  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    1/25

    6/6/

    Welcome 

    to 

    the 

    National 

    Universit   of  Sin a ore  NUS 

    Kent Ridge Campus + University Town

    Bukit Timah Campus

    Duke‐NUS @ Outram Campus

    Yale‐NUS College

    K Y YONG, National University of  Singapore 

    Kent Ridge Campus 

    Kent RidgeCampus

    University TownBukit TimahCampus

    OutramCampus

    GFA: 250,000m2

    Land: 19 ha

    GFA: 38,700 m2

    Land: 5.3 ha

     2   ,Land: 3 ha

      ,Land: 141 ha

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    2/25

    6/6/

    -

    Fusionopolis

    National

    University

    Hospital

    3

    Singapore

    Science ParksMap courtesy ofJTC Corporation

    Kent Ridge CampusKent Ridge Campus

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    3/25

    6/6/

    National University of Singapore

    Planning, Design and 

    Construction of  Underground 

    ‐ some challenges ‐

    K Y Yong, National University of  Singapore

    Paul Fok, Land Transport Authority, Singapore

    Presented  

    at  

    the 

    World  

    Tunnel  

    Congress 

    2012

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    4/25

    6/6/

    Planning, Design and Construction of  

    Underground MRT System in Singapore

    •   Overview of 

     Singapore

     Transport

     System

    •   Site Investigation‐   Adequacy and reliability of  SI

    ‐  Geotechnical Interpretative Baseline Report

    ‐   Detection of  pile capacity 

    •   Deeper excavation for MRT Stations

    •   Challenges in urban tunnel construction‐   ace pressures

    ‐   Tunnel near critical structures

      Tunnels 

    in 

    settling 

    ground‐   Durability of  tunnel structure 

    •   Conclusions 

    MRT Network

     in

     Singapore

    Now 176 km of rail 122 stations; by 2020, 280km rail and 183 Stations

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    5/25

    6/6/

    Major Underground Road Tunnels

    CTE: North Tunnel: 0.7 km;

    KPE: Total tunnel length:

    9km; Opened 26 Oct 2007

    Woodsville Interchange:

    Total tunnel length: 0.69km;

    Opened 28 Jan 2012

    North South Expressway

    Tunnel and Semi Tunnel :

    12.3 km to be completed

    around 2020

    South Tunnel: 1.7 km; Opened:

    21 Sep 1991

    Fort Canning Tunnel:

    0.35 km; Opened 16 Jan

    2007

    and 20 Sep 2008

    MCE Tunnel : 3.5km to be

    opened at end 2013

    Singapore UndergroundRoad System: underground

    road tunnels

    GEOLOGY OF SINGAPORE

    Old AlluviumSedimentary 

    Formation

    Bukit Timah 

    Granite

    Kallang 

    Formation

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    6/25

    6/6/

    GEOLOGY ALONG THE MRT NORTH‐EAST LINE

    Site Investigation: field

    and laboratory works

    Site Investigation Report

    Geotechnical Factual

    Report (GFR)

    Geotechnical

    Interpretative

    Report (GIR)

    Contains the factual data from site

    investigation & laboratory tests

    Interpreted ground conditions for design,

    e.g. design sections, design parameters

    Geotechnical

    Interpretative

    Baseline Report

    (GIBR)

    Nature, form, composition, properties

    and structure of the ground and

    groundwater, artificial obstructions

    From DTL

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    7/25

    6/6/

    Challenges in Site Investigation

    •   To have more boreholes  – practical 

    problems

    •   To carry out geophysical survey

    Prediction of 

     soil

    ‐rock

     interface

     from

     boreholes

    Tunnel Alignment

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    8/25

    6/6/

    Longitudinal 

    Soil Profile

    FILL

    F1 : FLUVIAL SAND

    E : PEAT/ORGANIC CLAY

    M : MARINE CLAY

    G (I)

    G (II)

    G (III)

    G (IV)

    G (V)

    G (VI)

