MONTHLY REPORT
Consultancy Services for Third Party
1.0
2.0
3.0 Revi
4.0
5.0
6.0 Dis
7.0 Detail
8.0
9.0 Details of So
10.0 Non Compl
uality Audit (TPQA) for National Cyclone Risk Mitigatio
INDEX
Project Background
Third Party Quality Audit Consultant
iew meetings and Major Events of this Month
Status of TPQA Visits
Progress of NCRMP works
rict wise status of tests conducted by TPQA
of Audit Reports Submitted during this Month
Observations of Submitted Reports
cial & Environmental Reports Submitted in this Mon
liance Reports(NCRs) Submitted During this month
Project (NCRMP)
2
3
3
4
5
26
27
28
h 36
36
-
7/31/2019 3.November MPR 2011
3/47
MONTHLY REPORT
Consultancy Services for Third Party
1.0 Project Background
Andhra Pradesh (AP) state has one of t
nine coastal districts cover 26,000 km o
cyclonic situations set in to the Bay of
increasing resulting in very devastating
from 1892 to 1989, there were as many
It is essential to provide safe residential
to natural calamities such as cyclones
experiences of Government of Andhra
existing facilities available in the project
The Government of India has applied
Association (IDA) toward the cost of
proceeds to payments for goods, works,
National Cyclone Risk Mitigation Projec
Hyderabad has invited the consultants
Audit for 9 coastal districts namely Srik
Guntur, Prakasam and Nellore. The
Shelters, Roads to habitations an
Association and received through Gove
implemented by various line departm
agreements are concluded in each distri
District
No. of works(Un
RHB RCS MP
Srikakulam 6 8 -
Vizianagaram - - -
Visakhapatnam 8 6 7
East Godavari 2 8 3
West Godavari 10 - -
uality Audit (TPQA) for National Cyclone Risk Mitigatio
he longest coastal belts in India. Out of 67,362 Km of roa
f road length. Every year during the period of April-May a
engal. With the recent changes in climatic conditions, th
cyclones like Laila, Jal etc where the loss is enormous
as 67 cyclones within the State.
accommodation to the vulnerable population during any e
nd associated tidal waves and storm surges. The proje
Pradesh in mitigating such disasters during the past and
area in Andhra Pradesh.
for a credit of US$ 255 Million equivalent from the I
National Cyclone Risk Mitigation Project (NCRMP), an
, related services and consulting services under this Proje
(NCRMP) Project Implementation Unit (PIU), Andhra P
to submit proposals for providing the consultancy servic
akulam, Vijayanagaram, Visakhapatnam, East Godavari,
roject Construction of Multipurpose Cyclone Shelt
Roads & Bridges under NCRMP is funded by In
rnment of India. This consultancy is envisaged to audit t
ents working under PIU. The number of works und
ict is shown in the table below.
er Concluded Agreements) No. of works und
S BridgesRoads(R&B)
Total RHB RCS MPCS
4 1 19 6 4 -
2 1 3 - - -
- - 21 8 5 5
- - 13 2 6 -
- - 10 2 - -
Pro
ject (NCRMP)
network in the state, the
d September-December,
e catastrophic events are
. In the 97 years ranging
ventuality or disaster due
ct is formulated based on
also keeping in view the
ternational Development
it intends to apply the
ct.
radesh, headquartered at
s for Third Party Quality
West Godavari, Krishna,
ers, Roads to Cyclone
ternational Development
he quality of works being
er progress / for which
r ProgressNo. ofworks
notstarted
BridgesRoads(R&B)
3 1 5
2 1 0
- - 3
- - 5
- - 8
-
7/31/2019 3.November MPR 2011
4/47
MONTHLY REPORT
Consultancy Services for Third Party
2.0 Third Party Quality Audit C
To provide Consulting Services of Third
Cyclone Shelters, Roads to habitations,
Disaster Management & Project Directo
with Egis India Consulting Engineers (
between The Commissioner for Disaste
the Egis International in JV with Egis In
3.0 Review Meetings and Major
The Major activities of this month are as
The modified Quality AssuranceNecessary modifications are also c
1. Volume 1 Contains Intro
2. Volume 2 Contains Qual
0
5
10
15
20
25
30
uality Audit (TPQA) for National Cyclone Risk Mitigatio
onsultant.
Party Quality Auditor for Construction of Multipurpose C
and Roads and Bridges under NCRMP in 9 coastal distri
r, Project Implementation Unit (PIU) NCRMP has selecte
I) Pvt. Ltd. On 31st
May2011, the Contract for Consult
r Management & Project Director, Project Implementatio
ia Consulting Engineers (I) Pvt. Ltd.
ctivities of this month
follows.
lan in 3 volumes duly attending the remarks pointedrried out based on discussions during TPQA review mee
duction, Quality Assurance Plans, Check Lists and Q.C F
lity Control Test Procedures.
No. o
Work
Project (NCRMP)
clone Shelters, Roads to
cts The Commissioner for
d Egis International in JV
ncy Service was signed
n Unit (PIU) NCRMP and
out by the World Bank.ing held on 05-11-2011.
rmats.
f works not started
s Under Progress
-
7/31/2019 3.November MPR 2011
5/47
MONTHLY REPORT
Consultancy Services for Third Party
4.0 Status of TPQA Visits:
The following table shows the details of
District
Srikakulam
Vizianagaram
Vishakhapatnam
East Godavari
West Godavari
Krishna
Guntur
Prakasam
Nellore
No. of
uality Audit (TPQA) for National Cyclone Risk Mitigatio
TPQA visits to sites in respective districts.
Total Number of Visits
Up to Oct.'2011 In Nov.'2011
82 19
45 4
61 19
64 39
75 35
45 31
68 24
94 29
98 11
isits by TPQA
Project (NCRMP)
Up to Nov.'2011
101
49
80
103
110
76
92
123
109
-
7/31/2019 3.November MPR 2011
6/47
MONTHLY REPORT
Consultancy Services for Third Party
5.0 Progress of NCRMP works:
The district wise progress of works is
Krishna District has just started. At m
departments are to analyze the reason
agreement conditions should be impose
Third Party
S.No. District
1 Srikakulam
2 Vizianagaram
3 Visakhapatnam
4 East Godavari
5 West Godavari
6 Krishna
7 Guntur
8 Prakasham
9 Nellore
Total
Total Packages for which Agreement
Total Number of works in the above
uality Audit (TPQA) for National Cyclone Risk Mitigatio
shown below. The works in the West Godavari are not
any places the first milestone is completed but works
s for the slow progress and if necessary penalty for the
d.
uality Audit by Egis India consulting services
Summary of Activities
Agreements for PackagesCommunicated
St
PR R&B Progre
5 5 14
0 3 3
13 0 18
4 0 8
3 0 2
4 0 5
6 2 4
11 1 18
16 0 22
62 11 94
s are received
ackages
Project (NCRMP)
started and the works in
are not started. The line
slow progress as per the
atus of works
s Not Started
5
0
3
5
8
3
13
6
2
45
73
139
-
7/31/2019 3.November MPR 2011
7/47
MONTHLY REPORT
Consultanc
Status
Category Packages allotted under Phase - 1Ne
RHB
NCRMP/B-W/AP/RHB/PRED/01/Santhabommali/003
Rr
RJR
R
S
NCRMP/B-W/AP/RHB/PRED/01/Polaki/006
R
D
RTR
NCRMP/B-W/AP/RHB/PRED/01/Polaki/005
REJT
Bridges
NCRMP/B-W/ AP/Br/R&B/01/Patnavanipeta/001
CKPC
S
NCRMP/B-W/AP/Br/R&B/01/ Surampeta/003
CBNR
y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk
f works in Srikakulam District up to 30.11.2011
ames of works underach package
Agreement No. / Date DHS DFC
oad from DPN R&Bad to Uddandapalem
/2010-11, Dt.30.04.2011
30.04.11 30.04.
oad from K. Umiladaunction to Koduru (Linkoad)
/2010-11, Dt.30.04.2011
30.04.11 30.04.
oad from Borubhadra,alagam to Kollipadu viaeepuram, Gantapeta
/2010-11, Dt.30.04.2011
30.04.11 30.04.
oad from R&B roadobagam to
uubakavanipeta viaajapathinagaram
/2010-11, Dt.
30.04.201130.04.11 30.04.
oad fromalasamudram to Dolaegulator
/2010-11, Dt.30.04.2011
30.04.11 30.04.
oad from R&B roaddulavalasa - Killam tonnam via
alasamudram
/2011-12, Dt.30.04.2011
30.04.11 31.01.
onstruction of bridge atm 11/6-8 of NH-5 toatnavanipetaonnecting
undarapalem
46/2011, Dt.17.12.2010
17.12.10 17.06.
onstruction of Minorridge at Km 12/2-4 ofH-5 to Surampetaoad via Naruva,entada
45/2010-2011,Dt17.12.2010
17.12.10 17.03.
6 | P a g e
Mitigation Project (NCRMP)
Progress up to30.11.2011
.12
First Milestone i.e.Earthwork & Cd works&GSB
.12
First Milestone i.e.Earthwork & Cd works&GSB
.12
First Milestone i.e.Earthwork & Cd works&GSB
.12First Milestone i.e.Earthwork & Cd works&GSB
.12
First Milestone i.e.Earthwork & Cd works&GSB
.12First Milestone i.e.Earthwork & Cd works&GSB
.12
First Milestone i.e.Foundation up to wellcapping
.12
Second Milestone i.e.Completion up to belowthe deck slab.
