    GeneratorInterconnection

    Standards Establishuniformtechnicalandprocedural

    requirementsforinterconnectionofgenerationontheelectricgrid

    Interconnectionstandardsaredrivenby

    Safety(peopleandproperty)

    Gridreliability,performance

    Costconsiderations

    Fairness(justandreasonable,andnotundulydiscriminatoryorpreferential)

  • 7/28/2019 4 Ellis InterconnectionStandards

    3/24

    WhatInterconnection

    StandardsandProceduresApply?

    Distribution System Guidelines

    IEEE 1547, PUC/PRC

    IEEE, ANSI, IEC

    NEC

    Bulk System Guidelines

    NERC, FERCIEEE, ANSI, IEC

    NESC

    Plenty of technical andjurisdictional overlap,

    confusion, contradiction

  • 7/28/2019 4 Ellis InterconnectionStandards

    4/24

    Applytogenerators,participatinginwholesalemarket,

    regardlessofsizeandinterconnectionlocation TSO/DSOfollowproforma proceduresviaOATT

    Proceduresandrequirementsgenerallybasedonsize

    LargeGeneratingFacilities(>20MW):LGIP/LGIA

    SmallGeneratingFacilities(SGF)(

  • 7/28/2019 4 Ellis InterconnectionStandards

    5/24

    Applytogeneratorsuptoacertainsize,connectedto

    thegrid,butnot participatinginwholesalemarket NetMetering,PURPAorsimilararrangementforsale of

    electricitytothehostutilityonly

    TypicallycoverREandotherDG,allcustomerclasses Proceduresandstandardsvarybystate

    GenerallyconformwithFERCSGIP,butsomehave

    significant

    differences Technicalstandardsfocusedonthedistribution

    systemandDER

    StateJurisdictional

    InterconnectionStandards(PUC/PRCRule)

  • 7/28/2019 4 Ellis InterconnectionStandards

    6/24

    StateJurisdictional

    InterconnectionStandards

    State policy

    www.dsireusa.org / July 2009

    *Standard only applies to net-metered systems

    WA: 20,000

    OR: 25/2,000*

    CA: no limit

    MT: 50*

    NV: 20,000

    UT: 25/2,000*

    NM: 80,000

    WY: 25*

    HI: no limit

    CO: 10,000

    MN: 10,000

    LA: 25/300*

    AR: 25/300*

    MI: no limit

    WI: 15,000

    MO: 100*

    IN: no limit

    IL: 10,000

    FL: 2,000*

    KY: 30*

    OH: 20,000

    NC: no limit

    VT: no limit

    NH: 100*

    MA: no limit

    37 states +DC & PR

    have adopted aninterconnection

    policy

    Notes: Numbers indicate system capacity limit in kW. Some state limits vary by customer type (e.g., residential/non-residential).No limit means that there

    is no stated maximum size for individual systems. Other limits may apply. Generally, state interconnection standards apply only to investor-owned utilities.

    CT: 20,000

    PA: no limitNJ: 2,000*

    DC: 10,000

    MD: 10,000

    NY: 2,000

    VA: 20,000

    SC: 20/100*

    GA: 10/100*

    PR: no limit

    TX: 10,000

    NE: 25*

    KS: 25/200*

    SD: 10,000

  • 7/28/2019 4 Ellis InterconnectionStandards

    7/24

    InterconnectionRequirements

    forSGF(FERCOrder2006)

    FastTrackProcessforSGFthatpasscertainscreens

    SGFcapacity

  • 7/28/2019 4 Ellis InterconnectionStandards

    8/24

    TypicalDERInterconnectionProcess

    Example:

    CPUCRule21

    Interconnection

    Process

    Source: California Interconnection Guidebook

    http://www.energy.ca.gov/distgen/interconnection

    /guide_book.html

  • 7/28/2019 4 Ellis InterconnectionStandards

    9/24

    TypicalDERInterconnectionProcess

    Example:

    CPUCRule21Initial

    TechnicalReview

    Methodology

    Source:

    http://www.energy.ca.gov/distgen/interconnection

    /application.html

  • 7/28/2019 4 Ellis InterconnectionStandards

    10/24

    IEEE1547StandardFamily(AppliestoDERnolargerthan10MVA)

