a project report submitted in partial fulfillment of

Upload: anchal-midha

Post on 04-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 A Project Report Submitted in Partial Fulfillment Of

    1/14

    a.

    1

    A Project report submitted in partial fulfillment of

    The requirement for the degree of

    Masters of Computer Applications

    ENGINEERING COLLEGE AJMER

    BADLIYA CHAURAYA

    AJMER

  • 7/30/2019 A Project Report Submitted in Partial Fulfillment Of

    2/14

    a.

    2

  • 7/30/2019 A Project Report Submitted in Partial Fulfillment Of

    3/14

    a.

    3

    S.No. Contents Page

    no.

    1. Title of the project 4

    2. Introduction(Abstract)

    3. Certificate from

    organization

    4. Contents

    5. Acknowledgement

    6 Platform used

    7 Front & back-end used

    8 Project Analysis

    9 Feasibility study & cost

    benefit analysis

    10 Project design

    11 Table structure

    12 Coding

    13 Form design

  • 7/30/2019 A Project Report Submitted in Partial Fulfillment Of

    4/14

    a.

    4

    14 Future scope of the

    project

    .15 Refrences

  • 7/30/2019 A Project Report Submitted in Partial Fulfillment Of

    5/14

    a.

    5

    Hotel Management System

    INTRODUCTION(ABSTRACT):-

    The field of computers has taken a giant leap at the threshold of

    twentieth century.

    Computers have become an integral part of modern man all over the

    globe. The proverb

    Need is the mother of invention is proving equally correct in case of

    computers.

    Computers have already had a considerable impact on many aspects

    of our

    society. Medicine, law enforcement, government, banking, education,

    transportation,

    planning these are only some of the fields in which computers are

    already playing the

    highly significant role. Over the next few years you can expect a vast

    increase in the

    range of computer applications and a corresponding increase in theeffect computers will

    have on our daily lives.

  • 7/30/2019 A Project Report Submitted in Partial Fulfillment Of

    6/14

    a.

    6

    .

    A research work owes its success from commencement to

    completion, to the people in love with researchers at various

    stages. Let we express our gratitude to all those who helped us in

    various stage of this study. First, we would like to express our

    sincere gratitude indebtedness to Mr. Nitin Jain (Principal, IPS). We

    would also like thanking all the people who have helped us in the

    project deve lopment & we are also grateful to our guide Mr.Yogesh

    Sharma for the help provided in completion of the project, whichwas assigned to us.

    Last but not least, we pay our sincere thanks and gratitude to all

    the Staff Members of I.T Department for making our project

    valuable and fruitful. We are also thankful to all my colleagues for

    their co-operation and support.

  • 7/30/2019 A Project Report Submitted in Partial Fulfillment Of

    7/14

    a.

    7

    The existing system is manual. It maintains hugerecords for various departments. The book keepingprocedure istedious and is prompt to errors. Very careful handling isneededin manual systems. Even a very minute mistake may lead toimbalanced results. Manual processes results in waste oftime

    and energy.In the earlier system the inventory report iscalculated manually. Whenever the accounting is to beperformed. That information must be extracted from the filesand the calculation will have to check by the Concernperson.The existing system leads to a lot of problems. Theexisting system consumed a lot of stationary cost. Daily

    transactions are maintained in journals. These journalentries arethen posted on to the ledger accounts correspondingly.PROPOSED SYSTEM:This project integrates all Operation processes in thecomputer to synergies the important resources of MaterialandMoney. The department people can gather the needed

    information at their desk without any manual burdens.This project reduces manual burdens andautomates the functions of various departments. In manualprocess, to decide the Room booking details, vacatingdetailshave to be verified each time. But with this project theseprocessare automatedandno manual checking is required.

  • 7/30/2019 A Project Report Submitted in Partial Fulfillment Of

    8/14

    a.

    8

    This project reports can be automatically generated.The processes of creating reports are manually very tediouswhich are made very easy and automatically through thisproject. The reports produced helps in making managementdecision easily. With this project, since all information aboutprevious years is readily available, such reports can be

    producedwithin few seconds.Thus the project eliminates many difficultiessaving a lot of time and energy, which could be used forsomeother constructive purpose towards the organizationssuccess.ADVANTAGES:

    1. Less effort2. Quick reference3. Future enhancement

  • 7/30/2019 A Project Report Submitted in Partial Fulfillment Of

    9/14

    a.

    9

    Feasibility is the determination of whether or not a project is worth doing.

    The process followed in making this determination is called a feasibility

    study. This type of study determines if a project can and should be taken.