-
7/31/2019 3.November MPR 2011
8/47
MONTHLY REPORT
Consultanc
NCRMP/B-W/AP/Br/R&B/01/Bendigadda/004
CleBoin
Roads NCRMP/B-W/AP/RD/R&B/01/Nowpada/006)IV0
RCS
NCRMP/B-W/AP/RCS/PRED/01/V.Kotturui/002
RU
RBOS
R
to
RKC
NCRMP/B-W/AP/RCS/PRED/01/Etcherla/005
RB
RD
Rr
&RrP
y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk
onstruction of Highvel bridge acrossendigadda at KM 4/10Pundi-Parlakimidi roadSrikakulam Dt, A.P.
1/2010,Dt.11.11.2010 11.11.10 11.05.
provements Naupada-enkatapuram road from0to15/0km
43/2010-11,17.12.2010 17.12.10 17.03.
oad from NP road toRK Puram
G.O.Rt.No.451, Dt.06.04.2011
06.04.11 29.09.
oad from Deppuru,ahadapalli road tonkuluru to Cyclonehelter
G.O.Rt.No.451, Dt.06.04.2011
06.04.11 29.09.
oad from R & B Road
Devunthalada
G.O.Rt.No.451, Dt.
06.04.201106.04.11 29.09.
oad from Pollada toomarthalada toyclone Shelter
G.O.Rt.No.451, Dt.06.04.2011
06.04.11 29.09.
oad from Koyyam R &Road tooosavanipeta
G.O.Rt.No.451, Dt.06.04.2011
30.04.11 07.05.
oad from Mentada toovupeta
G.O.Rt.No.451, Dt.06.04.2011
30.04.11 07.05.
oad from Kotcherelaad to Kollibhemavaram
Cyclone Shelter
G.O.Rt.No.451, Dt.06.04.2011
30.04.11 07.05.
oad from Kotcherlaad toathesundrapalem
G.O.Rt.No.451, Dt.06.04.2011
30.04.11 07.05.
7 | P a g e
Mitigation Project (NCRMP)
.12
First Milestone i.eFoundation upto wellcaping
.12Second mile stonei.e.WMM,Shoulders
.12
E/W,pipeculverts,GSB,R/W
.12E/W,pipeculverts,GSB,R/W
.12
E/W,pipeculverts,GSB,R/W
.12
E/W,pipeculverts,GSB,R/W
.12
E/W,pipe culverts,GSB.
.12
E/W,pipe culverts,GSB.
.12
E/W,pipe culverts,GSB.
.12
E/W,pipe culverts,GSB.
-
7/31/2019 3.November MPR 2011
9/47
MONTHLY REPORT
Consultanc
Status of
CategoryPackages allotted
under Phase - 1
Names of works
packag
Bridges
NCRMP/ B-W/ AP/Br/ R&B/ 02/
Puligadda/ 007
Construction of MiKm. 7/2 near Puliga RamatheerthamKonathalapalem viPasupam, Kollaya
Road)
NCRMP/ B-W/ AP/Br/ R&B/ 02/
Chakaligadda / 008
Construction of MiKm 15/2 near Cha
Konada Ramatheertto Konatalapalem (vi
Pasupam, KollayRoad)
Road (R&B)NCRMP/B-
W/AP/RD/R&B/ 02/Konada/009
Improvements toKonada RamatheeRoad to Konathal
Pasupam, YeKollayavalasa fro
16/5 (Km 0/0 to 4/0 icrossin
y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk
works in Vizianagaram District up to 30.11.2011
under each
e
Agreement No./ Date DHS
nor Bridge atda of Konada
R&B Road toYerukonda,
valasa (Z.P.
31/2010-201 Dt.1.12.2010
01.12.10 3
nor Bridge atkaligedda ofham R&B roadia) Yerukonda,valasa (ZP
34/2010-2011 Dt.8.12.2010
08.12.10 0
Road fromrtham (R&B)palem (Via)ukonda,
Km 12/0 toi.e. up to NH-5)
33/2010-201 Dt.8.12.2010
08.12.10 0
8 | P a g e
Mitigation Project (NCRMP)
DFCProgress up to
30.11.2011
1.05.12
40.72% of workcompleted
7.06.12
74.57% of workcompleted
7.03.1295% of workcompleted
-
7/31/2019 3.November MPR 2011
10/47
MONTHLY REPORT
Consultanc
Status of
Category Packages allotted under Phase - 1
RHB
NCRMP/B-W/AP/RHB/PRED/03/Nakkapalli/001
NCRMP/B-W/AP/RHB/PRED/03/Anandapuram/003
NCRMP/B-W/AP/RHB/PRED/03/Paravada/004
NCRMP/B-W/AP/RHB/PRED/03/Rambilli/006
NCRMP/B-W/AP/RHB/PRED/03/Atchutapuram/007
y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk
orks in Visakhapatnam District up to 30.11.2011
Names of works
under eachpackage
AgreementNo. / Date
DHS DFC
Road from Vempadu toPatimeeda
/2010-11, Dt.11.01.2011
11.01.11 11.01.12
Road from R&B road toMulaparra up to Beach
end
/2010-11, Dt.11.01.2011
11.01.11 27.10.11
Road from R&B B.PKallalu to
Matchvanipalem
/2010-11, Dt.10.03.2011
10.03.11 09.12.11
Road from R & B roadto Pothu Rajannapalem
/2010-11, Dt.28.03.2011
28.03.11 27.12.11
Road from R & B roadto Jalaripeta
/2010-11, Dt.28.03.2011
28.03.22 28.12.11
Road from R & B roadto Venkayyapalem
/2010-11, Dt.11.01.2011
11.01.11 11.10.11
Road from R&B road toAva- Somavaram
/2011-12, Dt.27.04.2011
27.04.11 26.01.12
9 | P a g e
Mitigation Project (NCRMP)
Progress up to 30.11.2011
Third Milestone i.e Road furniture& Shoulders work are in progress
Third Milestone i.eShoulders work are in progress
For Second Milestone i.e WBM
Gr-III is in progressFor Second Milestone i.e WBM
Gr-III is in progress
Collection of B.T material isstarted for Third Milestone i.e B.T
& Shoulders ..etc work
Third Milestone i.e Road furniture
& Shoulders work are inprogrress
Third Milestone i.e Road furniture
& Shoulders work are inprogrress
Third Milestone i.e Road furniture& Shoulders work are in progress
Third Milestone i.eShoulders work are in progress
For Second Milestone i.e WBM
Gr-III is in progressFor Second Milestone i.e WBM
Gr-III is in progress
-
7/31/2019 3.November MPR 2011
11/47
MONTHLY REPORT
Consultanc
Status of
CategoryPackages allotted under
Phase - 1Nam
RCS
NCRMP/B-W/AP/RCS/PRED/03/Anandapuram/001
NCRMP/B-W/AP/RCS/PRED/03/Rambilli/002
RK
R
NCRMP/B-W/AP/RCS/PRED/03/Nakkapalli/003
RPed
RoadR &
y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk
Road from R&B Roadto Avarajam
/2011-12, Dt.27.04.2011
27.04.11 26.01.12
orks in Visakhapatnam District up to 30.11.2011
s of works under eachpackage
Agreement No. /Date
DHS
Road from NH-5 toRamarayadupalem
/2010-11, Dt. 15.09.2011 15.09.11
oad from R&B road to
Krishnampalem/2010-11, Dt. 15.09.2011 15.09.11
oad from R & B road toattubolu to Marripalem
/2010-11, Dt. 15.09.2011 15.09.11
oad from R & B road toRajakoduru
/2010-11, Dt. 15.09.2011 15.09.11
oad from R & B road toteenarla to Chinateenarla
/2010-11, Dt. 15.09.2011 15.09.11
rom Upamaka RajayyapetaB road to Janakayyapeta
/2010-11, Dt. 15.09.2011 15.09.11
10 | P a g e
Mitigation Project (NCRMP)
Collection of B.T material is
started for Third Milestone i.e B.T& Shoulders ..etc work
DFCProgress up
to30.11.2011
14.06.12
1st Milestonei.e WBM
Grade- II is inprogress.
14.09.12
1st Milestonei.e CD works
are completed
& WBM Grade-II is in
progress.
14.09.12
Ready tostarted
14.09.12
1st Milestonei.e CD works
and WBMGrade- II is in
progress.
14.06.12Earth work
widening is inprogress.
14.06.12
Earth workwidening is in
progress.
