© BIS 2006 B U R E A U O F I N D I A N S T A N D A R D S MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG NEW DELHI 110002 IS : 8009 (Part II) - 1980 (Reaffirmed 2006) Edition 1.1 (1989-03) Price Group 5 Indian Standard CODE OF PRACTICE FOR CALCULATION OF SETTLEMENT OF FOUNDATIONS PART II DEEP FOUNDATIONS SUBJECTED TO SYMMETRICAL STATIC VERTICAL LOADING (Incorporating Amendment No. 1) UDC 624.15 : 624.131.526 : 006.76

Upload: garapati-avinash

Post on 04-Jul-2015

271 views

Category:

Education


4 download

DESCRIPTION

is code

TRANSCRIPT

Page 1: 8009 2 deep_foundations_settl_po-new

© BIS 2006

B U R E A U O F I N D I A N S T A N D A R D SMANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG

NEW DELHI 110002

IS : 8009 (Part II) - 1980(Reaffirmed 2006)

Edition 1.1(1989-03)

Price Group 5

Indian StandardCODE OF PRACTICE FOR

CALCULATION OF SETTLEMENT OF FOUNDATIONS

PART II DEEP FOUNDATIONS SUBJECTED TO SYMMETRICAL STATIC VERTICAL LOADING

(Incorporating Amendment No. 1)

UDC 624.15 : 624.131.526 : 006.76

Page 2: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

© BIS 2006

BUREAU OF INDIAN STANDARDS

This publication is protected under the Indian Copyright Act (XIV of 1957) andreproduction in whole or in part by any means except with written permission of thepublisher shall be deemed to be an infringement of copyright under the said Act.

Indian StandardCODE OF PRACTICE FOR

CALCULATION OF SETTLEMENT OF FOUNDATIONS

PART II DEEP FOUNDATIONS SUBJECTED TO SYMMETRICAL STATIC VERTICAL LOADING

Foundation Engineering Sectional Committee, BDC 43Chairman Representing

PROF DINESH MOHAN Central Building Research Institute (CSIR), Roorkee

Members

DR R. K. BHANDARI Central Building Research Institute (CSIR), RoorkeeCHIEF ENGINEER Calcutta Port Trust, Calcutta

SHRI S. GUHA ( Alternate )SHRI M. G. DANDAVATE The Concrete Association of India, Bombay

SHRI N. C. DUGGAL ( Alternate )SHRI A. G. DASTIDAR In personal capacity (5, Hungerford Road, 221,

Hungerford Street, Calcutta)SHRI V. C. DESHPANDE The Pressure Piling Co (I) Pvt Ltd, BombayDIRECTOR (CSMRS) Central Water Commission, New Delhi

DEPUTY DIRECTOR (CSMRS) ( Alternate )SHRI A. H. DIVANJI Asia Foundations and Construction Co Pvt Ltd,

BombaySHRI A. N. JANGLE ( Alternate )

DR R. K. DAS GUPTA Simplex Concrete Piles (India) Pvt Ltd, CalcuttaADDITIONAL CHIEF ENGINEER ( Alternate )

DR JAGDISH NARAIN Indian Geotechnic Society, New DelhiPROF SWAMI SARAN ( Alternate )

SHRI G. S. JAIN G. S. Jain & Associates, RoorkeeSHRI ASHOK KUMAR JAIN ( Alternate )

JOINT DIRECTOR (D) National Buildings Organisation, New DelhiSHRI SUNIL BERY ( Alternate )

JOINT DIRECTOR RESEARCH (SM), RDSO

Ministry of Railways

JOINT DIRECTOR RESEARCH(B & S), RDSO ( Alternate )

DR R. K. KATTI Indian Institute of Technology, Bombay

( Continued on page 2 )

Page 3: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

2

( Continued from page 1 )

Members RepresentingSHRI S. R. KULKARNI M. N. Dastur & Co Pvt Ltd, Calcutta

SHRI S. ROY ( Alternate )SHRI O. P. MALHOTRA Public Works Department, ChandigarhSHRI V. B. MATHUR Mckenzies Limited, BombaySHRI A. P. MATHUR Central Warehousing Corporation, New DelhiSHRI T. K. D. MUNSI Engineers India Limited, New Delhi

SHRI M. IYENGAR ( Alternate )SHRI B. K. PANTHAKY The Hindustan Construction Company Limited,

BombaySHRI V. M. MADGE ( Alternate )

SHRI M. R. PUNJA Cemindia Co Ltd, BombaySHRI S. MUKHERJEE ( Alternate )

SHRI N. E. V. RAGHVAN The Braithwaite Burn & Jessop Construction Co Ltd,Calcutta

SHRI A. A. RAJU Vijayanagar Steel Plant (SAI), New DelhiPROF GOPAL RANJAN University of Roorkee, RoorkeeSHRI T. N. SUBBA RAO Gammon India Limited, Bombay

