    Category Packages allotted under Phase - 1

    MPCS

    C

    s

    K

    y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk

    of works in Prakasam District up to 31.10.2011

    ames of worksunder each

    package Agreement No. / Date D

    hakicherla cyclone

    elter in Ulavapadu

    andal Prakasam

    District

    Not furnished

    anaparthy cyclone

    shelter in

    Nagulappapadu

    andal PrakasamDistrict

    Not furnished

    23 | P a g e

    Mitigation Project (NCRMP)

    HS DFC

    Progress upto

    31.10.2011

    Foundationconcrete work is

    in progress.

    Foundationconcrete work is

    in progress.

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    25/47

    Consultanc

    Stat

    Category Packages allotted under Phase - 1 Na

    RHB

    NCRMP/B-W/AP/RHB/PRED/09/Bogole/001

    Roa

    Roa11/0Venk

    NCRMP/B-W/AP/RHB/PRED/09/Bogole/002RoaTella

    NCRMP/B-W/AP/RHB/PRED/09/Chittamur/003

    RoaPittu

    RoaSam

    NCRMP/B-W/AP/RHB/PRED/09/Kavali/004

    Roa

    Roato G

    RoaChe

    NCRMP/B-

    W/AP/RHB/PRED/09/Vidavalur/005

    Roa

    RoaAlag

    RHB

    NCRMP/B-W/AP/RHB/PRED/09/Muthukur/006

    Roa

    NCRMP/B-W/AP/RHB/PRED/09/V.Chalam/007

    SurvColo

    Roa

    y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk

    s of works in Nellore District up to 30.11.2011

    es of works under each packageAgreement No. /

    DateDHS

    from NH 5 to Sambasivapuram

    34/2010-11, Dt.19.01.2011

    19.01.11

    from 9/6 of Zuvvaladinne R&B Road toof Zuvvaladinne R&B viaideshpalem (Venkideshpalem)

    from 1/6 of Zuvvaladinne R&B road togunta

    / 2010 - 11, Dt.07.02.2011

    07.02.11

    from R&B road to Muttembake Viaanipalli 2010-11Dt

    18.01.201118.01.11

    from R&B Chittamur to Somaudram

    from K.T R&B Road to Alliguntapalem

    32/2010-11, Dt.17.01.2011

    17.01.11

    from Km 5/8 of Chennayapalem Roadmmadi Bandala

    from Pedapattapupalem R&B road tonayapalem H. Wada

    from R&B Road Alaganipadu to Vavilla/ 2011 - 12, Dt.

    27.04.201127.04.11

    from R&B road Kancharapalem HW tonipadu

    from R&B Road to PatuvariKandriga/2010-11Dt.25.04.2011

    25.04.11

    palli Pudiparthi Road to Srikanthny / 2011 - 12, Dt.

    27.04.201127.04.11

    from R & B Road to Edagali Kandriga

    24 | P a g e

    Mitigation Project (NCRMP)

    DFCProgress up to

    30.11.2011

    19.4.12

    WBM Gr-II Completed

    WBM Gr-III is inProgress

    06.11.11 WBM Gr-II Completed

    18.4.12

    GSB Completed

    GSB Completed

    27.4.12

    BT is in progress

    BT Completed

    Side Earth in progress

    27.7.12

    CC Road completed

    Side Earth is inProgress

    25.1.2012 BT Completed

    27.4.2012WBM Gr_III Completed

    WBM Gr.II Completed

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    26/47

    Consultanc

    NCRMP/B-W/AP/RHB/PRED/09/Allur/009Roa(via)

    RCS

    NCRMP/B-W/AP/RCS/PRED/09/Kota/001

    Roa

    Roa

    NCRMP/B-W/AP/RCS/PRED/09/Muthukur/002

    RoaBand

    NCRMP/B-W/AP/RCS/PRED/09/Chillakur/004RoaVella

    NCRMP/B-W/AP/RCS/PRED/09/T.P.Gudur/005

    RoaPatta

    NCRMP/B-

    W/AP/RCS/PRED/09/DV.Satram/008

    Roa

    Berje

    y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk

    from R&B Road Allur to GalidibbaluChukavanidibba

    /2010-11 Dt.24.01.2011

    24.01.11

    from R&B Road to A.S. Puram2010-11Dt10.05.2011 10.05.11

    from GD road to Vavillapalem

    from R&B road Kappaladoruvu tolapalem H.Wada

    /2010-11 Dt.21.04.2011

    21.04.11

    from Katuivaripalem R&B Road topalm

    /2010-11Dt23.05.2011

    23.05.2011

    from 7/2 M.C road to Venkannapalempupalem

    2011-10 Dt17.05.2011

    17.05.2011

    from R&B road to Sullurpeta Mallam to

    ngalapalli cyclone shelter

    /2010-11 Dated

    9.05.2011 09.05.2011

    25 | P a g e

    Mitigation Project (NCRMP)