-
7/31/2019 3.November MPR 2011
12/47
MONTHLY REPORT
Consultanc
Status of
Category Packages allotted under Phase - 1
MPCS
NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/
NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/00
NCRMP/B-W/AP/MPCS/PRED/03/Rambillii/00
NCRMP/B-W/AP/MPCS/PRED/03/Parawada/00
y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk
orks in Visakhapatnam District up to 30.11.2011
Names of works undereach package
Agreement No./ Date
Milestone Comple
First Second
003
Construction of cycloneshelter at Gajapathi
Nagaram
/2011-12, Dt.03.10.2011
02.02.12 02.06.12
Construction of cycloneshelter at Ratnayampeta
/2011-12, Dt.03.10.2011
02.02.12 02.06.12
2
Construction of cycloneshelter at Patimeeda
/2011-12, Dt.03.10.2011
02.03.12 02.08.12
Construction of cycloneshelter at Moolaparra
/2011-12, Dt.03.10.2011
02.03.12 02.08.12
Construction of cycloneshelter at Bangarampeta
/2011-12, Dt.03.10.2011
02.03.12 02.08.12
Construction of cyclone
shelter atVenkayyapalem
/2011-12, Dt.03.10.2011 02.01.12 02.04.12
1Construction of cyclone
shelter atTikkavanipalem
/2011-12, Dt.07.10.2011
06.01.12 06.04.12
11 | P a g e
Mitigation Project (NCRMP)
tion Dates
Progress w.r.t.milestone up to30.11.2011Third
02.10.12 Not to be started
02.10.12
E/W for foundationwork is in progress
02.01.13 Not to be started
02.01.13
E/W for foundationwork is in progress
02.01.13
Foundation PCCwork is in progress
02.07.12
Earth work
excavation is inprogress
06.07.12
Earth workexcavation is inprogress
-
7/31/2019 3.November MPR 2011
13/47
MONTHLY REPORT
Consultanc
Status of wo
Category Packages allotted under Phase - I
N
RHB (2 )RCS (8)MPCS (3)
NCRMP/B-W/AP/RHB/PRED/04/Katrenikona/003
Roto
to
NCRMP/B-W /RCS/PRED/04/Karapa/001Ac
NCRMP/B-W/AP/RHB/PRED/04/Karapa/001/
B
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Roto P
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Roto K
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Roto
y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk
rks in East Godavari District up to 30.11.2011
mes of works
under eachpackage
AgreementNo. / Date
Mile stones
First Second
ad from PR roadsasarivanipeta andCyclone Shelter
/2011-12Dt:27.04.2011
30-11-2011 30-11-2011 2
pproach Road toclone Shelter at
Adavipudi
2011-12Dt:20.05.2011
30-11-2011 31-10-2011 3
Road fromurajanapalli tondulavaripalem
2011-12Dt:27.04.2011
30-09-2011 31-10-2011 3
d from R&B Road.Chodipallipeta CS
2011-12Dt:07.09.2011
3 months 3 months
d from R&B Road.Chodipallipeta CS
/2011-12Dt:07.09.2011
3 months 3 months
d from R&B RoadHukumpeta CS
/2011-12Dt:07.09.2011
3 months 3 months
12 | P a g e
Mitigation Project (NCRMP)
Remarks
Third
-01-2012
Work stopped due toland acquisition problem
In between chainageKm.1.400 to Km.2.280
1-01-2012
Work stopped due toland acquisition problemPipe Culverts completed
in Km :0/2 & 1/6Culverts completed in
Km:0/2 & WBM Gr. iiiLayer work is in progress
in between chainageKm.1.100 to Km. 1.775
1-01-2012
Jungle clearance & Np3600 mm dia pipe Culvert
Completed in Km. 0/2
3 months
Jungle clearance & Np3600 mm dia pipe Culvert
Completed in Km. 0/2
3 months
Work stopped due toland acquisition problem
In between chainageKm.1.400 to Km.2.280
3 months
Work stopped due toland acquisition problemPipe Culverts completed
in Km :0/2 & 1/6
-
7/31/2019 3.November MPR 2011
14/47
MONTHLY REPORT
Consultanc
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Rot
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Roto
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004/
Roto
NCRMP/B-W/AP/RCS/PRED/04/Uppalaguptam/003
Roto C
NCRMP/B-W/AP/MPCS/PRED/04/Uppalaguptam/002
C
PedUpp
NCRMP/B-W
/AP/MPCS/PRED/04/Thondangi/004
C
L
NCRMP/B-W/AP/MPCS/PRED/04/Thondangi/004
C
y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk
d from R&B RoadGaddipeta CS
/2011-12Dt:07.09.2011
3 months 3 months
d from R&B RoadDanavaipeta CS
/2011-12Dt:07.09.2011
3 months 3 months
d from R&B RoadG.Musalayyapeta
CS
2011-12Dt:07.09.2011
3 months 3 months
d from R&B Roadhinaraghavulapetayclone Shelter
/2011-12 Dt:23.09.2011
3 months/22.11.2011
3 months22.06.2011
onstruction ofclone Shelter ataraghavulapeta ofalaguptam Mandal
E.G.Dt.
/2011-12Dt:17.10.2011
3 months16.01.2012
3 months16.04.2012
1
onstruction ofclone Shelter at
xamanudupaduinThondangi
/2011-12
Dt:07.09.2011
onstruction ofclone Shelter atAvulamanda
/2011-12Dt:07.09.2011
13 | P a g e
Mitigation Project (NCRMP)
3 months
Jungle clearance is inprogress
3 months
Jungle clearance is inprogress
3 months To be started
----------- Not yet Started
3 months6.07.2012
Not yet Started
Not yet Started
Not yet Started
-
7/31/2019 3.November MPR 2011
15/47
MONTHLY REPORT
Consultanc
Status of
CategoryPackages allotted under
Phase - 1Names of
RHB
NCRMP/B-W/AP/RHB/PRED/05/Mogalthuru/001
Road from NHarijanawada o
R&B road at PanBadava
Mogalthuru Vemto Gogulamm
From Narsapur Mvia Venkateswa
Road from NH(Mo
NCRMP/B-W/AP/RHB/PRED/05/Narsapur/002
R&B Road to I(Na
Road from R&B
Road from LB Ch(Na
NCRMP/B-W/AP/RHB/PRED/05/Kalla/003
From A-U R&B
From A-U R&B Ro
y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk
works in West Godavari District up to 30.11.2011
works under each package
Agreement No./ Date
DHS
H 214 A at Ranga Statue center tof Kalipatnam (E) (Mogalthuru Mandal
W.G.Dist.)
/2011-12 , Dt.27.04.2011
27.04.11
chayat Office to Pulaparthivarithota via(Mogalthuru Mandal W.G.Dist.)
a R&B Road at Uchintha Kalava Bridgea Harijanapeta (Mogalthuru Mandal
W.G.Dist.)
ogalthuru R&B road to Dayadaldaspetara Swamy temple (Mogalthuru Mandal
W.G.Dist.)
14 A road to Harijanapeta of Kothotaalthuru Mandal W.G.Dist.)
Indira nagar (via) Pochamma templersapur Mandal W.G.Dist.)
/2011-12 , Dt.09.05.2011
09.05.11
road to Pedalanka (Narsapur MandalW.G.Dist.)
ria CC road to Chillapalem of LB Cheriarsapur Mandal W.G.Dist.)
Road to Satyanarayanapuram, (KallaMandal W.G.Dist.)
/2011-12 , Dt.26.05.2011
26.05.11d to Mekaladibba
14 | P a g e
Mitigation Project (NCRMP)
DFCProgress up to
30.11.2011
26.07.2012
Works notstarted
GrII and GSB595 mts
Completed,2 culverts
completed
Works notstarted
CC Roadcompleted
08.05.2012 Works not started
25.02.2012 Works not started
-
7/31/2019 3.November MPR 2011
16/47
MONTHLY REPORT
Consultanc
Statu
CategoryPackages allotted under Phase -
1Nam
RHB
NCRMP/B-W/AP/RHB/PRED/06/Machipatnam/001
Road
NCRMP/B-W/AP/RHB/PRED/06/Machipatnam/002
Road f
Road
NCRMP/B-W/AP/RHB/PRED/06/Kruthivennu/003
Roa
Roa
y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk
of works in Krishna District up to 30.11.2011
es of works under eachpackage
Agreement No. /Date
DHS
onnecting R&B road throughGantalammapalem
/2011-12Dt.27.4.2011
27.04.11 26
rom R & B Road to B.V Thota
/2011-12Dt.27.4.2011
27.04.11 26
from Potlapalem Z.P road toChikativanipalem
from Intheru R&B Road toRangaraopet
/2011-12Dt.27.4.2011
27.04.11 26
from R&B road to CycloneShelter at Chandala
15 | P a g e
Mitigation Project (NCRMP)
DFCProgress up to
30.11.2011
.01.2012
GSB work in progressand Pipe culvert
excavation work inprogress
.01.2012
Jungle clearance andearth work in progress
Jungle clearance andearth work in progress
.01.2012
Jungle clearance andearth work in progress
Jungle clearance andearth work in
progress.Material collected(sand) and Gravel.
Pipe culvertconstruction work in
progress
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
17/47
MONTHLY REPORT
Consultanc
Status
Category Packages allotted under Phase - 1N
RCSNCRMP/B-W
/AP/RCS/PRED/06/Machipatnam/001
Bh
Rot
Pot
y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk
of works in Krishna Districts up to 30.11.2011
mes of worksunder each
package
Agreement No./ Date
Milestone Completion Dat
First Second Th
Road fromgireddipalli R&B
Road toamakhandam
/2011-12/Dt.02.09.2011
01.12.2011 01.03.12 01.
oad from R&Bad Chinnapuram
Gundupalem
/2011-12/27.04.2011
01.12.2011 01.03.12 01.
Road fromlapalem Z.P roadto Pothepalli.
/2011-12/Dt.02.09.2011
01.12.2011 01.03.12 01.
16 | P a g e
Mitigation Project (NCRMP)
sProgressw.r.t.milestone
up to30.11.2011
Remarksird
6.12 5%Jungle
clearancework in
progress
6.12 10%
GSB workin progress
6.12 10%
Jungleclearance
work inprogress
and leavestaken
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
18/47
MONTHLY REPORT
Consultanc
Status
CategoryPackages allotted under
Phase - 1Names
RHB
NCRMP/B-W/AP/RHB/PRED/07/KARLAPAL
EM/001
Ro
NCRMP/B-W/AP/PRED/07/Nagaram/002
R/f R&
R/f
Bridges
NCRMP/B-W/AP/Br/R&B/07/Bapatla/010
ReconstrucBapatla-Su
NCRMP/B-W/AP/Br/R&B/07/Bapatla/011
ReconstrucBapatla-Pa
y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk
of works in GUNTUR District up to 30.11.2011
f works under each package
Agreement No./Date
DHS
R/f Ganapavaram R&Bad to Kesavapuri ST colony 7/2011-2012
27.04.201127.04.11
B Road to Mohammad Alipalem
8/2011-201227.04.2011
27.04.11
R&B Road to Katuivaripalem.
tion of High level Bridge @Km5/2 ofryalanka Road across Perali drain inGuntur
79/2010-20111.12.2010
01.12.10
tion of High level Bridge @Km2/4 ofndurangapuram Road across Perali
drain in Guntur78/2010-2011
1.12.201001.12.10
17 | P a g e
Mitigation Project (NCRMP)
DFCProgress up to
30.11.2011
26.01.2012
2nd milestonecompleted ,Work
yet to be start
26.4.2012
CC Roadcompleted, Earth
Work is inprogress.