SHRI S. A. REDDI ( Alternate )SHRI Y. V. NARASIMHA RAO Bokaro Steel Plant (Steel Authority of India), BokaroDR V. V. S. RAO Nagadi Consultants Pvt Ltd, New DelhiSHRI ARJUN RIJHSINGHANI Cement Corporation of India, New Delhi

SHRI O. S. SRIVASTAVA ( Alternate )DR A. SARGUNAN College of Engineering, Guindy, Madras

SHRI S. BOOMINATHAN ( Alternate )SHRI K. R. SAXENA Public Works Department, Government of Andhra

Pradesh, HyderabadDR S. P. SHRIVASTAVA United Technical Consultants Pvt Ltd, New Delhi

DR R. KAPUR ( Alternate )BRIG OMBIR SINGH Engineer-in-Chief’s Branch, Army Headquarters,

New DelhiMAJ H. K. BHUTANI ( Alternate )

SHRI N. SIVAGURU Ministry of Shipping and Transport, New DelhiSHRI D. V. SIKKA ( Alternate )

SUPERINTENDING ENGINEER (DESIGNS)

Central Public Works Department, New Delhi

EXECUTIVE ENGINEER (DESIGNS) V( Alternate )

SHRI M. D. TAMBEKAR Bombay Port Trust, BombayDR A. VARADARAJAN Indian Institute of Technology, New Delhi

DR R. KANIRAJ ( Alternate )SHRI G. RAMAN,

Director (Civil Engg)Director General, ISI ( Ex-officio Member )

SecretarySHRI K. M. MATHUR

Deputy Director (Civil Engg), ISI

Pile Foundations Subcommittee, BDC 43 : 5Convener

SHRI M. D. TAMBEKAR Bombay Port Trust, Bombay

( Continued on page 21 )

Page 4: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

3

Indian StandardCODE OF PRACTICE FOR

CALCULATION OF SETTLEMENT OF FOUNDATIONS

PART II DEEP FOUNDATIONS SUBJECTED TO SYMMETRICAL STATIC VERTICAL LOADING

0. F O R E W O R D

0.1 This Indian Standard was adopted by the Indian StandardsInstitution on 31 December 1980, after the draft finalized by theFoundation Engineering Sectional Committee had been approved bythe Civil Engineering Division Council.

0.2 The settlement of a deep foundation may be the result of one ormore of the following causes:

0.2.1 Catastrophic settlement may occur if the static load is excessive.When the static load is not excessive, the resulting settlement may bedue to the following:

0.3 If a structure settles uniformly, it will not theoretically sufferdamage, irrespective of the amount of settlement. But, theunderground utility lines may be damaged due to excessive settlementof the structure. In practice, settlement is generally non-uniform. Suchnon-uniform settlements induce secondary stresses in the structures.

a) Static loading;b) Deterioration of the foundation structure;c) Mining subsidence; andd) Vibration subsidence due to underground erosion and other

causes.

a) Elastic compression of the foundation structure;b) Slip of the foundation structure relative to the soil;c) Elastic deformation or immediate settlement of the surrounding

soil and soil below the foundation structure;d) Primary consolidation settlement of the surrounding soil;e) Primary consolidation settlement of the soil below the

foundation structure;f) Creep of the foundation structure under the constant axial load;

andg) Secondary compression of the surrounding soil and soil below the

foundation structure.

Page 5: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

4

Depending upon the permissible extent of these secondary stresses,the settlements have to be limited. Alternatively, if the estimatedsettlements exceed the allowable limits, the foundation dimensions orthe design may have to be suitably modified. Therefore, this Code isprepared to provide a common basis, to the extent possible, for theestimation of the settlement of foundations subjected to symmetricalstatic vertical loading. The Code is in two parts: Part I deals withshallow foundations. This Part II deals with deep foundation. Part I iscomplimentary to this part.0.4 A settlement calculation involves many simplifying assumptions asdetailed in 4.1. In the present state of knowledge, the settlement compu-tations at best estimate the most probable magnitude of settlement.0.5 This edition 1.1 incorporates Amendment No. 1 (March 1989). Sidebar indicates modification of the text as the result of incorporation ofthe amendment.0.6 For the purpose of deciding whether a particular requirement ofthis standard is complied with, the final value, observed or calculated,expressing the result of a test or analysis, shall be rounded off inaccordance with IS : 2-1960*. The number of significant placesretained in the rounded off value should be the same as that of thespecified value in this standard.

1. SCOPE1.1 This Standard (Part II) provides simple methods for the estimationof elastic compression of the foundation structure, immediate andprimary consolidation settlements of deep foundations undersymmetrical static vertical loads. In addition, procedures forcomputing time rate of settlement are also given.1.2 In this standard, it is presumed that the load on the foundationwill be limited to safe bearing capacity and therefore catastropicsettlements are not expected. Settlement due to deterioration offoundations, mining and other causes cannot, in the present state ofknowledge, be estimated. Even though, it is known that inorganicclays and plastic silts, secondary compression plays an important part,satisfactory theoretical methods are not available. Such methods arenot also available for computation of settlement due to the slip offoundation structure with reference to the surrounding soils andcreeping of foundation structure and therefore not covered in this code.

