ProfileEstablished in 1931 Phoenix is based in central London.
We specialise in the complete installation of Mechanical & Electrical to all work sectors including quality office developments, commercial and public buildings, data centers, retail, health, education, leisure,
hotels, residential and pharmaceuticals.
The company has an extensive client base including financial institutions, insurance companies, the legal and accountancy sectors and major pharmaceutical companies. Our clients include prominent
main and management contractors.
Our experience ranges from projects with a value in excess of £50M to £1M. Our special Phoenix Direct division undertakes projects up to
the value of £1M.
Phoenix Mechanical was introduced in 2008 to form a stronger team and provide a fully coordinated and integrated service solution.We offer an M&E design & build management facility along with
design and development, installation of MV / LV distribution systems, shell & core, CAT A & B fit-out, HV cabling and switchgear, lighting control, BMS, Public Health, water treatment and commissioning,
At Phoenix we believe that the way to promote our business is through the development of good working relationships with our
clients. We aim to provide a high quality installation in an efficient, friendly manner on time and to budget.
Phoenix ME A better way to do business
Management Staff phoenix me a better way to do business
Lee ComptonCEO
Head of financeDuncan McArthur
DirectorStewart Crane
Operations DirectorTerry Perkins
Operations DirectorDerek Joiner
Operations DirectorMike Viney
Project Director Sean O’Connor
QHSE ManagerRichard Veroft
DirectorColin Mint
Operations DirectorSimon Collingbourne
Procurement Manager
Claire Walker
Estimating ManagerRichard Carey
CAD ManagerTony Deacon
Customer RelationsDanielle Browne
Managing DirectorAlan Tarrant
Project Director Andrew Lessiter
Contracts Services Manager
Brett Cowlbeck
Phoenix Direct
Project DirectorPaul Carless
Operations DirectorAdam Cecil
Phoenix ME A better way to do business
Staff Number
Directors 4
Operations Directors 5
Project Directors 3
Project Managers 35
Financial Managers 14
CAD Engineers 14
Head office and site support 25
Testing & Commissioning 17
Electricians 96
Apprentices 14
Labourers 5
Staff Breakdown
Turnover
Phoenix ME A better way to do business
2012 - £52M
2013 - £62M
2014 - £77.3M
2015 Forecast - £85M
Confidential Financial client
Phoenix ME A better way to do business
E C Harris was appointed to project manage a complete
refurbishment in Burgess Hill, Surrey.
The professional team who have carried out the design consists
of architects Pringle Brandon Perkins + Will and Building Service
Consultants Maleon.
Wates Interiors are the principal contractor and Phoenix have
been appointed to partner them to carry out the full M&E Cat
A&B refurbishment.
An office development of 6 No. floors (lower ground, ground, 1st
to 3rd floors and roof) and was originally constructed in 1970’s.
Includes open plan office areas, on Ground, First & Second
Floors totalling approximately 11,000m2 with the Third floor
containing Café, Restaurant, Kitchen, Meeting Rooms and
Plantrooms. There are new toilet facilities at Ground, First,
Second & Third floor with new shower & toilet facilities at Lower
Ground Floor. The ground floor comprises the main entrance,
reception, offices and circulation spaces. A large atrium rises
from ground floor to roof level and provides natural light to the
office floors and the reception. At lower ground floor level there
is also a Wellness Centre, the DPC, Plantrooms, stores and
engineers workshop.
Phoenix were responsible for the full coordination of the services
with the architectural design intent, and drawings were produced
on site with support from our head office. These were issued to
the professional team for approval and reviewed during
workshops both on site and at Maleon’s offices.
Client – Confidential Financial clientMain Contractor – Wates
Architect – Pringle Brandon + Will Consultant – Maleon
Programme Duration – Aug 14 – Jul 15Value – £8.3M
Area – 11,000M2
Phoenix undertook the complete fit out from shell
and core to of the 17 floors and 428,000 square
foot of office space for at The Place (Mini shard)
London bridge.