Earth Work is in
Progress.
31.5.2012
Total cost of projectis Rs 330.00 lakhs,
total amountof 1st, 2nd milestone is Rs
2,05,33,000.00 , Upto 30.11.2011 Work
done is2,10,00,000.00
31.5.2012
Total cost of projectis Rs 370.00 lakhs,
total amountof 1st, 2nd mile
stone is Rs1,91,98,882.00 Upto 30.11.2011 Work
done is Rs2,80,00,000.00
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
19/47
MONTHLY REPORT
Consultanc
Statu
Category Packages allotted under Phase - 1Na
RCS
NCRMP/B-W/AP/RCS/PRED/07/P
Palem/001
R
NCRMP/B-
W/AP/RCS/PRED/07/KarlaPalem/002
R
r
Pe
NCRMP/B-
W/AP/RCS/PRED/07/Nizampatnam/003
Ro
y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk
s of works in GUNTUR District up to 30.11.2011
mes of works under each
package
Agreement No. /
DateDHS D
Road from R&B Road to
Mandevaripalem
/2010-11
Dt.01.11.201101.11.11 31.07
ad from R&B Road Alluru to
Yadavapalem
/2010-11
Dt.01.11.201101.11.11 31.07
ad from Ganapavaram R & B
oad to Pedamarpuvaripalem
/2010-11
Dt.01.11.201101.11.11 31.10
Road from R & B Road to
Chinapuluguvaripalem
/2010-11
Dt.01.11.2011
01.11.11 31.10
Road from R & B road to
Yaramvaripalem
/2010-11
Dt.01.11.201101.11.11 31.10
Road from R & B road to
dagollapalem Cyclone Shelter
/2010-11
Dt.01.11.201101.11.11 31.1
edagollapalem PR Road to
Bonthagorlapalem
/2010-11
Dt.01.11.201101.11.11 31.1
Road from R&B Road to
Gurunadhanagar
/2010-11 Dt.
17.10.201117.10.11 16.0
ad from R&B Road to Adavala
H/O Bavajipalem
/2010-11 Dt.
17.10.201117.10.11 16.0
18 | P a g e
Mitigation Project (NCRMP)
C Progress up to 31.10.2011
.2012 Not yet started
.2012 Not yet started
.2012 Not yet started
.2011 Not yet started
.2011 Not yet started
.201 Not yet started
.201 Not yet started
7.12 Work to be Grounded
7.12 Work to be Grounded
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
20/47
MONTHLY REPORT
Consultanc
NCRMP/B-
W/AP/RCS/PRED/07/Bapatla/004
y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk
Road from R&B Road to
Atlavaripalem
/2010-11 Dt.
17.10.201117.10.11 16.0
Road from R&B Road to
Hanumanthanagar2010-11
Dt13.10.201113.10.11 12.07
Road from R & B road to
Adarsanagar
19 | P a g e
Mitigation Project (NCRMP)
7.12 Work to be Grounded
.2012
Not yet started
Not yet started
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
21/47
Consultanc
Statu
CategoryPackages allotted under
Phase- 1Names of w
pa
BRIDGESNCRMP/B-W/AP/Br/R&B/08/
Kanaparthi/012
Construction oat Km 16/10 of Kanaparthi
D
RHB
NCRMP/B-W/AP/RHB/PRED/08/S.Konda/001
Road from PAtlavaripale
Road fromSom
Road froNarra
NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002
Road from NH5
Road fromChaliv
Road from PaMosa
Road fro
BinginapalliCyclo
y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk
s of works in Prakasam District up to 31.10.2011
rks under eachkage
Agreement No. / Date DHS
f High level BridgeNaguluppalapaduoad in Prakasamistrict
76/2010-11 Dated 1/12/2010 01.12.10
kala ZP Road toCyclone shelter
NCRMP/B-W/AP/RHB/PRED/08/S.Konda/001
Dated 10/02/201110.02.11
R&B Road torajupalli
NCRMP/B-W/AP/RHB/PRED/08/S.Konda/001
Dated 10/02/201110.02.11
R&B road toaripalem
NCRMP/B-
W/AP/RHB/PRED/08/S.Konda/001Dated 10/02/2011 10.02.11
to MulaguntapaduNCRMP/B-
W/AP/RHB/PRED/08/S.Konda/002dated 10/02/2011
10.02.11
R&B road tondradibba
NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002
dated -10/02/201110.02.11
kala R&B road toaladinne
NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002
dated 10/02/201110.02.11
R&B road to
i Harijanawadae Shelter
NCRMP/B-
W/AP/RHB/PRED/08/S.Konda/002dated 10/02/2011
10.02.11
20 | P a g e
Mitigation Project (NCRMP)
DFCProgress up to
31.10.2011
31.5.12piers raised up to bedblock & Abutment filter
media working progress
9.2.12
cc road completed &pipe culvert is in
progress
9.2.12
CC road layingprogress,
9.2.12 work not resumed
10.02.12 not started
10.02.12
C.D work is inprogress,Gsb to bedone
10.02.12
earth work wideningprogress,Gsb to bedone
10.02.12 Work not Resumed
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
22/47
Consultanc
Statu
CategoryPackages allotted under Phase -
1Names of
each
RHB
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/00
3
Road fromto M T
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/00
4
Road fromto San
Road froRoad to P
NCRMP/B-W/AP/RHB/PRED/08/Ulavapadu/07
Road froSubbara
NCRMP/B-W/AP/RHB/PRED/08/Ulavapadu/08
Road fromto Ram
NCRMP/B-W/AP/RHB/PRED/08/Tangutur/09
Road fromto Vas
NCRMP/B-W/AP/RHB/PRED/08/Tangutur/10
Road froKes
y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk
s of works in Prakasam District up to 31.10.2011
works underpackage
Agreement No. / Date DHS
&B Road Alluraju colony NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/003
Dated 27/04/201127.04.11
EM R&B Roaduvarigunta
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/004
Dated 27/04/201127.04.11
KEM R & Bllareddypalem
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/004
Dated 27/04/201127.04.11
MC Road toudu Satram
NCRMP/B-W/AP/RHB/PRED/08/Ulavapadu/07
dated 27/04/201127.04.11
R&B road Tettuayapatnam
NCRMP/B-W/AP/RHB/PRED/08/Ulavapadu/08dated 27/04/2011
27.04.11
&B road Pellurepallipadu
NCRMP/B-W/AP/RHB/PRED/08/Tangutur/09 dated
16/03/201116.03.11
R&B road toupalem
NCRMP/B-W/AP/RHB/PRED/08/Tangutur/10 dated
16/03/201116.03.11
21 | P a g e
Mitigation Project (NCRMP)
DFCProgress up to
31.10.2011
27.04.12
CC road compleetd, Gsbprogress material approvalshall be taken from
competent authority.
27.04.12 WBM Gr-I II progress
27.04.12 WBM Gr-I II progress
27.04.12 Gsb progress
27.04.12 WBM Gr-I I progress
16.03.12
CC road compleetd,Gsbprogress material approval
shall be taken fromcompetent authority.C.D
work is in progress
16.03.12 Gsb progress
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
23/47
Consultanc
Status of
CategoryPackages allotted under Phase
- I
Namesunde
pac
RCS
NCRMP/B-W/AP/RCS/PRED/08/Vetapalem/001
Road frroad to vi
colonysh
Road frot
Challare
Road frroad to j
nagarcyclon
Road frroad to
colonysh
Road frroad to
shelMankena
NCRMP/B-W/AP/RCS/PRED/08/Chirala/002
Road frRo
Keertivcyclon
Road frRoad tocyclonechiralaprakasa
y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk
works in Prakasam District up to 30.11.2011
of worksr eachkage
Agreement No. / DateMile sto
First Seconom R&Bijayanagarcyclonelter
NCRMP/B-W/AP/RCS/PRED/08/Vetapalem/00
1 dated 2011/12 dated30.09.2011
29.01.2012
29.05.22
NH roadoddypalem
om R&Bevarakshcolonyshelter
om R&Bamnagarcyclonelter
om R&Bcycloneter atvaripalem
m R&Bd toripalemshelter
NCRMP/B-W/AP/RCS/PRED/08/Chirala/002
dated 27.08.2011
om R&Bevinutala
shelter ofandal in
m district.
22 | P a g e
Mitigation Project (NCRMP)
nesRemarks
d Third
0129.09.2012
cc roadcompleted &
Grade-II work isin progress
Grade-IIIprogress
cc road work is
in progress
not started
not started
not started
cc road laid 260m out of 800 m
work is notresumed.
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
24/47
Consultanc
Status
Category Packages allotted under Phase - 1
MPCS
C
s
K
y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk
of works in Prakasam District up to 31.10.2011
ames of worksunder each
package Agreement No. / Date D
hakicherla cyclone
elter in Ulavapadu
andal Prakasam
District
Not furnished
anaparthy cyclone
shelter in
Nagulappapadu
andal PrakasamDistrict
Not furnished
23 | P a g e
Mitigation Project (NCRMP)
HS DFC
Progress upto
31.10.2011
Foundationconcrete work is
in progress.
Foundationconcrete work is
in progress.