2. TERMINOLOGY2.0 For the purpose of this standard, the definitions of terms given in

*Rules for rounding off numerical values ( revised ).

Page 6: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

5

Part I of this code, IS : 2911 (Part I/Sec 1)-1979*, IS : 2809-1972†, andthe following shall apply.2.1 Deep Foundation — A foundation whose depth is greater thanits width.

3. SYMBOLS3.1 For the purpose of this standard and unless otherwise defined inthe text the following letter symbols shall have the meaning indicatedagainst each:

*Code of practice for design and construction of pile foundations: Part I Concretepiles, Section I Driven cast in-situ piles ( first revision ).

†Glossary of terms and symbols relating to soil engineering ( first revision ).

A = Area of cross section of pile, cm2

B = Width of pile group, cmCc = Compression indexCv = Average coefficient of consolidation, m2/yearDf = Depth of foundation, cmDp = Length of pile, cmEv = Modulus of elasticity in the vertical direction, kg/cm2

Ep = Modulus of elasticity of pile material kg/cm2

eo = Initial void ratio at mid-height of layerHc = Thickness of compressible stratum undergoing settlement, cmHI = Thickness of layer I, cmHII = Thickness of layer II, cmmv = Coefficient of volume compressibility, cm2/kgn = No. of pilesP = Average load on each pile of the foundation, kgPb = Average point resistance of each pile of the foundation, kgp = Foundation pressure on an equivalent raft, kg/cm2

po = Initial effective pressure at mid-height of layer, kg/cm2

r = Number of rows in the square groupS1 = Settlement of a single pile at a load equal to the total load on

the group divided by the number of piles, cmSI = Settlement of layer I, cmSII = Settlement of layer II, cmSa = Settlement in the absence of the soft clay layer, cmSc = Primary consolidation settlement of clay layer, cmSf = Final settlement, cmSi = Immediate settlement, cmSoed = Settlement reported from one dimensional consolidation

test, mSs = Settlement of the foundation structure, cms = Ratio of spacing of piles to pile diametert = Time at which the settlement is required, years

Page 7: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

6

4. GENERAL CONSIDERATIONS AND OBSERVATIONS4.1 Requirements, Assumptions and Limitations4.1.1 The following information is necessary for a satisfactory estimateof the settlement of foundations:

4.1.2 The following assumptions are made in settlement analysis:

4.1.3 The thickness and location of compressible layers may be estimatedwith reasonable accuracy. But often the soil properties are not accuratelyknown due to sample disturbance. Further, the properties may varywithin each layer and average values may have to be worked out.4.1.4 The settlement computation is highly sensitive to the estimationof the effective stresses and pore pressures existing before loading andthe stress history of the soil layer in question.

The methods suggested in this standard for the determination ofthese parameters and evaluation of the extent of over consolidation aregenerally expected to yield satisfactory results.4.1.5 Unequal settlements may cause a redistribution of loads oncolumns. Therefore, settlements may cause changes in the loads actingon the foundation. To take into account the effect of settlements onredistribution of loads, a trial and error procedure may be adopted. Inthis procedure, the settlements are first computed assuming that theload distribution is independent of the settlements. Then, thedifferences in settlements between different parts of the structure areworked out and also new trial values of load distribution arecomputed. By trial and error, the settlements at different parts of thestructure are made compatible with the structural loads which causedthem. However, in clays, though the settlements often occur over long

µi, µo = Factors related to depth of the equivalent raft foundation,thickness of compressible soil layer and length/width ratio ofequivalent raft foundation

∆p = Pressure increment, kg/cm2

a) Details of soil layers including the position of water table;b) The effective stress-void ratio relationship of the soil in each

layer; andc) State of stresses in the soil medium before the construction of

the structure and the extent of over consolidation of thefoundation soil.

a) The total stresses induced in the soil by the construction of thestructure are not changed by the settlement;

b) Induced stresses on soil layers due to imposed loads can beestimated, and

c) The load transmitted by the structure to the foundation is staticand vertical.