    This project has also undertaken in the scope of feasibility study. As in the

    manual system there are so many deficiencies so to overcome from these

    deficiencies new computerized system required. But whether the new

    system is feasible in the realistic condition or not for this purpose we have

    seen this project from different criterias. Many feasibility studies are

    necessary for both users and analysts.

    I. Technical feasibility

    II. Operational feasibility

    III. Economic feasibility

    During technical analysis the technical merits of the system concept are

    evaluated, at the same collecting additional information about

    performance, reliability, maintainability and produce ability. In some cases,

    it also includes a limited amount of research and design.

  • 7/30/2019 A Project Report Submitted in Partial Fulfillment Of

    10/14

    a.

    10

    Technical analysis begins with an assessment of the viable of the proposed

    system. What technologies are required to accomplish system function and

    performance? What new method algorithms or processes are required and

    what is their development risk? How will these technologies affect cost?

    Technical feasibility is frequently the most difficult area to assess at this

    stage of the product engineering process. Because objectives functions and

    performance are somewhat hazy anything seems possible if the right

    assumptions are made. It is essential that the process of analysis and

    definition to be conducted in parallel with an assessment of technical

    feasibility.

    The considerations those are normally associated with technical feasibility

    include:

    :

    Can the system element to design so that necessary function and

    performance are achieved within the constraints uncovered during analysis?

    Resource Availability: Are skilled staff available to develop the system

    element in question are the other necessary resources (hardware and

    software) available to build the system?

    out by a small group of people who are familiar with It is

    mainly related to human organizational and political aspects. The points to

    be considered are:

    1) What changes will be brought with the system?

  • 7/30/2019 A Project Report Submitted in Partial Fulfillment Of

    11/14

    a.

    11

    2) What organizational structures are disturbed?

    3) What new skills will be required?

    Do the existing staff members have these skills? If not, can they be trained

    in due course of time?

    This feasibility study is carried information system techniques, who

    understand the parts of the business that are relevant to the project and

    are skilled in system analysis and design process.

    From Office management point of view it is operationally feasible

    because workload also reduced and they can utilize their valuable time

    in other value addition activities. Proposed System is beneficial only if

    that can termed into information system that will meet the operating

    requirements of the organization. This test of feasibility asks if the

    system will work when it si developed and installed.

    This is an important question that would help us perceive any resistance

    that might come form the end user community. Top management iscommitted to this project and is highly supportive. End user community

    has

    been suffering from the ill effects of the existing system and perceives

    that the proposed system would ease their work. There was no resistance

    from the employees for the proposed system as they were happy to learn

    that the manual system is bight automated.

    End user community was tiered getting a lashing from their management

    that they are not providing right and the accurate information. They have

    spent countless nights in re-working to providing accurate information.

    However, the problem of timeliness still persists. The users of the proposed

  • 7/30/2019 A Project Report Submitted in Partial Fulfillment Of

    12/14

    a.

    12

    system welcomed the change as they knew that the new system would

    bring right, useful information as and when required.

    :

    Economic analysis is the most frequently used method for evaluating the

    effectiveness of a candidate system. More commonly known as

    cost/benefit analysis, the procedure is to determine the benefit s and

    savings that are expected from a candidate system and compare them

    with costs. If benefits outweigh costs, then the decision is made to design

    and implement the system. This is an ongoing effort that improves in

    accuracy at each phase of the system life cycle.

    Cost benefit analysis is complicated by criteria that very with the

    characteristics of the system to be developed the relative size of the

    project and the expected return on investment desired as part of a

    companys strategic plan. In addition many benefits derived from

    computer based system are ignitable (e.g. better design quality through

    iterative intimation, increase customer satisfaction throw programmable

    control, and better business, decisions through reformatted and pre-

    analysis sales data ). Direct quantities comparisons may be difficulty to

    achieve.

  • 7/30/2019 A Project Report Submitted in Partial Fulfillment Of

    13/14

    a.

    13

    Any Process that is only in the planning stage andneeds to be converted into reality requires three importantstepsnamely planning, analysis and design. All the above threedesignis very important. It is conversion of the ideas intoreality by putting together all ideas block and achievingrealism.

    System design is the process of planning a new business orone to replace or complement an existing system. Itdescribeshow a system will meet the requirement identified during thesystem analysis. It also describes the data .Calculations tobeperformed and data stored desired. In short, system designstated how to accomplish the objectives. Many tools assist

    system design, including data flow diagram.

  • 7/30/2019 A Project Report Submitted in Partial Fulfillment Of

    14/14

    a.

    1.An Integrated approach to Software Engineering :

    Pankaj Jalote

    2.The Complete Reference JAVA 2 : Herbert

    Schildt

    3.Software Engineering A practitioners approach :

    Roger S. Pressman