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
25/47
Consultanc
Stat
Category Packages allotted under Phase - 1 Na
RHB
NCRMP/B-W/AP/RHB/PRED/09/Bogole/001
Roa
Roa11/0Venk
NCRMP/B-W/AP/RHB/PRED/09/Bogole/002RoaTella
NCRMP/B-W/AP/RHB/PRED/09/Chittamur/003
RoaPittu
RoaSam
NCRMP/B-W/AP/RHB/PRED/09/Kavali/004
Roa
Roato G
RoaChe
NCRMP/B-
W/AP/RHB/PRED/09/Vidavalur/005
Roa
RoaAlag
RHB
NCRMP/B-W/AP/RHB/PRED/09/Muthukur/006
Roa
NCRMP/B-W/AP/RHB/PRED/09/V.Chalam/007
SurvColo
Roa
y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk
s of works in Nellore District up to 30.11.2011
es of works under each packageAgreement No. /
DateDHS
from NH 5 to Sambasivapuram
34/2010-11, Dt.19.01.2011
19.01.11
from 9/6 of Zuvvaladinne R&B Road toof Zuvvaladinne R&B viaideshpalem (Venkideshpalem)
from 1/6 of Zuvvaladinne R&B road togunta
/ 2010 - 11, Dt.07.02.2011
07.02.11
from R&B road to Muttembake Viaanipalli 2010-11Dt
18.01.201118.01.11
from R&B Chittamur to Somaudram
from K.T R&B Road to Alliguntapalem
32/2010-11, Dt.17.01.2011
17.01.11
from Km 5/8 of Chennayapalem Roadmmadi Bandala
from Pedapattapupalem R&B road tonayapalem H. Wada
from R&B Road Alaganipadu to Vavilla/ 2011 - 12, Dt.
27.04.201127.04.11
from R&B road Kancharapalem HW tonipadu
from R&B Road to PatuvariKandriga/2010-11Dt.25.04.2011
25.04.11
palli Pudiparthi Road to Srikanthny / 2011 - 12, Dt.
27.04.201127.04.11
from R & B Road to Edagali Kandriga
24 | P a g e
Mitigation Project (NCRMP)
DFCProgress up to
30.11.2011
19.4.12
WBM Gr-II Completed
WBM Gr-III is inProgress
06.11.11 WBM Gr-II Completed
18.4.12
GSB Completed
GSB Completed
27.4.12
BT is in progress
BT Completed
Side Earth in progress
27.7.12
CC Road completed
Side Earth is inProgress
25.1.2012 BT Completed
27.4.2012WBM Gr_III Completed
WBM Gr.II Completed
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
26/47
Consultanc
NCRMP/B-W/AP/RHB/PRED/09/Allur/009Roa(via)
RCS
NCRMP/B-W/AP/RCS/PRED/09/Kota/001
Roa
Roa
NCRMP/B-W/AP/RCS/PRED/09/Muthukur/002
RoaBand
NCRMP/B-W/AP/RCS/PRED/09/Chillakur/004RoaVella
NCRMP/B-W/AP/RCS/PRED/09/T.P.Gudur/005
RoaPatta
NCRMP/B-
W/AP/RCS/PRED/09/DV.Satram/008
Roa
Berje
y Services for Third Party Quality Audit (TPQA) for National Cyclone Risk
from R&B Road Allur to GalidibbaluChukavanidibba
/2010-11 Dt.24.01.2011
24.01.11
from R&B Road to A.S. Puram2010-11Dt10.05.2011 10.05.11
from GD road to Vavillapalem
from R&B road Kappaladoruvu tolapalem H.Wada
/2010-11 Dt.21.04.2011
21.04.11
from Katuivaripalem R&B Road topalm
/2010-11Dt23.05.2011
23.05.2011
from 7/2 M.C road to Venkannapalempupalem
2011-10 Dt17.05.2011
17.05.2011
from R&B road to Sullurpeta Mallam to
ngalapalli cyclone shelter
/2010-11 Dated
9.05.2011 09.05.2011
25 | P a g e
Mitigation Project (NCRMP)
24.4.2012 GSB is Completed
10.2.2012
Earth work inembankment
Earth work inembankment
21.1.2012 WBM-Gr-III
23.2.2012
Jungle clearance is inprogress
17.2.2012 GSB is in progress
9.2.2012
Construction of culvert
is in progress
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
27/47
Consultancy Services for Third P
6.0 District wise status of tests
Apart from monitoring the tests
various stages, the Third party Q
These tests are carried out in th
laboratories. The details of tests c
S.No. District
1 Srikakula
2 Vizianagar
3 Visakhapatn
4 East Godav
5 West Goda
6 Krishna
7 Guntur
8 Prakasha
9 Nellore
Total
The works in West Godavari a
rty Quality Audit (TPQA) for National Cyclone Risk Miti
conducted by TPQA:
being conducted by the implementation team (contract
ality Audit team also conducted tests to confirm its com
site itself and in some cases samples are collected a
nducted in the field till end of September 2011 are prese
Summary of QC Tests - Up to 30.11.2011
Total No. TestsDone
Total
Passed
174 156
m 159 156
am 250 244
ari 119 119
ari 11 11
3 2
173 173
259 257
240 236
1388 1354
d Krishna Districts were just started
ation Project (NCRMP)
rs & Line department) at
pliance with the standards.
nd testing done in outside
ted.
o. of Tests
Failed
18
3
6
0
0
1
0
2
4
34
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
28/47
Consultancy Services for Third P
7.0 Details of Audit Report
S.NO District
1 Prakasham NCRMP
2 PrakashamW/A
3 Prakasham NCR
4 PrakashamW/A
5 PrakashamW/A
6 Prakasham NCRMP /
7 PrakashamW/A
8 Prakasham NCRM
rty Quality Audit (TPQA) for National Cyclone Risk Miti
s Submitted During this Month:
Package Number
/ B-W /AP/RHB/ PRED / 08 / Tangatur/10For the wo
Kesupa
NCRMP/B-/RHB/PRED/08/KOTHAPATNAM/003
Road frM.T.Raj
mand
P/B-W/AP/Br/R&B/08/Kanaparthy/012 ConstrucNagulupp
NCRMP/B-/RHB/PRED/08/Singarayakonda/001
Road fAulava
NCRMP/B-/RHB/PRED/08/KOTHAPATNAM/004
The WorPullareddy
B-W /AP/RHB/ PRED / 08 / Ulavapadu/008
Road f
Ramayap
NCRMP/B-/RHB/PRED/08/KOTHAPATNAM/004
The WorSankuvari
P/B-W/AP/RHB/PRED/08/S.Konda/001 Road from
The Wor
ation Project (NCRMP)
Name of work
rk Road from R&B Road tolem in Tangatur Mandal
m R&B Road to Allur tou colony in Kothapatnaml in Prakasham district.
ion of HLB in Km 16/10 ofapadu-Kanaparthy road inPrakasam district
rom Pakala ZP Road toripalem Cyclone Shelter
from KEM R&B Road TOalem village Kothhapatnam
mandal.
rom R&B Road Tettu to
tnam in Ulavapadu Mandal
from KEM R&B Road TOunta village Kothhapatnam
mandal.
R&B Road to Somarajupalli
Road from M.C Road to
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
29/47
Consultancy Services for Third P
8.0 Observations in the s
Name ofWork:
For the work R
1. 35.76 % value of t
2. Works to be doneMile stone 1 to theMile stone 2 to theMile stone 3 to the
3. Widening work is iTPQA Staff for ve
approved materialIRC-36-1970 ParaI) When an existinbenches of up tofresh embankmenutilized in the widefreshly material isinstead of resortinII) The layers of thof IRC-36. In suchusual wider rollers
approved plant.4. Construction of Pi5. Rcc NP3 1000mm
furnished. The fiel6. The field officers a
culverts. As per IRembankment areaembankment shallto avoid displaceii) The soil in such
compacted thorourollers or other heother approved m
7. GSB material samThe test results ar
8. Shoulder construspecifications, thewith the constructi
9. Q.C Lab is not estand maintain regi
Name ofWork:
Road from R&Prakasham dis
1. 8.77% value of th
2. Works to be done
rty Quality Audit (TPQA) for National Cyclone Risk Miti
ubmitted reports:
ad from R&B Road to Kesupalem in Tangatur M
he work is completed.
as per Milestone:end of Dt: 18.07.11- Earthwork, CD Works .end of Dt: 18.10.11- WBM Gr-II, Gr-III and CD works.end of Dt: 18.01.12- BT, CC Pavement and Road furnitu
in progress. The field officers are requested to provide theification and to conduct the field tests. The field officers a
for embankment as per IRC-36.9 states thatg embankment is to be widened, and its slopes are steep00mm width shall be cut in to the old slope for ensuring at material to be added. The material obtained from cuttingning of the embankment. However, when the existing sloto be placed in flatter than 4:1, the slope surface may onlg to benching.e widened embankment shall be compacted to requiremecases where the width of the widened portion is insufficie
, compaction may be carried out with the help of tandem/
ped causes way and CD works are in Progress.dia Pipes received at the site. The MTC of NP3 1000 m
d officers are requested to supply the same for verificatiore requested to follow the IRC-36 specifications during fillC 36, Para 8, The filling around and over culverts and othshall be carried out independently of the work on the mai
l be brought up simultaneously in equal layers on each sident and unequal pressure.cases shall be deposited in layers not exceeding 150mm
ghly to the requirements of Para 7.14. When it may be imvy equipment, The compaction shall be carried out by mthods.
ples were collected by the TPQA and field officers and see awaited.tion is in progress. The field officers are requested to follocode states that Shoulder construction should be so orgaon of different layers of the pavement.ablished at site work. It is suggested to provide Q.C lab aters.