    24.4.2012 GSB is Completed

    10.2.2012

    Earth work inembankment

    Earth work inembankment

    21.1.2012 WBM-Gr-III

    23.2.2012

    Jungle clearance is inprogress

    17.2.2012 GSB is in progress

    9.2.2012

    Construction of culvert

    is in progress

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    27/47

    Consultancy Services for Third P

    6.0 District wise status of tests

    Apart from monitoring the tests

    various stages, the Third party Q

    These tests are carried out in th

    laboratories. The details of tests c

    S.No. District

    1 Srikakula

    2 Vizianagar

    3 Visakhapatn

    4 East Godav

    5 West Goda

    6 Krishna

    7 Guntur

    8 Prakasha

    9 Nellore

    Total

    The works in West Godavari a

    rty Quality Audit (TPQA) for National Cyclone Risk Miti

    conducted by TPQA:

    being conducted by the implementation team (contract

    ality Audit team also conducted tests to confirm its com

    site itself and in some cases samples are collected a

    nducted in the field till end of September 2011 are prese

    Summary of QC Tests - Up to 30.11.2011

    Total No. TestsDone

    Total

    Passed

    174 156

    m 159 156

    am 250 244

    ari 119 119

    ari 11 11

    3 2

    173 173

    259 257

    240 236

    1388 1354

    d Krishna Districts were just started

    ation Project (NCRMP)

    rs & Line department) at

    pliance with the standards.

    nd testing done in outside

    ted.

    o. of Tests

    Failed

    18

    3

    6

    0

    0

    1

    0

    2

    4

    34

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    28/47

    Consultancy Services for Third P

    7.0 Details of Audit Report

    S.NO District

    1 Prakasham NCRMP

    2 PrakashamW/A

    3 Prakasham NCR

    4 PrakashamW/A

    5 PrakashamW/A

    6 Prakasham NCRMP /

    7 PrakashamW/A

    8 Prakasham NCRM

    rty Quality Audit (TPQA) for National Cyclone Risk Miti

    s Submitted During this Month:

    Package Number

    / B-W /AP/RHB/ PRED / 08 / Tangatur/10For the wo

    Kesupa

    NCRMP/B-/RHB/PRED/08/KOTHAPATNAM/003

    Road frM.T.Raj

    mand

    P/B-W/AP/Br/R&B/08/Kanaparthy/012 ConstrucNagulupp

    NCRMP/B-/RHB/PRED/08/Singarayakonda/001

    Road fAulava

    NCRMP/B-/RHB/PRED/08/KOTHAPATNAM/004

    The WorPullareddy

    B-W /AP/RHB/ PRED / 08 / Ulavapadu/008

    Road f

    Ramayap

    NCRMP/B-/RHB/PRED/08/KOTHAPATNAM/004

    The WorSankuvari

    P/B-W/AP/RHB/PRED/08/S.Konda/001 Road from

    The Wor

    ation Project (NCRMP)

    Name of work

    rk Road from R&B Road tolem in Tangatur Mandal

    m R&B Road to Allur tou colony in Kothapatnaml in Prakasham district.

    ion of HLB in Km 16/10 ofapadu-Kanaparthy road inPrakasam district

    rom Pakala ZP Road toripalem Cyclone Shelter

    from KEM R&B Road TOalem village Kothhapatnam

    mandal.

    rom R&B Road Tettu to

    tnam in Ulavapadu Mandal

    from KEM R&B Road TOunta village Kothhapatnam

    mandal.

    R&B Road to Somarajupalli

    Road from M.C Road to

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    29/47

    Consultancy Services for Third P

    8.0 Observations in the s

    Name ofWork:

    For the work R

    1. 35.76 % value of t

    2. Works to be doneMile stone 1 to theMile stone 2 to theMile stone 3 to the

    3. Widening work is iTPQA Staff for ve

    approved materialIRC-36-1970 ParaI) When an existinbenches of up tofresh embankmenutilized in the widefreshly material isinstead of resortinII) The layers of thof IRC-36. In suchusual wider rollers

    approved plant.4. Construction of Pi5. Rcc NP3 1000mm

    furnished. The fiel6. The field officers a

    culverts. As per IRembankment areaembankment shallto avoid displaceii) The soil in such

    compacted thorourollers or other heother approved m

    7. GSB material samThe test results ar

    8. Shoulder construspecifications, thewith the constructi

    9. Q.C Lab is not estand maintain regi

    Name ofWork:

    Road from R&Prakasham dis

    1. 8.77% value of th

    2. Works to be done

    rty Quality Audit (TPQA) for National Cyclone Risk Miti

    ubmitted reports:

    ad from R&B Road to Kesupalem in Tangatur M

    he work is completed.

    as per Milestone:end of Dt: 18.07.11- Earthwork, CD Works .end of Dt: 18.10.11- WBM Gr-II, Gr-III and CD works.end of Dt: 18.01.12- BT, CC Pavement and Road furnitu

    in progress. The field officers are requested to provide theification and to conduct the field tests. The field officers a

    for embankment as per IRC-36.9 states thatg embankment is to be widened, and its slopes are steep00mm width shall be cut in to the old slope for ensuring at material to be added. The material obtained from cuttingning of the embankment. However, when the existing sloto be placed in flatter than 4:1, the slope surface may onlg to benching.e widened embankment shall be compacted to requiremecases where the width of the widened portion is insufficie

    , compaction may be carried out with the help of tandem/

    ped causes way and CD works are in Progress.dia Pipes received at the site. The MTC of NP3 1000 m

    d officers are requested to supply the same for verificatiore requested to follow the IRC-36 specifications during fillC 36, Para 8, The filling around and over culverts and othshall be carried out independently of the work on the mai

    l be brought up simultaneously in equal layers on each sident and unequal pressure.cases shall be deposited in layers not exceeding 150mm

    ghly to the requirements of Para 7.14. When it may be imvy equipment, The compaction shall be carried out by mthods.

    ples were collected by the TPQA and field officers and see awaited.tion is in progress. The field officers are requested to follocode states that Shoulder construction should be so orgaon of different layers of the pavement.ablished at site work. It is suggested to provide Q.C lab aters.