The works included install of some 10,000 light
fittings complete with dedicated lighting control
system, low level busbar system to all floor levels
for LV power distribution. Install of modular wiring
for both lighting and small power system. UPS
system with riser distribution and full fit out of IT
rooms to each levels.
Specialist lighting to level 14 and 17 for the news
canteen and function spaces and fit out of the
television studios to level 2.
The fit out was completed as staged handovers of
floors but the project in it entirety was completed
within an 8 month period with all floors running
concurrently.
phoenix me a better way to do business
Mini Shard
Client – Confidential Main Contractor – ISG
Architect – Pringle Brandon Consultant – TB&A
Programme Duration –Dec 13 – Nov 14
Value – £13MArea – 39,000M2
phoenix me a better way to do business
Phoenix have been appointed to carry out the Cat B Fit-Out
for Amazon’s new London head office. Works consisted of the
electrical, mechanical and public health services over 11 floors,
with additional plant space on the roof and basement levels.
All co-ordination drawings were produced on site and approval
given via workshops with the professional team.
Services consisted of extension to the LV system, new dedicated
UPS system and CRAC units serving MDF & IDF rooms, high and
low level power track installation serving fan coils with LTHW heater
batteries, fully addressable Simmtronic lighting control system and
specialist feature lighting.
Installation of new Advanced Air fan coil units served by new chilled
water installation, and the relocation of existing FCU’s, new supply
air and extract air system. Installation of public health tea points on
all levels west and east sides.
Flushing and commissioning was via a temporary floor mounted
pumps. All electrical testing and commissioning was
undertaken by Phoenix JIB approved operatives.
Tribble
Client – AmazonMain Contractor – BW Interiors
Architect – AI ArchitectsConsultant – YES Engineering
Quantity Surveyor – Cushman & WakefieldProgramme Duration –
2013 – PresentValue – £7M
Area – 3700M²
60 Holborn Viaduct, EC1
phoenix me a better way to do business
Phoenix have been appointed to carry out the Cat A&B Fit-Out
for Jardine Lloyd Thompson’s new London head office. Works
consisted of the electrical, mechanical and public health
services over 10 floors, with additional plant space on the roof
and basement levels.
All co-ordination drawings were produced on site and approval
given via workshops with the professional team.
Services consisted of extension to the LV system, new
dedicated UPS systems serving SER & MER rooms, high and
low level power track installation serving fan coils with electric
heater batteries, fully addressable DALI lighting control system
and specialist feature lighting.
Installation of 602 ability Matrix fan coil units served by new
chilled water installation, new supply and extract system.
Installation of public health showers, tea points and a fully
workable kitchens on various levels
Flushing and commissioning was via a temporary floor. Mounted
pumps over seen by Chesterfield prior to installation. All
electrical testing and commissioning was undertaken by
Phoenix JIB approved operatives.
JLT St Botolphs
Client – JLTMain Contractor – ISG
Architect – M Moser AssociatesConsultant – Grontmij
Quantity Surveyor – Capita SymondsProgramme Duration - 36 Weeks
(November 2012 – July 2013)
Value – £10MArea – 27,000M2
Phoenix were appointed by ISG to carry out the Mechanical,
Electrical and Public Health Cat ‘A’ installation on levels Grd, 1,
2, 3, 5, 7, 8 & 9 and Cat ‘B’ fit out works on levels Grd, 1, 7, 9
and basement levels within the Walbrook.