Road to Allur to M.T.Raju colony in Kothapatnarict.work is completed.
as per Milestone:
ation Project (NCRMP)
andal
re.material test reports toe requested to use only
r than 4:1, horizontaldequate bond with theof the benches could bee against which thebe ploughed or scarified
nts of Para 7.12 and 7.14nt to permit the use ofheep foot roller or other
dia pipes are not
ing around and over theer structures in then embankment. Thee of the structure, so as
in loose thickness and
practicable to use powerchanical tampers or by
nt for necessary tests.
w the IRC 36nised as to keep pace
d conduct regular test
m Mandal in
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
30/47
Consultancy Services for Third P
benches of upfresh embankbe utilized in t
the freshly mascarified inste
2. The layers of tof IRC-36. In susual wider roother approve
4. Clause -1501 of (i) Contraction joindirection of trafficpavement is neith
Normally it may v(ii) Construction jsuspended for mo(iii) Expansion joiimpregnated joint/
5. The quality controshall be produced
6. QC laboratory issee that the Quali
7. As per the agree4.75 mm size ofthe contractor prabove said materiare found CBR va6.The field officeEngineer in Charg
8. CD work in KM 0/work is completeMTCs of pipes fo
9. For CD work in Kto be taken up. Th
10. The field officers aculverts. As per IRembankment areaembankment shallavoid displacemeII) The soil in suchcompacted thorourollers or other heother approved m
11. Shoulders need t
edges also.12. Shoulders are to13. Km and HM ston
provide the same.14. Cautionary sign b15. The project inform
be provided as pe
rty Quality Audit (TPQA) for National Cyclone Risk Miti
to 600mm width shall be cut in to the old slope for ensurient material to be added. The material obtained from c
he widening of the embankment. However, when the ex
terial is to be placed in flatter than 4:1, the slope surfaced of resorting to benching.
he widened embankment shall be compacted to requiremuch cases where the width of the widened portion is insullers, compaction may be carried out with the help of taplant.
ORD states thatts shall be mechanically sawn joints spaced 2.5 m to 3.7shall not be less than the width of the pavement. Joir too soft nor too hard and is able to bear the weight of th
ry from 8 to 12 hours depending on weather conditions.ints shall be butt joints and placed after a days workre than 30 minutes.nts shall be provided near bridges and slab culvertspremoulded synthetic joint filler board, about 20 mm thickl tests should be conducted as per IRC SP-11, Maintainto QA wing for verification.ot provided at site. The line deportment is requested toy lab is established at site at an early stage.ent condition the GSB material is well graded material (
ravel 66% and sand of size < 2.36mm @34%) is to becured the quarry waste material from Chimakurthi graal, the same material is collected for testing for its suitablue is 23 which is more than the required value of 20 andrs are requested to get the prior approval before pre.00 and 0/800 with 600mm dia NP3 pipe culvert work is infurther work has to be taken up. The field officers are
verification.1/10 with 600mm dia NP3 pipe culvert, earth work is in
e field officers are requested to provide the MTCs of pipe
re requested to follow the IRC-36 specifications during fillC 36, Para 8, The filling around and over culverts and othshall be carried out independently of the work on the mai
l be brought up simultaneously in equal layers on each sidt and unequal pressure.cases shall be deposited in layers not exceeding 150mm
ghly to the requirements of Para 7.14. When it may be imvy equipment, The compaction shall be carried out by mthods.be taken up simultaneously with the GSB laying work
e taken up In between KM 0/350 to 1/0, & 3/65 to 3/80es are not available on the the road stretch. The field
ards at necessary points and village name boards are noatory boards with all details were not provided as per agr the guidelines given by PIU, NCRMP.
ation Project (NCRMP)
ng adequate bond with thetting of the benches couldisting slope against which
may only be ploughed or
nts of Para 7.12 and 7.14ficient to permit the use ofndem/sheep foot roller or
m. Length of panel in thets shall be cut when thee machine and crew.
is over or when work is
nd consist of a bitumen, and dowel bars.QC record and the same
ake necessary action and
stone aggregate9.5 mm toused for construction. Butnite quarry instead of theility like CBR, PI the resultPI is NP which is less thanceeding further from the
progress. The pipe layingrequested to provide the
rogress. Further work hass for verification.
ing around and over theer structures in then embankment. Thee of the structure, so as to
in loose thickness andracticable to use powerchanical tampers or by
, for better compaction at
officers are requested to
t provided.regement.The same shall
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
31/47
Consultancy Services for Third P
4. Milestone3 up to
5. The alignment is6. Piers and Abutme
be taken up.7. Non destructive te
12.09.2011 and th8. The field officers
rusting.9. The field officers
conduct all the reconsistency, soun
10. The reinforcemenin clean and suita
11. The width of filter to provide the testCl.710.1.4 of IRC78.The field office
12. TPQA Site Enginaggregate and wa
13. The informatory &agreement. The s
14. Project Name boa15. The field officers
verification16. The replica are r
Dated 03-09-201117. Safety measures
contractor as per
Name ofWork:
Constructiondistrict
1. 88.48 % value of t
2. C.C.Road is com3. Cores will be take4. i) Construction o
(ii) length of the p(iii) Joints shall be
of the machin
5. Construction jointfor more than 30
6. Expantion joints
impregnated joint(i) After compl
wet Hessain24 hrs
(ii) Upon the reand cured b
7. Widening work is i
rty Quality Audit (TPQA) for National Cyclone Risk Miti
31.05.2012 : Completion of entire work including approac
erified and found fairly tallying with the approved drawing.nts and bed block Concrete work completed. Centering
st conducted for Piers and Abutments with Rebound hae results are varying from 24 N/mm2 to 33 N/mm2.are also requested to apply cement slurry to the steel
are also requested to get the samples of cement testeduired tests on cement such as cube strength, initial setti
dness etc.steel shall be neatly stored on wooden blocks, racks orly marked to facilitate inspection and identification as per
media is verified and found between o.6m to 0.65m.Thereports for back fill material for verification. The back fill
78.It is observed that the construction of filter material is nrs are requested to rectify the same as pre IRC-78.eers have conducted tests for the input materials likter at site and the result found within the specified limits.identification of semi reflective sign boards with all detailme may be provided immediately at site..
rd with details are not provided at site. It shall be providedare requested to provide the invoices bills of the mate
eceived from the Executive Engineer wide Letter No.for the previous observations.for workers such as helmets, gum shoes, jackets etc.,.2 of agreement clause
f HLB in Km 16/10 of Naguluppapadu-Kanapa
he work is completed.
leted. In between stretches 0/350 to 1/0, Curing is in Progn to verify depth and compressive strength after 28 daysf joints shall be mechanically sawn joints spaced 2.5 m toanel in the direction of traffic shall not be less than the wicut when the pavement is neither too soft nor too hard
e and crew. Normally it may vary from 8 to 12 hrs depend
shall be butt joints and placed after a days work is overinutes
shall be provided near bridges and slab culverts a
/ premoulded synthetic joints filler board about 20 mm thition of the finishing operations, the surface of the pavecloth, burlap or jute mats. They shall be maintained full
moval of the wet covering out the end of 24 hrs, the slabponding or sprinklers.
in progress. The field officers are requested to provide the
ation Project (NCRMP)
es
.work for deck Slab has to
mer by Site Engineers on
ars so as to protect from
from every consignment,g time, Final setting time,
latforms above the groundCl.1603 of MORTHield officers are requestedmaterial shall conform theot as per cl.710.1.4 of IRC
Coarse aggregate, fine
were not provided as per
as per specifications.
rials like cement, steel for
467/E.E.(R&B)/ATO/2011
are to be provided by the
thy road in Prakasam
ress.f laying.3.75 mth of the pavement.nd able to bear the weight
ing on weather conditions
r when work is suspended
d consists of a bitumen
k, and dowel barsent shall be covered withwetted and in position for
shall be thoroughly wetted
material test reports to
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
32/47
Consultancy Services for Third P
scarified insteii) The layers o
7.14 of IRC-
use of usualor other appr
8. For GSB materialaboratory for conlimit, 3) Free swe
9. The quality contr shall be produced
10. Q.C Lab is not estmaintain registers.
Name ofWork:
The Work from
1. 6.67 % of the wor 2. Works to be done
Mile stone 1 to theMile stone 2 to theMile stone 3 to the
3. Widening work is iTPQA Staff for ve
approved materialIRC-36-1970 Parai) When an exi
benches of ufresh embanbe utilized inthe freshly mscarified inste
ii) The layers o7.14 of IRC-use of usualor other appr
4. The contractor pr is collected for temore than the reqmaterial is suitablapproval from theproceeding furthe
5. Shoulder formatio6. Earth work excav
up.7. Km and HM stone
the same.8. Cautionary sign b9. The quality contr
shall be produced10. QC laboratory is
th t th Q li
rty Quality Audit (TPQA) for National Cyclone Risk Miti
ad of resorting to benching.the widened embankment shall be compacted to requ
6. In such cases where the width of the widened portion
ider rollers, compaction may be carried out with the helpved plant.l, The field officer collected the soil samples and seducting tests like. 1) Maximum dry density and OMC,ll index. The test results are awaited.l tests should be conducted as per IRC SP-11, Maintaito QA wing for verification.ablished at site work. It is suggested to provide Q.C lab a.