Page 8: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

7

periods, the readjustment of column loads due to creep in structuralmaterials are often not taken note of.4.1.6 The soil layers experience stresses due to the imposed loads. It iscustomary to compute stresses induced in soil by simple formulaebased on theory of elasticity or by approximate methods.4.2 Soil Profile4.2.1 The soil profile may be simplified into one or more layersdepending upon the extent of uniformity. The settlement is computedas the sum of the settlements of all layers which are affected by thesuperimposed loads.4.2.2 The following are the possible types of soil formations forpurposes of computing the settlements of deep foundations:

4.2.3 Rock is incompressible compared to soil and therefore, if thefoundation rests on soil, the settlement of rock stratum is neglected.4.2.4 Sands and other cohesionless soils undergo settlementimmediately; whereas clays undergo immediate and consolidationsettlements. The immediate settlement can be estimated by pile loadtests and by theoretical methods, using elastic constants obtained fromundrained tests. The consolidation settlements are estimated byapproximate methods using the consolidation test results. The totalsettlements can be estimated as the sum of immediate andconsolidations settlements or by theoretical methods using the elasticconstants obtained from drained tests.4.3 General Observations on Computation of Settlements ofDeep Foundations4.3.1 The methods of estimating the settlement of deep foundationsdepend upon the type of deep foundation and the manner of transfer ofloads from the foundation structure to the foundation soil apart fromthe type of soil profile. Therefore, the methods given are groupedunder several heads, depending upon these factors.

NOTE — In the present state of knowledge, even the methods available for estimatingtotal settlements are in a developing stage and therefore no reference is made todifferential settelements in this standard.

4.3.2 The theoretical estimation of settlement is done by integrating thevertical strain for the entire depth of soil or rock formation. In generalthe theoretical method is tedious, other procedures are adopted.

a) Homogeneous cohesionless deposit,b) Homogeneous cohesive soil deposit,c) Deposit of two or more regular soil layers,d) Erratic soil deposit, ande) Thin soil deposit resting on rock.

Page 9: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

8

5. STEPS INVOLVED IN SETTLEMENT COMPUTATIONS

5.1 The following are the necessary steps in settlement analysis:

6. COLLECTION OF RELEVANT INFORMATION

6.1 The following details pertaining to the proposed structure arerequired for a satisfactory estimation of settlements:

7. DETERMINATION OF SUBSOIL PROFILE

7.1 It is required that a sufficient number of borings be taken inaccordance with IS: 1892-1979* to indicate the limits of variousunderground strata, and to furnish the location of water table and waterbearing strata. Generally, it will be sufficient, if two exploratory holesare located diagonally on opposite corners, unless the proposed structureis small, in which case one bore hole at the centre may be sufficient. Forlarge structures, additional bore holes may be driven suitably.

7.2 A plot of the borings is likely to show some irregularities in thevarious strata. However, in favourable cases, all borings may besufficiently alike to allow the choosing of an idealized profile, whichdiffers only slightly from any individual borings and which is a closerepresentation of average strata characteristics.

7.3 Adequate boring data and.good judgement in the interpretation ofthe data are prime requisites in the calculation of settlements. In thecase of cohesionless soils, the data should include the results of

a) Collection of relevant information,b) Determination of subsoil profile,c) Stress analysis,d) Estimation of settlements, ande) Estimation of time rate of settlements.

a) Site plan showing the location of proposed as well asneighbouring structures;

b) Building plan giving the detailed layout of load bearing wallsand columns and the dead and live loads to be transmitted to thefoundation;

c) Other relevant details of the structure, such as rigidity ofstructure; and

d) A review of the performance of structures, if any, in the localityand collection of data from actual settlement observation onstructures in the locality.

*Code of practice for subsurface investigation for foundations ( first revision ).

Page 10: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

9

standard penetration tests ( see IS : 2131-1981* ). In the case ofcohesive soils, the data should include consolidation test results onundisturbed samples [ see IS : 2720 (Part 15)-1986† ]. Accuracy ofsettlement calculation improves with increasing number ofconsolidation tests on undisturbed samples. The number of samples tobe tested depends on the extent of uniformity of soil deposit and thesignificance of the proposed structure. In general, in the case of claylayers, for each one of the clay layers within the zone of stress influenceat least one undisturbed sample should be tested for consolidationcharacteristics. In the case of thick clay layers, consolidation testshould be done on samples collected at 2 m or lesser intervals.

8. STRESS ANALYSIS8.1 Initial Pore Pressure and Effective Stress8.1.1 The total vertical pressure at any depth below ground surface isdependent only on the weight of the overlaying materials. The valuesof natural unit weight obtained for the sample at different depths,should be used to compute the pressures. To obtain initial effectivepressure, neutral pressure values should be subtracted from the totalpressure. The possible major types of preloading conditions that canexist are the following ( see Fig. 7 of Part I of this Code ):

8.1.2 In simple static case and in the overconsolidated case, the neutralpressure at any depth is equal to the unit weight of water multiplied bythe depth below the free water surface. In residual hydrostatic case, acondition of partial consolidation under the overburden has beenrecently placed as for example in made up lands and delta deposits. Inthis case, the neutral pressure is greater than that in the previous case,since it includes hydrostatic excess pressure. If allowed sufficient time,this case would merge with the static case. In the artesian case there isupward percolation of water through the clay layer due to natural orartificial cases and in addition to the hydrostatic pressure a seepagepressure acts upwards and reduces the effective pressure in the soil. Inthe pre-compressed or overconsolidated case, the clay might have beensubjected to a higher effective pressure in the past than exists at present.This may be due to the water table having been lower in the past thanat present or due to the erosion or removal of some depth of material atthe top. The identification of one of the four cases listed above for thegiven site conditions is essential for the satisfactory evaluation ofmagnitude of settlements. The detailed procedure and the implicationsare described in Appendix A of Part I of this Code.