The Cat ‘A’ works comprised off fully co-ordinated services
installation comprising off approx. 200 Diffusion FCUs a floor
with associated BMS controls and power supplying conditioned
air to the office space. FCUs were fed via a dedicated CHW
system that was integrated to the landlord system. Installation of
new DBs and associated tap off, h/l modular wiring power and
Simmtronic lighting control system
The Cat ‘B’ works comprised off installation off a dedicated AC
system to the on floor SERs, post room , and executive shower
room. Modifications to the Cat ‘A’ service to accommodate the
new meeting rooms, executive meeting rooms, executive offices,
tea points, WCs and pantry. A new kitchen ventilation system
providing conditioned air to the kitchen located on level 7 via an
AHU located within the ceiling void and extract fan at roof level.
Electrical installation comprising of fully co-ordinated under
power track installation, power supplies to SERs, desk top fit out,
specialist lighting to all executive areas and main receptions
New WCs, tea points, pantry and kitchen were provided
throughout consisting of all new DWS & PH and dedicated
extract ventilation system
phoenix me a better way to do business
Walbrook
Fit-Out
ClientMinerva & AJG Gallagher's
Main Contractor - ISGArchitect
Fosters & partnersScott Brownrigg
Morey SmithConsultant
Cat A GronmijCat B HPF
Programme DurationOct 2012 – Dec 14
Value – £4.2M
phoenix me a better way to do business
Phoenix were appointed as the principal contractor,
responsible for the full Design and Build and the Construction
of a 7 storey building which was located between two existing
buildings. The new building housed new Generators, MV and
LV switch panels and associated services. New Chillers were
added to the roof on one of the existing buildings which
required full structural strengthening.
Two floors in the existing building were stripped out and fully
fitted out as Data Halls.
The other ten floors in the building were occupied and all
existing services were maintained throughout the project. A
new incoming MV supply substation
was built under the DLR and new bulk fuel tanks were
housed in an external compound.
Within the data halls we installed new PDU’s, Cooling
CRACs, fire protection, water mist, new UPS system
were installed in new rooms and ventilation and
humidification systems were added in addition to the new
power and lighting systems. A full BMS/PMS and EMS
were installed to control the Generators and Power
management.
Harbour Exchange Data Centre
Client – ConfidentialMain Contractor – Phoenix
Architect – NWAConsultant – Houseman HendersonProgramme Duration - 44 Weeks
(January 2012 – November 2012)
Value – £18MArea – 8000M²
phoenix me a better way to do business
BP4 Canary Wharf
Client – Canary Wharf GroupMain Contractor – Canary Wharf Group
Architect – K.P.FConsultant – Hilson Moran
Programme Duration - May 12 – Dec 13Value – £11.8M
Phoenix was appointed to carry out the
Shell and Core Installation to BP4, 25
Churchill Place. The project is a 530,000
square feet, high quality commercial office
block, located towards the East end of
Canary Wharf.
The development is a 23 storey tower
consisting of one basement level, one
promenade level, a double height entrance,
mid-level plantrooms at level 12 and
plantrooms on level 21, 22 and 23. The
building consists of 20 office floors.
Our scope consists of MV & LV Switchgear,
risings busbar, lighting & small power, dial
controlled lighting system and photovoltaic
system.
Phoenix ME A better way to do business
Endorsements
Quadrant 3Peter Devenish
Technical Services Manager Sir Robert McAlpine
“100% well lead from the Project Director, Project Manager and all site staff”
“Attitude excellent from the project manager through to all the team”
“Project completed early and within budget / costs allocated”
BMW
Phil PowerProject Manager
Paragon
“This being our 1st project with Phoenix we are receiving the
level of service that you would expect from a leading contractor.
We are ensured a friendly yet professional service lead by great management”
Double Negative
Project Director BW Interiors
“Bought competitively & quick.Final account good”
“Director always keen to come to site and assist. Honest approach from the Project
Manager and all the Phoenix team”
Skype
Andrew HargraveConstruction Director
ISG
“Phoenix consistently delivered an excellent product on time /on budget and to the highest
quality”
Salford Police Station
David RogersonProject Manager
Mace
“Pro-active attitude throughout”
“Good overall performance from the Phoenix Team and I look forward to
working with Phoenix again”