    Road to Allur to M.T.Raju colony in Kothapatnarict.work is completed.

    as per Milestone:

    ation Project (NCRMP)

    andal

    re.material test reports toe requested to use only

    r than 4:1, horizontaldequate bond with theof the benches could bee against which thebe ploughed or scarified

    nts of Para 7.12 and 7.14nt to permit the use ofheep foot roller or other

    dia pipes are not

    ing around and over theer structures in then embankment. Thee of the structure, so as

    in loose thickness and

    practicable to use powerchanical tampers or by

    nt for necessary tests.

    w the IRC 36nised as to keep pace

    d conduct regular test

    m Mandal in

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    30/47

    Consultancy Services for Third P

    benches of upfresh embankbe utilized in t

    the freshly mascarified inste

    2. The layers of tof IRC-36. In susual wider roother approve

    4. Clause -1501 of (i) Contraction joindirection of trafficpavement is neith

    Normally it may v(ii) Construction jsuspended for mo(iii) Expansion joiimpregnated joint/

    5. The quality controshall be produced

    6. QC laboratory issee that the Quali

    7. As per the agree4.75 mm size ofthe contractor prabove said materiare found CBR va6.The field officeEngineer in Charg

    8. CD work in KM 0/work is completeMTCs of pipes fo

    9. For CD work in Kto be taken up. Th

    10. The field officers aculverts. As per IRembankment areaembankment shallavoid displacemeII) The soil in suchcompacted thorourollers or other heother approved m

    11. Shoulders need t

    edges also.12. Shoulders are to13. Km and HM ston

    provide the same.14. Cautionary sign b15. The project inform

    be provided as pe

    rty Quality Audit (TPQA) for National Cyclone Risk Miti

    to 600mm width shall be cut in to the old slope for ensurient material to be added. The material obtained from c

    he widening of the embankment. However, when the ex

    terial is to be placed in flatter than 4:1, the slope surfaced of resorting to benching.

    he widened embankment shall be compacted to requiremuch cases where the width of the widened portion is insullers, compaction may be carried out with the help of taplant.

    ORD states thatts shall be mechanically sawn joints spaced 2.5 m to 3.7shall not be less than the width of the pavement. Joir too soft nor too hard and is able to bear the weight of th

    ry from 8 to 12 hours depending on weather conditions.ints shall be butt joints and placed after a days workre than 30 minutes.nts shall be provided near bridges and slab culvertspremoulded synthetic joint filler board, about 20 mm thickl tests should be conducted as per IRC SP-11, Maintainto QA wing for verification.ot provided at site. The line deportment is requested toy lab is established at site at an early stage.ent condition the GSB material is well graded material (

    ravel 66% and sand of size < 2.36mm @34%) is to becured the quarry waste material from Chimakurthi graal, the same material is collected for testing for its suitablue is 23 which is more than the required value of 20 andrs are requested to get the prior approval before pre.00 and 0/800 with 600mm dia NP3 pipe culvert work is infurther work has to be taken up. The field officers are

    verification.1/10 with 600mm dia NP3 pipe culvert, earth work is in

    e field officers are requested to provide the MTCs of pipe

    re requested to follow the IRC-36 specifications during fillC 36, Para 8, The filling around and over culverts and othshall be carried out independently of the work on the mai

    l be brought up simultaneously in equal layers on each sidt and unequal pressure.cases shall be deposited in layers not exceeding 150mm

    ghly to the requirements of Para 7.14. When it may be imvy equipment, The compaction shall be carried out by mthods.be taken up simultaneously with the GSB laying work

    e taken up In between KM 0/350 to 1/0, & 3/65 to 3/80es are not available on the the road stretch. The field

    ards at necessary points and village name boards are noatory boards with all details were not provided as per agr the guidelines given by PIU, NCRMP.

    ation Project (NCRMP)

    ng adequate bond with thetting of the benches couldisting slope against which

    may only be ploughed or

    nts of Para 7.12 and 7.14ficient to permit the use ofndem/sheep foot roller or

    m. Length of panel in thets shall be cut when thee machine and crew.

    is over or when work is

    nd consist of a bitumen, and dowel bars.QC record and the same

    ake necessary action and

    stone aggregate9.5 mm toused for construction. Butnite quarry instead of theility like CBR, PI the resultPI is NP which is less thanceeding further from the

    progress. The pipe layingrequested to provide the

    rogress. Further work hass for verification.

    ing around and over theer structures in then embankment. Thee of the structure, so as to

    in loose thickness andracticable to use powerchanical tampers or by

    , for better compaction at

    officers are requested to

    t provided.regement.The same shall

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    31/47

    Consultancy Services for Third P

    4. Milestone3 up to

    5. The alignment is6. Piers and Abutme

    be taken up.7. Non destructive te

    12.09.2011 and th8. The field officers

    rusting.9. The field officers

    conduct all the reconsistency, soun

    10. The reinforcemenin clean and suita

    11. The width of filter to provide the testCl.710.1.4 of IRC78.The field office

    12. TPQA Site Enginaggregate and wa

    13. The informatory &agreement. The s

    14. Project Name boa15. The field officers

    verification16. The replica are r

    Dated 03-09-201117. Safety measures

    contractor as per

    Name ofWork:

    Constructiondistrict

    1. 88.48 % value of t

    2. C.C.Road is com3. Cores will be take4. i) Construction o

    (ii) length of the p(iii) Joints shall be

    of the machin

    5. Construction jointfor more than 30

    6. Expantion joints

    impregnated joint(i) After compl

    wet Hessain24 hrs

    (ii) Upon the reand cured b

    7. Widening work is i

    rty Quality Audit (TPQA) for National Cyclone Risk Miti

    31.05.2012 : Completion of entire work including approac

    erified and found fairly tallying with the approved drawing.nts and bed block Concrete work completed. Centering

    st conducted for Piers and Abutments with Rebound hae results are varying from 24 N/mm2 to 33 N/mm2.are also requested to apply cement slurry to the steel

    are also requested to get the samples of cement testeduired tests on cement such as cube strength, initial setti

    dness etc.steel shall be neatly stored on wooden blocks, racks orly marked to facilitate inspection and identification as per

    media is verified and found between o.6m to 0.65m.Thereports for back fill material for verification. The back fill

    78.It is observed that the construction of filter material is nrs are requested to rectify the same as pre IRC-78.eers have conducted tests for the input materials likter at site and the result found within the specified limits.identification of semi reflective sign boards with all detailme may be provided immediately at site..

    rd with details are not provided at site. It shall be providedare requested to provide the invoices bills of the mate

    eceived from the Executive Engineer wide Letter No.for the previous observations.for workers such as helmets, gum shoes, jackets etc.,.2 of agreement clause

    f HLB in Km 16/10 of Naguluppapadu-Kanapa

    he work is completed.

    leted. In between stretches 0/350 to 1/0, Curing is in Progn to verify depth and compressive strength after 28 daysf joints shall be mechanically sawn joints spaced 2.5 m toanel in the direction of traffic shall not be less than the wicut when the pavement is neither too soft nor too hard

    e and crew. Normally it may vary from 8 to 12 hrs depend

    shall be butt joints and placed after a days work is overinutes

    shall be provided near bridges and slab culverts a

    / premoulded synthetic joints filler board about 20 mm thition of the finishing operations, the surface of the pavecloth, burlap or jute mats. They shall be maintained full

    moval of the wet covering out the end of 24 hrs, the slabponding or sprinklers.

    in progress. The field officers are requested to provide the

    ation Project (NCRMP)

    es

    .work for deck Slab has to

    mer by Site Engineers on

    ars so as to protect from

    from every consignment,g time, Final setting time,

    latforms above the groundCl.1603 of MORTHield officers are requestedmaterial shall conform theot as per cl.710.1.4 of IRC

    Coarse aggregate, fine

    were not provided as per

    as per specifications.

    rials like cement, steel for

    467/E.E.(R&B)/ATO/2011

    are to be provided by the

    thy road in Prakasam

    ress.f laying.3.75 mth of the pavement.nd able to bear the weight

    ing on weather conditions

    r when work is suspended

    d consists of a bitumen

    k, and dowel barsent shall be covered withwetted and in position for

    shall be thoroughly wetted

    material test reports to

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    32/47

    Consultancy Services for Third P

    scarified insteii) The layers o

    7.14 of IRC-

    use of usualor other appr

    8. For GSB materialaboratory for conlimit, 3) Free swe

    9. The quality contr shall be produced

    10. Q.C Lab is not estmaintain registers.

    Name ofWork:

    The Work from

    1. 6.67 % of the wor 2. Works to be done

    Mile stone 1 to theMile stone 2 to theMile stone 3 to the

    3. Widening work is iTPQA Staff for ve

    approved materialIRC-36-1970 Parai) When an exi

    benches of ufresh embanbe utilized inthe freshly mscarified inste

    ii) The layers o7.14 of IRC-use of usualor other appr

    4. The contractor pr is collected for temore than the reqmaterial is suitablapproval from theproceeding furthe

    5. Shoulder formatio6. Earth work excav

    up.7. Km and HM stone

    the same.8. Cautionary sign b9. The quality contr

    shall be produced10. QC laboratory is

    th t th Q li

    rty Quality Audit (TPQA) for National Cyclone Risk Miti

    ad of resorting to benching.the widened embankment shall be compacted to requ

    6. In such cases where the width of the widened portion

    ider rollers, compaction may be carried out with the helpved plant.l, The field officer collected the soil samples and seducting tests like. 1) Maximum dry density and OMC,ll index. The test results are awaited.l tests should be conducted as per IRC SP-11, Maintaito QA wing for verification.ablished at site work. It is suggested to provide Q.C lab a.