*Method of standard penetration test for soils ( first revision ).†Methods of test for soils: Part 15 Determination of consolidation properties ( first

revision ).

a) Simple static case,b) Residual hydrostatic case,c) Artesian case, andd) Overconsolidated case.

Page 11: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

10

8.2 Pressure Increment

8.2.1 The pressure increment is defined as the difference between theinitial intergranular pressure as existed in the field prior to applicationof load and the final intergranular pressure after application of load.The following may contribute to the pressure increment:

8.2.2 The pressure increment due to imposed loads shall be determinedas detailed in 8.3. The residual hydrostatic excess pressure should beestimated by the methods given in Appendix A of Part I of this Code.The pressure changes caused by changes in water table elevations ofartesian pressures may be estimated by field observations of groundwater elevations or by anticipated fluctuations in the water table orartesian pressures due to natural or man-made causes.8.3 Pressure Increment due to Superimposed Loads

8.3.1 The stresses induced by the superimposed loads on the lowerstrata can be determined by elastic theory or by approximate methods.8.3.2 The pressure increments due to the loads from deep foundationsare not usually calculated using the elastic theory due to the followingreasons:

8.3.3 In view of the foregoing, approximate methods are widelyadopted ( see Fig. 1 ).8.3.4 For friction pile groups it is assumed that the fictitious footing isat a depth of Dp/3 above the pile tip ( see Fig. 1B ).8.3.5 For point bearing pile groups the pile group is replaced by afictitious footing at the top of the bearing layer ( see Fig. 1C ). The loadis assumed to be uniformly distributed and spread at 2 : 1 slope, or at60º to the horizontal.

a) Pressure transmitted to the clay by construction of buildings orby other imposed loads;

b) Residual hydrostatic excess pressures;c) Pressure changes caused by changes in the elevation of the

water table above the compressible stratum; andd) Pressure changes caused by changes in the artesian pressure

below the compressible stratum.

a) The distribution of friction along the length of the pile or otherdeep foundation and the bearing load are not known;

b) The influence of the method and process of installation of thefoundation structure are not known; and

c) Variation in the distribution of the loads due to time dependenteffects such as thixotrophy, varying loads, change in groundwater, consolidation is not known.

Page 12: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

11

FIG. 1 APPROXIMATE SOLUTION

Page 13: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

12

8.3.6 For pile groups which transmit the loads partly through frictionand partly through point bearing, such as the case of point bearingpiles through compressible strata into sand ( see Fig. 1D ) the stress inthe compressible upper strata may be computed assuming that thefrictional load acts on a fictitious footing at HI/3 above the bearingstratum, where HI is the thickness of the compressible strata. Thestresses in the bearing stratum may be computed assuming that thetotal load acts on a fictitious footing at the top of the stratum.8.3.7 In cases shown in Fig. 1B and 1D, if for some depth from groundlevel the soil is poor and cannot provide any friction, that thicknessshould be neglected in arriving at the location of the fictitious footing.8.4 Negative Skin Friction8.4.1 Negative skin friction is a downward force, acting on piles and otherdeep foundations, due to the surrounding soil moving downwardsrelative to the foundation structure. This can happen in the case of deepfoundations passing through compressible strata into a bearing stratum,if there is a recent fill or if it is proposed to fill up the site or if it is proposedto lower the ground water table. In such situations, the friction developedwill be acting downward and therefore should be added to the point load.

9. ESTIMATION OF SETTLEMENTS9.1 End Bearing Piles on Rock9.1.1 If piles are well seated in rock, the settlement may consist of elasticcompression of foundation structure and the immediate settlement ofrock. In which case, the settlement should be computed from:

9.1.2 The elastic compression of the foundation structure should, ingeneral, be computed by:

9.1.3 In this case, the point resistance may normally be equal to theload on the pile, as practically there may not be any development ofskin friction. However, the point resistance could be more than theload on pile due to development of negative skin friction ( see 8.4 ); inwhich case, the negative skin friction should be estimated and addedto the load on pile to get the point resistance.9.1.4 The immediate settlement may be computed for the equivalentraft shown in Fig. 1A by the procedures given in 9.1.4.1 and 9.1.4.2that is the settlement is calculated for a footing, which would havedimensions just sufficient to enclose or circumscribe the pile group asif it is located at shallow depths and thereafter the calculated value iscorrected for depth.