KEM R&B Road TO Pullareddypalem village Kot
is completed.as per Milestone: (Two works in this package)end of Dt: 26.08.11- Earthwork, CD Works and GSB.end of Dt: 26.12.11- WBM Gr-II, Gr-III and Shoulders.end of Dt: 26.04.12- BT and Road furniture.
in progress. The field officers are requested to provide theification and to conduct the field tests. The field officers a
for embankment as per IRC-36.9 states thatting embankment is to be widened, and its slopes areto 600mm width shall be cut in to the old slope for ensu
ment material to be added. The material obtained from cthe widening of the embankment. However, when the eterial is to be placed in flatter than 4:1, the slope surfac
ad of resorting to benching.the widened embankment shall be compacted to requ
6. In such cases where the width of the widened portionider rollers, compaction may be carried out with the helpved plant.cured the quarry waste material from Chimakurthi granitting for its suitability like CBR and PI, the result are founuired value of 20 and PI is NP which is less than 6.As pee for sub grade construction. However the usage of thiscompetent authority. The field officers are requested to gfrom the Engineer in Charge.
n has to be done simultaneously with the GSB,WBM GrIItion is completed for CD work at KM 1/100 and 1/600.F
s are not available on the the road stretch. The field office
ards at necessary points and village name boards are nol tests should be conducted as per IRC SP-11, Maintaito QA wing for verification.ot provided at site. The line deportment is requested to
l b i t bli h d t it t l t
ation Project (NCRMP)
irements of Para 7.12 andis insufficient to permit the
of tandem/sheep foot roller
nt to Engineering college) Liquid limit and Plastic
QC record and the same
nd conduct regular test and
hhapatnam mandal.
material test reports toe requested to use only
teeper than 4:1, horizontaling adequate bond with theutting of the benches couldxisting slope against whiche may only be ploughed or
irements of Para 7.12 andis insufficient to permit theof tandem/sheep foot roller
quarry, the same material
d CBR value is 23 which isr clause 401.4 and 408 thismaterial requires deviationt the prior approval before
nd Gr IIIrther work has to be taken
rs are requested to provide
t provided.QC record and the same
take necessary action and
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
33/47
Consultancy Services for Third P
Mile stone 2 to thMile stone 3 to th
3. The formation wid
locations shoulder4. CC road in betwe
out of estimate wiin the width of the
5. The WBM GRADEenclosed in annex
6. The BT road comtallying with the afor Combined OGCombined OGPCenclosed in Annex
7. The granular shou8. The CC road com
age of 28 days tefor M-30 Grade of
9. Concrete cores arthe thickness and223 mm.
10. The compressive
26.08 N/mm2 to85% of Grade of c
11. 1000mm dia eightspan RCC slabmeasurements ar
12. White wash to betraffic.
13. The widths of Sh5/4. it is suggeste
14. MORD Specificati
Concrete roads fothe CC road as m
15. (i) Construction o(ii) length of the p(iii) Joints shall beof the machine an
16. Construction jointsuspended for mo
Name ofWork:
The Work from
1. 28.47% of the wo2. Works to be done
Mile stone 1 to theMile stone 2 to theMile stone 3 to the
rty Quality Audit (TPQA) for National Cyclone Risk Miti
end of Dt: 26.12.11- WBM Gr-II, Gr-III and Shoulders .end of Dt: 26.04.12- BT and Road furniture.
ths and Earthen shoulder widths are verified from Km 5/1
s have slipped and the same shall be rectified.n stretches Km 4/471 to Km 5/080. The width of the r
dth 3.75 meters. The field officers are requested to furnroad.
-II thickness are verified and is tallying with the approveure-2
pleted in between stretches Km 3/0 to Km 4/368.The thpproved Estimate. The reports are enclosed in AnnexurePC and SEAL COAT test conducted and the percentagend SEAL COAT observed as 4.2% to 4.4%. Hence sat
ure-III and Annexure-IV
lder work is in progress. The relative compaction test to
pleted in between stretches Km 4/4 to Km 5/67. The cost conducted and the values are in between range 32.0concrete.
taken from the cc road randomly in between stretchesstrength of the CC road. The Avg.thickness of cores ar
trength of cores are tested, the average compressive str
7.13 N/mm2. The minimum Avg. values of compressiveoncrete (M30=30.00 N/mm2) i.e. 25.5 N/mm2. Hence sa
rows culvert, 600mm dia single row culvert in villageculvert, and Side drains in village portion are comverified and are tallying with the approved drawing.
done to parapet walls of the existing culverts for the
ulders are found Narrow at Bucking hum canal bridgeto provide extra width.
ns and IRC: SP-62-2004, Guidelines for the constructi
r low volume roads, need to be followed in cutting and sntioned below.
f joints shall be mechanically sawn joints spaced 2.5 m toanel in the direction of traffic shall not be less then the wicut when the pavement is neither too soft nor to hard a
d crew. Normally it may vary from 8 to 12 hrs depending
s shall be butt joints and placed after a days workre than 30 minutes
KEM R&B Road TO Sankuvarigunta village Koth
k is completed.as per Milestone: (Two works in this Package)end of Dt: 26.08.11- Earthwork, CD Works and GSB.end of Dt: 26.12.11- WBM Gr-II, Gr-III and Shoulders.end of Dt: 26 04 12 BT and Road furniture
ation Project (NCRMP)
50 to Km 5/4 and at some
ad verified as 5.5 meters
ish the reasons for change
Drawing, the reports are
ickness are verified and is-II. The BT extraction testof Binder content in the
isfactory. The reports are
e done.
mpressive strength at theN/mm2 to 34.66 N/mm2,
m 4/4 to Km 5/67, to findobserved as 195 mm to
ngth of core is in between
strength of core should beisfactory
portion, 2 vents of 2.0 mtspleted and the physical
clear visibility of vehicular
between Km 5/150 to Km
n and design of Cement
acing of joints and curing
3.75 midth of the pavement.nd able to bear the weighton weather conditions
is over or when work is
hapatnam mandal.
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
34/47
Consultancy Services for Third P
which the freploughed or s
ii) The layers o
7.14 of IRC-3use of usualroller or other
4. C.C Road comple5. It is observed that
MORD SpecificatiConcrete roads fothe CC road as m
(i) Construction(ii) Length of the
(iii) Joints shall bof the machin(iv)Expantion joi
impregnated(v) After complet
wet Hessain24 hrs
(vi)Upon the reand cured by
6. Two sets of cubeone set is 26.52 N
for 28days strenconcrete.
7. Approximate Comthe results are var
8. Cores will be take9. The contractor pr
is collected for tesmore than the reqmaterial is suitablapproval from the
proceeding furthe10. The thickness fo
estimated thickne11. WBM Gr II work c
a. SHOULDERspecification okeep pace wit
12. The field officers aculverts. As per IRembankment area
embankment shallavoid displacemei) The soil in suchcompacted thorourollers or other heother approved m
13. As per agreement
rty Quality Audit (TPQA) for National Cyclone Risk Miti
shly material is to be placed in flatter than 4:1, the slcarified instead of resorting to benching.the widened embankment shall be compacted to requi
6. In such cases where the width of the widened portionwider rollers, compaction may be carried out with theapproved plant.ed in between stretches 1/400 to 1/500 Km.the groves are not cut as per MORD specificationons and IRC: SP-62-2004, Guidelines for the constructir low volume roads, need to be followed in cutting and sntioned below.
of joints shall be mechanically sawn joints spaced 2.5 m tpanel in the direction of traffic shall not be less than the
cut when the pavement is neither too soft nor too harde and crew. Normally it may vary from 8 to 12 hrs dependnts shall be provided near bridges and slab culverts a
joints/ premoulded synthetic joints filler board about 20 mion of the finishing operations, the surface of the pavecloth, burlap or jute mats. They shall be maintained fully
oval of the wet covering out the end of 24 hrs, the slabponding or sprinklers.are tested for 7 days compressive strength at laborator
/mmand average value of another set is 26.61 N/mm2. A
th produced an average compressive strength of 31.
pressive strength of C.C.Road is tested with Rebound hying from 32 N/mm2 to 38 N/mm2.n to verify depth and compressive strength after 28 dayscured the quarry waste material from Chimakurthi graniteting for its suitability like CBR and PI, the result are founuired value of 20 and PI is NP which is less than 6. As p
for sub grade construction. However the usage of thiscompetent authority. The field officers are requested to g
from the Engineer in Charge.GSB and WBM Gr II are verified at random and fo
s.mpleted in between KM 0/000 to KM1/340, WBM GrII Wonstruction work is in progress, the field officers aref IRC36. It specifies that the shoulder construction shothe construction of different layers of the pavement
re requested to follow the IRC-36 specifications during fillC 36, Para 8, The filling around and over culverts and othshall be carried out independently of the work on the mai
l be brought up simultaneously in equal layers on each sidt and unequal pressure.cases shall be deposited in layers not exceeding 150mmghly to the requirements of Para 7.14. When it may be imvy equipment, The compaction shall be carried out by mthods.5.2 Clause Environment Management Plan not followe
ation Project (NCRMP)
ope surface may only be
rements of Para 7.12 and
is insufficient to permit theelp of tandem/sheep foot
on and design of Cementpacing of joints and curing
3.75 m
idth of the pavement.
nd able to bear the weighting on weather conditionsnd consists of a bitumen
thick, and dowel barsent shall be covered withwetted and in position for
shall be thoroughly wetted
and the average value of
nd one set of cubes tested
0 N/mm for M-30 grade
mmer on 06.10.2011 and
f laying.quarry, the same materialCBR value is 23 which isr clause 401 and 408 thisaterial requires deviation
t the prior approval before
nd fairly tallying with the
rk has to be taken up.requested to follow the
ld be so organized as to
ing around and over theer structures in then embankment. The
e of the structure, so as toin loose thickness andracticable to use powerchanical tampers or by
at site. It is suggested to
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
35/47
Consultancy Services for Third P
18. QC laboratory issee that the Qualit
Name ofWork:
Road from R&
1. 26.35 % value of t2. C.C.Road 300 m
progress.3. Cores will be take4. MORD Specificati
Concrete roads fothe CC road as m
(i) Constructio(ii) Length of th(iii)Joints shall
of the macconditions.
Construction jointfor more than 30Expantion jointsimpregnated joint
5. Longitudinal joints
(i) After complwet Hessain24 hrs.
(ii) upon the reand cured b
6. For GSB materialaboratory for conlimit, The test res
7. The quality contr Maintain QC reco
8. Q.C Lab is not estmaintain registers.
Name ofWork:
The Work Roa
1. 20.00 % value of t2. Works to be done
Mile stone 1 to theMile stone 2 to theMile stone 3 to the
3. The 600mm dia600mm dia doubldia Triple row culv
i) The field officerculverts. As per Iembankment are
rty Quality Audit (TPQA) for National Cyclone Risk Miti
ot provided at site. The line deportment is requested toy lab is established at site at an early stage.