    KEM R&B Road TO Pullareddypalem village Kot

    is completed.as per Milestone: (Two works in this package)end of Dt: 26.08.11- Earthwork, CD Works and GSB.end of Dt: 26.12.11- WBM Gr-II, Gr-III and Shoulders.end of Dt: 26.04.12- BT and Road furniture.

    in progress. The field officers are requested to provide theification and to conduct the field tests. The field officers a

    for embankment as per IRC-36.9 states thatting embankment is to be widened, and its slopes areto 600mm width shall be cut in to the old slope for ensu

    ment material to be added. The material obtained from cthe widening of the embankment. However, when the eterial is to be placed in flatter than 4:1, the slope surfac

    ad of resorting to benching.the widened embankment shall be compacted to requ

    6. In such cases where the width of the widened portionider rollers, compaction may be carried out with the helpved plant.cured the quarry waste material from Chimakurthi granitting for its suitability like CBR and PI, the result are founuired value of 20 and PI is NP which is less than 6.As pee for sub grade construction. However the usage of thiscompetent authority. The field officers are requested to gfrom the Engineer in Charge.

    n has to be done simultaneously with the GSB,WBM GrIItion is completed for CD work at KM 1/100 and 1/600.F

    s are not available on the the road stretch. The field office

    ards at necessary points and village name boards are nol tests should be conducted as per IRC SP-11, Maintaito QA wing for verification.ot provided at site. The line deportment is requested to

    l b i t bli h d t it t l t

    ation Project (NCRMP)

    irements of Para 7.12 andis insufficient to permit the

    of tandem/sheep foot roller

    nt to Engineering college) Liquid limit and Plastic

    QC record and the same

    nd conduct regular test and

    hhapatnam mandal.

    material test reports toe requested to use only

    teeper than 4:1, horizontaling adequate bond with theutting of the benches couldxisting slope against whiche may only be ploughed or

    irements of Para 7.12 andis insufficient to permit theof tandem/sheep foot roller

    quarry, the same material

    d CBR value is 23 which isr clause 401.4 and 408 thismaterial requires deviationt the prior approval before

    nd Gr IIIrther work has to be taken

    rs are requested to provide

    t provided.QC record and the same

    take necessary action and

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    33/47

    Consultancy Services for Third P

    Mile stone 2 to thMile stone 3 to th

    3. The formation wid

    locations shoulder4. CC road in betwe

    out of estimate wiin the width of the

    5. The WBM GRADEenclosed in annex

    6. The BT road comtallying with the afor Combined OGCombined OGPCenclosed in Annex

    7. The granular shou8. The CC road com

    age of 28 days tefor M-30 Grade of

    9. Concrete cores arthe thickness and223 mm.

    10. The compressive

    26.08 N/mm2 to85% of Grade of c

    11. 1000mm dia eightspan RCC slabmeasurements ar

    12. White wash to betraffic.

    13. The widths of Sh5/4. it is suggeste

    14. MORD Specificati

    Concrete roads fothe CC road as m

    15. (i) Construction o(ii) length of the p(iii) Joints shall beof the machine an

    16. Construction jointsuspended for mo

    Name ofWork:

    The Work from

    1. 28.47% of the wo2. Works to be done

    Mile stone 1 to theMile stone 2 to theMile stone 3 to the

    rty Quality Audit (TPQA) for National Cyclone Risk Miti

    end of Dt: 26.12.11- WBM Gr-II, Gr-III and Shoulders .end of Dt: 26.04.12- BT and Road furniture.

    ths and Earthen shoulder widths are verified from Km 5/1

    s have slipped and the same shall be rectified.n stretches Km 4/471 to Km 5/080. The width of the r

    dth 3.75 meters. The field officers are requested to furnroad.

    -II thickness are verified and is tallying with the approveure-2

    pleted in between stretches Km 3/0 to Km 4/368.The thpproved Estimate. The reports are enclosed in AnnexurePC and SEAL COAT test conducted and the percentagend SEAL COAT observed as 4.2% to 4.4%. Hence sat

    ure-III and Annexure-IV

    lder work is in progress. The relative compaction test to

    pleted in between stretches Km 4/4 to Km 5/67. The cost conducted and the values are in between range 32.0concrete.

    taken from the cc road randomly in between stretchesstrength of the CC road. The Avg.thickness of cores ar

    trength of cores are tested, the average compressive str

    7.13 N/mm2. The minimum Avg. values of compressiveoncrete (M30=30.00 N/mm2) i.e. 25.5 N/mm2. Hence sa

    rows culvert, 600mm dia single row culvert in villageculvert, and Side drains in village portion are comverified and are tallying with the approved drawing.

    done to parapet walls of the existing culverts for the

    ulders are found Narrow at Bucking hum canal bridgeto provide extra width.

    ns and IRC: SP-62-2004, Guidelines for the constructi

    r low volume roads, need to be followed in cutting and sntioned below.

    f joints shall be mechanically sawn joints spaced 2.5 m toanel in the direction of traffic shall not be less then the wicut when the pavement is neither too soft nor to hard a

    d crew. Normally it may vary from 8 to 12 hrs depending

    s shall be butt joints and placed after a days workre than 30 minutes

    KEM R&B Road TO Sankuvarigunta village Koth

    k is completed.as per Milestone: (Two works in this Package)end of Dt: 26.08.11- Earthwork, CD Works and GSB.end of Dt: 26.12.11- WBM Gr-II, Gr-III and Shoulders.end of Dt: 26 04 12 BT and Road furniture

    ation Project (NCRMP)

    50 to Km 5/4 and at some

    ad verified as 5.5 meters

    ish the reasons for change

    Drawing, the reports are

    ickness are verified and is-II. The BT extraction testof Binder content in the

    isfactory. The reports are

    e done.

    mpressive strength at theN/mm2 to 34.66 N/mm2,

    m 4/4 to Km 5/67, to findobserved as 195 mm to

    ngth of core is in between

    strength of core should beisfactory

    portion, 2 vents of 2.0 mtspleted and the physical

    clear visibility of vehicular

    between Km 5/150 to Km

    n and design of Cement

    acing of joints and curing

    3.75 midth of the pavement.nd able to bear the weighton weather conditions

    is over or when work is

    hapatnam mandal.

