Summary
Objectives
Capacities
Chronogram
AL
ICE
+ C
IEM
AT
+ C
ET
A +
EE
LA
Centro Extremeño de Tecnologías Avanzadoas
Madrid, 4 de Mayo 2006. p 2
Objectives
CETA-CIEMAT aims to:To create a center of excelence at Extremadura in the areas of Grid Technologies and e-Science.
The center is located at Trujillo (Extremadura).
AL
ICE
+ C
IEM
AT
+ C
ET
A +
EE
LA
Centro Extremeño de Tecnologías Avanzadoas
Madrid, 4 de Mayo 2006. p 3
Capacities, CPU
At the end 2005 CIEMAT purchased for the CETA the following computing resources:97 Blades: Dell PowerEdge 1855 Dual Xeon 3.2GHz, 4 Gb RAM.56 HP Proliant BL25p, dual Opteron (2.0 GHz) dual core, 4 Gb RAM.A
LIC
E +
CIE
MA
T +
CE
TA
+ E
EL
A
Centro Extremeño de Tecnologías Avanzadoas
Madrid, 4 de Mayo 2006. p 4
Capacities, SPECs
Following the SpecInt2K showed at spec.org for these computers:DELL 1555*2*97 = 301,670 SpecInt2KHP 1508*4*56 = 337,792 SpecInt2K
Total = 639,462 SpecInt2KAL
ICE
+ C
IEM
AT
+ C
ET
A +
EE
LA
Centro Extremeño de Tecnologías Avanzadoas
Madrid, 4 de Mayo 2006. p 5
Capacities, Storage I
Storage over hard disk:22 dual Xeon with 2 HBA, 11 blades Raid DS4100, with 154 hard disks of 400 GB each of one,11 blades EXP100, with 154 hard disks of 400 GB each of one.The configuration is 11 “logical bricks” with 2 servers plus 1 DS4100 plus 1 EXP100.
Total 120 Tb.
AL
ICE
+ C
IEM
AT
+ C
ET
A +
EE
LA
Centro Extremeño de Tecnologías Avanzadoas
Madrid, 4 de Mayo 2006. p 6
Capacities, Storage II
Storage over tape:IBM LTO tape library 3584,with 4 drivers, and 400 tapes units of 400 GB.
Total 160 TB.AL
ICE
+ C
IEM
AT
+ C
ET
A +
EE
LA
Centro Extremeño de Tecnologías Avanzadoas
Madrid, 4 de Mayo 2006. p 7
Present Status
At this moment the hardware is out the boxes, switch off in the CPD of Madrid, waiting for the new fan system (after the new space gained).When the fan system be ready the computers will be switch on.In parallel, at Trujillo we are creating a provisional (and little) CPD, where some computer (not a lot of) will be moved.
AL
ICE
+ C
IEM
AT
+ C
ET
A +
EE
LA
Centro Extremeño de Tecnologías Avanzadoas
Madrid, 4 de Mayo 2006. p 8
and the future
We foresee the following chronogramThis summer the infrastructure de EELA will be ready at Madrid. In the fall, a new cluster of EELA will be ready at Trujillo. The new center at Trujillo will be completely ready in 18 months.