Sf = Ss+Si .. (1)

Ss = .. (2)P Pb+

2-----------------

DpAEp-----------

Page 14: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

13

9.1.4.1 The immediate settlement beneath the centre or corner of theequivalent raft ( see Fig. 1A ) is given by:

where

9.1.4.2 The calculated settlement may be corrected for depth offoundation by:

The Depth factor may be read from Fig. 12 of Part 1 of this Code.9.1.5 The settlement may also be estimated from load tests. But ifthere is a possibility for development of negative skin friction, thesame should be estimated and the settlement value obtained from theload test modified appropriately.9.2 End Bearing Piles on Decomposed Rock9.2.1 The compressibility of decomposed rock cannot be reliablyestimated in the present state of knowledge. Settlement in thissituation can be estimated largely on local experience.9.3 End Bearing Piles through Compressible Strata into Sand9.3.1 The settlement of piles and pile groups through compressible stratainto sand depends upon the ratio between point resistance and total load.It will be the sum of the settlement of the compressible strata and thesand stratum. This approach is applicable for uniform soil deposition. Incase of stratified deposit this approach may require modification.9.3.2 Separation of Point Resistance and Skin Friction9.3.2.1 The separation of the point resistance and skin friction may beeffected by conducting cyclic load tests [ see IS : 2911 (Part 4)-1985* orone of the methods given in 9.3.2.2 and 9.3.2.3 ].9.3.2.2 Two piles test — In this method two piles may be drivenadjacent to each other at a distance of about two metres. One pileshould be driven into the bearing stratum and the other should bedriven until its point is about a metre above the surface of the bearingstratum. Load tests should be conducted simultaneously on these twopiles: the difference between the pile capacities is approximately equalto the point resistance.

Si = .. (3)

E = Modulus of Elasticity,µ = Poission’s ratio = 0.5, andI = Influence factor (same as given in Table 2 of Part I of this Code).

Corrected Settlement = Si × Depth factor .. (4)

*Code of practice for design and construction of pile foundations: Part 4 Load test onpiles ( first revision ).

pB 1 µ2–( )E

-------------------- I

Page 15: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

14

9.3.2.3 Instrumented pile test — In this method an instrumented pileload test is conducted. Strain gauges should be provided at variouslevels of the pile and a regular load test is done. From the strain gaugereadings the manner of the transfer of load to the soil can be estimated.

9.3.3 After separating the skin friction and point resistance, thesettlement of the upper strata (layer I) due to skin friction and thesettlement of the sand stratum (layer II) should be computed andadded to obtain the total settlement.

NOTE 1 — The thickness of the compressing strata will be 1/3 of the thickness of theupper strata for the approximate stress distribution method ( see Fig. 1D ).

NOTE 2 — po and ∆p are to be taken for the point at middle of the thickness (HI).

9.3.3.1 If the upper strata are pre-compressed, the settlement may beinsignificant. If, however, the settlement is proposed to be computed,the following formula is to be adopted in such cases:

where

mv is to be obtained as per Appendix C of Part I of this Code.

NOTE — If the clay is heavily over consolidated then it may not be possible to adoptthis procedure. But in such cases, it may not be necessary to compute the settlement.

9.3.4 The settlement of the sand stratum ( SII ) may be computed forthe equivalent raft loading shown in Fig. 1D by:

The constants µi and µ0 may be read from Fig. 2A (where Hc=HII).The deformation modulus Ev can be obtained or from standardpenetration test. The curves relating deformation modulus to standardpenetration resistance is shown in Fig. 2B.

NOTE 1 — In this case settlement is to be calculated for the loading at end and for thefrictional loading separately, and the two added together to obtain the relevant value.

Sf = SI+SII .. (5)

SI = .. (6)

SI = ∆p mv Hc .. (7)

SII = .. (8)

Cc Hc

1 eo+--------------- log10

p0 ∆p+

po-------------------

µi µo pB

Ev--------------------

Page 16: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

15

NOTE 2 — In this type of situation, the settlement of the foundation may be manytimes the settlement at corresponding load in a single pile load test. Therefore, pileload test is not to be used for estimating settlement in this case.

NOTE 3 — The possibility of development of negative skin friction should not beoverlooked in this case ( see 8.4 ).

9.4 End Bearing Piles Through Compressible Strata into Stiff Clay

9.4.1 In this case, initially, unless the compressable strata is very softthe load would be mostly carried by skin friction but ultimately all theload would be taken by end bearing on the stiff clay. The settlementshould, therefore, be computed by:

Sf = Ss+SII .. (9)

FIG. 2. SETTLEMENT CALCULATION OF SAND STRATUM ( Continued )

Page 17: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

16

9.4.2 The settlement due to compression of foundation structure ( Ss )should be computed as given in 9.1.2.

9.4.3 The settlement of the stiff clay ( SII ) may be computed byassuming that the foundation is replaced by an equivalent raft( see Fig. 1C ). The computation may be done by the procedure givenin 9.4.3.1 to 9.4.3.5 that is the settlement may be computed for theequivalent raft ( see Fig. 1C ), as if the footing is at shallow depths andthereafter the computed value may be corrected for depth etc.