Road to Somarajupalli
he work is completed. Shoulder works are not in progressters length is completed. In between stretches 1/076
n to verify depth and compressive strength after 28 daysions and IRC: SP-62-2004, Guidelines for the constructr low volume roads, need to be followed in cutting andntioned below.
of joints shall be mechanically sawn joints spaced 2.5 mpanel in the direction of traffic shall not be less than the
be cut when the pavement is neither too soft nor to hardhine and crew. Normally it may vary from 8 to 12
shall be butt joints and placed after a days work is overinutes
shall be provided near bridges and slab culverts a/ premoulded synthetic joints filler board about 20 mm thishall be provided for two lane road and shall be saw cut
tion of the finishing operations, the surface of the pavecloth, burlap or jute mats. They shall be maintained full
oval of the wet covering out the end of 24 hrs, the slaby ponding or sprinklers.l, The field officer collected the soil samples and sducting tests like. 1) Maximum dry density and OMC,lts are awaited.l tests should be conducted as per IRC SP-11, and red and the same shall be produced to QA wing for verificatablished at site work. It is suggested to provide Q.C lab a.
from M.C Road to Subbarayadu Satram in Ulav
he work is completed.as per Milestone:end of Dt: 26.08.11- Earthwork, CD Works and GSB.end of Dt: 26.12.11- WBM Gr-II,& Gr-III.end of Dt: 26.04.12- BT, shoulders and Road furniture.ingle row pipe culvert (2 No's) constructed at stretcherow culvert ( 3 No's) constructed at stretches Km 2/4,Km
ert (2 No's) constructed at stretches Km 3/0,& Km 3/4.
are requested to follow the IRC-36 specifications duringRC 36, Para 8, The filling around and over culverts a
shall be carried out independently of the work on th
ation Project (NCRMP)
take necessary action and
.to 1/376 Km, Curing is in
f laying.ion and design of Cementpacing of joints and curing
to 3.75 mwidth of the pavement.nd able to bear the weightrs depending on weather
or when work is suspended
d consists of a bitumenck, and dowel bars
ent shall be covered withy wetted and in position for
shall be thoroughly wetted
nt to Engineering college) Liquid limit and Plastic
uested the field officers toion.nd conduct regular test and
apadu Mandal
Km 1/6 and km 3/2. The2/8,& Km 4/2. The 600mm
filling around and over thend other structures in thee main embankment The
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
36/47
Consultancy Services for Third P
4. Widening work is iTPQA Staff for veapproved material
IRC-36-1970 Parai) When an exibenches of ufresh embanbe utilized inthe freshly mscarified inste
ii) The layers o7.14 of IRC-use of usualor other appr
5. GSB samples coll6. Project Name bo
specifications.7. White wash to be8. As per agreement
follow them.9. The quality contr
shall be produced10. QC laboratory is
see that the Qualit
Name ofWork:
Road from R&
1. 57.60% of work i2. Works to be done
Mile stone 1 to theMile stone 2 to theMile stone 3 to the
3. Cc road complete4. Approximate Com
the results are var5. 8No.s of Cores a
observed as 1986. MORD Specificati
Concrete roads fothe CC road as m
7. Field officer haveMORD(IRC;SP-62
8. After completion
Hessain cloth, bur9. upon the removal
cured by ponding10. Construction joint
suspended for mo11. Expantion joints
impregnated joint
rty Quality Audit (TPQA) for National Cyclone Risk Miti
in progress. The field officers are requested to provide theification and to conduct the field tests. The field officers afor embankment as per IRC-36.
9 states thatting embankment is to be widened, and its slopes areto 600mm width shall be cut in to the old slope for ensu
ment material to be added. The material obtained from cthe widening of the embankment. However, when the eaterial is to be placed in flatter than 4:1, the slope surfacad of resorting to benching.the widened embankment shall be compacted to requ
6. In such cases where the width of the widened portionider rollers, compaction may be carried out with the helpved plantcted and sent to laboratory for necessary tests. Awaitingrd with details are not provided at site. It is suggest
done to parapet walls of the existing culverts for the clear5.2 Clause Environment Management Plan not follow
l tests should be conducted as per IRC SP-11, Maintaito QA wing for verification.ot provided at site. The line deportment is requested toy lab is established at site at an early stage.
Road Pellur to Vasepallipadu - Tangur (M)
completed.as per Milestone:end of Dt: 16.07.11- Earthwork, CD Works and GSB.end of Dt: 16.11.11- WBM Gr-II, Gr-III and Shoulders.end of Dt: 16.03.12- BT and Road furniture.in between KM 0/258.50 to 0/434.50 Km, and between
pressive strength of C.C.Road is tested with Rebound hying from 26 N/mm2 to 32 N/mm2.e taken to verify the thickness and compressive strengm to 223mmons and IRC: SP-62-2004, Guidelines for the constructir low volume roads, need to be followed in cutting and sntioned below.stated that curing has been done on the next day of lay-2004) Specifications stipulates the following regarding cf the finishing operations, the surface of the concrete
lap or jute mats. They shall be maintained fully wetted anof the wet covering out the end of 24 hrs, the slab shallor sprinklers.s shall be butt joints and placed after a days workre than 30 minutesshall be provided near bridges and slab culverts an/ premoulded synthetic joints filler board about 20 mm thi
ation Project (NCRMP)
material test reports toe requested to use only
teeper than 4:1, horizontaling adequate bond with theutting of the benches couldxisting slope against whiche may only be ploughed or
irements of Para 7.12 andis insufficient to permit theof tandem/sheep foot roller
for resultd to provide them as per
visibility of vehicular traffic.d at site. It is suggested to
QC record and the same
take necessary action and
KM 4/800 to 5/100mmer on 29.09.2011 and
th .The average thickness
on and design of Cementpacing of joints and curing
ing the concrete, howeverring of C.C.Road.
shall be covered with wet
in position for 24 hrsbe thoroughly wetted and
is over or when work is
d consists of a bitumenk and dowel bars
MONTHLY REPORT
-
7/31/2019 3.November MPR 2011
37/47
Consultancy Services for Third P
approval from theproceeding furthe
15. As per agreement
follow them.
9.0 Details of Social & Enviro
S. No. Packag
1NCRM
W/AP/MPCS/PRED/
2 NCRMP/B-W/AP/RCS/
3NCRM
W/AP/MPCS/PRED/
4 NCRMP/B-W/AP/RCS/
5NCRM
W/AP/RCS/PRED/03
6NCRM
W/AP/MPCS/PRED/03
7NCRM
W/AP/MPCS/PRED/
8 NCRMP/B-W/AP/Br/R&
9NCRM
W/AP/RCS/PRED/
10 NCRMP/B-W/AP/Br/R
11 NCRMP/B-W/AP/Br/
12NCRM
W/AP/RHB/PRED/
10.0 Non Compliance Repo
S.No District
1 Nellore N
2 Nellore N
rty Quality Audit (TPQA) for National Cyclone Risk Miti
competent authority. The field officers are requested to gfrom the Engineer in Charge.5.2 Clause Environment Management Plan not followe
mental Reports Submitted in this Month:
e No. Name of the work
P/B-03/Nakkapalli/002
Construction of cyclone shelteBangarampeta
RED/03/Rambilli/002Road from R & B road to
Krishnampalem.
P/B-03/Nakkapalli/002
Construction of cyclone sheltePatimeeda
RED/03/Rambilli/002 Road from R & B road to Rajako
P/B-Anandapuram/001
Road from NH-5 toRamarayadupalem
P/B-/Payakaraopeta/003
Construction of cyclone shelteRatnayampeta
P/B-
O8/N.G.Padu/003
Kanaparthy Cyclone shelter
B/O8/Kanaparthy/012Construction of HLB @ Km.16/1Naguluppapadu-Kanaparthy R
P/B-8/Cheerala/002
Road from R&B Road to Devincyclone shelter
&B/O7/Bapatla/010Reconstruction of HLB at Km. 5
Bapatla-Suryalanka Road
&B/O7/Perali/011Reconstruction of HLB at Km. 2Bapatla-Pandurangapuram acr
Perali DrainP/B-
7/Nagaram/002Road from Ganapavaram R&B
to Mohammad Alipalem
rts (NCRs) Submitted in this Month:
Package No
RMP/B-W/AP/RHB/PRED/09/Kavali/004 Road fAl
RMP/B-W/AP/RHB/PRED/09/Kavali/004Road from 5
to
ation Project (NCRMP)
t the prior approval before
d at site. It is suggested to
District
atVisakhapatnam
Visakhapatnam
atVisakhapatnam
uru. Visakhapatnam
Visakhapatnam
atVisakhapatnam
Prakasam
0 ofad
Prakasam
tula
Prakasam
2 ofGuntur
4 ofss
Guntur
oad
Guntur
ame of Work
rom KT R&B road tolliguntalapalem.
8 of Chennayapalem Roadummadi bandla.
National Cyclone Risk Mitigation Project (NCRMP)Revenue (DM) Department
National Cyclone Risk Mitigation Project (NCRMP)Revenue (DM) Department
-
7/31/2019 3.November MPR 2011
38/47
Revenue (DM) DepartmentGovernment of Andhra Pradesh
Revenue (DM) DepartmentGovernment of Andhra Pradesh
in jointventure
Third Party Quality Audit
-
7/31/2019 3.November MPR 2011
39/47
-
7/31/2019 3.November MPR 2011
40/47
-
7/31/2019 3.November MPR 2011
41/47
-
7/31/2019 3.November MPR 2011
42/47
-
7/31/2019 3.November MPR 2011
43/47
-
7/31/2019 3.November MPR 2011
44/47
-
7/31/2019 3.November MPR 2011
45/47
-
7/31/2019 3.November MPR 2011
46/47
-
7/31/2019 3.November MPR 2011
47/47