    No. Title Status

    1547StandardforInterconnectingDistributedResourceswithElectric Power

    Systems 2003

    1547.1StandardforConformanceTestsProceduresforEquipment

    InterconnectingDistributedResourceswithElectricPowerSystems2005

    1547.2ApplicationGuideforIEEE1547StandardforInterconnecting

    Distributed

    Resources

    with

    Electric

    Power

    Systems

    2008

    1547.3GuideForMonitoring,InformationExchange,andControlofDistributed

    ResourcesInterconnectedwithElectricPowerSystems2007

    1547.4DraftGuideforDesign,Operation,andIntegrationofDistributed

    ResourceIslandSystemswithElectricPowerSystemsPending

    1547.5 DraftTechnicalGuidelinesforInterconnectionofElectricPower Sources

    Greaterthan10MVAtothePowerTransmissionGridPending

    1547.6DraftRecommendedPracticeForInterconnectingDistributedResources

    WithElectricPowerSystemsDistributionSecondaryNetworksPending

    1547.7

    DraftGuidetoConductingDistributionImpactStudiesforDistributed

    ResourceInterconnection Pending

  • 7/28/2019 4 Ellis InterconnectionStandards

    11/24

    InterconnectionStandards

    forDistributedEnergyResources

    IEEE1547VoltageandFrequencyTolerance

    Additionaldisconnectionrequirements CeasetoenergizeforfaultsontheAreaEPScircuit

    Ceasetoenergizepriortocircuitreclosure

    Detectislandconditionandceasetoenergizewithin2secondsoftheformationofanisland(antiislanding)

    (*) MaximumclearingtimesforDER 30kW;

    DefaultclearingtimesforDER>30kW

    VoltageRange(%Nominal) Max.ClearingTime(sec)*

    V

  • 7/28/2019 4 Ellis InterconnectionStandards

    12/24

    50% < V > 88%

    V < 50%

    110% < V > 120%

    V > 120%

    InterconnectionStandards

    forDistributedEnergyResources

  • 7/28/2019 4 Ellis InterconnectionStandards

    13/24

    InterconnectionStandards

    forDistributedEnergyResources

    Otherapplicablecodesandstandards(not

    exhaustive) RequirementVoltageRegulation MaintainservicevoltagewithinANSIC84RangeA(+/5%)

    Voltagecontrol Notpermitted(IEEE1547)

    Flicker MaximumBorderlineofIrritationCurve(IEEE1453)

    Harmonics

  • 7/28/2019 4 Ellis InterconnectionStandards

    14/24

    InterconnectionStandards

    forTransmissionConnectedSystems

    SomekeydifferencescomparedtoDER

    NeedtoconsidersomeoftheseforPVassystemsize&penetrationincrease

    Requirement

    VoltageTolerance Ridethrough3phasefaultPOIforupto150ms

    FrequencyTolerance Basedoninterconnectionrequirements

    PowerFactorCapability +/ 0.95pf(orhigherdependingonstudyresults)

    VoltageControlPowerfactor,reactivepowerorvoltagecontrolatthe

    discretionoftransmissionoperator

    Synchronization,

    Protection

    Dedicatedswitchingandprotectionequipment

    requiredfortransmissionconnectedsystems

    SCADA/EMSintegration Requiredinallcases

    PowerControlEmergingforhighpenetrationwind. Mayneedhandle

    withmarketinstrumentsinsomecases

    Other NERCFAC/TPL/MOD/PRC/VARstandards

  • 7/28/2019 4 Ellis InterconnectionStandards

    15/24

    FrequencyandVoltage

    ToleranceStandards(BulkSystem)

    FrequencyRange(Hz)

    Max.ClearingTime(sec)*

    59.4 60.5 N/A

    59.4 58.5or

    60.6 61.5 3min

    58.4 57.9or

    61.6 61.730sec

    57.8 57.4 7.5sec

    57.3 56.9 45cycles

    56.8 56.5 7.2cycles

    61.7instantaneous

    WECCOffNominalFrequencyTolerance VoltageTolerance(LVRT)

    Tolerate

    bolted

    fault

    (0

    volts)

    at

    POI

    for

    upto9cycles(150ms)

    FERCOrder661A:appliestowind

    generators>20MVA

    WECCLVRTcriterion:appliestoall

    generators

    >10

    MVA

    FrequencyTolerance Forexample,WECCONFstandard,

    whichappliestoallgenerators

    RulesstillevolvingintheUSand

    elsewhere

  • 7/28/2019 4 Ellis InterconnectionStandards

    16/24

    FrequencyandVoltage

    ToleranceStandards(BulkSystem)

