  • 5/26/2018 5 Creating a New Project

    1/11

    Lesson 5: Creating a New Configuration 1

    Interactive Graphical

    SCADA SystemG

    SS

    Lesson 5:

    Creating a New Configuration

  • 5/26/2018 5 Creating a New Project

    2/11

    G

    Lesson 5: Creating a New Configuration 2

    Topics:

    Create a new configuration Create servers

    Create operator stations

    Choose PLC drivers

    Contents of this lesson

  • 5/26/2018 5 Creating a New Project

    3/11

    Lesson 5: Creating a New Configuration 3

    New configuration first steps

    Create the new

    configuration

    [System Configuration]

    Set up server(s) and

    operator stations

    [System Configuration]

    Design symbols

    [Symbol Editor/

    External program]

    Set up the

    PLC drivers

    [System Configuration]

    Create background

    drawings

    [External program]

    Prepare data list

    of process

    components

  • 5/26/2018 5 Creating a New Project

    4/11

    Lesson 5: Creating a New Configuration 4

    System Configuration

    1. Start System Configuration.

    2. In the File menu, choose

    New Configuration Wizard.

  • 5/26/2018 5 Creating a New Project

    5/11

    Lesson 5: Creating a New Configuration 5

    Create project using wizard

    1. Specify configuration name.2. Specify configuration location.

  • 5/26/2018 5 Creating a New Project

    6/11

    Lesson 5: Creating a New Configuration 6

    Add the IGSS server

  • 5/26/2018 5 Creating a New Project

    7/11Lesson 5: Creating a New Configuration 7

    Many different drivers(80+)

    7T develops

    specific drivers

    OPC client-side driver

    Internal Simulation driver OPC (OLE for Process Control) Client-Side Driver ABB Procontic T200, Hitachi H Series & Sprecher+Schue Phoenix Fernwirk protocol driverABB RCOM Extended Protocol Driver P-NET FieldbusAEG Modicon Modbus & Milltronics Enviroranger ERS 500 Sabroe&Soeby COMSAB IIAI800 AlarmNet Driver Saia S-BusAlfa Laval SattBus SAIA-P8Allen Bradley RS-linx SattControl Comli 31B&K 1301 IEEE 488 Interface Driver Siemens L2-FMSBOSCH BEP19 / BEP19E Siemens PROFIBUS/MPI & Siemens Industrial Ethernet S7Brodersen System 2000 interface driver Siemens S7 HMI Adapter (S7 protocol)CMM 7000 Siemens S7 Netlink driver Data file driver Siemens S7 PCA adapter interface driver Data file interface driver Siemens S7 PPI adapter interface driver DDE Supermax Siemens S7 TeleService interfaceDupline Modem Interface D 9091 Siemens S7 using SICOS protocol and S7 functionsFPC Link Siemens Simatic / TI500 Series & Texas Instruments 500 SeriesFT2000 (AlarmNet driver) Siemens Simatic S5 AS511Gascromatograph file interface driver Siemens Sinec H1 (SICOS protocol)Generic TCP/IP Driver Siemens Sinec L2 (FDL protocol)IDEC Izumi FA-Series Siemens Sinec L2 (SICOS protocol)KOYO DirectNet Driver SQUARE-D Multidrop COM port protocol driver Mitsubishi Melsec-A (Serial RS232) Square-D SY/MAX SY/LINK

    Mitsubishi Melsec-A (TCP/IP) Stella Primary Net Driver MJK Data Transmitter 795 Stella Secondary Net Driver MODBUS/TCP Driver TCP/IP driver for MJK Equipment with GPRS interfaceNewLog Data Logger Driver Telemechanique Xway (Uni-Telway, Fipway and Ethway)ODBC Interface Driver Teletronic TelelogOmron FinsGateway Driver TP 5-Tone Radio Driver Omron SysMac Link Driver VIPA TCP/IP driver Omron Sysmac Way rum & Jensen PS4

    More than 80 PLC drivers

    available

  • 5/26/2018 5 Creating a New Project

    8/11Lesson 5: Creating a New Configuration 8

    Add the driver(s)

    1. Click New Driver.

    2. Choose driver.

  • 5/26/2018 5 Creating a New Project

    9/11Lesson 5: Creating a New Configuration 9

    Add operator stations

    1. Click Add an Operator Station.2. Specify IP address of

    IGSS Server.

  • 5/26/2018 5 Creating a New Project

    10/11Lesson 5: Creating a New Configuration 10

    Final setup in System Configuration

    1. Verify that the setup

    is correct.

    2. In the File menu,

    select Save and Start Definition.

  • 5/26/2018 5 Creating a New Project

    11/11Lesson 5: Creating a New Configuration 11

    Find presentations and

    exercises on

    www.7t.dk/igss

    Try it yourself ...

    Exercise: Creating a new configuration

    http://www.7t.dk/igsshttp://www.7t.dk/igsshttp://www.7t.dk/igsshttp://localhost/var/www/apps/conversion/tmp/scratch_5/YouTube05,%20Exercise%20-%20Creating%20a%20New%20Project.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_5/YouTube05,%20Exercise%20-%20Creating%20a%20New%20Project.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_5/YouTube05,%20Exercise%20-%20Creating%20a%20New%20Project.pdfhttp://www.7t.dk/igsshttp://www.7t.dk/igsshttp://www.7t.dk/igsshttp://www.7t.dk/igsshttp://www.7t.dk/igsshttp://www.7t.dk/igss