    SELECTION OF APPROPRIATE

    TECHNOLOGY/DESIGN

  • 7/28/2019 5 Pdw (Selection of App Tech)

    2/10

    1. Selection of Appropriate Technology /

    Appropriate design

    Determined by the following factors:

    a. Type of User - the planners have to consider thetype of users (e.g. women, children, persons withdisability) to be more socially responsive.

    b. Available Local Resources - selection of anappropriate design could be awkward in the sensethat there are available standard designs for someselected structure or interventions.

  • 7/28/2019 5 Pdw (Selection of App Tech)

    3/10

    - In the selection process, it is important toconsider whether these standard designscan be applied to local conditions.

    - For some, standards could mean technicalspecifications of materials to be used forsuch intervention.

    - Technical specifications may not be

    applicable in some communities but thestandard functional design, or the purposefor which it is applied, can be the same.

  • 7/28/2019 5 Pdw (Selection of App Tech)

    4/10

    c. Geographical Location of the Community- thisinvolves identifying a wide range of applicable

    options based on the geographical location and thesocio-cultural orientation of the community.

    d. Cost Effectiveness during SPI and O & M

  • 7/28/2019 5 Pdw (Selection of App Tech)

    5/10

    FOR BUILDINGS:

    - STANDARD DESIGN

    - ALTERNATIVE DESIGN

  • 7/28/2019 5 Pdw (Selection of App Tech)

    6/10

    FOR WATER SYSTEMS:

    -LEVEL1

    -LEVEL 2

    Any level will generally depend on

    the capacity of the community to

    pay monthly bill, and on the

    communitys lifestyle

  • 7/28/2019 5 Pdw (Selection of App Tech)

    7/10

    FOR ROADS:

    - ROAD WIDTH SELECTION

    Selection of Road Width willdepend on the following:

    1. Traffic Volume

    2. Mode of Transportation3. Geographical Location and

    Condition

  • 7/28/2019 5 Pdw (Selection of App Tech)

    8/10

    Continuation of ROADS:

    - APPLICATION OF DESIGN LIMITSa. 1 layer of gravelling for road

    improvement

    b. 2 layers of gravelling for earth road and

    road construction

    c. If possible, road profile should

    generally follow the existing slope of

    the area/old roadd. PCCP should only be along critical

    slopes or should not exceed a volume

    of 180 m3 whichever is smaller

  • 7/28/2019 5 Pdw (Selection of App Tech)

    9/10

    Social and Environmental Safeguards

    In adherence to the provisions of the Loan

    Agreement (LA) and existing laws of thecountry, the Project observes the social and

    environmental safeguards policies set forth

    during project implementation

  • 7/28/2019 5 Pdw (Selection of App Tech)

    10/10

    Social and Environmental Safeguards

    Aspects of Project safeguards:

    1. Social Safeguards e.g proponent barangay to observeactivities during the selection and implementation phase of sub-

    project to include the ff: land acquisition, resettlement and

    rehabilitation of project affected persons; safety; IndigenousPeoples concern; the respect of cultural practices in IP areas;

    establishment of property ownership used for the sub-project;

    and the practice of just compensation for people affected by the

    proposed sub-project.

    2. Environmental Safeguards

    covers compliance toexisting laws required by the Environmental Impact

    Assessment (EIA) such as; Environmental Compliance

    Certificate (ECC), Certificate of Non-Coverage (CNC), and

    Environmental Management Plan (EMP)