    F2 : FLUVIAL CLAY

    Tunnels to 6th AvenueTKK Stn

    C918

    Limit of Contract

    Hwa Chong Institution

    C918

    Limit of ContractC917

    Tunnels to Botanic Garden

      -   5   -   4

       A

      -   4   -   2   -   1    0

       1   7

       1   4   6

       0   1   8

       0   1   9

       2   1   4   7

       0   1   5

       2   1   5   4

       2   3   6   6

       3   6   5

       K   0   1   3

       D   T   2   0   2   0

       D   T   2   1   4   9

       D   T   2   0   2   1

       T   2   1   5   1

       0   1   4

       2   1   5   2

       2   1   5   3

       3   6   5   A

       T   2   7   0   8

       2   3   6   7

       D   T   2   1   4   8

       T   2   1   5   0

       D   T   2   3   6   8   A

       D   T   2   3   6   8

       D   T   2   1   4   9

       T   2   3   7   1

      a  r  r  e  r

       l  y  o  v  e  r

       0   2   4

       1   4   5

    C919

       2   3   0

       4   2   4

       4   2   3

    Cut & Cover 130-

    120-

       B   H   B

       B   H   B

       B   H   B

       B   H

       B   H   B

       D   T   2

       D   T   2

       D   T   2

       D   T

       D   T

       B   K

       D   T

       D   T

       D   T   B   D    B

       K   D   D

       T

       D   T

      D   D   T   D   D

       C   C   4

       D   T   2

       C   C   4

       C   C   4

       C   C   4

    G III OR BETTERROCK

    G VIG VI

    E G VI

    G V & G IV

    G VI

    G V & G IV

    F1 & F2

    F1 & F2

    FILL

    1550-

    80-

    100-

    90-

    110-

    70-

    60-

    G III OR BETTER

    ROCK

    To City To Bukit Panjang

    15

    Boreholes and probes concentrated onERSS and Station Box

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    9/25

    6/6/

    Bukit Timah Granite

    Geological Conditions at T4

     

    Kallang Formation

    Bukit Timah Granite

    Bukit Timah Granite

    Bukit Timah Granite

    Ground formation

     in

     cross

     section

    It is also important to plot geotechnical profile against

    the section of the station box or tunnelling

    Cross section without round formation

    Blk 60 Blk 67

       2   1 .   1

      u  n

      n  o  w  n

    3.63

    m

       2   0 .   6

      u  n   k  n  o  w  n

    3.29m

       2   1 .   0

    5.34m

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    10/25

    6/6/

    Borehole BH

    Cross Section with Geotechnical Profile

       2   5  m

      a   i  n   b   l   d  g .  p   i   l  e  s   )

    OA

    Fill

    M

       2   2  m    (

       l   i   f   t  -  c  o  r  e

      p   i   l  e  s   )

    +103.2m

    +101.6mFill

    +99mM

    +88.6m

    O(D) N-SPT~20

    +86.1m

    O(C) N-SPT~49

     

    G002

      u

      n   k  n  o  w  n   (

    4.4m

    7m4.6m

    5m   +80.1m

    O(B) N-SPT~89

    O(A) N-SPT~100

    Geophysical Survey

    •   Commonly used methods

     

      Seismic refraction

      Seismic reflection

      Surface wave method

      ‐

    20

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    11/25

    6/6/

    Geophysical Survey

    •   Methods commonly used for soil / rock 

    interface identification 

    •   Results are

    ‐   indirect interpretation of  ground condition

    ‐   influenced by many factors, e.g. utilities,

    traffic noise

     

    Soil / Rock

     Interface

      – Accuracy

     ?

    Interpreted Profile of Surface Wave Velocity

    Interpreted Rock Profile

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    12/25

    6/6/

    Soil / Rock

     Interface

      – Accuracy

     ?

     ABH1

    8

     ABH2

    1

     ABH2

    6 FILLF1

    GV &

    GVI

    GIII &

    II

    FILLF1

    GV &

    GVI

    GII & GIGIII, GII &

    G1

    FILLF2EF1F2F1

    GVI &

    GV

    GII

    HDB

    Tunnelling

    induced ground

    settlement

    impacts footing

    Geotechnical 

    Challenges

    4 Storey

    Block

    Spread Footing

    Existing

    Micropiles

    150mm, 200mm

    Head Room

    Clearance height ~

    6.5m

    110m

    100m

    3

    m

    RL 107.58

    GVI

    Section A‐A

    90m

      .