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    34/47

    Consultancy Services for Third P

    which the freploughed or s

    ii) The layers o

    7.14 of IRC-3use of usualroller or other

    4. C.C Road comple5. It is observed that

    MORD SpecificatiConcrete roads fothe CC road as m

    (i) Construction(ii) Length of the

    (iii) Joints shall bof the machin(iv)Expantion joi

    impregnated(v) After complet

    wet Hessain24 hrs

    (vi)Upon the reand cured by

    6. Two sets of cubeone set is 26.52 N

    for 28days strenconcrete.

    7. Approximate Comthe results are var

    8. Cores will be take9. The contractor pr

    is collected for tesmore than the reqmaterial is suitablapproval from the

    proceeding furthe10. The thickness fo

    estimated thickne11. WBM Gr II work c

    a. SHOULDERspecification okeep pace wit

    12. The field officers aculverts. As per IRembankment area

    embankment shallavoid displacemei) The soil in suchcompacted thorourollers or other heother approved m

    13. As per agreement

    rty Quality Audit (TPQA) for National Cyclone Risk Miti

    shly material is to be placed in flatter than 4:1, the slcarified instead of resorting to benching.the widened embankment shall be compacted to requi

    6. In such cases where the width of the widened portionwider rollers, compaction may be carried out with theapproved plant.ed in between stretches 1/400 to 1/500 Km.the groves are not cut as per MORD specificationons and IRC: SP-62-2004, Guidelines for the constructir low volume roads, need to be followed in cutting and sntioned below.

    of joints shall be mechanically sawn joints spaced 2.5 m tpanel in the direction of traffic shall not be less than the

    cut when the pavement is neither too soft nor too harde and crew. Normally it may vary from 8 to 12 hrs dependnts shall be provided near bridges and slab culverts a

    joints/ premoulded synthetic joints filler board about 20 mion of the finishing operations, the surface of the pavecloth, burlap or jute mats. They shall be maintained fully

    oval of the wet covering out the end of 24 hrs, the slabponding or sprinklers.are tested for 7 days compressive strength at laborator

    /mmand average value of another set is 26.61 N/mm2. A

    th produced an average compressive strength of 31.

    pressive strength of C.C.Road is tested with Rebound hying from 32 N/mm2 to 38 N/mm2.n to verify depth and compressive strength after 28 dayscured the quarry waste material from Chimakurthi graniteting for its suitability like CBR and PI, the result are founuired value of 20 and PI is NP which is less than 6. As p

    for sub grade construction. However the usage of thiscompetent authority. The field officers are requested to g

    from the Engineer in Charge.GSB and WBM Gr II are verified at random and fo

    s.mpleted in between KM 0/000 to KM1/340, WBM GrII Wonstruction work is in progress, the field officers aref IRC36. It specifies that the shoulder construction shothe construction of different layers of the pavement

    re requested to follow the IRC-36 specifications during fillC 36, Para 8, The filling around and over culverts and othshall be carried out independently of the work on the mai

    l be brought up simultaneously in equal layers on each sidt and unequal pressure.cases shall be deposited in layers not exceeding 150mmghly to the requirements of Para 7.14. When it may be imvy equipment, The compaction shall be carried out by mthods.5.2 Clause Environment Management Plan not followe

    ation Project (NCRMP)

    ope surface may only be

    rements of Para 7.12 and

    is insufficient to permit theelp of tandem/sheep foot

    on and design of Cementpacing of joints and curing

    3.75 m

    idth of the pavement.

    nd able to bear the weighting on weather conditionsnd consists of a bitumen

    thick, and dowel barsent shall be covered withwetted and in position for

    shall be thoroughly wetted

    and the average value of

    nd one set of cubes tested

    0 N/mm for M-30 grade

    mmer on 06.10.2011 and

    f laying.quarry, the same materialCBR value is 23 which isr clause 401 and 408 thisaterial requires deviation

    t the prior approval before

    nd fairly tallying with the

    rk has to be taken up.requested to follow the

    ld be so organized as to

    ing around and over theer structures in then embankment. The

    e of the structure, so as toin loose thickness andracticable to use powerchanical tampers or by

    at site. It is suggested to

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    35/47

    Consultancy Services for Third P

    18. QC laboratory issee that the Qualit

    Name ofWork:

    Road from R&

    1. 26.35 % value of t2. C.C.Road 300 m

    progress.3. Cores will be take4. MORD Specificati

    Concrete roads fothe CC road as m

    (i) Constructio(ii) Length of th(iii)Joints shall

    of the macconditions.

    Construction jointfor more than 30Expantion jointsimpregnated joint

    5. Longitudinal joints

    (i) After complwet Hessain24 hrs.

    (ii) upon the reand cured b

    6. For GSB materialaboratory for conlimit, The test res

    7. The quality contr Maintain QC reco

    8. Q.C Lab is not estmaintain registers.

    Name ofWork:

    The Work Roa

    1. 20.00 % value of t2. Works to be done

    Mile stone 1 to theMile stone 2 to theMile stone 3 to the

    3. The 600mm dia600mm dia doubldia Triple row culv

    i) The field officerculverts. As per Iembankment are

    rty Quality Audit (TPQA) for National Cyclone Risk Miti

    ot provided at site. The line deportment is requested toy lab is established at site at an early stage.