FIG. 2B CURVES RELATING TO DEFORMATION MODULUS

FIG. 2. SETTLEMENT CALCULATION OF SAND STRATUM

Page 18: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

17

NOTE — Alternatively, the settlement of stiff clay may be computed as per 9.3.4. Themodulus Ev may be obtained from undrained test to work out the immediate settlementand from drained test to obtain the immediate plus consolidation settlement.

9.4.3.1 The total settlement should be computed from:

9.4.3.2 The immediate settlement may be computed by Equation 3given in 9.1.4.1. The value of E in this case shall be determined fromthe stress-train curve obtained from triaxial consolidated undrainedtest with a consolidation pressure equal to effective pressure at thedepth from which the sample was taken. The value of I may bedetermined from Fig. 11 of Part I of this Code (the value of HII is sameas Ht) for finite thickness of clay stratum or from Table 2 of Part I ofthis Code for semi-infinite clay stratum.9.4.3.3 The consolidation settlement shall be calculated from:

Where

9.4.3.4 Soed may be calculated on the same lines as SI is calculatedin 9.3.3 that is by Equation 6 or 7 as the case may be. ( Hc = HII ).9.4.3.5 The calculated settlement SII may be corrected for depth offoundation by applying the depth factor correction read from Fig. 12 ofPart I of this Code.9.5 End Bearing Piles Embedded in Firm Stratum Underlain bySoft Clay Layer9.5.1 If the bearing stratum is underlain by a soft clay layer, thesettlement of the pile foundation is given by:

Sa may be computed, as if the soft clay layer does not exist, according to9.3 or 9.4 as the case may be. Sc may be calculated on the same lines asSI is calculated in 9.3.3 i.e. by Equation 6 or 7 as the case may be. Sc mayoften be large compared to Sa and therefore must not be overlooked.

NOTE — In this case, Hc is equal to the thickness the soft clay layer.

9.6 Friction Piles in Cohessionless Soils9.6.1 The settlement of a single pile in cohesionless soils can bereliably estimated by pile load test [ see IS : 2911 (Part 4)-1985* ].

SII = Si+Sc .. (10)

Sc = λ Soed .. (11)

λ = a factor related to the pore pressure parameter A and theratio HII/B and read Fig. 10 of Part I of this Code. In theabsence of data regarding A, it may be sufficient to take thevalue of λ from Table 1 of Part I of this Code.

Sf = Sa + Sc .. (12)

*Code of practice for design and construction of pile foundations: Part 4 Load test onpiles ( first revision ).

Page 19: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

18

9.6.2 The settlement of a friction pile group in cohesionless soils isexpected to be less than the observed settlement of a test pile (drivenalone—not a pile in the group) as the soil between the piles is compactedby displacement due to pile driving. It can reasonably be assumed thatthe settlement of a pile group in cohesionless soils will be equal to thesettlement of a well foundation having a depth and base equal to theoverall dimensions of the pile group estimated by Equation 8 and Fig. 2.9.6.3 Alternatively, the settlement may be computed adopting one ofthe following formulae, suggested by Skempton and Mayerhoffrespectively. Pile load test may be conducted after all the piles of thegroup have been driven [ see IS : 2911 (Part 4)-1985* ]. Then, thesettlement of the group is given by:

9.7 Friction Piles in Cohesive Soils9.7.1 The pile group may be replaced by on equivalent foundation asshown in Fig. 1A or 1B ( see 8.3.3 to 8.3.5 ). For this equivalent footing,the settlement may be computed by the same procedure as givenin 9.4.3, 9.4.3.1 to 9.4.3.4 that is, the settlement may be computed forcalculation of SII, but depth correction is not applied in this case.9.8 Pile Foundations in Erratic Deposits9.8.1 In variable erratic soil deposits, if the variation occurs overdistances greater than half the width of foundation, settlementanalysis should be based on the worst and the best conditions. That is,worst properties should be assumed under the heavily loaded regionsand the best properties under the lightly loaded regions.9.8.2 If the variation occurs over distances lesser than half the widthof foundation, the settlement analysis should be based on worst andaverage condition. That is, the worst properties should be assumedunder the heavily loaded region and the average properties under thelightly loaded regions.9.9 Caissons and Well Foundations9.9.1 Two limiting cases can be identified in the case of Caissons andwell foundations:

9.9.2 The case of smooth foundation can be treated as a shallow

*Code of practice for design and construction of pile foundations: Part 4 Load test onpiles ( first revision ).

Sf = S1 .. (13)

or Sf = S1 (applicable only to a square group) .. (14)

a) A smooth foundation with no adhesion, andb) A rough foundation with full adhesion.

4B + 2.7B + 3.6

-----------------------2

s 5 s 3⁄–( )1 1 r⁄+( )2---------------------------

Page 20: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

19

foundation and the relevant clauses in Part I of this Code may be seen.However, the results obtained should be corrected for the effects ofdepth as given in Fig. 3.

9.9.3 For the case of a rough foundation, the settlement may be computedadopting the procedure laid down in 9.3 or 9.4 or 9.7 as the case may be.