    GIII

    Piles obstruction

    to TBM tunnelling

    Mixed face

    tunnelling

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    13/25

    6/6/

    Station T11  – Grouting Works for Steel Pile Cutting

    ST/0099 DT/2132

    103.5

    98.5 IL

    103.5

    84.

    082.

    4

    Steel Piles

    H356x368Steel Piles

    H254x254

    97.

    8

    86.

    7

    DTL

    tunnels

    Tanalised

    Piles

    TBM

    directionSteel Piles to be cut from TBM face

    5m

    Steel Piles

    H254x254

    Steel Piles spacing

    unknown

    Jet Grout

    June 6, 2013 Page 25IBA Briefing #2

    .

    1Water-sealant Grouting 74.

    1Toe Level Unknown

    Cement Grout (microfine)

    18m

    GV 5m

    Detection of  Pile Depth  – Accuracy?DTL3 Example  – Ground Penetration Radar Survey

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    14/25

    6/6/

    Detection of  Pile Depth  – Accuracy?

    Estimated Pile Penetration: 21~22m (or)

    26~27 m

    Challenges in

     SI

     and

     detection

     of 

     piles

     

    •   More efficient and accurate methods are 

    required to determine 

      rock levels 

      depth of  piles 

    construction in urban areas

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    15/25

    6/6/

    Subway

    Deeper Excavation  – Bencoolen Station

    SMU

    BENCOOLENSTREET

    Depth of s tation 43.2m

    Ground treatment

     to

     control

     settlement

     

    Clay without Ground

    Treatment

    Deep Excavations in Sof t Clay

    with Ground Treatment

    Ground

    Treatment

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    16/25

    6/6/

    90

    95

    100

    105

    90

    95

    100

    105

    70

    75

    80

    85

       E   l  e  v  a   t   i  o  n   (  m   R   L   )

    70

    75

    80

    85

       E   l  e  v  a   t   i  o  n   (  m   R   L   )

    DSM

    55

    60

    65

    -20 0 20 40 60 80 100

    Displacement (mm )

    Design-East Bound IW5TA09

    55

    60

    65

    -20020406080100

    Displacement (mm )

    Design-West Bound IW5TA08

    March 2011

    C485

    TBM for

     Downtown

     Line

     (DTL)

    •   DTL1:  3 EPBMs

    •   DTL2:  10 EPBMs + 9 Slurry TBMs

    •   DTL3: 19 TBMs

    EPBM (C902) Slurry TBM (C915) EPBM (C917)

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    17/25

    6/6/

    Volume losses for EPBM in Jurong 

    (Sedimentary) Formation

    Blow‐Out

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    18/25

    6/6/

    Tunneling in Mixed Face Conditions

    Tunnel Alignment

    Tunneling under a building

    North Bound

    Tunnel

    South Bound

    Tunnel

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    19/25

    6/6/

    Typical instrumentation array prior to 

    tunnel crossing beneath critical structures

         1   m

    surface settlement

    measurementassumed lateral

    ground settlement

    measurement

    extensometer 

    inclinometer 

    roun e orma on

    Phase VA

    1974-1977

    Phase VI

    1979-1985

    Original Shoreline

    1950s Reclamation

    Package C

    Tunnels 

    in 

    settling 

    ground 

    Phase VII

    1979-1985

    Phase VB

    1974-1977

    ase

    1972-1994

    1964 Shoreline

    N

     Area Stu died f or

    Consolidation Settlement Analysis

    • Sand-fill 5m – 20m, typically 10m

    • Marine Clay, 10m-35m thick , still conso lidating.