    Road to Somarajupalli

    he work is completed. Shoulder works are not in progressters length is completed. In between stretches 1/076

    n to verify depth and compressive strength after 28 daysions and IRC: SP-62-2004, Guidelines for the constructr low volume roads, need to be followed in cutting andntioned below.

    of joints shall be mechanically sawn joints spaced 2.5 mpanel in the direction of traffic shall not be less than the

    be cut when the pavement is neither too soft nor to hardhine and crew. Normally it may vary from 8 to 12

    shall be butt joints and placed after a days work is overinutes

    shall be provided near bridges and slab culverts a/ premoulded synthetic joints filler board about 20 mm thishall be provided for two lane road and shall be saw cut

    tion of the finishing operations, the surface of the pavecloth, burlap or jute mats. They shall be maintained full

    oval of the wet covering out the end of 24 hrs, the slaby ponding or sprinklers.l, The field officer collected the soil samples and sducting tests like. 1) Maximum dry density and OMC,lts are awaited.l tests should be conducted as per IRC SP-11, and red and the same shall be produced to QA wing for verificatablished at site work. It is suggested to provide Q.C lab a.

    from M.C Road to Subbarayadu Satram in Ulav

    he work is completed.as per Milestone:end of Dt: 26.08.11- Earthwork, CD Works and GSB.end of Dt: 26.12.11- WBM Gr-II,& Gr-III.end of Dt: 26.04.12- BT, shoulders and Road furniture.ingle row pipe culvert (2 No's) constructed at stretcherow culvert ( 3 No's) constructed at stretches Km 2/4,Km

    ert (2 No's) constructed at stretches Km 3/0,& Km 3/4.

    are requested to follow the IRC-36 specifications duringRC 36, Para 8, The filling around and over culverts a

    shall be carried out independently of the work on th

    ation Project (NCRMP)

    take necessary action and

    .to 1/376 Km, Curing is in

    f laying.ion and design of Cementpacing of joints and curing

    to 3.75 mwidth of the pavement.nd able to bear the weightrs depending on weather

    or when work is suspended

    d consists of a bitumenck, and dowel bars

    ent shall be covered withy wetted and in position for

    shall be thoroughly wetted

    nt to Engineering college) Liquid limit and Plastic

    uested the field officers toion.nd conduct regular test and

    apadu Mandal

    Km 1/6 and km 3/2. The2/8,& Km 4/2. The 600mm

    filling around and over thend other structures in thee main embankment The

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    36/47

    Consultancy Services for Third P

    4. Widening work is iTPQA Staff for veapproved material

    IRC-36-1970 Parai) When an exibenches of ufresh embanbe utilized inthe freshly mscarified inste

    ii) The layers o7.14 of IRC-use of usualor other appr

    5. GSB samples coll6. Project Name bo

    specifications.7. White wash to be8. As per agreement

    follow them.9. The quality contr

    shall be produced10. QC laboratory is

    see that the Qualit

    Name ofWork:

    Road from R&

    1. 57.60% of work i2. Works to be done

    Mile stone 1 to theMile stone 2 to theMile stone 3 to the

    3. Cc road complete4. Approximate Com

    the results are var5. 8No.s of Cores a

    observed as 1986. MORD Specificati

    Concrete roads fothe CC road as m

    7. Field officer haveMORD(IRC;SP-62

    8. After completion

    Hessain cloth, bur9. upon the removal

    cured by ponding10. Construction joint

    suspended for mo11. Expantion joints

    impregnated joint

    rty Quality Audit (TPQA) for National Cyclone Risk Miti

    in progress. The field officers are requested to provide theification and to conduct the field tests. The field officers afor embankment as per IRC-36.

    9 states thatting embankment is to be widened, and its slopes areto 600mm width shall be cut in to the old slope for ensu

    ment material to be added. The material obtained from cthe widening of the embankment. However, when the eaterial is to be placed in flatter than 4:1, the slope surfacad of resorting to benching.the widened embankment shall be compacted to requ

    6. In such cases where the width of the widened portionider rollers, compaction may be carried out with the helpved plantcted and sent to laboratory for necessary tests. Awaitingrd with details are not provided at site. It is suggest

    done to parapet walls of the existing culverts for the clear5.2 Clause Environment Management Plan not follow

    l tests should be conducted as per IRC SP-11, Maintaito QA wing for verification.ot provided at site. The line deportment is requested toy lab is established at site at an early stage.