    Proposed NERCPRC024

    Wouldapplytoallgenerators20MVAorlarger,andstationswithmultiple

    unitswithtotalcapacityof75MVAor

    more

  • 7/28/2019 4 Ellis InterconnectionStandards

    17/24

    EmergingPowerControl

    forHighPenetrationWindP

    kan

    Pbr

    Pkan

    Pbr

    Pkan

    Pbr

    Absolute power limit

    Power ramp limit

    Delta power limit

    Source: Energinet.dk

  • 7/28/2019 4 Ellis InterconnectionStandards

    18/24

    MediumVoltageStandard

    inGermany(10kVto110kV)

    FaultTolerance

    AppliestoPVasof2011 Invertersmustcomplywithboundaryline2

    Mustprovidereactivesupportduringfault(voltagecontrol)

    Source: E. Troester, New German Grid

    Codes for Connecting PV to the Medium

    Voltage Power Grid, 2nd International

    Conference on Concentrating

    Photovoltaic Power plant

  • 7/28/2019 4 Ellis InterconnectionStandards

    19/24

    MediumVoltageStandard

    inGermany(10kVto110kV)

    StaticVoltageSupport

    Providecapabilityof+/ 0.95pfatfulloutput(impactsequipmentrating) Dispatchcouldbeconstantpf,constantVar,Var supportbasedon

    poweroutput(seeexamplebelow)orVar supportbasedonvoltage

    AppliestoPVasof2010

    Source: E. Troester, New German Grid

    Codes for Connecting PV to the Medium

    Voltage Power Grid, 2nd International

    Conference on Concentrating

    Photovoltaic Power plant

  • 7/28/2019 4 Ellis InterconnectionStandards

    20/24

    MediumVoltageStandard

    inGermany(10kVto110kV)

    ActivePowerControl

    Reducepoweroutputwhenfrequencyisabove50.2Hz AppliestoPVasof2010

    Source: E. Troester, New German Grid

    Codes for Connecting PV to the Medium

    Voltage Power Grid, 2nd International

    Conference on Concentrating

    Photovoltaic Power plant

  • 7/28/2019 4 Ellis InterconnectionStandards

    21/24

    AFewObservations WindandPVinterconnectionstandardsondifferenttracks,but

    converging NorthAmericanapproachtobulksystemstandardstendstobe

    technologyneutral

    Itmakestechnicalsensetoapplydifferentrequirementstodifferent

    technologies(e.g.,Europeanapproach) Difficulttoreachconsensus,longprocess

    IEEE1547providesgreatfoundationforDER

    Somefuturecapabilitiesshouldbemandatedbystandards;

    someshouldbeincentivized bymarkets

    E.g.,primaryfrequencysupport

  • 7/28/2019 4 Ellis InterconnectionStandards

    22/24

    WhereareWeGoing? Reconciledistribution/transmissionstandards

    Voltage/frequencytolerance

    Reactivepowercapability,volt/var control SCADAintegration

    Power/Frequencycontrol

    Specialcases(e.g.,islands)orfuture veryhighpenetration?

    Harmonizationisimportantforefficiencyandcost

    Severalactiveeffortsunderway

    IEEE1547.4,1547.5,1547.6,P2030(SmartGrid)

    (http://grouper.ieee.org/groups/scc21/1547/1547_index.html)

    US:NERCIVGTF(http://www.nerc.com/filez/ivgtf.html)

    Europe:Mediumandlowvoltagegridcodes(GR,SP,FR,IT)

  • 7/28/2019 4 Ellis InterconnectionStandards

    23/24

    QuestionsandDiscussionQuestionsandDiscussion

  • 7/28/2019 4 Ellis InterconnectionStandards

    24/24

    Codes&StandardsSpecifictoPV

    Source DocumentsIEEESCC21 StandardsCoordinatingCommitteeonFuelCells,Photovoltaics,

    DispersedGeneration,andEnergy

    Storage

    IEEE1547series(DERupto10MVA)

    StandalonePVsystems,batteries(several)

    P2030 (SmartGrid Newinitiative)

    UnderwritersLaboratoriesInc.(UL)PV

    StandardsTechnicalPanels UL1703(PVmodules)

    US1741(Inverters,chargecontrollers)

    NFPA NEC,Article690(solarPhotovoltaicSystems)

    ASTME44.09 TechnicalCommitteeon

    PhotovoltaicElectricPowerConversion

    SeveraladdressingPVmoduleandarray

    testing

    IECTC82 Solarphotovoltaicenergy

    systems

    Severaladdressingmeasurement,safety,

    testprocedures