10. ESTIMATION OF TIME RATE OF SETTLEMENT

10.1 The settlement at any time, may be estimated by the applicationof the principles of Tarzaghi’s one dimensional consolidation theory.Based on this theory, the total settlement at time is given by:

where

FIG. 3 POULOS CORRECTION FOR DEPTH

Sf = Si + USc .. (15)

U = degree of consolidation;= F( T ); and .. (16)

T = .. (17)Cv t

H2-----------

Page 21: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

20

The relationship between T and U in Equation (16), depends onpressure distribution and nature of drainage. This relationship isshown in Fig. 13 of Part I of this Code. When considering the drainageof clay layer, concrete of foundation may be assumed as permeable.The coefficient of consolidation shall be evaluated from the onedimensional consolidation tests using suitable fitting methods[ see IS : 2720 (Part 15)-1986* ].

10.2 In the case of evaluation of time rate of settlement of structuresconstructed with certain construction time, the procedure illustratedin Appendix D of Part I of this Code may be followed.

*Methods of test for soils: Part 15 Determination of consolidation properties ( firstrevision ).

Page 22: 8009 2 deep_foundations_settl_po-new

IS : 8009 (Part II) - 1980

21

( Continued from page 2 )

Members RepresentingDEPUTY DIRECTOR RESEARCH

(SM II), RDSOMinistry of Railways

DEPUTY DIRECTOR STANDARDS (B & S CB II), RDSO ( Alternate )

SHRI M. IYENGAR Engineers India Limited, New DelhiSHRI J. K. BAGCHI ( Alternate )

SHRI B. K. PANTHAKY Hindustan Construction Co Limited, BombaySHRI P. V. NAIK ( Alternate )

SHRI M. R. PUNJA Cemindia Company Limited, BombaySHRI S. MUKHERJEE ( Alternate )

SHRI D. SHARMA Central Building Research Institute (CSIR), RoorkeeSUPERINTENDING ENGINEER

(DESIGNS)Central Public Works Department, New Delhi

EXECUTIVE ENGINEER (DESIGNS) V( Alternate )

Adhoc Panel for Preparation of Code of Practice forCalculation of Settlement of Foundations,

BDC 43:5:1Member

DR S. MUTHUKUMARAN Department of Education (Ministry of Education& Culture)

Page 23: 8009 2 deep_foundations_settl_po-new

Bureau of Indian StandardsBIS is a statutory institution established under the Bureau of Indian Standards Act, 1986 to promoteharmonious development of the activities of standardization, marking and quality certification ofgoods and attending to connected matters in the country.

CopyrightBIS has the copyright of all its publications. No part of these publications may be reproduced in anyform without the prior permission in writing of BIS. This does not preclude the free use, in the courseof implementing the standard, of necessary details, such as symbols and sizes, type or gradedesignations. Enquiries relating to copyright be addressed to the Director (Publications), BIS.

Review of Indian StandardsAmendments are issued to standards as the need arises on the basis of comments. Standards are alsoreviewed periodically; a standard along with amendments is reaffirmed when such review indicatesthat no changes are needed; if the review indicates that changes are needed, it is taken up forrevision. Users of Indian Standards should ascertain that they are in possession of the latestamendments or edition by referring to the latest issue of ‘BIS Catalogue’ and ‘Standards : MonthlyAdditions’.This Indian Standard has been developed by Technical Committee : BDC 43

Amendments Issued Since Publication

Amend No. Date of IssueAmd. No. 1 March 1989

BUREAU OF INDIAN STANDARDSHeadquarters:

Manak Bhavan, 9 Bahadur Shah Zafar Marg, New Delhi 110002.Telephones: 323 01 31, 323 33 75, 323 94 02

Telegrams: Manaksanstha(Common to all offices)

Regional Offices: Telephone

Central : Manak Bhavan, 9 Bahadur Shah Zafar MargNEW DELHI 110002

323 76 17323 38 41

Eastern : 1/14 C. I. T. Scheme VII M, V. I. P. Road, KankurgachiKOLKATA 700054

337 84 99, 337 85 61337 86 26, 337 91 20

Northern : SCO 335-336, Sector 34-A, CHANDIGARH 160022 60 38 4360 20 25

Southern : C. I. T. Campus, IV Cross Road, CHENNAI 600113 235 02 16, 235 04 42235 15 19, 235 23 15

Western : Manakalaya, E9 MIDC, Marol, Andheri (East)MUMBAI 400093

832 92 95, 832 78 58832 78 91, 832 78 92

Branches : AHMEDABAD. BANGALORE. BHOPAL. BHUBANESHWAR. COIMBATORE.FARIDABAD. GHAZIABAD. GUWAHATI. HYDERABAD. JAIPUR. KANPUR. LUCKNOW.NAGPUR. NALAGARH. PATNA. PUNE. RAJKOT. THIRUVANANTHAPURAM.VISHAKHAPATNAM