    Road Pellur to Vasepallipadu - Tangur (M)

    completed.as per Milestone:end of Dt: 16.07.11- Earthwork, CD Works and GSB.end of Dt: 16.11.11- WBM Gr-II, Gr-III and Shoulders.end of Dt: 16.03.12- BT and Road furniture.in between KM 0/258.50 to 0/434.50 Km, and between

    pressive strength of C.C.Road is tested with Rebound hying from 26 N/mm2 to 32 N/mm2.e taken to verify the thickness and compressive strengm to 223mmons and IRC: SP-62-2004, Guidelines for the constructir low volume roads, need to be followed in cutting and sntioned below.stated that curing has been done on the next day of lay-2004) Specifications stipulates the following regarding cf the finishing operations, the surface of the concrete

    lap or jute mats. They shall be maintained fully wetted anof the wet covering out the end of 24 hrs, the slab shallor sprinklers.s shall be butt joints and placed after a days workre than 30 minutesshall be provided near bridges and slab culverts an/ premoulded synthetic joints filler board about 20 mm thi

    ation Project (NCRMP)

    material test reports toe requested to use only

    teeper than 4:1, horizontaling adequate bond with theutting of the benches couldxisting slope against whiche may only be ploughed or

    irements of Para 7.12 andis insufficient to permit theof tandem/sheep foot roller

    for resultd to provide them as per

    visibility of vehicular traffic.d at site. It is suggested to

    QC record and the same

    take necessary action and

    KM 4/800 to 5/100mmer on 29.09.2011 and

    th .The average thickness

    on and design of Cementpacing of joints and curing

    ing the concrete, howeverring of C.C.Road.

    shall be covered with wet

    in position for 24 hrsbe thoroughly wetted and

    is over or when work is

    d consists of a bitumenk and dowel bars

    MONTHLY REPORT

  • 7/31/2019 3.November MPR 2011

    37/47

    Consultancy Services for Third P

    approval from theproceeding furthe

    15. As per agreement

    follow them.

    9.0 Details of Social & Enviro

    S. No. Packag

    1NCRM

    W/AP/MPCS/PRED/

    2 NCRMP/B-W/AP/RCS/

    3NCRM

    W/AP/MPCS/PRED/

    4 NCRMP/B-W/AP/RCS/

    5NCRM

    W/AP/RCS/PRED/03

    6NCRM

    W/AP/MPCS/PRED/03

    7NCRM

    W/AP/MPCS/PRED/

    8 NCRMP/B-W/AP/Br/R&

    9NCRM

    W/AP/RCS/PRED/

    10 NCRMP/B-W/AP/Br/R

    11 NCRMP/B-W/AP/Br/

    12NCRM

    W/AP/RHB/PRED/

    10.0 Non Compliance Repo

    S.No District

    1 Nellore N

    2 Nellore N

    rty Quality Audit (TPQA) for National Cyclone Risk Miti

    competent authority. The field officers are requested to gfrom the Engineer in Charge.5.2 Clause Environment Management Plan not followe

    mental Reports Submitted in this Month:

    e No. Name of the work

    P/B-03/Nakkapalli/002

    Construction of cyclone shelteBangarampeta

    RED/03/Rambilli/002Road from R & B road to

    Krishnampalem.

    P/B-03/Nakkapalli/002

    Construction of cyclone sheltePatimeeda

    RED/03/Rambilli/002 Road from R & B road to Rajako

    P/B-Anandapuram/001

    Road from NH-5 toRamarayadupalem

    P/B-/Payakaraopeta/003

    Construction of cyclone shelteRatnayampeta

    P/B-

    O8/N.G.Padu/003

    Kanaparthy Cyclone shelter

    B/O8/Kanaparthy/012Construction of HLB @ Km.16/1Naguluppapadu-Kanaparthy R

    P/B-8/Cheerala/002

    Road from R&B Road to Devincyclone shelter

    &B/O7/Bapatla/010Reconstruction of HLB at Km. 5

    Bapatla-Suryalanka Road

    &B/O7/Perali/011Reconstruction of HLB at Km. 2Bapatla-Pandurangapuram acr

    Perali DrainP/B-

    7/Nagaram/002Road from Ganapavaram R&B

    to Mohammad Alipalem

    rts (NCRs) Submitted in this Month:

    Package No

    RMP/B-W/AP/RHB/PRED/09/Kavali/004 Road fAl

    RMP/B-W/AP/RHB/PRED/09/Kavali/004Road from 5

    to

    ation Project (NCRMP)

    t the prior approval before

    d at site. It is suggested to

    District

    atVisakhapatnam

    Visakhapatnam

    atVisakhapatnam

    uru. Visakhapatnam

    Visakhapatnam

    atVisakhapatnam

    Prakasam

    0 ofad

    Prakasam

    tula

    Prakasam

    2 ofGuntur

    4 ofss

    Guntur

    oad

    Guntur

    ame of Work

    rom KT R&B road tolliguntalapalem.

    8 of Chennayapalem Roadummadi bandla.

    National Cyclone Risk Mitigation Project (NCRMP)Revenue (DM) Department

    National Cyclone Risk Mitigation Project (NCRMP)Revenue (DM) Department

  • 7/31/2019 3.November MPR 2011

    38/47

    Revenue (DM) DepartmentGovernment of Andhra Pradesh

    Revenue (DM) DepartmentGovernment of Andhra Pradesh

    in jointventure

    Third Party Quality Audit

  • 7/31/2019 3.November MPR 2011

    39/47

  • 7/31/2019 3.November MPR 2011

    40/47

  • 7/31/2019 3.November MPR 2011

    41/47

  • 7/31/2019 3.November MPR 2011

    42/47

  • 7/31/2019 3.November MPR 2011

    43/47

  • 7/31/2019 3.November MPR 2011

    44/47

  • 7/31/2019 3.November MPR 2011

    45/47

  • 7/31/2019 3.November MPR 2011

    46/47

  • 7/31/2019 3.November MPR 2011

    47/47