    • Consol idation time expected 60-80 years

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    20/25

    6/6/

    100100

    9090

    8080

    Geological Profile

    7070

    6060

    5050

    4040

    Station T21 C&C Tunnel

    100100

    9090

    8080

    7070

    Station T22C&C Tunnel

    5050

    6060

    Shanghai Metro No. 1 Line

      .1995-2007 settlement development with time at different sections in Shanghai Metro No.1 Line

    -150

    -100

    -50

    0

         S

       e    t    t     l   e   m   e   n    t     /   m

    -300

    -250

    -200

         1     9     9    5     年     1     2     月

         1     9     9     6     年     3     月

         1     9     9     6     年     6     月

         1     9     9     6     年     9     月

         1     9     9     6     年     1     2     月

         1     9     9    7     年     3     月

         1     9     9    7     年     6     月

         1     9     9    7     年     9     月

         1     9     9    7     年     1     2     月

         1     9     9     8     年     3     月

         1     9     9     8     年     6     月

         1     9     9     8     年     9     月

         1     9     9     8     年     1     2     月

         1     9     9     9     年     3     月

         1     9     9     9     年     6     月

         1     9     9     9     年     9     月

         1     9     9     9     年     1     2     月

         2     0     0     0     年     3     月

         2     0     0     0     年     6     月

         2     0     0     0     年     9     月

         2     0     0     0     年     1     2     月

         2     0     0     1     年     3     月

         2     0     0     1     年     6     月

         2     0     0     1     年     9     月

         2     0     0     1     年     1     2     月

         2     0     0     2     年     3     月

         2     0     0     2     年     6     月

         2     0     0     2     年     9     月

         2     0     0     2     年     1     2     月

         2     0     0     3     年     3     月

         2     0     0     3     年     6     月

         2     0     0     3     年     9     月

         2     0     0     3     年     1     2     月

         2     0     0     4     年     3     月

         2     0     0     4     年     6     月

         2     0     0     4     年     9     月

         2     0     0     4     年     1     2     月

         2     0     0    5     年     3     月

         2     0     0    5     年     6     月

         2     0     0    5     年     9     月

         2     0     0    5     年     1     2     月

         2     0     0     6     年     3     月

         2     0     0     6     年     6     月

         2     0     0     6     年     9     月

         2     0     0     6     年     1     2     月

         2     0     0    7     年     3     月

         2     0     0    7     年     6     月

    Time

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    21/25

    6/6/

    Durability of  tunnel structure

    Typical durability

    problems in a live tunnel

    structure built in earlier

    MRT works

    Better quality of tunnelstructure in recent MRT

    works in Circle Line

    SFRC Segments

     for

     DTL3

      – 2350m

     of 

     bored

     tunnel

    • Elimination of risk of steel bar corrosion

    • Elimination of concrete spalling risk

    • ore ura e segmen w m n ma n enance

    effort

    Upper track in Kallang;

    Lower track in OA, short

    len th in Kallan ~650m

    Both tracks in Old

     Allu vium ~1350m

    Both tracks

    in Kallang

    ~350m

    Cross Over

    at Jln Besar 

    Tunnel Escape

    Shaft

    Sungei Road

    Station

    Kalang Bahru

    StationJalan Besar

    Station

    Tunnel Escape

    Shaft

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    22/25

    6/6/

    Challenges in Urban Tunnel 

    Construction

    •   accuracy of  SI and pile detection

    •   ground treatment to control settlement 

    •   face pressures in mixed soils

    •   tunnels near or below structure

    •   tunnels in settling ground

    •   Durability of 

     tunnel

     structures

    Grand Challenge: To Plan, Design and Develop a

    Sustainable and Liveable City for 6.9m People

    Intr  EconomicDevelopment

    Housing Water   ConclusionPort JurongIsland

    UAF NRF

    3rd April2007   44

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    23/25

    6/6/

    Land is the Most Critical Constraint for the Development of  Singapore Total Surface Area 

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    24/25

    6/6/

    The Deep Tunnel Sewerage

    System (DTSS)

    Crowded underground

     MRT

     lines

    Existing Tunnels

    Top tunnel in

    Marine Clay

    Bottom tunnel in

    OA

    Future Tunnels

    Existing

    Piles /

    Barrettes

    Transfer Beams

    and Barrettes for

    Underpinning

  • 8/19/2019 4) Keynote 1 by Prof Yong KY_Young People Session

    25/25

    6/6/

    INNOVATION FOR

     A CROWDEDUNDERGROUND

    THANK YOU