Twisted Pair Installation Considerations
NEXTAttenuationReturn Loss
PSNEXTELFEXT
![Page 3: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/3.jpg)
3
Tensile Load/Installation Pull
![Page 4: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/4.jpg)
4
Tensile Load/Installation Pull Guidelines
• Limit 90º bends in conduit to 2• Cable should not be pulled through a length of
conduit exceeding 30m (100 ft)• Support cables every 4 - 5 ft (1200mm - 1500mm)• Avoid sharp objects, turns and corners• Use a pulley or a third man at turns and corners• Do not “jerk” cable• Pull around obstructions (HVAC) as required
![Page 5: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/5.jpg)
5
Bend Radius
UTPno less than 4x
10x (multi-pair)
STPno less than
7.5cm (3”) non-plenum15cm (6”) plenum
![Page 6: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/6.jpg)
6
Compression
Correct
Incorrect
![Page 7: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/7.jpg)
7
EMI
![Page 8: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/8.jpg)
8
Optical Fiber Installation Considerations
NEXTAttenuationReturn Loss
PSNEXTELFEXT
![Page 9: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/9.jpg)
9
Optical Fiber Installation Guidelines
15/20x=pulling10x=static
50lbs.
@700% greater than CAT5
![Page 10: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/10.jpg)
10
Polarization
B
AB
A
B
BA
ANumber 1
Number 2
![Page 11: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/11.jpg)
11
Cable Management - Rack Rear
![Page 12: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/12.jpg)
12
Cable Management - Rack Front
![Page 13: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/13.jpg)
13
Cable Management - “Towel Bar”
![Page 14: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/14.jpg)
14
Cable Management - Cable Ties
![Page 15: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/15.jpg)
15
Slack - Outlet
![Page 16: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/16.jpg)
16
Slack - Rack
![Page 17: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/17.jpg)
17
Horizontal Pathways
• Underfloor Duct• Cellular Floor• Conduit• Raised/Access Floor• Cable Trays and Wireways• Ceiling Pathways• Perimeter Pathways• Furniture Pathways
![Page 18: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/18.jpg)
18
Underfloor Duct
![Page 19: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/19.jpg)
19
Cellular Floor
![Page 20: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/20.jpg)
20
Conduit 1
![Page 21: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/21.jpg)
21
Conduit 2
TC
1”
1-1/2”
1-1/2”
InnerductPull Tape
![Page 22: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/22.jpg)
22
Ducts and Conduit Guidelines
• Fiber and copper pulled in separate conduit− Use innerduct if in same conduit
• Clear internal obstructions, ream conduit ends, and use bushings• Pull all cable at same time, if possible• Use a partner at the entry point• Use lubricants if necessary (do not use petroleum-based)• Pull in a continuous manner without stopping• Do not pull a pull line through at the same time as the cable• Do not pull a terminated cable through the conduit• If pull boxes are used, pull to the first box, coil up the cable, then
feed it back into the pull box and then pull through to the next one
![Page 23: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/23.jpg)
23
Raised/Access Floor
![Page 24: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/24.jpg)
24
Ceiling Pathways
11 ft/3.4mmax
T TT T TT
J J J J(4-5 ft/1220-1525mm)
![Page 25: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/25.jpg)
25
Cabling Installations inCeilings and Access Floors
![Page 26: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/26.jpg)
26
Cable Trays & Wireways
ChannelLadder
Solid-BottomVentilated/Trough
Wireway
![Page 27: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/27.jpg)
27
Furniture Pathways & Installation
![Page 28: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/28.jpg)
28
Perimeter Pathways
![Page 29: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/29.jpg)
29
Vertical Pathway Cabling Installations
Conduit Sleeve
Strand
3-bolt Clamp
(Shoe or Pulley)
Conduit Sleeve
D-Rings or Straps
(Firestop)
![Page 30: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/30.jpg)
30
IDC and Color Coding
White/Blue
Blue/White
White/Orange
Orange/White
White/Green
Green/White
White/Brown
Brown/White
Pair 4Pair 1 Pair 2 Pair 3
25 pair Color Code
RedBlack
Violet
WhiteWhite
YellowYellow
Wires with predominant family color are tip.Wires with predominantpair color are ring.
5th pair = Slate
![Page 31: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/31.jpg)
31
Interconnection Hardware Installation
![Page 32: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/32.jpg)
32
Wiring Patterns
2 3 4 5 6 7 82
3 1 4
2
2 3 4 5 6 7 82
2 1 4
3
2 3 4 5 6 7 82
3 4
2
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
T568A T568B/AT&T 258A
![Page 33: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/33.jpg)
33
Wiring Patterns
Pin/Pair Assignment - T568A
1 2 3 4 5 6 7 8
Pair 2, (Orange)
Pair 3, (Green)
Pair 1, (Blue)
Pair 4, (Brown)
Pin/Pair Assignment - T568B
1 2 3 4 5 6 7 8
Pair 2, (Orange)
Pair 3, (Green)Pair 1, (Blue)
Pair 4, (Brown)
![Page 34: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/34.jpg)
34
T568A Wiring Pattern
White/GreenPin 1
Green
White/Orange
Blue
White/Blue
Orange
White/Brown
Brown
Pin 2
Pin 3
Pin 4
Pin 5
Pin 6
Pin 7
Pin 8
Pair 1
Pair 3
Pair 4
Pair 2
![Page 35: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/35.jpg)
35
T568B Wiring Pattern
White/OrangePin 1
Orange
White/Green
Blue
White/Blue
Green
White/Brown
Brown
Pin 2
Pin 3
Pin 4
Pin 5
Pin 6
Pin 7
Pin 8
Pair 1
Pair 2
Pair 4
Pair 3
![Page 36: 5 Installing Premises Cabling System](https://reader037.vdocument.in/reader037/viewer/2022102613/54518414af7959e94b8b4598/html5/thumbnails/36.jpg)
36
Untwist and Jacket Removal